Loading...
HomeMy WebLinkAbout61-10 RESOLUTIONRESOLUTION NO. 61-10 A RESOLUTION AWARDING BID #10-26 AND APPROVING THE PURCHASE OF CONCRETE DRAINAGE PIPE FROM SCURLOCK INDUSTRIES OF FAYETTEVILLE, INC. AND METAL AND PLASTIC DRAINAGE PIPE FROM WATER PRODUCTS, INC. IN VARYING UNIT PRICES FOR USE IN OZARK REGIONAL TRANSIT NEW FREEDOM PROJECTS AND OTHER CITY PROJECTS, AS NEEDED THROUGH THE END OF CALENDAR YEAR 2010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #10-26 and approves the purchase of concrete drainage pipe from Scurlock Industries of Fayetteville, Inc. and metal and plastic drainage pipe from Water Products, Inc. for the unit prices shown on the bid tabulation sheet, a copy of which is attached to this Resolution as Exhibit "A" and incorporated herein as if set out word for word, which is for use in Ozark Regional Transit New Freedom Projects and other city projects, as needed through the end of calendar year 2010. PASSED and APPROVED this 20th day of April, 2010. APPROVED: ATTEST: By: 1111 flb 4 &Ade SO 1 RA E. SMITH, City C1erk/TreasurAi„„0 :FAYETT S'A.; • ci\ • • • r. • EVI V?• -1:?IfANSIW 61/• 4/ % Tryettgle Bid 10-26, Drainage Pipe for ORT New Freedom Project BID: 10-26 DATE: 03/26/10 TIME: 2:00 PM CITY OF FAYETTEVILLE otai .a Irice = CERTIFIED: P. VICE, PURCH MGR $50,600.00 $209,244.54 $8,455.20 *NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formai authorization by City officials. Arbk;-. eq.2.7( DAT $6,311.20 $214,440.40 1,4 Contecit Construcdon Preclude, inc. Ferguson Waterworks Hanson Pipe & Precast Scurlock Industries of Fayetteville, Inc. Water Products, Inc. ffr-F'ff,'',' - ' v-mi-rtitsir,..1,5.,7-7f.r • itrw.i, "•';';'-71 '''''r l'i'-', ':""•.'ft *,f(.4.-•.::('- 5'.-Z!". f•:,'ZIOP, • ' -1•'-',•Y'tig•Pjlt,VF: 1 15- Diameter Reinforced Concrete Pipe 30 Feet No Bid No Bid 516.15 5484.50 $9.45 5283.50 $17.94 5538.20 2 18' Diameter Reinforced Concrete Pipe 30 Feet No Bid No Bid 520.83 $624.90 513.50 5405.00 $23.14 5694.20 3 24' Diameter Reinforced Concrete Pipe 120 Feet No Bid No Bid $32.99 53,958.80 519.15 52,298.60 $34.66 $4,159.20 4 30" Diameter Reinforced Concrete Pipe 30 Feet No Bid No Bid 547.50 $1,425.00 $28.00 5840.00 $52.00 51,560.00 5 36" Diameter Reinforced Concrete Pipe 30 Feet No Bid No Bid $65.40 51,962.00 $41.50 51,245.00 569.89 $2,096.70 6 15" Diameter Corrugated Metal Pipe 100 Feet 59.60 5960.00 59.14 $914.00 No Bid No Bid $8.95 $895.00 7 15" Corrugated Metal Flared End Section 2 Each 5125.00 5250.00 564.18 5128.32 No Bid No Bid $65.00 5130.00 8 15" Corrugated Metal Coupling Band 5 Each 59.60 $48.00 $9.14 545.70 No Bid No Bid 59.14 545.70 8 18' Diameter Corrugated Metal Pipe 100 Feet $11.60 51,160.00 $10.90 51,090.00 No Bid No Bid 510.67 51.067.00 10 18" Corrugated Metal Flared End Section2 Each 5160.00 5320.00 $83.20 5166.40 No Bid No Bid $84.00 5168.00 11 18" Comigateci Metal Coupling Band 5 Each 511.60 558.00 $10.90 554.50 No Bid No Bid 510.90 $54.50 12 24" Diameter Corrugated Metal Pipe 100 Feet $15.20 51,520.00 514.16 $1,416.00 No Bid No Bid 613.87 51,387.00 13 24" Corrugated Metal Flared End Section2 Each 5238.00 $476.00 5124.20 5248.40 140 Bid No Bid 5123.00 $246.00 14 24" Corrugated Metal Coupling Band5 Each $15.20 576.00 $14.16 $70.80 No Bld No Bid 514.16 $70.80 15 30" Diameter Corrugated Metal Pipe 1,600 Feet 520.40 532,640.00 $17.61 528,176.00 No Bid No Bid 517.14 527,424.00 16 30" Comigated Metal Flared End Section 2 Each $434.00 5868.00 5226.70 $453.40 No Bid No Bid 5221.00 $442.00 17 30- Corrugated Metal Coupling Band so Each $20.40 51,632.00 $17.61 51,408.80 No Bid 140 8(4 $17.61 $1,4013.80 18 36" Diameter Corrugated Metal Pipe 100 Feet $28.80 $2,880.00 $21.66 $2,166.00 No Bid No Bid $21.10 52,110.00 19 36" Corrugated Metal Flared End Section 2 Each $700.00 $1,400.00 5393.45 5786.90 No Bid No Bid 5339.00 5678.00 20 36" Corrugated Metal Coupling Band5 Each $28.80 5144.00 521.66 5108.30 No Bid No Bid 522.08 5110.40 21 42" Diameter Corrugated Metal Pipe 100 Feet 533.60 53,360.00 $25.42 52,542.00 No Bid No Bid $24.50 52,450.00 22 42' Corrugated Metal Flared End Section2 Each 51,320.00 52,640.00 5673.20 51,346.40 No Bid No Bid 5645.00 $1,290.00 23 42" Corrugated Metal Coupling Band5 Each 533.60 $168.00 $25.42 $127.10 No Bid No Bld 525.42 5127.10 24 15" Diameter Plasic Pipe 100 Feet No Bid 56.00 5600.00 No Bid No Bid $5.94 5594.00 25 15" Plastic Flared End Section2 Each No Bid $87.82 5175.64 No Bid No Bid 591.00 5182.00 se 18" Diameter Plastic Pipe 2,200 Feet No Bid 88.18 517,996.00 No Bid No Bid 88.09 $17,798.00 27 16" Flared End Section2 Each No Bid $117.97 $235.94 140131d $272.00 I $544.00 5120.00 5240.00 28 24" Diameter Plastic Plpe 2,420 Feet No Bid $13.11 531,726.20 No Bid No Bid $12.89 531,193.80 29 24' Flared End Section 2 Each 140 014 $151.39 5302.78 No Bid 5347.85 I $695.70 5152.00 5304.00 30 30" Diameter Plastic Pipe 1,600 Feet 140 8(4 $20.94 533,504.00 No Bid No Bid 520.62 532,992.00 31 30" Plastic Flared End Section2 Each No Bid 5311.96 5623.92 No Bid No Bid 5309.00 $618.00 32 36' Diameter Plastic Pipe 1,600 Feet No Bid $24.97 $39,952.00 No Bid 140 814 $24.45 539,120.00 33 36" Plastic Flared End Section 2 Each No Bid 5329.90 5659.80 No Bid No Bid 5330.00 $660.00 34 42" diameter plastic pipe 1,000 Feet No Bid $33.30 533,300.00 No Bld 140 8(4 532.59 $32,590.00 35 42' x 24" tee (ADS Part Number 4267AN)5 Each No Bid 5728.30 53,641.50 No Bid No BEd 5720.00 53,600.00 36 42' dia. 22.5 degree bend (ADS Part Number 4292AN)2 Each No Bid 5444.70 5889.40 No 1314 No Bid 5450.00 5900.00 37 sr dia. 11.25 degree bend (ADS Part Number 4291AN)2 Each No Bid $386.98 $773.96 No Bid No Bid 5400.00 $800.00 38 42" dia. wye (ADS Part Number 4287ANI30) 2 Each No Bid 5940.48 51,880.96 No 134d No Bid 5960.00 51,920.00 39 42" dia. couplers (ADS Part Number 4265 AA) 16 Each No Bid 5105.55 51,688.80 No Bid No Bid 5108.00 51,728.00 40 24" dia. couplers (ADS Part Number 2465AA)2 Each No Bid 522.31 $44.62 No Bid No 014 $24.00 $48.00 otai .a Irice = CERTIFIED: P. VICE, PURCH MGR $50,600.00 $209,244.54 $8,455.20 *NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formai authorization by City officials. Arbk;-. eq.2.7( DAT $6,311.20 $214,440.40 Terry Gulley Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements April 20, 2010 City Council Meeting Date Agenda Items Only Transportation Division Action Required: Transportation Services Department A resolution awarding Bid 10-26 and approving the purchase of drainage pipe for ORT New Freedom Projects and other city projects from Scurlock Industries for concrete pipe and from Water Products for metal and plastic pipe in the unit price amounts shown on the attached bid tabulation as needed through 12/31/2010. 145,400.00 60,000.00 Cost of this request 2100.5530.5216.00 4470.9470.