HomeMy WebLinkAbout212-10 RESOLUTIONRESOLUTION NO. 212-10 A RESOLUTION APPROVING A WATER AND SEWER UTILITY RELOCATION EXPENSE COST-SHARING AGREEMENT WITH THE ARKANSAS HIGHWAY AND TRANSPORTATION DEPARTMENT RELATED TO THE WIDENING OF CROSSOVER ROAD (STATE HIGHWAY 265) BETWEEN MISSION BOULEVARD AND JOYCE BOULEVARD BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a water and sewer utility relocation expense cost-sharing agreement with the Arkansas Highway and Transportation Department related to the widening of Crossover Road (State Highway 265) between Mission Boulevard and Joyce Boulevard. A copy of the agreement is attached as Exhibit "A." PASSED and APPROVED this 7th day of December, 2010. APPROVED: By: I 'i NELD airy, Mayor ATTEST: By: LAAJA-' ,yyiA itv SONDRA E. SMITH, City Clerk/Treasurer ,NG�SlkiT R4s,,s : FAYETTEVILLE: 4'01;vGT® t��ys�°` Rev. 09-23.08 ARKANSAS STATE HIGHWAY COMMISSION HIGHWAY - UTILITY CONSTRUCTION/RELOCATION AGREEMENT State Job No 040517 (Utilities) County Washington Federal Aid Project STP -9142 (9) Job Location Hwy. 45 — E. Joyce Blvd. AC X LS Route 265 Section 2 Utility Owner Fayetteville Water & Sewer (Fayetteville) (S) THIS AGREEMENT, made and entered into this/4- day of 0�it.rt'rvlC.lelt--• , 20 10 . by and between the Arkansas State Highway Commission, acting by and through the duly authorizer) representatives of the Arkansas State Highway and Transportation Department, with headquarters at Little Rock, Arkansas, hereinafter referred to as the "Department," and the Fayetteville Water & Sewer of Fayetteville, AR. acting by and through its duly authorized representatives, hereinafter referred to as the "Owner" WITNESSETH: The Department proposes to make highway improvements as specified under the above referenced job number and, the, "Owner" will adjust or relocate its existing facilities as set out in the attached plans and cost estimate. The Department will participate in the cost of' said adjustment/relocation to the extent that eligibility is hereinafter established. Payment will be made on Actual Cost basis as mutually agreed between "Owner" and "Department." This agreement is governed by all applicable State and Federal laws, rules, and regulations including the Arkansas State Highway Commission Utility Accommodation Policy adopted by Commission Minute Order 96-167 as amended and supplemented, the Federal Aid Program Guide on Utility Adjustments and Accommodation on Federal Aid Highway Projects as amended and supplemented, and the provisions of 23 CFR § 645 as amended and supplemented. DESCRIPTION OF WORK: See Exhibit "A" The Department agrees that the required adjustment is "See Exhibit A" eligible for reimbursement for the Actual Cost which is estimated to be $5,643,897.27 of which 52,728,925.99 to be paid by the Department and 52,914,971.28 is to be borne by Owner. Owner w' I not commence work until authorized by the Department, and will then endeavor to begin within calendar days and complete within 210 calendar days thereafter. �q[} �dn completion of said work, "Owner" is responsible for the cleanup and restoration of the work area including the disposal of surplus materials and debris. Final billing must include all supporting detail. "Owner" shall also submit one (1) set of "as -built" drawings at this time. Rev. 09-23.08 Payment will be 100% of lump sum bills and actual cost bills, at the discretion of the Department a IO% retainage can be withheld and released upon completion of an audit review. All final bills for utility relocation are subject to review and audit by state and/or federal auditors. Expenses incurred under an actual cost agreement may be billed to the Department monthly in increments of $5,000.00 or more. "Owner" must maintain cost records and accounts to support the agreed adjustment/relocation work. Said records to be retained and available for inspection for a period of three (3) years from date of final payment. "Owner" shall be responsible for any and all hazards to persons, property, and traffic. With respect to traffic control, owner shall adhere to the requirements of the "Manual on Uniform Traffic Control Devices", as amended and supplemented. Owner shall be responsible for and shall hold harmless the Arkansas State Highway Commission, the Department and their officers and employees from any and all claims, actions, causes of action, suits, damages, losses or liability whatsoever, arising out of Owner's performance of the work subject to this Agreement. Notwithstanding anything hereinbefore written, neither the "Owner" nor the "Department" by execution of this Agreement waives or relinquishes any rights which either may legally have within the limits of the Law or Constitution, either State or Federal. Fayetteville Water & Sewer Lt onel d c )orJc n Name (Typed or Printed) m�ycr Title � /igna . re ' FEDERAL TAXPAYER IDENTIFICATION h &dr Name (Typed or Printed) Z.U° ARKANSAS STATE HIGHWAY COMMISSION Acting By and Through The ARKANSAS HIGHWAY AND TRANSPORTATION DEPARTMENT (For) Director of Highways & Transportation *I r4 ht of Way P vision Head ,_<«« 11111 r f,,,�� Section Head -Utilities Section Right of Way Division Fayetteville. Water & Sewer Exhibit "A" DESCRIPTION OF WORK: Adjust the water and sewer facilities as required to clear highway construction by abandoning approximately 307 ft. of two (2) inch, 43 ft. of four (4) inch, 436 ft. of six (6) inch, 1,393 ft. of eight (8) inch, 10,496 ft. of twelve (12) inch, and 946 ft. of thirty-six (36) inch water mains; 1065 ft. of eight (8) inch and 386 ft. of twelve (12) inch sewer mains complete with all necessary valves, meters, services and appurtenances. Restore the function of the facilities by installing approximately 365 ft. of two (2) inch, 225 ft. of six (6) inch, 1,222 ft. of eight (8) inch, 10,430 ft. of twelve (12) inch, and 635 ft. of thirty-six (36) inch water mains; 1074 ft. of eight (8) inch and 403 ft. of twelve (12) inch sewer mains complete with all necessary valves, meters, services and appurtenances. Owner is not adequately staffed to perform this work; therefore, contract forces will be utilized and selected by low bid process. Owner will be upgrading facilities during construction in which betterment has been addressed. Owner has developed a replacement in-kind and betterment factor for reimbursement in which the Department concurs. This factor is to update based on low bids and quantities installed. Owner will be securing easements based on Owners estimated easement cost. Owner verifies cost of easements to be paid is based on previous documented practice and can support such by audit. Any offer in excess of documented practices must have prior written approval by Arkansas Highway & Transportation Department, Right of Way Division. The pro rata factor for reimbursement will be determined as follows: Replacement in-kind factor: Est. reimb. replacement in-kind construction cost Total est. replacement in-kind construction cost Reimbursement factor for betterment: Est. reimb. replacement in-kind construction cost Total est. construction cost for betterment Reimbursement factor for preliminary engineering: $2,051,397.42 = 87.58% $2,342,402.00 $2,051,397.42 = 43.75% $4,688,742.00 Est. reimb. replacement in-kind preliminary engineering $270,103.94 = 67.93% Total est. preliminary engineering $397,621.00 Construction Cost Const. Engr. Cost Reimbursement Factor 43.75% Cost Summary $4,688,742.00 $ 184,328.27 $4,873,070.27 $2,131,968.24 Preliminary Engr. Cost $ 397,621.00 Reimbursement Factor 67.93% $ 270,103.94 Health Board Fee $ 500.00 Advertisement $ 350.00 ADEQ Stormwater Permit $ 200.00 Arkansas Utility Protection Services $ 1,775.00 Storm Water Prevention Plan $ 3,184.00 Easement Filing $ 720.00 Easement mapping & preparation $ 42,897.00 Easements Acquisition $ 323,580.00 Reimbursement Factor 87.58% $ 373,206.00 $ 326,853.81 Total Cost $5,643,897.27 Total Reimbursement $2,728,925.99 ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Dan Flowers Director Phone (501) 569-2000 Fax (501) 569-2400 Chris Brown City of Fayetteville Water & Sewer 125 W. Mountain Fayetteville, Arkansas 72701 Dear Mr. Brown: December 29, 2010 RE: Job 040517 (Utilities) STP -9142 (9) P.O. Box 2261 Little Rock, Arkansas 72203-2261 W W W.AR KANSASH IGH W A YS.COM Enclosed is your copy of the utility agreement approved on December 27, 2010 covering reimbursement for the adjustment of your facilities on the referenced job. You are authorized to proceed with advertising for bids. If you need additional right of way to accomplish your adjustments, you may proceed with the acquisition of this right of way. You are required to furnish a copy of each bid received and the bid tabulation sheet for our review and concurrence. Should you elect to award the contract to other than the low qualified bidder, the Department will participate only in the amount of the low bid. No construction work should be performed until you receive a written work order from this office. If I may be of assistance, please advise. Yours truly, Patty Bray Utility Coordinator Utilities Section Right of Way Division PB/ Enclosures Cc: "C" File District Engineer W/Enclosures Resident Engineer W/Enclosures #43 "U" File McClelland Consulting Engineers —Robert White 1810 N. College Ave. Fayetteville, AR 72703 ppV 3(k. David Jurgens Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 12/1/2010 City Council Meeting Date Agenda Items Only Utilities Division Action Required: Utilities Department Resolution approving an agreement with the Arkansas Highway and Transportation Department for water and sewer relocations relating to the widening of Crossover Road (Highway 265) between Mission and Joyce Boulevard. Cost of this request Account Number 09018 08072 Project Number Budgeted Item XX 5,953,301 412,741 Category / Project Budget 727,308 329,692 Funds Used to Date 5,225,993 83,049 Remaining Balance Budget Adjushnent Attached W -S Relocations- 2009 Bonds Hwy 265 W -S Relocations Program Category / Project Name Water/Sewer Improvements Water/Sewer Improvements Program / Project Category Name Water and Sewer Water and Sewer Fund Name Depa t irector file -e/1/ Ci homey o Q _L Finance and Internal Services Director Date 11-22-10 Date 1 t"Z2-2.0 1' Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in City 11-19-10P03:36 R C V D Clerk's Office U""3 Comments: Revised January 15, 2009 le CITY COUNCIL AGENDA MEMO MEETING DATE OF DECEMBER 7, 2010 THE CITY OF FAYETTEVILLE, ARKANSAS ARKANSAS www.accessfayetteville.org To: Fayetteville City Council Thru: Mayor Lioneld Jordan Don Marr, Chief of Staff From: David Jurgens, Utilities Director Water/Sewer Committee Date: November 19, 2010 Subject: Crossover Road Water and Sewer Relocation AHTD-Utility Agreement RECOMMENDATION City Administration recommends approval of an agreement with the Arkansas Highway and Transportation Department for water and sewer relocations relating to the widening of Crossover Road (Highway 265) between Mission and Joyce Boulevard. BACKGROUND The project involves two simultaneous and collocated functions. The first is relocating water and sewer lines as required in preparation for the combined Arkansas Highway Department (AHTD) and City widening of Crossover Road (Hwy 265) between Mission and Joyce. The second is installing a 36" and 24" transmission main along Crossover to connect to the existing 24" main on Crossover at Mission and the existing 36" main on Old Wire Road. This is the second phase of the transmission main replacement, completing the northern portion of the loop that was initially constructed when the southern section of Crossover Road between Mission and Huntsville was widened by the AHTD. DISCUSSION This agreement obligates the AHTD to pay 48.35% of the total project cost, or an estimated $2,728,925.99, and the City to pay the remaining 51.65%, estimated at $5,643,897.27. In general, the AHTD pays for relocating lines currently existing outside the existing ROW, and the City pays for lines that are currently inside the ROW and any increases in capacity. The final cost will be based on the actual bids. In this arrangement, the City designs, awards, and supervises construction of the utility relocation project, and will submit monthly requests for reimbursement from the AHTD. Staff expects to advertise for bids for the utility relocations prior to January 31, 2011. BUDGET IMPACT This project is funded using Water and Sewer revenue bond funds. $5,225,993 is available in this account. $83,085 is available in the specific Highway 265 project fund. The actual appropriation, and the budget adjustment moving the funds from the revenue bond account to the project account, will be requested when the construction contract is awarded. AHTD Hwv 265 W -S Am* CCMemo NovlO.doc l ARKANSAS STATE HIGHWA Y . AND TRANSPORTATION DEPARTMENT Dan Flowers Director Phone(50I)569-2000 Fax (501)569-2400 Chris Brown City of Fayetteville Water & Sewer 125 W. Mountain Fayetteville, Arkansas 72701 Dear Mr. Brown: October 1, 2010 RE: Job 040517 (Utilities) STP -9142 (9) P.O. Box 2261 Little Rock, Arkansas 72203-2261 W W W.ARKANSASHIGHWAYS.COM Enclosed is your copy of the utility agreement approved on October 1, 2010, covering reimbursement for the adjustment of your facilities on the referenced job. You are authorized to proceed with advertising for bids. If you need additional right of way to accomplish your adjustments, you may proceed with the acquisition of this right of way. You are required to furnish a copy of each bid received and the bid tabulation sheet for our review and concurrence. Should you elect to award the contract to other than the low qualified bidder, the Department will participate only in the amount of the low bid. No construction work should be performed until you receive a written work order from this office. If I may be of assistance, please advise. Yours truly, Patty Bray`... Utility Coordinator Utilities Section Right of Way Division PB/ Enclosures Cc: "C" File District Engineer W/Enclosures Resident Engineer W/Enclosures #43 "U" File McClelland Consulting Engineers —Robert White 1810 N. College Ave. Fayetteville, AR 72703 Aiwk\eA( Co�S� (-fir to-�-cam RESOLUTION NO. A RESOLUTION APPROVING A WATER AND SEWER UTILITY RELOCATION EXPENSE COST-SHARING AGREEMENT WITH THE ARKANSAS HIGHWAY AND TRANSPORTATION DEPARTMENT RELATED TO THE WIDENING OF CROSSOVER ROAD (STATE HIGHWAY 265) BETWEEN MISSION BOULEVARD AND JOYCE BOULEVARD BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a water and sewer utility relocation expense cost-sharing agreement with the Arkansas Highway and Transportation Department related to the widening of Crossover Road (State Highway 265) between Mission Boulevard and Joyce Boulevard. A copy of the agreement is attached as Exhibit "A." PASSED and APPROVED this 7th day of December, 2010. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer