HomeMy WebLinkAbout110-11 RESOLUTIONRESOLUTION NO. 110-11 A RESOLUTION AWARDING BID #11-40 AND AUTHORIZING A CONTRACT WITH FOCHTMAN ENTERPRISES, INC. IN THE AMOUNT OF $92,377.40 FOR CONSTRUCTION OF A PARKING LOT AT BRYCE DAVIS PARK, AND APPROVING A FIFTEEN PERCENT (15%) PROJECT CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-40 and authorizes a contract with Fochtman Enterprises, Inc. in the amount of $92,377.40 for construction of a parking lot at Bryce Davis Park. A copy of the contract is attached as Exhibit "A". Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a fifteen percent (15%) project contingency. PASSED and APPROVED this 5'h day of July, 2011. APPROVED: ATTEST: B � n BYk j..A)(Rirmn p pa q k IC -RI(' SONDRA E. SMITH, City Clerk/T asurer AGREEMENT EXHIBIT BETWEEN CITY OF FAYETTEVILLE AND CONTRACTOR l y THIS AGREEMENT is dated as of the 6449 day of kit, in the year 2011 by and between the City of Fayetteville, Arkansas (hereinafter cal e CITY OF FAYETTEVILLE) and Fochtman Enterprises, Inc. herein after called CONTRACTOR). CITY OF FAYETTEVILLE and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of the construction of a 24 -space asphalt parking area with standard concrete curb and gutter, flush concrete curb, pond grading and approximately 82 linear feet of 5 -foot wide concrete sidewalk, the planting of trees and associated site work at Bryce Davis Park and all items indicated in the Drawings and Specifications. Article 2. PROJECT MANAGER. The Project has been designed by City of Fayetteville Parks and Recreation Department 1455 South Happy Hollow Road Fayetteville, Arkansas 72701 will be hereinafter called PARKS AND RECREATION DEPARTMENT PROJECT MANAGER and who is to act as CITY OF FAYETTEVILLE's representative, assume all duties and responsibilities, and have the rights and authority assigned to PROJECT MANAGER in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. Article 3. CONTRACT TIME. 3.1. The Work for Construction of Bryce Davis Parking Lot shall be substantially completed within 90 consecutive calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.B & C of the General Conditions within 120 consecutive calendar days after the date when the Contract Time commences to run. 3.2. Liquidated Damages. CITY OF FAYETTEVILLE and CONTRACTOR recognize that time is of the essence of the Agreement and that CITY OF FAYETTEVILLE will suffer financial Toss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by CITY OF FAYETTEVILLE if the Work is not completed on time. Accordingly, City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 1 of 8 June 2011 instead of requiring any such proof, City of Fayetteville and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by CITY OF FAYETTEVILLE, CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. CITY OF FAYETTEVILLE shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the following Schedule of Values pursuant to paragraphs 4.1 and 4.2 below: 4.1. For all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2. Payment Items City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 2 of 8 June 2011 FOCHTMAN ENTERPRISES, INC Pay Items ',ITEM# ..-: . _.!.;:_ . ;-. .. .DESCRIPTION:... ... '. ', ;.' _.UNIT EST. TY. UNIT PRICE ":: :TOTAL '-_-• 1 MOBILIZATION (1) L.S. 1 $2,700.00 $2,700.00 2 BONDS AND INSURANCE L.S. 1 $1,500.00 $1,500.00 3 EROSION CONTROL- INCLUDING SILT FENCE, CONCRETE WASH OUT AND CONSTRUCTION ENTRANCE (8) LS, 1 $1,700.00 $1,700.00 4 SITE PREPARATION - INCLUDING TREE PRESERVATION FENCING, TREE PLANKING AND PROTECTION OF EXISTING TRAIL & REMOVAL OF TWO TREES (3)(4) L.S. 1 $5,500.00 $5,500.00 5 SELECTIVE SITE DEMOLITION (8) L.S. 1 $1,400.00 $1,400.00 6 UNCLASSIFIED EXCAVATION C.Y. 2150 $6:00 $12,900.00 7 IMPORTED HILLSIDE -COMPLETE IN PLACE (5) C.Y. 620 $8.00 $4,960.00 8 CONCRETE FLUSH CURB 6" THICK (5) COMPLETE IN PLACE PER DETAIL S.Y. 68 $34.00 62,312.00 9 CONCRETE STANDARD CURB (5) L.F. 490 $8.50 $4,165.00 10. C •""`. ",..0 ."rv, A v tai uv11/11 4..1. 114 r -1-,,,c mark S.Y. 85 $27.00 $2,295.00 11 CONCRETE APRON COMPLETE IN PLACE S.F. 300 $4.00 $1,200.00 12 3" ASPHALT- COMPLETE IN PLACE (5) S.Y. 1600 $13.00 $20,800.00 13 582 -COMPLETE IN PLACE (5) Ton 790 $16.00 $12,640.00 14 WHEEL STOPS COMPLETE IN PLACE (5) EA. 22 $80.00 $1,760.00 15 PARKING STRIPING AND ADA SYMBOL(5) L.S. 1 $900.00 $900.00 16 LIQUID AMBAR STYRACIFLUA-'HAPIDAZE'- 2" CAL, COMPLETE IN PLACE EA. 3 $500.00 $1,500.00 17 TOPSOIL (COMPLETE IN PLACE) G.Y. 419 $19.00 $7,961.00 18 FESCUE SOD COMPLETE IN PLACE (6)(7) S.F. 17130 $0.30 $5,139.00 19 FESCUE SEED COMPLETE IN PLACE INCLUDING STRAW (6)(7) S.F. 5227 $0.20 $1,045.40 Total $92,377.40 City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 2 of 8 June 2011 As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.6 of the General Conditions. Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in the General Conditions. 5.1. Progress Payments. CITY OF FAYETTEVILLE shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02 . All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, Tess the aggregate of payments previously made and less such amounts as PARKS AND RECREATION DEPARTMENT PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, and if the character and progress of the Work have been satisfactory to CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, CITY OF FAYETTEVILLE, on recommendation of PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to CITY OF FAYETTEVILLE as provided in paragraphs 14.02.B.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 3 of 8 June 2011 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), Tess such amounts as PARKS AND RECREATION DEPARTMENT PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.6 & C of the General Conditions, CITY OF FAYETTEVILLE shall pay the remainder of the Contract Price as recommended by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in said paragraphs 14.07.B & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce CITY OF FAYETTEVILLE to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data." 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, or furnishing of the Work. 6.3. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such report and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 4 of 8 June 2011 the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. CONTRACTOR is aware of the general nature of work to be performed by CITY OF FAYETTEVILLE and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. CONTRACTOR has given PARKS AND RECREATION DEPARTMENT PROJECT MANAGER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between CITY OF FAYETTEVILLE and CONTRACTOR concerning the Work consist of the following: 7.1. This Agreement (pages 1 to 8, inclusive). 7.2. Performance and Payment Bonds, (Exhibits A and B respectively). 7.3. Certificates of Insurance, (Exhibit C). 7.4. - Documentation submitted by CONTRACTOR prior to Notice of Selection (Exhibit D). 7.5. General Conditions (pages 1 to 42, inclusive). 7.6. Supplementary Conditions (pages 1 to 13 inclusive). 7.7. Specifications consisting of Divisions 1 through 32 as listed in table of contents thereof. 7.8. Addenda numbers 1 through 2, inclusive. City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 5 of 8 June 2011 7.9. One set of drawings (not attached hereto) consisting of: a cover sheet and additional sheets numbered two - nine with each sheet bearing the following general title: Construction of Bryce Davis Parking Lot. 7.10. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.10.1. Notice to Proceed 7.10.2 All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. Article 8. MISCELLANEOUS. 8.1. Terms used in the Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3. CITY OF FAYETTEVILLE and CONTRACTOR each binds itself, it partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives• in respect to all - covenants, agreements and obligations contained in the Contract Documents. 8.4. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intention of the stricken provision. 8.5. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 6 of 8 June 2011 8.6. Freedom of Information Act. City contract and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, CONTRACTOR will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.) Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 8.7. No liens against this construction project are allowed. Arkansas law (A.C.A. §§ 18-44-501 through 508) prohibits the filing of any mechanics' or rnaterialmen's liens in relation to this public construction project. Arkansas law requires and the Contractor promises to provide and file with the Circuit Clerk of Washington County a bond in a sum equal to the amount of this contract. Any subcontractor or materials supplier may bring an action for non-payment of labor or materials on the bond. The Contractor promises to notify every subcontractor and materials supplier for this project of this paragraph and obtain their written acknowledgement of such notice prior to commencement of the work of the subcontractor or materials supplier. City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 7 of 8 June 2011 IN WITNESS WHEREOF, CITY OF FAYETTEVILLE and CONTRACTOR have signed this Agreement in quadruplicate. One counterpart each has been delivered to CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, and two counterparts have been delivered to CONTRACTOR. All portions of the Contract Documents have been signed, initialed, or identified by CITY OF FAYETTEVILLE and CONTRACTOR or identified by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER on their behalf. This Agreement will be effective on Effective Date of the Agreement). CITY OF FA ETTEVILLE: City of Fayetteville [CORPORATE SEAL] Attest i%Ok, 15, c iT(y) -b ,4 ,t`iv`. , Rw�R >,,, * If a •.. \'�' • S p sG�i• Address for giving noti.�;•'C.`•• F .1-..... • •%' FAYETiEVILt E s • ••.N.. 9 A • . (If CITY OF FAYETTEVILL .r * Attest i By: , 2011 (which is the [CORPORATE SEAL] 1)» ration, attest by the Secretary. Address for giving notices FOOD) E .Y-??-1%ifC. 170 1%8 ViUiSAP--11701 lebody, attach License No. evidence of authority to sign and resolution or other documents Agent for service of process: authorizing execution of Agreement.) (If CONTRACTOR is a corporation, attach evidence of authority to sign) City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Page 8 of 8 June 2011 License No. 003899071 1 State of Arkansas Contractors Licensing Board FOCHTMAN ENTERPRISES, INC. PO .DRAWER 1168 FAYETTEVILLE, AR 72702-1168 This is to Certify That FOCHTMAN ENTERPRISES, 1NC_ is duly licensed under the provisions of Act 150 of the 1965 Acts as amended and is entitled to practice Contracting in the State of Arkansas within the following classification: HIGHWAY, RAILROAD, AIRPORT CONSTRUCTION MUNICIPAL & UTILITY CONSTRUCTION with the following suggested bid limit Unlimited from July 23, 2010 until July 31, 2011 when this Certificate expires. Witness our hands of the Board, dated at North Little Rock. Arkansas: CHAIRMAN SECRETARY July 23, 2010 ARTICLES OF INCORPORATION OF FOCHTMAN ENTERPRISES, INC. The undersigned natural persons of the age of twenty-one years or more, in order to form a corporation for the purposes hereinafter stated, under and pursuant to the Arkansas Business Corporation Act, hereby certify as follows: 1. The name of this corporation is FOCHTMAN ENTERPRISES,INC.. 2. The nature of the business of the corporation and the object or purposes proposed to be transacted, promoted or carried on by it are as follows: (a) To act asa general contractor for the installation of underground utilities, construction, repairing, and remodeling of buildings and public works of all kinds, and for the improvement of real estate, and the doing of any and all other business and contracting incidental thereto, or connected therewith, and the doing and performing of any and all acts or things necessary, proper; or convenient for or incidental to the furtherance or the carrying out of the powers or purposes herein mentioned. (b) To conduct any other business enterprise not contrary to law. (c) To exercise all of the powers enumerated in Section 4 of the Arkansas Business Corporation Act. 3. The period of existence of this corporati..on..shall....be perpetual 4. The registered office•of this corporation shall be located at 113 East Ernna, Springdale, Arkansas, and the name of the registered agent of this corporation at that address is Jill Jacoway. 5. The total amount of the authorized capital stock of this corporation is 2,000 shares of common' stock with no par value each. 6. This corporation shall not commence business until at least $300.00 has been received as consideration for the issuance of shares. 7. The names and addresses of the incorporators are as follows: NAME: ADDRESS: Earl W. Fochtman 1810 Overcrest Str., Fayetteville, Arkansas Gayle M. Fochtman 1810 Overcrest Str., Fayetteville, Arkansas -1- 8. The initial number of Directors constituting the initial Board of Directors shall be two. At the meeting of the shareholders next following the time when the number of shareholders of record shall be more than two, additional Directors shall be elected so that the total number of Directors shall be equal to the number of shareholders of record (but not to exceed five unless the corporate bylaws specifically so provide.) 9. The President and Secretary of the corporation shall have the authority on behalf of the corporation to: (a) enter into any contract between the corporation and all of its shareholders; (b) impose restrictions on the future transfer (whether inter vivos, by inheritance or testamentary gift), hypothecation or other disposition of its shares; (c) grant purchase options to the corporation or its shareholders; or (d) require the corporation or its shareholders to purchase such shares upon stated contingencies. In addition, any and all of such restrictions, options or requirements may be imposed on all shares of the corporation, issued and unissued, upon the unanimous resolution of the Board of Directors and the consent of all stockholders as of the date of the Board's resolution. 10. I`lo contract entered into by this corporation shall be invalid or unenforceable because of the interest of any Director in the contract, either directly or indirectly. 11. Pursuant to Section 1244 of the Internal Revenue Code, this corporation adopts the following plan: (a) The plan shall be effective upon the filing of these Articles of Incorporation with the Secretary of State of Arkansas. (b) This corporation is authorized to offer and issue 300 shares of common stock on or after the effective date hereof. (c) This corporation shall offer and issue such shares of common stock on the effective date hereof until the first to occur of (i) two years after the adoption of this plan or (ii) the date on which this corporation shall make a subsequent offer-ing of any stock. (d) The maximum amount to be received by this corporation in consideration of the common stock to be issued hereunder shall be Five Hundred Thousand Dollars ($500,000.00). -2- (e) Such common stock shall be issued only for money and other property (other than stock or securities). (f) There are no offers to sell any other stock of the corporation outstanding, and the corporation shall offer and issue only such common stock described herein during the term hereof. EXECUTED this ,;k5 - day of L.... ..r...1-: , 1978. EARL W. FOCHT !\N { '6. f�°�� 4 ,,( f1:7 ,/)) J'�/ GAYLE M. FOCHTMAN ACKNOWLEDGMENT STATE OF ARKANSAS ) )SS. COUNTY OF WASHINGTON ) I, the undersigned, a Notary Public duly conunissioned to take acknowledg- ments and administer oaths in the State of Arkansas, do hereby certify that on thi s day , personally appeared before me the above named i ncorporators who, being by me first duly sworn, declared that they were the only incorporators referred to in Number Seven of the foregoing Articles of Incorporation, and that they signed these Articles for the purposes therein mentioned and set forth. WITNESS my hand and seal as such Notary. Public .this....day..of �...( 1978. ' My conunissi.on, expires: -3- NOTARY PUBLIC n�an•c.ri Aic.cura V..; 11.3 crieTIFICATE MUST PE FILED witb the COUNTY CLERK FL ED JUL. 2 7 197P WIPiSTON BRYANT SECRF,TARY ary STATE ‘E-341,,Z-ALL4,411-.2. WINSTON BRYANT SECRETARY FSTATZ LIME ROCIC, ARK. E-12 P.7 Alison Jumper Submitted By City of Fayetteville Staff Review Forth City Council Agenda items and Contracts, Leases or Agreernents 7/5/2011 City Council Meeting Date Agenda Items Only Park Planning Division Action Required: Parks and Recreation Department A resolution awarding Bid #11-40 and approval of a contract with Fochtman Enterprises, Inc. in the amount of $92,377 with a 15% project contingency of $13,857 for a total project cost of $106,234 for the Construction of Bryce Davis Parking Lot. 106,234.00 Cost of this request 2250.9255.5806.00 Account Number 02013.0802 Project Number Budgeted Item 176,770.00 Category / Project Budget 56,603.20 $ Neighborhood Park Development Program Category / Project Name Parks Development Funds Used to Date Program / Project Category Name 120,166.80 Remaining Balance Budget Adjustment Attached Parks Development/PLDO NW Fund Name /p//e// Date torney \_Ptekkii CbfI Date 6-24-244 Finance and Internal Services Director Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in C V —17-11P12:42 R C V D Clerk's Office / Date Received in Mayor's Office Comments: Budget Adjustment attached. Revised January 15, 2009 THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS www a ccesstayetteville c►rx CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff From: Date: Subject: Bid #11-40, Construction of North Bryce Davis Parking Lot Agenda Request for July 5, 2011 Meeting Connie Edmonston, Parks and Recreation Director (TV Alison Jumper, Park Planning Superintendent 61 June 13, 2011 PROPOSAL: Bryce Davis Park is located at 1595 N. Dartmouth Drive. Approximately 17 acres were added to the existing 9.2 acre park in 2008. The park now serves as a community park for the northwest quadrant of the City. A master plan for the park was developed in 2008 and is being constructed in phases. Previous phases included the addition of a restroom, a dog park, walking path, and large pavilion. The addition of a parking lot to meet city ordinances and to accommodate added park users is required as part of the final phase. The bid for the construction of the parking lot advertised on May 26 and June 2 and opened on June 13. Four vendors including Fochtman Enterprises, Inc., Pavecon, LTD., Sweetser Construction, Inc., and Tomlinson Asphalt Co., Inc. submitted bids with Fochtinan Enterprises, Inc. being the low bid in the amount of $92,377. If approved, the construction of the parking lot is anticipated to begin in late July and be completed in October 2011. RECOMMENDATION: A resolution awarding BID #11-40 and approval of a contract with Fochtman Enterprises, Inc. in the amount of $92,377 with a 15% project contingency of $13,857 for a total project cost of $106234 for the Construction of Bryce Davis Parking Lot. BUDGET IMPACT: The project is funded with Park Development Funds and Park Land Development Funds Northwest Quadrant. Total project cost including a 15% project contingency is $106,234. Attachments: Bid Tabulation Sheet Fochtman Enterprises, Inc. Bid Submittal Contract Agreement Signed by Contractor Purchase Requisition RESOLUTION NO. A RESOLUTION AWARDING BID #11-40 AND AUTHORIZING A CONTRACT WITH FOCHTMAN ENTERPRISES, INC. IN THE AMOUNT OF $92,377.40 FOR CONSTRUCTION OF A PARKING LOT AT BRYCE DAVIS PARK, AND APPROVING A FIFTEEN PERCENT (15%) PROJECT CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-40 and authorizes a contract with Fochtman Enterprises, Inc. in the amount of $92,377.40 for construction of a parking lot at Bryce Davis Park. A copy of the contract is attached as Exhibit "A". Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a fifteen percent (15%) project contingency. PASSED and APPROVED this 5th day of July, 2011. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer ARKANSAS BID: 11-40 6/14/2011 TIME: 2:00 PM CITY OF FAYETTEVILLE Bid 11-40, Construction of Bryce Davis Parking Lot Bid Tabulation BIDDER TOTAL BID PRICE 1 Fochtman Enterprises, Inc. $92,377.40 2 Pavecon, Ltd. $109,243.10 3 Sweetser Construction, Inc. $103,446.75 4 Tomlinson Asphalt Co., Inc. $120,565.95 "NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. CERTIFIED: P. VICE, PURCH MGR WITNESS DAT i ave.l ev'le • Project Check List Bid 1140, Construction of Brvice Davis Parking Lot This checklist is for the Bidder's use in preparing & submitting a bid. It is not intended to include all details necessary to prepare a bid and shall not be used as a substitute for the requirements of the bid documents. information is shown below only as a matter of convenience. Use of this checklist does not relieve the Bidder from the responsibility of meeting all requirements of the Specifications concerning the preparation of an acceptable bid. Bidders are welcome to use this form as a coversheet for a sealed envelope; however, using this form itself is NOT a requirement % Bid Bond of the amount bid accompanied by required documentation (Power of Attorney, etc.) - In lieu of a bid bond, the bidder may submit a cashier's check for at Least five percent (5%) of the amount bid (inclusive of any deductive alternates). Cashiers checks shall be made payable to the City of Fayetteville, AR. addenda shall be signed, acknowledged, and submitted on the appropriate forms (submitting the actual addendums or marking acknowledgement on other bid pages). 11 line items shall be appropriately filled out and extended to reveal the line item price as well as the total bid price. Total base bid should be calculated in the provide space. All bidders shall submit the following forms with each bid: Bid Proposal Form, Vendoj.References, Debarment Certification Form, & Statement of Disclosure. All pages provided with signature lines shall be appropriately signed, dated accordingly, and included with submitted bid documents. I bid documents shall be delivered in a sealed envelope to the address listed below before the stated deadline on the coversheet of the bid. All bids should be delivered with the name of the bidder (contractor) on the sealed envelope as well as the bidders Arkansas Contractors License Number. City of Fayetteville, AR Purchasing Division — Suite 306 113 W. Mountain Fayetteville, AR 72702 CONTRACTOR NAME: FOCRIMpf\ VW WI S iSi inG ARKANSAS CONTRACTOR'S LICENSE #: n(TB960111 City of Fayetteville Bid 11-40 Construction of Bryce Davis Parking Lot May 2011 Section 00 21 17 City of Fayetteville Bid 11-40, Construction of Bryce Davis Parking Lot Statement of Disclosure (please submit with Bid) ATTENTION: Please submit this form with your bid. DISCLOSURE STATEMENT: Bidder must disclose any possible conflict of interest with the City of Fayetteville, including, but not limited to, any'relationship with any City of Fayetteville employee. Your response must disclose if a known relationship exists between any principal or employee of your firm and any City of Fayetteville employee or elected City of Fayetteville official. If, to your knowledge, no relationship exists, this should also be stated in your response. Failure to disclose such a relationship may result in cancellation of a purchase and/or contract as a result of your response. This form must be completed and returned in order for your bid/proposal to be eligible for consideration. PLEASE CHECK ONE OF THE FOLLOWING TWO OPTIONS, AS IT APPROPRIATELY APPLIES TO YOUR FIRM: 1.) NO KNOWN RELATIONSHIP EXISTS 2.) RELATIONSHIP EXISTS (Please explain) PLEASE FILL OUT THE SECTION BELOW AND SUBMIT THIS FORM WITH YOUR BID: 1.) I, as an officer of this organization, or per the attached letter of authorization, am duly authorized to certify the information provided herein are accurate and true; and 2.) My organization shall comply with all State and Federal Equal Opportunity and Non - Discrimination requirements and conditions of employment. Mt W. RIMMArl. Printer Name End of Section 00 21 17 City of Fayetteville Bid 11-40 Construction of Bryce Davis Parking Lot May 2011