>ccotio( Account Number 09030/1 >occ< Project Number Budgeted Item X 387,500.00 Category / Project Budget ORT Sidewalks & Pads Grant Various Capital Projects Program Category / Project Name Grants Various Capital Projects Funds Used to Date Program / Project Category Name 387,500.00 Street Cap lmpr Remaining Balance Fund Name Budget Adjustment Attached Dep Director A'/(1Attorney Date 0/1C) Date \Poi Otc LL -5-7oto Finance and Internal Services Director Date Date rzgl. ate Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: 220-09 Comments: Revised January 15, 2009 'Mtteville THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS wwmaccessfaYetteville•org To: Thru: From: Date: Mayor and City Council Don Marr, Chief of Staff Terry Gulley, Transportation Services Department Director April 1, 2010 Subject: A Resolution awarding Bid 10-26 and approving the purchase of drainage pipe for ORT New Freedom Projects and other city projects from Scurlock Industries for concrete pipe and from Water Products for metal and plastic pipe in the unit price amounts shown on the attached bid tabulation as needed through the end of calendar year 2010. PROPOSAL City Council approved an agreement with Ozark Regional Transit on November 3, 2009 to utilize $387,500 in Federal Transit Administration grant funds for sidewalk, transit shelter and bench concrete pad construction. Staff received sealed formal bids for curb and gutter, concrete flatwork, topsoil, aggregate, and drainage pipe in quantities estimated for the Ozark Regional Transit sidewalks and concrete pads project. These bids were opened on March 26, 2010. In accordance with the Agreement of Understanding Between City of Fayetteville and Ozark Regional Transit, these bids were submitted to Ozark Regional Transit for concurrence. Grant funds must be spent by September 1, 2012. RECOMMENDATION Staff recommends a resolution awarding Bid 10-26 and approving the purchase of drainage pipe for ORT New Freedom Projects and other city projects from Scurlock Industries for concrete pipe and from Water Products for metal and plastic pipe in the unit price amounts shown on the attached bid tabulation as needed through the end of calendar year 2010. BUDGET IMPACT $387,500 is budgeted in the ORT Sidewalks & Pads Grant project. Additional funding for other city drainage projects is included in various capital project budgets. Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain - Fayetteville, AR 72701 CCMemoORTB1d10-2601Aprl RESOLUTION NO. A RESOLUTION AWARDING BID #10-26 AND APPROVING THE PURCHASE OF CONCRETE DRAINAGE PIPE FROM SCURLOCK INDUSTRIES OF FAYET IEVILLE, INC. AND METAL AND PLASTIC DRAINAGE PIPE FROM WATER PRODUCTS, INC. IN VARYING UNIT PRICES FOR USE IN OZARK REGIONAL TRANSIT NEW FREEDOM PROJECTS AND OTHER CITY PROJECTS, AS NEEDED THROUGH THE END OF CALENDAR YEAR 2010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #10-26 and approves the purchase of concrete drainage pipe from Scurlock Industries of Fayetteville, Inc. and metal and plastic drainage pipe from Water Products, Inc. for the unit prices shown on the bid tabulation sheet, a copy of which is attached to this Resolution as Exhibit "A" and incorporated herein as if set out word for word, which is for use in Ozark Regional Transit New Freedom Projects and other city projects, as needed through the end of calendar year 2010. PASSED and APPROVED this 20th day of April, 2010. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer