Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
197-10 RESOLUTION
RESOLUTION NO. 197-10 A RESOLUTION APPROVING CONTRACT AMENDMENT #2 TO A CONTRACT WITH MCCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $32,036.33 FOR FINAL DESIGN SERVICES FOR MOUNT SEQUOYAH PRESSURE PLANE IMPROVEMENTS ASSOCIATED WITH THE CANTERBURY WATER TANK INCLUDING WATER PUMP STATION AND OFF-SITE WATER LINE EXTENSIONS, AND MAINTAINING A $20,000.00 CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Contract Amendment #2, a copy of which is attached as Exhibit "A," to the contract with McClelland Consulting Engineers in the amount of $32,036.33 for final design services for Mount Sequoyah pressure plane improvements associated with the Canterbury water tank, including water pump station and off-site water line extensions. Section 2. That the City Council of the City of Fayetteville, Arkansas maintains a project contingency of $20,000.00. PASSED and APPROVED this 16th day of November, 2010. APPROVED: B ATTEST: 8.41() SONDRA E. SMITH, City Clerk/Treasurer °ai9ii11tPtP1�„° 0�RK/TR� of,, 0 : FAYETTEVILLE •0 ° ae9s°9,QKANS%a J� ®✓sAA®47° o®®°° ©yb° °e°®°°uiaalamD AMENDMENT NO. 2 To AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES Between CITY OF FAYETTEVILLE, ARKANSAS And McCLELLAND CONSULTING ENGINEERS, INC. FAYETTEVILLE, ARKANSAS For The MOUNT SEQUOYAH PRESSURE PLANE IMPROVEMENTS PROJECT October 20, 2010 The October 5, 2004 Agreement between the CITY OF FAYETTEVILLE and McCLELLAND CONSULTING ENGINEERS, INC. is hereby amended to provide for engineering services during portions of the construction phases, to include site work and water main construction under Contract Section I, the Canterbury Tank, and general construction administration assistance; engineering coordination services between water main plans for Contract Section II, part of which were developed by McClelland Consulting Engineers, Inc, and part of which were developed by Jorgenson & Associates; and adjustments to current billing rates. The total estimated compensation for the previously approved engineering services and these additional services will be adjusted from $171,600 to $203,636.33, as further defined in Appendix A and B to this Amendment No. 2. All other provisions, covenants, recitals, terms and conditions of the Agreement, which are not expressly amended herein, shall remain in full force and effect. The parties hereby have executed this Amendment No. 2 on this date, the/0" day of L -r tivenapt., 2010. FY042150 Amendment No. 2 By: By: By: CITY 0 FtYETT LE, ANSAS M. yor AT : 'Q&dam ity "Clerk c :FAYETTEVILLE: McClelland Consulting Engineers, Inc.',/ VG O6/1 Ti le: President ATTrjel L% hc/� By: Page 1 APPENDIX A To AMENDMENT NO. 2 MOUNT SEQUOYAH PRESSURE PLANE IMPROVEMENTS PROJECT October 20, 2010 TASK DESCRIPTION Amendment No. 1 Amount Billed to Date (8/31/2010) Amendment No. 2 Estimated Fee Public Involvement and Communications $37,860 $9,632.50 $9,632.50 Preliminary Engineering Report $5,200 $5,183.75 $5,183.75 Surveying for Preliminary Design $21,400 $19,936.25 $19,936.25 Preliminary Geotechnical Services $8,710 $9,989.50 $9,989.50 Preliminary Design Services $40,900 $40,575.75 $40,575.75 Final Design Services $52,810 $64,352.75 $81,762.58 Bidding Services $4,720 $6,625.00 $9,000.00 Direct Expenses - $1,603.83 $2,400.00 Storm Water Pollution Prevention Plan - $460.00 $860.00 Construction Phase Services - $13,118.00 $24,296.00 Total Estimated Compensation $171,600 $171,477.33 $203,636.33 J:2004/042150/Amendment/Appendix A to Amendment No. 2.xls APPENDIX B TO AMENDMENT NO. 2 MOUNT SEQUOYAH PRESSURE PLANT IMPROVEMENT PROJECT McClelland Consulting Engineers 2010 Billing Rates Effective October 4, 2010 CATEGORY *HOURLY RATE Principal Engineer $ 155.00 Sr. Project Manager $ 143.00 Project Manager $ 135.00 Project Engineer IV $ 127.00 Project Engineer III $ 115.00 Project Engineer II $ 105.00 Project Engineer I $ 84.00 Landscape Architect IV $ 109.00 Landscape Architect III $ 100.00 Landscape Architect II $ 75.00 Landscape Architect I $ 55.00 Engineering Technician IV $ 90.00 Engineering Technician III $ 84.00 Engineering Technician II $ 65.00 Engineering Technician I $ 55.00 Construction Observer IV $ 90.00 Construction Observer III $ 80.00 Construction Observer II $ 61.00 Construction Observer I $ 55.00 Chief Draftsman $ 73.00 Draftsman II $ 60.00 Draftsman I $ 50.00 Survey Technician $ 80.00 Registered Land Surveyor $ 104.00 Survey (2 -Man or 1-Man/Robotic) Crew $ 143.00 Field Survey -1 Man $ 72.00 Party Chief $ 66.00 Soils Lab Supervisor $ 60.00 Soils Lab Technician II $ 45.00 Soils Lab Technician I $ 42.00 Office Admin $ 60.00 Clerk/Typist $ 50.00 Mileage $ 0.50 * Subject to Annual Adjustment Please implement these new billing rates immediately on all new jobs and on all hourly rates. David Jurgens Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 11/16/2010 City Council Meeting Date Agenda Items Only Utilities Capital Projects Division Action Required: Utilities Department Approval of Amendment 2 to the engineering services agreement with McClelland Consulting Engineers for $32,036.33, for final design services for Mt. Sequoyah Pressure Plane Improvements associated with the Canterbury Water Tank including water pump station and off site water line extensions, and approval to maintain the previously approved $20,000 contingency. 32,036 Cost of this request 5400.5700.5314.02 Account Number 04036-1 Project Number Budgeted Item xx $ 1,753,000 Category/Project Budget 1,675,369 Funds Used to Date 77,631 Remaining Balance Budget Adjustment Attached Mt Sequoyah Press Plane Imprvmt Program Category / Project Name Water and Wastewater Program / Project Category Name Water/Sewer Fund Name Depart e• : iyector f� vt0 . rney 2z- cA Date Date to -2S_ zoiD Finance and Internal Services Director Date Chief of Sta ,J„ ay Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: 193-05 4/16/2003 900 Received in City10-22q-,14504:18 R C V D Clerk's Office Date Comments: Revised January 15, 2009 avettevll1e CITY COUNCIL AGENDA MEMO MEETING DATE OF NOVEMBER 16, 2010 THE CITY OF FAYETTEVILLE, ARKANSAS ARKANSAS www.accessfayetteville.org To: Fayetteville City Council Thru: Mayor Lioneld Jordan Don Marr, Chief of Staff From: David Jurgens, Utilities Director Fayetteville Water and Sewer Comm Date: October 22, 2010 Subject: Approval of Amendment 2 to the engineering services agreement with McClelland Consulting Engineers for $32,036.33, for final design services for Mt. Sequoyah Pressure Plane Improvements. RECOMMENDATION Staff recommends approval of Amendment 2 to the engineering services agreement with McClelland Consulting Engineers for $32,036.33, for final design services for Mt. Sequoyah Pressure Plane Improvements associated with the Canterbury Water Tank including water pump station and off site water line extensions, and approval to maintain the previously approved $20,000 contingency. BACKGROUND The original design contract was awarded to McClelland Consulting Engineers in October, 2004 to evaluate and design the water storage tank and related piping and pump stations in the Mt. Sequoyah water pressure plane. Amendment No. 1 was approved in November, 2008 for the final design of the water tank site and bidding services. The contract did not include construction phase services. DISCUSSION This amendment covers construction phase services to oversee the construction of the foundation for the water tank. All other construction phases will be inspected by city staff. This amendment also covers the final design services of the Stone Mountain water pump station that will be necessary for the water project. City staff evaluated several pump station options before selection surface mounted vertical turbine pumps. The preliminary design utilized a lower cost, higher maintenance multi -stage centrifugal pump. This evaluation will save funds in both operation and maintenance costs, but requires more engineering evaluation than was budgeted for in the initial engineering contract. BUDGET IMPACT There is currently $77,631.33 in the project budget before this change order is executed. Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain - Fayetteville, AR 72701 McClel CCMemo Amedment2 220ct10.doc RESOLUTION NO. A RESOLUTION APPROVING CONTRACT AMENDMENT #2 TO A CONTRACT WITH MCCLELLAND CONSULTING ENGINEERS 1N THE AMOUNT OF $32,036.33 FOR FINAL DESIGN SERVICES FOR MOUNT SEQUOYAH PRESSURE PLANE IMPROVEMENTS ASSOCIATED WITH THE CANTERBURY WATER TANK INCLUDING WATER PUMP STATION AND OFF-SITE WATER LINE EXTENSIONS, AND MAINTAINING A $20,000.00 CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Contract Amendment #2, a copy of which is attached as Exhibit "A," to the contract with McClelland Consulting Engineers in the amount of $32,036.33 for final design services for Mount Sequoyah pressure plane improvements associated with the Canterbury water tank, including water pump station and off-site water line extensions. Section 2. That the City Council of the City of Fayetteville, Arkansas maintains a project contingency of $20,000.00. PASSED and APPROVED this 16th day of November, 2010. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer