Loading...
HomeMy WebLinkAbout33-10 RESOLUTIONRESOLUTION NO. 33-10 A RESOLUTION AWARDING BID #10-15 AND APPROVING A CONTRACT WITH SWEETSER CONSTRUCTION, INC. IN THE AMOUNT OF $122,027.00 FOR CONSTRUCTION OF IAMS DOG PARK AT BRYCE DAVIS PARK, AND APPROVING A 10% PROJECT CONTENGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #10-15 and approves a contract, a copy of which is attached to this Resolution as Exhibit "A" and incorporated herein, with Sweetser Construction, Inc. in the amount of $122,027.00 for construction of Iams Dog Park at Bryce Davis Park, and approves a ten percent (10%) project contingency. PASSED and APPROVED this 16th day of February, 2010. APPROVED: ATTEST: By. IO LD JO , Mayor 804.44, ,O,n447,4_, SONDRA E. SMITH, City Clerk/Treasurer "G\®m. o. �G G\TY o �•. A4i9 FAYEITEVILLE: NISiet Section 00 52 13 AGREEMENT BETWEEN CITY OF FAYETTEVILLE AND CONTRACTOR THIS AGREEMENT is dated as of the /Io'' day of -31-0 in the year 2010 by and between the City of Fayetteville, Arkansas (hereinafter calle CITY OF FAYETTEVILLE) and Sweetser Construction, Inc. (herein after called CONTRACTOR). CITY OF FAYETTEVILLE and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of the construction of This project includes constructing a water line extension, electric line extension, installing a pavilion (provided by others), fencing, picnic tables, sidewalks, benches, tree plantings and associated concrete paving at Bryce Davis Park and all items indicated in the Drawings and Specifications. Article 2. ENGINEER. The Project has been designed by City of Fayetteville Parks and Recreation Division 1455 South Happy Hollow Road Fayetteville, Arkansas 72701 will be hereinafter called PARKS AND RECREATION DIVISION PROJECT MANAGER and who is to act as CITY OF FAYETTEVILLE's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. Article 3. CONTRACT TIME. 3.1. The Work for the Construction of lams Park at Bryce Davis shall be substantially completed within 60 consecutive calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.B & C of the General Conditions within 75 consecutive calendar days after the date when the Contract Time commences to run. 3.2. Liquidated Damages. CITY OF FAYETTEVILLE and CONTRACTOR recognize that time is of the essence of the Agreement and that CITY OF FAYETTEVILLE will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the Bid 10-15 Page 1 of 8 delays, expense and difficulties involved in proving the actual loss suffered by CITY OF FAYETTEVILLE if the Work is not completed on time. Accordingly, instead of requiring any such proof, City of Fayetteville and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by CITY OF FAYETTEVILLE, CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. CITY OF FAYETTEVILLE shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the following Schedule of Values pursuant to paragraphs 4.1 and 4.2 below: 4.1. For all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2. Bid 10-15 Page 2 of 8 PAYMENT ITEMS As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by PARKS AND RECREATION DIVISION PROJECT MANAGER as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.8 of the General Conditions. Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by PARKS AND RECREATION DIVISION PROJECT MANAGER as provided in the General Conditions. 5.1. Progress Payments. CITY OF FAYETTEVILLE shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by PARKS AND RECREATION DIVISION PROJECT MANAGER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02 . All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, less the Bid 10-15 Page 3 of 8 Sweetser Construction, Inc. ITEM DESCRIPTION UNITS QUAN. UNIT PRICE TOTAL 1 MOBILIZATION (1) L.S. 1 $3,500.00 $3,500.00 2 BID BONDS AND INSURANCE LS. 1 $1,500.00 $1,500.00 3 EXCAVATION SAFETY L.S. 1 $100.00 $100.00 4 SITE PREPARATION LS. 1 $5,500.00 $5,500.00 5 WATER LINE EXTENSION-APPROX. 1038 L.F. (5) LS. 1 $15,000.00 $15,000.00 6 ELECTRIC LINE EXTENSION-APPROX. 1130 L.F. (5) L.S. 1 $6,780.00 $6,780.00 7 FILL COMPLETE IN PLACE (5) CY 469 $10.00 $4,690.00 8 UNCLASSIFIED EXCAVATION (5) CY 612 $10.00 $6,120.00 9 POST AND 3 RAIL FENCE W/ BLACK VINYL CHAIN LIP L.F. 1125 $12.00 $13,500.00 10 4' CHAIN LINK GATES (5) EA. 3 $195.00 $585.00 11 6' CHAIN LINK MAINTENANCE GATES (5) EA. 2 $290.00 $580.00 13 PAVILION FOOTINGS (5)(6) LS. 1 $2,400.00 $2,400.00 12 SILVA CELLS- INSTALLED (5) EA. 64 $250.00 $16,000.00 14 CONCRETE MOW STRIP 4" x 18" (5) S.Y. 190 $40.00 $7,600.00 15 CONCRETE - 4" THICK W/ INTEGRAL COLOR (5) S.Y. 106 $44.00 $4,664.00 16 CONCRETE - 4" THICK, NO COLOR (5) S.Y. 114 $32.00 $3,648.00 17 CONCRETE - 5" THICK SHELTER SLAB (5) S.Y. 145 $48.00 $6,960.00 18 SANDBLAST AND PAINT PAVILION (7) L.S. 1 $3,000.00 $3,000.00 19 PICNIC TABLES -COMPLETE IN PLACE (11) EA. 2 $1500.00 $3,000.00 20 BIKE RACK -COMPLETE IN PLACE (11) EA. 2 $300.00 $600.00 21 6' BENCHES -COMPLETE IN PLACE (11) EA. 2 $1,000.00 $2,000.00 22 DRINKING FOUNTAIN WITH DOG BOWL- COMPLETE EA. 1 $6,300.00 $6,300.00 23 QUERCUS PHELLOS-WILLOW OAK (9), ACER SACCHARUM (4), ACER RUBRUM (6), CARYA LS. 1 $5,000.00 $5,000.00 24 SITE RESTORATION LS. 1 $3,000.00 $3,000.00 TOTAL $122,027.00 As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by PARKS AND RECREATION DIVISION PROJECT MANAGER as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.8 of the General Conditions. Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by PARKS AND RECREATION DIVISION PROJECT MANAGER as provided in the General Conditions. 5.1. Progress Payments. CITY OF FAYETTEVILLE shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by PARKS AND RECREATION DIVISION PROJECT MANAGER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02 . All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, less the Bid 10-15 Page 3 of 8 aggregate of payments previously made and Tess such amounts as PARKS AND RECREATION DIVISION PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.6.5 & 14.02.D of the General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the PARKS AND RECREATION DIVISION PROJECT MANAGER, and if the character and progress of the Work have been satisfactory to CITY OF FAYETTEVILLE and PARKS AND RECREATION DIVISION PROJECT MANAGER, CITY OF FAYETTEVILLE, on recommendation of PARKS AND RECREATION DIVISION PROJECT MANAGER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to CITY OF FAYETTEVILLE as provided in paragraphs 14.02.8.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), less such amounts as PARKS AND RECREATION DIVISION PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.6.5 & 14.02.D of the General Conditions. 5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.B & C of the General Conditions, CITY OF FAYETTEVILLE shall pay the remainder of the Contract Price as recommended by PARKS AND RECREATION DIVISION PROJECT MANAGER as provided in said paragraphs 14.07.6 & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce CITY OF FAYETTEVILLE to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data." 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, or furnishing of the Work. Bid 10-15 Page 4 of 8 6.3. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that CITY OF FAYETTEVILLE and PARKS AND RECREATION DIVISION PROJECT MANAGER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. CONTRACTOR is aware of the general nature of work to be performed by CITY OF FAYETTEVILLE and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. CONTRACTOR has given PARKS AND RECREATION DIVISION PROJECT MANAGER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by PARKS AND RECREATION DIVISION PROJECT MANAGER is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Bid 10-15 Page 5 of 8 Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between CITY OF FAYETTEVILLE and CONTRACTOR concerning the Work consist of the following: 7.1. This Agreement (pages 1 to 8, inclusive). 7.2. Performance and Payment Bonds, (Exhibits A and B respectively). 7.3. Certificates of Insurance, (Exhibit C). 7.4. Documentation submitted by CONTRACTOR prior to Notice of Selection (Exhibit D). 7.5. General Conditions (pages 1 to 42, inclusive). 7.6. Supplementary Conditions (pages 1 to 13 inclusive). 7.7. Specifications consisting of Divisions 1 through 31 as listed in table of contents thereof. 7.8. Addenda numbers 1-2, inclusive. 7.9. One set of drawings (not attached hereto) consisting of: a cover sheet and additional sheets numbered two through eleven with each sheet bearing the following general title: Construction of lams Park at Bryce Davis. 7.10. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.10.1. Notice to Proceed 7.10.2 All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. Article 8. MISCELLANEOUS. 8.1. Terms used in the Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may Bid 10-15 Page 6 of 8 become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3. CITY OF FAYETTEVILLE and CONTRACTOR each binds itself, it partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8.4. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intention of the stricken provision. 8.5. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 8.6. Freedom of Information Act. City contract and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, CONTRACTOR will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.) Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. IN WITNESS WHEREOF, CITY OF FAYETTEVILLE and CONTRACTOR have signed this Agreement in quadruplicate. One counterpart each has been delivered to CITY OF FAYETTEVILLE and PARKS AND RECREATION DIVISION PROJECT MANAGER, and two counterparts have been delivered to CONTRACTOR. All portions of the Contract Documents have been signed, initialed, or identified by CITY OF FAYETTEVILLE and CONTRACTOR or identified by PARKS AND RECREATION DIVISION PROJECT MANAGER on their behalf. Bid 10-15 Page 7 of 8 This Agreement will be effective on 4)41' Effective Date of The Agreement). CITY OF FAY.TTEVILLE: B ayor [CORPORATE SEAL] Attest 0160 A 4 I. • 14.11, , i fT Secretary. Aimilmsto Y® mG� Address for giving nigkles :FAYETTEVILLE: e RA S� i'9s�° l � P O �eS 1;11 `�G' aON° G°oo> , 2010 (which is the SWEETSER CQN Bv: N, INC. [CORPORATE SEAL] *Attest * If a Corporation, attest by the Address for giving notices (If CITY OF FAYETTEVILLE is a public body, attach License No. evidence of authority to sign and resolution or other documents Agent for service of process: authorizing execution of Agreement.) (If CONTRACTOR is a corporation, attach evidence of authority to sign.) Bid 10-15 Page 8 of 8 Alison Jumper Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 2/16/2010 City Council Meeting Date Agenda Items Only Park Planning Division Action Required: Parks and Recreation Department A resolution awarding Bid #10-15 and approval of a contract with Sweetser Construction, Inc. in the amount of $122,027 with a 10% project contingency of $12,203 for a total project cost of $134,230 for the construction of lams Dog Park at Bryce Davis. 134,230.00. Cost of this request 2250.9255.5806.00 Account Number 02013.0902 02013.0802 Project Number Budgeted Item 475,000.00 Category / Project Budget 183,424.00 Funds Used to Date 291,576.00 Remaining Balance Budget Adjustment Attached [= Neighborhood Park Development Neighborhood Park Development Program Category / Project Name Parks Development Parks Development Program / Project Category Name Donations Parks Development/PLDO (NW) Fund Name eDirecto pao Ade ttorney P4 o k ;— d Date Date Finance and Internal Services Director Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: 141-09, 06-10 onlimmionolgammeneriro Received in City Clerk's Office Received in Mayor's Office Revised January 15, 2009 THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE www.accessfayetteville.org CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff Connie Edmonston, Parks and Recreation Director r/. From: Alison Jumper, Park Planning Superintendent In Date: February 4, 2010 "� Subject: Bid # 10-15 Construction of lams Dog Park at Bryce Davis PROPOSAL: Bryce Davis Park is located at 1595 N. Dartmouth Dr. Approximately 17 acres were added to the existing 9.2 acre park in 2008. The park will now serve as a community park for the northwest quadrant of the City. A master plan for the park has been developed and is being constructed in phases. Phase one includes the addition of a restroom which is currently under construction. Future phases include the construction of a dog park, walking path, fishing pier, pavilion and picnic areas. On June 16, 2009, the City Council passed Resolution Number 141-09 authorizing City Council to accept a donation from Procter and Gamble in the amount of $30,000 to contribute to the development of a dog park (see attached resolution). On January 5, 2010 the City Council passsed Resolution Number 06-10 authorizing the Mayor to apply to the Arkansas Department of Parks and Tourism for a General Improvements Fund Grant in the amount of $160,000 for improvements to Bryce Davis Park. If this grant is received it will help fund subsequent phases of the master plan development. The bid for the construction of the dog park advertised on January 18th and 25th and opened on February 3rd. Six vendors including Alpha Building Corporation, Danny Robinson Construction, LLC, Fochtman Enterprises, Inc., Kim Hoadley Construction Company, Inc., Midland Construction, Inc. and Sweetser Construction, Inc, submitted bids with Sweetser Constrction, Inc. being the low bid in the amount of $122,027. If approved, the construction of the dog park is anticipated to begin in late February and be completed in April 2010. RECOMMENDATION: A resolution awarding BID #10-15 and approval of a contract with Sweetser Construction, Inc. in the amount of $122,027 with a 10% project contingency of $12,203 for a total project cost of $134,230 for the Construction of Iams Dog Park at Bryce Davis. THE CITY OF FAYETTEVILLE, ARKANSAS BUDGET IMPACT: The project is funded with Park Development funds. The contract with Alpha Building Corporation for the restroom encumbered $175,534 leaving approximately $291,576 for the remaining phases. The project cost for the dog park including a 10 % contingency is $134,230. Attachments: Iams Dog Park Location Map Resolution No. 141-09 Resolution No. 06-10 Bid Tab Contract Agreement Signed by Contractor Purchase Requisition RESOLUTION NO. A RESOLUTION AWARDING BID #10-15 AND APPROVING A CONTRACT WITH SWEETSER CONSTRUCTION, INC. IN THE AMOUNT OF $122,027.00 FOR CONSTRUCTION OF LAMS DOG PARK AT BRYCE DAVIS PARK, AND APPROVING A 10% PROJECT CONTENGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #10-15 and approves a contract, a copy of which is attached to this Resolution as Exhibit "A" and incorporated herein, with Sweetser Construction, Inc. in the amount of $122,027.00 for construction of Iams Dog Park at Bryce Davis Park, and approves a ten percent (10%) project contingency. PASSED and APPROVED this 16th day of February, 2010. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer aye evlle BID: 10-15 DATE: 02/03/10 TIME: 3:00 PM CITY OF FAYETTEVILLE Bid 10-15, Construction of lams Park at Bryce Davis 1 Alpha Building Corporation $7,466.00 $12,390.00 $3,847.00 $132,708.00 2 Danny Robinson Construction, LLC $5,890.00 $13,120.00 $7,000.00 $131,352.00 3 Fochtman Enterprises, Inc. $7,790.00 $16,640.00 $3,720.00 $131,594.00 4 Kim Hoadley Construction Co., Inc. $5,200.00 $11,200.00 $5,035.00 $144,526.00 5 Midland Construction, Inc. $7,980.00 $15,168.00 $4,500.00 $183,968.00 6 Sweetser Construction, Inc. $7,600.00 $16,000.00 $5,000.00 $122,027.00 *NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. CERTIFIED: P u.� P. VICE PURCH MGR cZOSto WITNESS ATE City Of Fayetteville - Purchase Order (PO) Request (Not a Purchase Order) All purchases under $2500 shall be used on a P -Card unless medical or 1099 service related (Call x256 with questions) All PO Request shall be scanned to the Purchasing e-mail: Purchasing@cifayetteville.ar.us Requisition No.: Date: 2/4/2010 dumber: Expected Delivery Date: Vendor* 56870 Vendor Name: SweetserConstruction, Inc. Mail Yes:_ No: Address: 590 West Poplar Fob Point: Taxable Yes:_ No: Quotes Attached Yes. x_ No: City: Fayetteville State: AR Zip Code: 72703 Ship to code: Divi -.n : ad , •.ral: %� IRK* Requester. Alison Jumper Requeste s Employee #: 2369 ` 469 Item Description Quantity Unit of Issue Unit Cost Extended Cost Account Numbers Project/Subproject # Inventory # Fixed Asset # 1 2 3 4 5 6 7 8 9 10 Construction, of lams Park at Bryce Davis Per Bid # 10-15 1 Is 92,027.00 $92,027.00 2250.9255.5806.00 02013!0802 Construction of lams Park at Bryce Davis 1 Is 30,000.00 $30,000.00 2250.9255.5806.00' 02013:0902 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Shipping/Handling Lot $0.00 - Special Instructions: Subtotal: Tax: Total: $122,027.00 $122,027.00 Approvals: Mayor: Finance Dispatch Department Budget Manager: Utilities Manager: Director: Purchasing Manager: & Internal Services Director: Manager: IT Manager: Other: Revised 1/2/2008 Alison Jumper Submitted By , City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 2/16/2010 City Council Meeting Date Agenda Items Only Park Planning Division Action Required: Parks and Recreation Department A resolution awarding Bid #10-15 and approval of a contract with XXXXXXXXXX, Inc. in the amount of $XX,XXXX with a 10% project contingency of $XXXX for a total project cost of $XXXXXX for the construction of lams Dog Park at Bryce Davis. Cost of this request 2250.9255.5806.00 Account Number 02013.0902 02013.0802 Project Number Budgeted Item 111/3111 475,000.00 Category / Project Budget 183,424.00 Funds Used to Date 291,576.00 Remaining Balance Budget Adjustment Attached Neighborhood Park Development Neighborhood Park Development Program Category / Project Name Parks Development Parks Development Program / Project Category Name Donations Parks Development/PLDO (NW) Fund Name //'iiia. 4111 4/461 4.4.4 le mnt Directo (•.---r ity Attorney Yo,A 04. Finance and Internal Services Director l Date -Z7-/0 Date " la "24113 Date Date /A'70 Da e Previous Ordinance or Resolution # 141-09, 06-10 Original Contract Date: Original Contract Number: Comments: Revised January 15, 2009 le THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS www.accessfayetteville.org CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff Connie Edmonston, Parks and Recreation Director(/o, From: Alison Jumper, Park Planner Date: January 19, 2010 Subject: Bid # 10-15 Construction of lams Dog Park at Bryce Davis This bid will open on February 1. An updated memo, staff review and purchase requisition will be provided at Agenda Session. PROPOSAL: Bryce Davis Park is located at 1595 N. Dartmouth Dr. Approximately 17 acres were added to the existing 9.2 acre park in 2008. The park will now serve as a community park for the northwest quadrant of the City. A master plan for the park has been developed and is being constructed in phases. Phase one includes the addition of a restroom which is currently under construction. Future phases include the construction of a dog park, walking path, fishing pier, pavilion and picnic areas. On June 16, 2009, the City Council passed Resolution Number 141-09 authorizing City Council to accept a donation from Procter and Gamble in the amount of $30,000 to contribute to the development of a dog park (see attached resolution). On January 5, 2010 the City Council passsed Resolution Number 06-10 authorizing thel Mayor to apply to the Arkansas Department of Parks and Tourism for a General Improvements Fund Grant in the amount of $160,000 for improvements to Bryce Davis Park. If this grant is received it will help fund subsequent phases of the master plan development. The bid for the construction of the dog park advertised on January 18th and 25th and opened on February 1st XXX vendors including XXXXXXXXX submitteed bids with XXXXXX being the low bid in the amount of $XXX,XXX. If approved, the construction of the dog park is anticipated to begin in late February and be completed in April 2010. THE CITY OF FAYETTEVILLE, ARKANSAS RECOMMENDATION: A resolution awarding BID #10-15 and approval of a contract with XXXXXXXXX. in the amount of $XXXXXX, with a XX% project contingency of $XXXXXXX for a total project cost of $XXX,XX for the Construction of Iams Dog Park at Bryce Davis. BUDGET IMPACT: The project is funded with Park Development funds. The contract with Alpha Building Corporation encumbered $175,534 leaving approximately $XXX,XXX for the remaining phases. The project cost for the dog park including a XX % contingency is $XXX,XXX. Attachments: Iams Dog Park Location Map Resolution No. 141-09 Resolution No. 06-10 Bid Tab Contract Agreement Signed by Contractor Purchase Requisition RESOLUTION NO. A RESOLUTION AWARDING BID #10-15 AND APPROVING A CONTRACT WITH IN THE AMOUNT OF $ FOR CONSTRUCTION OF LAMS DOG PARK AT BRYCE DAVIS PARK, AND APPROVING A 10% PROJECT CONTENGENCY OF BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #10-15 and approves a contract, a copy of which is attached to this Resolution as Exhibit "A" and incorporated herein, with in the amount of $ for construction of Iams Dog Park at Bryce Davis Park, and approves a ten percent (10%) project contingency of PASSED and APPROVED this 16th day of February, 2010. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer RESOLUTION NO. 06-10 A RESOLUTION AUTHORIZING TI -IE MAYOR TO APPLY TO THE ARKANSAS DEPARTMENT OF PARKS AND TOURISM FOR A GENERAL IMPROVEMENT FUND GRANT IN THE AMOUNT OF . $160,000.00 FOR IMPROVEMENTS TO BRYCE DAVIS PARK WHEREAS, the City of Fayetteville recognizes the need to provide public recreation facilities for its citizens and visitors; and WHEREAS, the City wishes to apply for general improvement funds through the Arkansas Department of Parks and Tourism to provide programs, maintain, or fund improvements at Bryce Davis Park; and WHEREAS, the Mayor and City Council understand that if granted funds for park development, the City must account for fund expenditures and complete the project prior to June 30, 2011; and WHEREAS, the City of Fayetteville will sign a contract agreeing to provide necessary resources to maintain Bryce Davis Park and its facilities for a period of fifteen (15) years; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby authorizes - the Mayor to submit an application for a general improvement fund grant in the amount of $160,000.00 to the Arkansas Department of Parks and Tourism for improvements Bryce Davis Park. PASSED and APPROVED this 5`1' day of January, 2010. APPROVED: B ATTEST: By: `` ✓ °t'nAki .)M SONDRA E. SMITH, City Clerk/Treasurer /cnrr• FAYETTEVILLE: : ���i,NGTO31Y