HomeMy WebLinkAbout174-11 RESOLUTIONRESOLUTION NO. 174-11 A RESOLUTION AWARDING BID #11-49 AND APPROVING A CONTRACT WITH SECOND NATURE PROPERTY MANAGEMENT, LLC IN THE AMOUNT OF $138,555.00 FOR THE CONSTRUCTION OF A MODULAR BLOCK RETAINING WALL NEAR THE GARLAND AVENUE U OF A FARM TRAIL TUNNEL, AND APPROVING A TWENTY PERCENT (20%) PROJECT CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-49 and approves a contract with Second Nature Property Management, LLC in the amount of $138,555.00 for the construction of a modular block retaining wall near the Garland Avenue U of A Farm Trail tunnel. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a twenty percent (20%) project contingency. PASSED and APPROVED this 4th day of October, 2011. APPROVED: ATTEST: By: By: C,lvC4 &) SONDRA E. SMITH, City Clerk/Treasurer 0;,• Y °P.'. :moo,qoS :FAYETTEVILLE: Matt Mihalevich Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements October 4, 2011 City Council Meeting Date Agenda Items Only Engineering Division Action Required: Development Services Department Staff recommends approval of a resolution awarding Bid #11-49 and approval for the installation of a modular block retaining wall for the approaches ramps to the tunnel under Garland Avenue along the U of A Farm Trail by Second Nature Property Management, LLC. of Fayetteville in the amount of $138,555.00. Approval of a 20% contingency in the amount of $27,711.00 is also requested. $ 166,266.00 Cost of this request 4520.9550.5814.05 Account Number 060361 1002 Project Number Budgeted Item X 776,574.00 Category / Project Budget 276,400.27 $ Transportation Bond Trail Improvements U of A Farm Trail (Scull Creek / Agri Park) Program Category / Project Name Trail Improvements Funds Used to Date Program / Project Category Name 500,173.73 Sales Tax Construction Bond Remaining Balance Fund Name Budget Adjustment Attached Finance and Internal Services Director 01.10 Date 9-- 30 11 Date Date /1-3-/I Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in City ;fig -30- 1 1 P01 : 02 RCV;: Clerk's Office Urb Comments: Revised January 15, 2009 evUe THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS www.accessfayetteville.org CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Don Marr, Chief of Staff Jeremy Pate, Development Services Director Chris Brown, City Engineer 4 From: Matt Mihalevich, Trails CoordinatorM\ Date: September 30th, 2011 Subject: U of A Farm Trail — Retaining Wall Bids RECOMMENDATION: Staff recommends approval of a resolution awarding Bid #11-49 and approval for the installation of a modular block retaining wall for the approaches ramps to the tunnel under Garland Avenue along the U of A Farm Trail by Second Nature Property Management, LLC. of Fayetteville in the amount of $138,555.00. Approval of a 20% contingency in the amount of $27,711.00 is also requested. PROPOSAL: The U of A Farm Trail is a 2.3 mile trail connecting the new bike lanes on Mt. Comfort Road east under I-540 across the U of A Farm to connect to Scull Creek Trail (see attached site plan). This highly requested trail will provide a safe alternative transportation route for the numerous residents and businesses west of I-540. The new trail will include a tunnel for safe crossing under Garland Avenue (Highway 112). The tunnel will be located just south of Knapp Street near the Pauline Whitaker Animal Science Arena. The City's in-house trails construction crew has been working diligently on the trail project and will install the tunnel using the precast box culvert sections. The trail will ramp down at 5% on each side of the tunnel and retaining walls are necessary to retaining the soil on each side as the trail drops below grade and under Garland Avenue. Due to the scale of the retaining wall project, we have requested assistance of a private contractor to perform the installation work. The City's in-house construction crew will assist with the major excavation and site preparation for the retaining wall contractor. BUDGET IMPACT: Funds for the installation of the fencing have been budgeted as part of the Transportation Bond Trail Development Prograrn. Five bidders responded to the request for formal bids and Second Nature Property Management, LLC was low bid - See attached bid tab. RESOLUTION NO. A RESOLUTION AWARDING BID #11-49 AND APPROVING A CONTRACT WITH SECOND NATURE PROPERTY MANAGEMENT, LLC IN THE AMOUNT OF $138,555.00 FOR THE CONSTRUCTION OF A MODULAR BLOCK RETAINING WALL NEAR THE GARLAND AVENUE U OF A FARM TRAIL TUNNEL, AND APPROVING A TWENTY PERCENT (20%) PROJECT CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-49 and approves a contract with Second Nature Property Management, LLC in the amount of $138,555.00 for the construction of a modular block retaining wall near the Garland Avenue U of A Farm Trail tunnel. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a twenty percent (20%) project contingency. PASSED and APPROVED this 4th day of October, 2011. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer Existing Bike Lanes on Mt. Comfort Road Legend - l! cif A Farm Trail - Scull Creek Trail - Bike Lane rI Bike Lane/Shared Lan Shared Lane y`.. Imo_ ,fir: 1�i iHr- i" I t=✓�`�I -701V-1- '., , rtarrrausrw V+I U of A Farm Trail 2.3 Miles �1e ENGINEERING DIVISION 117 W. YOONTAIN STII[CT ww1�1 wN11 .�•on,.IFW U OFA FARM TRAIL RETAINING WALL SITE PLAN STA. 84+00 TO 94+00 Ta'awertyeville ARKANSAS BID; 11-49 DATE: 09/14111 TIME: 3:00 PM CITY OF FAYETTEVILLE Bid 11-49, Construction - Block Retaining Wall Installation 'NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. BIDDER = `. TOTAL BASF; BID 1 Fochtman Enterprises, Inc. $ 412,810.00 2 General Construction Solutions, Inc. $ 345,618.01 3 Prime Contracting, Inc. $ 232,076.00 4 Second Nature Property Management, LLC $ 138555.00 'NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. City Of Fayetteville Paqursrtron No.- Date: 10/4/2011 P.0 Number- Expected Delivery Dale! Vendor #. Pending Vendor Name: SBCdnd Nature Property Management, LLC Mail Yes:_ No: Address: Fob Paint: Taxable Yes. Nd JYeS: Quotes Attae No: City: Slate: Zip Code: Ship 10 co2s: 1U4 Divisors Head Py�proval:/ , ( I Requester: Ginny Gundlach 1 Matt Mihalevich Requesters Employee#: 2283 Extension: L./ 48s{ Item Description Ouantity Unit 01 Issue Unit Cost Extended Cost Account Numbers Project/Subproject # Inventory # Fixed Asset # 1 2 3 4 5 +S 7 8 9 10 Retaining Wal! Installation for U OA Farm Trail 1 LOT 5138.555.00 5138.555.00 4520.9550.5814.05 06036.1002 $0.00 50.20 50 05 20.30 so.oa 50.00 00.00 50 00 50 00 Special Instructions: Per Bid 11-49 and Res. Suolotal: Tax: Total: $138,555.00 50.00 $138,555.00 Approvals: Mayor: Finance Dispatch rIeparlmenl Director: Budget Manager: Utilities Manager: A, Purchasing Manager: G Internal Services Director: --5cgit IT Manager: Manager: ether• Matt Mihalebtch Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements October . ', 2011 City Council Meeting Date Agenda Items Only Engineering Division Action Required: Development Services Department Staff recommends approval of afesolution awarding Bid #11-49 and approval for the installation of a modular block retaining wall for the approach ramps to the tunnel under Garland Avenue along'the U of A Farm Trail by Second Nature Property Management, LLC. of Fayetteville in the amount of $138,555:00 plus sales tax in the amount of $12,816.34 for a total contract amount•pf $151,371.34. Approval of a 20%.Contingency in the amount of $30,274.27 is also requested. 181,645.61 Cost of this request 4520.9550.5814.05 Account Number 06036 / 1002 Project Number Budgeted Item X 776,04.00 'category / Project Budget $ 276,400.27 Funds Used to Date $ ; f 500,173.73 ,Remaining Balance Budget Adjustment Attached Transportation Bond Trail Improvements U of A Farm Trail (Scull Creek / Agri Park) Program Category / Project Name Trail Improvements Program / Project Category Name Sales Tax Construction Bond Fund Name Fin.nce a d Intern rServices Director U Chief of Date Date Pre' ous Ordinance or Resolution # Original'Contract Date: \t Original Contract Number: Received in City Clerk's Office avb Comments: Revised January 15, 2009 THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS www.accessfayettevllle.org CITY COUNCIL AGENDA MEMO To: Mayor and Ciy. Council Thru: Don Marr, Chief of Staff Jeremy Pate, Development Services Director Chris Brown, City Engineeref; From: Matt Mihalevich, Trails Coordinator` Date: September 14th, 2011 Subject: U of A Farm Trail — Retaining Wall Bids RECOMMENDATION: Staff recommends approval of a resolution awarding'Bid' # 11-49 and approval for the installation of a modular block retaining wall for the approach ramps to the tunnel under Garland Avenue along the U of A Farm Trail by Second Nature Property Management, LLC. of Fayetteville in the amount of $138,555.00 plus sales tax in the amount of $12,816.34 for a total contract amount of $15..1,371.34. Approval of a 20% contingency in the amount of $30,274.27 is also requested. PROPOSAL: The U of A Farm Trail is a 2.3 mile trail connecting the new bike lanes on Mt. Comfort Road east under 1-540 across the U of A Farm to connect to Scull Creek Trail (see attachedsite plan). This highly requested trail will provide a safe alternative transportation route for the numerous residents.nd businesses west of I-540. The new trail will include a tunnel for safe crossing under Garland Avenu\(Highway 112). The tunnel will be located just south of Knapp Street near the Pauline Whitaker Animal Science\Arena. The City's in-house trails construction crew has been working diligently on the trail project and will intall the tunnel using the precast box culvert sections. The trail will ramp down at 5% on each side of the hnnel and retaining walls are necessary to retaining the soil on each side as the trail drops below grade and unar Garland Avenue. Due to the scale of the retaining wall project, we have requested assistance of a private\contractor to perform the installation work. , The City's in-house construction crew will assist with the major excavation and site preparation for the retaining wall contractor. BUDGET IMPACT: Funds for the installation of the fencing have been budgeted as part of the Transportation Bond it Development Program. Five bidders responded to the request for formal bids and Second Nature P perty Management, LLC was low bid - See attached bid tab. RESOLUTION NO. A. 4 Bid #11-49 Second Nature Property Management, LLC Page 3 of 8 A RESO.UTION AWARDING BID #11-49 D APPROVING A CONTRAC WITH SECOND NATURE PROPERT MANAGEMENT, LLC IN THE AMUNT OF $151,371.34 FOR THE CONSTRUCTION OF A MODULAR BL CK RETAINING WALL NEAR 'HE GARLAND AVENUE U OF A FARM T ` AIL TUNNEL, AND APPRO ING A TWENTY PERCENT (20%) PROJECT C'NTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSA Section 1: That the City Coun it of #11-49 and approves a contract with co of $151,371.34 for the construction of a U of A Farm Trail tunnel. Section 2: That the City Council o twenty percent (20%) project contingency. the C' y of Fayetteville, Arkansas hereby awards Bid nd N. ure Property Management, LLC in the amount od ar block retaining wall near the Garland Avenue City of Fayetteville, Arkansas hereby approves a PASSED and APPROVED thi - 4 day of 0 APPROVED: By: LIONELD JORDAN, : yor tober, 2011. ATTES By: SONDRA E. ITH, City Clerk/Treasurer City Of Fayetteville Reqursrtion hfa.: hate: 1014/2011 P.0 tlunber: Expected Delivery Date: Vendor#: UL1 ita Zepang aL Vendor Name: Second Nalure Property Management. LLC Mail Yes:_ No:_ Address: \ Fob Point: Taxable Yes:_ No: Quotes Attached Yes: No: City: �. State: Zip Code: Ship 10 code: 104 Divisonad roval: Requester Ginn, Gundla0h / Matt Mihalevich , Requester's Employee #: 2283 Extension: � 4591 Item Description Quanlity Unit of Issue- Unit Cost Extended Cost Account Numbers ProjeWSubproject # inventory 5 Fixed Asset # 1 2 3 4 5 6 7 6 13 10 Retaining Wall Installation for U of A Farm Trail 1 LOT 513555-00 5138.555.00 4520-8550-5814.05 06036.1002 50.00 'to -4o $0 00 50-00 50 00 30.00 $0.00 -50 00 50.00 Special lnatructions: Per Bid 11-49 and Res _ Subtotal: Tax. Total: $136,555-00 �i 512,516.34 5151,371.34 Approvals: Mayor: Finance Dispatch Department Director. Budget Manager: Utilities Manager: Purchasing Manager: Menial Services Director: IT Manager: Manager: Other:. Matt Mihalevich Submitted By City of Fayetteville Staff Review Form City Council Agenda items and Contracts, Leases or Agreements Mayor's Signature Only City Council Meeting Date Agenda Items Only Engineering Division Action Required: Development Services Department Staff requests the Mayor's approval of the attached City of Fayetteville standard contract with Second Nature Property Management, LLC for the installation of modular block retaining walls for the approach ramps to the tunnel under Garland Avenue along the U of A Farm Trail. On October 4th, 2011 resolution number 174-11 was approved awarding Bid #11-49 and approving a contract with Second Nature Property Management, LLC in the amount of $138,555.00 and approving a twenty percent (20%) project contingency. 166.266.00 Cost of this request 4520.9550.5814.05 Account Number 06036/ 1002 Project Number Budgeted Item X $ 776,574.00 Category / Project Budget 276,400.27 Transportation Bond Trail Improvements U of A Farm Trail (Scull Creek / Agri Park) Program Category / Project Name Trail Improvements Funds Used to Date Program / Project Category Name 500,173.73 Sales Tax Construction Bond Remaining Balance Fund Name Budget Adjustment Attached 1 . 16 -'1-7 Finance and Internal Services Director Date 4L_./(46....-%(7 - Chief of St ff Mayer Date / r//, Date Previous Ordinance or Resolution # Res. 174-11 Original Contract Date: Original Contract Number: Received in City 10-27-11 A08:40 RCVD Clerk's Office Received in Mayor's Office Comments: Revised January 15, 2009 ve.. vine THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS www.accessfayetteville.org MEMO To: Mayor Thru: Don Marr, Chief of Staff Jeremy Pate, Development Services Director Chris Brown, City Engineer From: Matt Mihalevich, Trails Coordinator Iry'1/4-41` .; Date: October 27th, 2011 Subject: U of A Farm Trail Retaining Wall Contract with Second Nature Property Management, LLC. RECOMMENDATION: Staff requests the Mayor's approval of the attached City of Fayetteville standard contract with Second Nature Property Management, LLC for the installation of modular block retaining walls for the approach ramps to the tunnel under Garland Avenue along the U of A Farm Trail. On October 4th, 2011 resolution number 174-11 was approved awarding Bid #11-49 and approving a contract with Second Nature Property Management, LLC in the amount of $138,555.00 and approving a twenty percent (20%) project contingency. PROPOSAL: The U of A Farm Trail is a 2.3 mile trail that will connect the new bike lanes on Mt. Comfort Road east under I- 540 across the U of A Farm to connect to Scull Creek Trail (see attached site plan). This highly requested trail will provide a safe altemative transportation route for the numerous residents and businesses west of 1-540. The new trail includes a tunnel for safe crossing under Garland Avenue (Highway 112) near the Pauline Whitaker Animal Science Arena. The City's in-house trails construction crew has installed the tunnel using the precast box culvert sections and we are now ready for Second Nature Property Management, LLC to install the modular block retaining walls for the tunnel approaches. BUDGET IMPACT: Funds for the installation of the retaining walls have been budgeted as part of the Transportation Bond Trail Development Program. Second Nature Property Management, LLC was low bidder of five bids submitted. Existing Bike Lanes on Mt Comfort Road Li of A Farm Trail Scull Creek Trail Bike Lane Bike Lane/Shared Lan U of A Farm Trail 2.3 Miles RESOLUTION NO. 174-11 A RESOLUTION AWARDING BID #11-49 AND APPROVING A CONTRACT WITH SECOND NATURE PROPERTY MANAGEMENT, LLC IN THE AMOUNT OF $138,555.00 FOR THE CONSTRUCTION OF A MODULAR BLOCK RETAINING WALL NEAR THE GARLAND AVENUE U OF A FARM TRAIL TUNNEL, AND APPROVING A TWENTY PERCENT (20%) PROJECT CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-49 and approves a contract with Second Nature Property Management, LLC in the amount of S138,555.00 for the construction of a modular block retaining wall near the Garland Avenue U of A Farm Trail tunnel. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a twenty percent (20%) project contingency. PASSED and APPROVED this 4th day of October, 2011. APPROVED: ATTEST: ray: irs).)Zi:(c .(J (c. L /WC-. SONDRA E. SMITH, City Clerk/Treasurer va�e..evi�le THE CITY OF FAYETTEVILLE, ARKANSAS ARKANSAS www.accessfayettevilie.org CONTRACT Reference Bid: 11-49, Construction — Block Retaining Wall Installation Contractor: Second Nature Property Management, LLC Term: Specific Project Only — No Revolving Terms This contract executed this ! day of 114.64a , 2011, between the City of Fayetteville, Arkansas, and Second Nature Property Management, LLC. In consideration of the mutual covenants contained herein, the parties agree as follows: 1. Second Nature Property Management, LLC at its own cost and expense shall furnish all labor, materials, supplies, machinery, equipment, tools, supervision, bonds, insurance, tax permits, and all other accessories and services necessary to complete items bid per Bid 11-49 as stated in Second Nature Property Management, LLC's bid proposal, and in accordance with specifications attached hereto and made a part hereof under Bid 11- 49. 2. The City of Fayetteville shall pay Second Nature Property Management, LLC for work as described in Bid 11- 49, not to exceed $138,555 based on Second Nature Property Management, LLC submitted bid. Payments will be made after approval and acceptance of work, and submission of detailed invoice. Payments will be made within a maximum 30 days after acceptance of invoice. Second Nature Property Management, LLC agrees to make detailed invoicing related documentation available to the City. 3. The Contract documents which comprise this contract between the City of Fayetteville and Second Nature Property Management. LLC consist of this Contract and the following documents attached hereto, and made a part hereof: A. Bid form identified as Invitation to Bid 11-49 with the specifications and conditions typed thereon. B. Second Nature Property Management, LLC bid proposal, including mark up on materials and hourly rates. C. The Notice to Prospective Bidders and the Bid Tabulation. 4. These Contract documents constitute the entire agreement between the City of Fayetteville and Second Nature Property Management, LLC and may be modified only by a duly executed written instrument signed by the City of Fayetteville and Second Nature Property Management, LLC. 5. Second Nature Property Management, LLC shall not assign its duties under the terms of this agreement. 6. Second Nature Property Management, LLC agrees to hold the City of Fayetteville harmless and indemnify the City of Fayetteville, against any and all claims for property damage, personal injury or death, arising from performance of this contract. This clause shall not in any form or manner be construed to waive that tort immunity set forth under Arkansas Law. 7. Second Nature Property Management, LLC shall furnish a certificate of insurance addressed to the City of Fayetteville, showing that he carries the following insurance which shall be maintained throughout the term of the Contract. Any work sublet, the contractor shall require the subcontractor similarly to provide worker's compensation insurance. In case any employee engaged in work on the project under this contract is not protected under Worker's Compensation Insurance, Second Nature Property Management, LLC shall provide Bid 11-49, Construction — Block Retaining Wall Installation Page 1 of 2 and shall cause each Subcontractor to provide adequate employer's liability insurance for the protection of such of his employees as are not otherwise protected. Workmen's Compensation Comprehensive General & Automobile Insurance Bodily Injury Liability Property Damage Liability Statutory Amount $500,000 for each person injured. $1,000,000 for each accident. $1,000,000 aggregate. The premiums for all insurance and the bond required herein shall be paid by Second Nature Property Management, LLC. 8. Second Nature Property Management, LLC shall furnish proof of licensure as required by all federal, state, and local agencies. 9. This contract may be terminated without penalty by the City of Fayetteville or Second Nature Property Management, LLC with 30 days written notice. 10. Freedom of Information Act: City of Fayetteville contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. 25- 19-101 et. Seq.). Only legally authorized photo coping costs pursuant to the FOIA may be assessed for this compliance. 11. Changes in Scope or Price: Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. Second Nature Property Management, LLC CIT j OF FAYETTEVILLE, ARKANSAS By: 4 WLGGij4,-/1 /Y rtf.y.5ie4009 , e62'4v T Printed Contractor Name & Title /few/me IONE ATTEST: A TTE Company Secretary i4/C Business Address City, State & Zip Code Date Signed: 71/1//� Bid 11-49, Construon -- Block Retaining Wall Installation Page 2 of 2 AN, Mayor 141617et- 0716.14_, Sondra Smith, City Clerk Date Signed: ///eip o oll f1iiiife, 0'tit1VTR�f %s , r: FAYETTEVILLE; -: :]- f ,°+•4 GI Oi4C:%%.t► g. Matt Mihalevich Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements N/A City Council Meeting Date Agenda Items Only Engineering Division Action Required: Attatid. iltadum, ?1'01,-e&I-j Awry&Aut. Development Services Department Staff requests approval of change order #1 with Second Nature Property Management, LLC in the amount of $5,744.49 to the original contract amount of $138,555.00 for unforseen additional work required on the Retaining Walls for Meadow Valley Trail (Formerly U of A Farm Trail). These additional costs fall within the 20% project contingency approved by Resolution #174-11 for the award of Bid #11-49 and contract with Second Nature Property Management, LLC. 5,744.49 Cost of this request $ 789,549.00 4520.9550.5814.05 $ Account Number 06036 / 1002 Project Number Budgeted Item X Category / Project Budget 756,195.19 Transportation Bond Trail Improvements U of A Farm / Meadow Valley Trail Program Category / Project Name Trail Improvements Funds Used to Date Program / Project Category Name 33,353.81 Sales Tax Construction Bond Remaining Balance Fund Name Budget Adjustment Attached Deparfinenirector (*(-741/..7 Attorney Finance and Internal Services Director 014.10/ Previous Ordinance or Resolution # 174-11 Date Date Date Original Contract Date: Original Contract Number: Received i City 3— l 2 A08 : 24 RCVD Clerk's Office Comments: Revised January 15, 2009 '1.e..ev111e THE CITY OF FAYETfEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS www.accessfayetteville.org MEMO To: Mayor Thru: Don Marr, Chief of Staff Jeremy Pate, Development Services Director Chris Brown, City Engineer di From: Matt Mihalevich, Trails Coordinatore' Date: February 9th, 2012 Subject: Meadow Valley Trail — Second Nature Property Management, LLC - Change Order #1 RECOMMENDATION: Staff requests approval of change order #1 with Second Nature Property Management, LLC in the amount of $5,744.49 to the original contract amount of $138,555.00 for unforeseen additional work required on the Retaining Walls for Meadow Valley Trail (Formerly U of A Farm Trail). These additional• costs fall within the 20% project contingency approved by Resolution #174-11 for the award of Bid #11-49 and contract with Second Nature Property Management, LLC. PROPOSAL: As construction continues on the 2.3 mile Meadow Valley Trail, retaining walls are being installed along each end of the tunnel under Garland Ave. by Second Nature Property Management, LLC. The complete retaining wall construction was bid as Bid #11-49, however due to unforeseen changes to the scope of work, the items outlined in change order #1 are necessary to complete the installation of the retaining walls. BUDGET IMPACT: Change order #1 will increase the original contract amount of $138,555.00 by $5,744.49 for a new contract price of $144,299.49. The City Council approved a 20% contingency, or $27,711. After the approval of change order #1, $21,966.51 in contingency will remain. Funds for the installation of the retaining walls have been budgeted as part of the Transportation Bond Trail Development Program and sufficient funds are available for change order #1. City of Fayetteville Change Order No. 1 Project Title: Meadow Valley Trail — Retaining Wall Installation Contract No. Bid 11-49 Contract Date: November 1, 2011 Contractor: Second Nature Property Management, LLC The following changes are hereby made to the contract documents: Additions: I.) Upgrade the geogrid on the top three courses along Knapp Street to Fortrac MP80 instead of the specified Fortrac Strata SG 350. The contractor cost for the Fortrac MP80 geogrid is $3.37 more per square yard than the Fortrac Strata SG 350 (see attached quote) resulting in a cost increase of $2,281.49 for the 677 square yards needed. Create pay item CO 1-1 in the Lump Sum amount of $2,281.49 2.) Additional site excavation from wall to existing cut, create pay item CO 1-2 in the Lump Sum amount of $6,640.00 The contractor has provided a quote for the time and hourly rate to perform the additional excavation as shown below: Backhoe Work & Loading 80 hours $65.00/hr. $5,200.00 Skid Steer Work 32 hours $45.00/hr $1,440.00 $6,640.00 3.) Increase plan quantity of Select Fill (Item #7) by 160 cubic yards to account for additional select fill. Pay item still paid as a plan quantity item using the bid unit price of $6.35 per cubic yard the total cost increase is $1,016. Deletions: 1.) Reduce Quantity of Item#8, Native Soil from 2,077 cubic yards to 400 cubic yards (plan quantity) to account for the reduction in excavation of the back slope. Increase the unit cost of Native Soil from $6.57 per cubic yard to $23.63 per cubic yard. Total cost for this item will be reduced from $13,645.00 to $9,452.00 for a reduction of (4,193.00) Justification: 1.) The top three courses of the wall along Knapp Street require concrete to be poured within the voids in the blocks to support a concrete barrier wall above. The Fortrac MP80 geogrid is specifically designed to resist the chemical affects from concrete and is necessary in this application. This specification requirement was left off the original plans and specifications. 2.) The City crews performed the majority of the soil excavation for the wall, however additional excavation of approximately 8" was necessary over the entire wall excavation area to establish the elevations and steps for the foundation of the walls. This excavation was not included in the original bid, and will be accomplished by the contractor. 3.) The City crews over excavated a section of wall along the Pauline Whitaker Arena side. Select Fill was chosen to be used to fill this void due to the lower bid cost than Native Soil. Deduction Justification 1.) The quantity for Item #8, Native Soil has been significantly reduced due to the ability of the City crews to excavate the back wall of the walls to a near vertical back slope instead of the 45 degree slope shown in the bid plans. This slope area was not excavated, therefore the wall contractor did not have to fill this area back with native soil as originally planned. The contractor based his bid on payment for this work, so the unit cost has been increased to cover the costs the contractor has built into this pay item. 400 cubic yards of native soil will still be necessary to fill the top layer over the geogrid. Original Contract Price: , $_138,555.00 As adjusted by previous changes: $ This C.O. will increase contract by: $ 5,744.49 The new contract price will be: $_144,299.49 CHANGE TO CONTRACT TIME The contract time will be extended by 7 calendar days due to unforeseen conditions. The 60 calendar day substantial completion requirement will be omitted and the 90 calendar day final completion will be used as the contract time with liquidated damages assessed at the final completion rate. The new date for completion of all work under the contract will be April 1st, 2012 APPROVALS REQUIRED To be effective this change order must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terms of the General Conditions of the Contract. Requested by A Date 2 r 2 ' 12 Matt Mihalevich, Trails Coordinator Recommended By Date Z - Chris Brown, City Engineer Approved by Contractor L Date Zr z� m Kimb h g Approved by May r .� �. Lioneld or or n Date ae"de Y V Y 11 Y I1 W o D D D VENDOR NO. 21427 Second Nature Property Mgmt 144 Abbey Ln Fayetteville AR 72703 Each Package Must Be Marked Exactly As Shown Here City of Fayetteville, Arkansas DATE 11/02/11 FOB Fyv PURCHASE ORDER # 11-0000486-001 TERMS NET 30 DAY Unit QtDescription and Qty. of Recdvy ed Account Number Unit Price TOTALS Issue 1.00 JOB _ a) Retaining Wall Installation for -1-3 5 .00 X5-5-. U of A Farm Trail 'Per Bid #11-49 Res #174-11 Contract #2216 4520.9550.5814.05 060361002 £fy OoLVi LL - 4 • 1 To -e Go(o U � )-Y 'B) CD A i .H d aI �Z SHIP TO: Transportation Dept • 1525 S Happy Hollow Rd Fayetteville AR 72701 Sales Tax Total: $ 0 Apperson,G Purchase Order Total: 1385.00 DEPARTMENT VERIFICATION O E ADDITIONAL APPROVAL RECEIVED CHECK # DEPT HEAD APPROVAL DOES NOT MEET PURCHASING POLICY AMOUNT TO PAY CONTRACT PAYMENT OTHER AIP VERIFICATION APPROVED BY PURCHASING VERIFICATION PRICE CHANGE VERIFICATION PROJECT # THIS PAYMENTS PREVIOUS PAYMENT(S) S RETURN CHECK TO TOTAL PYMT(S) $ SEND COPY TO BALANCE $ DEPT COPY GEOGRID a❑ REINFORCEMENT FORTRAC 80 MP FORTRAC 80 MP IS MADE WITH POLYVINYL ALCHOHOL (PVA) YARNS, CRAFTED INTO A STABLE, INTERLOCKING PATTERN AND THEN COATED FOR PROTECTION FROM INSTALLATION DAMAGE. FORTRAC IS EASY TO INSTALL, UNAFFECTED BY FREEZE -THAW CONDITIONS, AND RESISTANT TO CHEMICAL, BIOLOGICAL AND ULTRA -VIOLET EXPOSURE. THE HIGH JUNCTION STRENGTH CAPACITY OF FORTRAC GEOGRIDS PROVIDES AN EFFICIENT TENSILE REINFORCEMENT FOR A WIDE RANGE OF SOIL TYPES. FORTRAC MP GEOGRIDS HAVE BEEN DEVELOPED FOR USE AS TENSILE REINFORCEMENT FOR RETAINING WALLS, STEEPENED SLOPES, ROADWAYS AND LANDFILL LINING SYSTEMS. FORTRAC GEOGRIDS ARE PRODUCED AT HUESKER'S MANUFACTURING FACILITY THAT HAS ACHIEVED ISO 9001 CERTIFICATION FOR ITS SYSTEMATIC APPROACH TO QUALITY IN DEVELOPMENT, MANUFACTURE, INSPECTION, SALES AND APPLICATION SUPPORT OF GEOSYNTHETICS. PROPERTY TEST METHOD ENGLISH units' SI units' MasslUnit Area ASTM D-5261 11 oz/yd2 375 g/m2 Aperture Size Measured 0.8 X 1.2 inch 20 X 30 mm Percent Open Area CW022125 70 % 70 % Wide Width Tensile Strength (MD) @ Ultimate ASTM D-6637 5480 Iblft 80.0 kN/m @ 2% Strain ASTM D-6637 2190 lb/ft 32.0 kN/m @ 5% Strain ASTM D-6637 4930 lb/ft 72.0 kN/m Elongation at Break ASTM D-6637 4 - 6 % 4 - 6 % Long Term Design Strength* (MD) Sand, Silt and Clay GRI GG4(b) 3134 lb/ft 45.7 kN/m pH Resistance Range (MD) ASTM D-5819 2— 13 2— 13 ' MARV - Minimum average roll values are based on a 95% confidence level. * LTDS = TuLTIMATE FSio x FSCR x FSCD x FSBo x FSjNT 5480 1.05 x 1.514 x 1.1 x 1.0 x 1.0 LTDS = 3134 lb/ft - Sand Silt and Clay LTDS = TALLOWABLE x FSUNC FSio = factor of safety for installation damage FSCR = factor of safety for creep deformation (75 Years) FSco = factor of safety for chemical degradation (2 < pH < 13) FSgo = factor of safety for biological degradation FS1NT = factor of safety for joints (seams and connections) FSUNC = factor of safety for uncertainties Standard Roll Size: 12.14 ft (3.7 m) wide x 328.1 ft (100 m) long = 443 yd2 (370 m2) Each roll of Fortrac geogrid delivered to the project site is labeled by HUESKER ° with a roll label that indicates manufacturer's name, product identification, lot number, roll number and roll dimensions. All rolls of Fortrac are encased in a sturdy polyethylene wrap to shield the product from rain, dirt, dust and ultraviolet light. Contact HUESKER for information on our material warranty. 80MPs106 EILHJ.JE$KER 10701-W S. Commerce Blvd., Charlotte, NC 28273 • www.hueskerinc.com • (704)588-5500 • (800)942-9418 Feb 07 12 11:18a William Kimbrough Feb 07 2012 10:34 HP LRSERJET FR?i 4799664741 p.2 9999999899 • P.2 Midwest Block & Brick %SWAM Pr .da Group Second Nature L andcpe PruJerx Avis Auto Property Bid Date: t21812011 1aOt Dec An S1n9See Ar.T2T 4 Phase (479).760.78e7 Fu(479).97Z7t 0 QUOTE ONLY G77 FORTRAC 80 MP 5.45 per sq.yd. /C�ly ifl /tT 11G !/ '/c/� & Su /37e971& j'j4Z (t/t'/2 Terms: Ciw kfto o?w0coq+ ojora F%Jcft& psiARIOW"O 0%fi4r l 6" tM .d 1K4.d. Sew dadugd b l.rt G� d nrwrl�i. 9rpa11ah�R*shCrdilns6bac�dOa�iT:OaoO Quoted Howa couch Date: 12l8tt l Matt Mihalevich Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements N/A City Council Meeting Date Agenda Items Only Engineering Division Development Services Department Action Required: Staff requests approval of change order #2 and reconciliation change order with Second Nature Property Management, LLC in the amount of $5,166.44 to the previously amended contract amount of $144,299.49 for additional quantity of modular block retaining wall necessary to establish grades on the retaining walls for Meadow Valley Trail. These additional costs for both change orders fall within the 20% project contingency approved by Resolution #174-11 for the award of Bid #11-49 and contract with Second Nature Property Management, LLC. $ 5,166.44 Cost of this request 4520.9550.5814.05 Account Number 06036 / 1002 Project Number Budgeted Item X $ 433,527.00 Category / Project Budget $ 373,647.73 Funds Used to Date $ 59,879.27 Remaining Balance Budget Adjustment Attached Transportation Bond Trail Improvements U of A Farm I Meadow Valley Trail Program Category / Project Name Trail Improvements Program / Project Category Name Sales Tax Construction Bond Fund Name Previous Ordinance or Resolution # 174-11 Date Original Contract Date: Lc21-.-. Original Contract Number: Date _wz2 inane and nternal Services Director D to b S v Chi of S aff Date Mayor Da e 06-15-12A11:52 RCVD Received in City Clerk's Office ENTERED Received in Mayor's Office Revised January 15, 2009 • a e eVl e ARKANSAS� MEMO To: Mayor and City Council Thru: Don Marr, Chief of Staff Jeremy Pate, Development Services Director C]► Chris Brown, City Engineer From: Matt Mihalevich, Trails Coordinator KA Date: June 14th, 2012 THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE Subject: Meadow Valley Trail -- Second Nature Property Management, LLC - Change Order #2 and Reconciliation Change Order RECOMMENDATION: Staff requests approval of change order #2 and reconciliation change order with Second Nature Property Management, LLC in the amount of $5,166.44 to the previously amended contract amount of $144,299.49 for additional quantity of modular block retaining wall necessary to establish grades on the retaining walls for Meadow Valley Trail (Formerly U of A Farm Trail). These additional costs for both change orders fall within the 20% project contingency approved by Resolution #174-11 for the award of Bid #11-49 and contract with Second Nature Property Management, LLC. PROPOSAL: The retaining walls for the 2.3 mile Meadow Valley Trail have been completed along each end of the tunnel under Garland Ave. by Second Nature Property Management, LLC. The retaining wall construction was bid as Bid #11-49, however to establish positive drainage away from the wall and to match precise elevations along Knapp Street, additional blocks as outlined in Change Order #2 were necessary to complete the retaining walls. BUDGET IMPACT: Change Order #1 increased the original contract amount of $138,555.00 by $5,744.49 for an amended contract price of $144,299.49. Change Order #2 will increase the contract amount by another $5,166.45 resulting in an new contract price of $149,465.94. The City Council approved a 20% contingency, or $27,711. After the approval of change order #1 and #2, $16,800.06 in contingency will remain unused. Funds for the installation of the retaining walls have been budgeted as part of the Transportation Bond Trail Development Program and sufficient funds are available for change order #1. City of Fayetteville Change Order No. 2 and Reconciliation Change Order Project Title: Meadow Valley Trail — Retaining Wall Installation Contract No. Bid 11-49 Contract Date: November 1, 2011 Contractor: Second Nature Property Management, LLC The following changes are hereby made to the contract documents: Additions: 1.) Increase plan quantity of Modular Block Retaining Wall (Item #1) by 645 square feet to account for additional block retaining wall necessary to complete the project. - Pay item still paid as a square foot item using the bid unit price of $8.01 per square foot the total cost increase is $5,166.45. Justification: 1.) Additional blocks were necessary on the top courses to match the precise road grades along Knapp Street and create positive drainage away from the retaining wall in Agri Park. Original Contract Price: $ 138,555.00 As adjusted by previous changes: $ 5,744.49 This C.O. will increase contract by: $ 5,166.45 The new contract price will be: $ 149,465.94 CHANGE TO CONTRACT TIME The final completion contract time will be extended by 41 calendar days due to unforeseen conditions. The new date for completion of all work under the contract will be May 111h 2012 APPROVALS REQUIRED To be effective this change order must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terns of the General Conditions of the Contract. Requested by Date Matt Mihalevich, Trails Coordinator Recommended By __ 1 W� Date Chris Brown, City Engineer Approved by Contractor L_. Date Wil mK' rou Approved by Mayor Date ione Jo an Jun 13 12 04:52p William Kimbrough 4799664741 p.3 Second Nature 144 Abbey Lane Fayetteville, AR 72703 Bill To City of Fayetteville Invoice Date Invoice # 618/2012 2037 P.O. No. Terms Project Chnage Order Quantity description Rate Amount 645 Retaining Wall -Labor 2-86 1,844.70 Retaining Wall Overhead 0.03 0.03 645 Retaining Wall Materials 3.7986 2,450.I0T 645 Retaining Wall Materials 0.9153 590.37T Fayetteville Sales Tax 9.25% 281.25 Total $5,166.45 ** CHANGE ORDER ** lay-RVl e PURC�HAS ORME VENDOR NO. 21427 Second Nature Property Mgmt Each Package Must Be Marked PURCHASE ORDER # Exactly As Shown Here City of Fayottoviilo, Arkansas 11-0000486-100 2/24/12 144 Abbey Ln Fayetteville AR 72703 FOB Fyv TERMS NET 30 DAY Unit QLY. Description and Qty' of Received Account Number Unit Price TOTALS Issue 1.00 JOB a) Retaining Wall Installation for 138555.00 138555.00 U of A Farm Trail Per Bid #11-49 Res #174-11 Contract #2216 4520.9550.5814.05 060361002 Contract Change Order #2 - Increase contract by $5,166.45 to allow for additional block necessary for plan quantity increase of 645 square feet 4520.9550.5814.05 06036/1002 SHIP TO: Transportation Dept 1525 S Happy Hollow Rd Fayetteville AR 72701 Continued on Next Page DEPARTMENT VERIFICATION BY DATE ADDITIONAL APPROVAL RECEIVED CHECK# DEPT HEAD APPROVAL DOES NOT MEET PURCHASING POLICY AMOUNT TO PAY $ CONTRACT PAYMENT OTHER NP VERIFICAT1ON APPROVED BY PURCHASING VERIFICATION PRICE CHANGE VERIFICATION PROJECT # THIS PAYMENT $ RETURN CHECK TO SEND COPY TO PREVIOUS PAYMENT(S} $ TOTAL PYMT(S) $ BALANCE $ DEPT COPY Fayled ** CHANGE ORDER ** PURCHAS ORDER VENDOR NO. 21427 Second Nature Property Mgmt 144 Abbey Ln Each Package Must Be Marked Exactly As Shown Here City of Fayetteville, Arkansas DATE 2/24/12 PURCHASE ORDER # 11-0000486-100 Fayetteville AR 72703 FOB Fyv TERMS NET 30 DAY Unit Oty Description and Oty. Of Recehred Account Number Unit Price TOTALS Issue 1.00 EA b) Contract Change Order #1 02/15/12 C/O ##1 to incr contract by $5,744.49 to allow for an upgrade to the geogrid, add'l site excavation, increased qty of select fill 4520.9550.5814.05 060361002 SHIP TO: Transportation Dept 1525 S Happy Hollow Rd Fayetteville AR 72701 Apperson, G DEPARTMENT VERIFICATION RECEIVED DEPT HEAD APPROVAL AMOUNT TO PAY NP VERIFICATION PURCHASING VERIFICATION PRICE CHANGE VERIFICATION RETURN CHECK TO SEND COPY TO BY DATE $ 5744.49 5744.49 Sales Tax Total: $.00 Purchase Order Total: 144299.49 ADDITIONAL APPROVAL CHECK # DOES NOT MEET PURCHASING POUCY CONTRACT PAYMENT OTHER PROJECT # THIS PAYMENT $ PREVIOUS PAYMENT(S) $ TOTAL PYMT(S) $ BALANCE $ DEPT COPY