HomeMy WebLinkAbout185-10 RESOLUTIONRESOLUTION NO. 185-10 A RESOLUTION AWARDING BID #10-63 AND AUTHORIZING A CONTRACT WITH KING ELECTRICAL CONTRACTORS, INC. IN THE AMOUNT OF $45,140.00 FOR THE PURCHASE AND INSTALLATION OF LIGHTING IMPROVEMENTS FOR THE POLICE DEPARTMENT BUILDING BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #10-63 and authorizes a contract, a copy of which is attached as Exhibit "A," with King Electrical Contractors, Inc. in the amount of $45,140.00, for the purchase and installation of lighting improvements for the Police Department building. PASSED and APPROVED this 2nd day of November, 2010. APPROVED: B ATTEST: By: DN-, cQ . SONDRA E. SMITH, City Clerk/Treasurer City of Fayetteville Bid 10-63, Construction — Police Department Lighting Upgrade Draft Contract — Between City and Contractor This contract executed this, ds day of A../64,44AJ , 2010, between the City of Fayetteville, Arkansas, and King Electrical Contractors, Inc. In consideration of the mutual covenants contained herein, the parties agree as follows: 1. King Electrical Contractors, Inc. at its own cost and expense shall furnish all labor, materials, supplies, machinery, equipment, tools, supervision, bonds, insurance, tax permits, and all other accessories and services necessary to complete items bid per Bid 10-63 as stated in King Electrical Contractors, Inc. bid proposal, and in accordance with specifications attached hereto and made a part hereof under Bid 10- 63, all included herein as if spelled out word for word. 2. The City of Fayetteville shall pay King Electrical Contractors, Inc. based on their bid proposal in an amount not to exceed $45,140.00. Payments will be made after approval and acceptance of work and submission of invoice. Payments will be made approximately 30 days after receipt of invoice. 3. The Contract documents which comprise the contract between the City of Fayetteville and King Electrical Contractors, Inc. consist of this Contract and the following documents attached hereto, and made a part hereof: A. Bid form identified as Invitation to Bid 10-63 with the specifications and conditions typed thereon. B. King Electrical Contractors., Inc. bid proposal. C. The Notice to Prospective Bidders and the Bid Tabulation. 4. These Contract documents constitute the entire agreement between the City of Fayetteville and King Electrical Contractors, Inc. and may be modified only by a duly executed written instrument signed by the City of Fayetteville and King Electrical Contractors, Inc. 5. King Electrical Contractors, Inc. shall not assign its duties under the terms of this agreement. 6. King Electrical Contractors, Inc. agrees to hold the City of Fayetteville harmless and indemnify the City of Fayetteville, against any and all claims for property damage, personal injury or death, arising from King Electrical Contractors, Inc. performance of this contract. This clause shall not in any form or manner be construed to waive that tort immunity set forth under Arkansas Law. 7. King Electrical Contractors, Inc. shall furnish a certificate of insurance addressed to the City of Fayetteville, showing that he carries the following insurance which shall be maintained throughout the term of the Contract. Any work sublet, the contractor shall require the subcontractor similarly to provide worker's compensation insurance. In case any employee engaged in work on the project under this contract is not protected under Worker's Compensation Insurance, King Electrical Contractors, Inc. shall provide and shall cause each Subcontractor to provide adequate employer's liability insurance for the protection of such of his employees as are not otherwise protected. Workmen's Compensation Statutory Amount Comprehensive General & Automobile Insurance City of Fayetteville, AR Bid 10-63, Construction — Police Department Lighting Upgrades Page 1 of 2 Bodily Injury Liability $500,000 for each person injured. $1,000,000 for each accident. Property Damage Liability $1,000,000 aggregate. The premiums for all insurance Contractors, Inc. and the bond required herein shall be paid by King Electrical 8. King Electrical Contractors, Inc. to furnish proof of licensure as required by all local and state agencies. 9. This contract may be terminated by the City of Fayetteville or King Electrical Contractors, Inc. with 10 days written notice. 10. Freedom of Information Act: City of Fayetteville contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. 25-19-101 et. Seq.). Only legally authorized photo coping costs pursuant to the FOIA may be assessed for this compliance. 11. Changes in Scope or Price: Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. WITNESS OUR HANDS THIS C DAY OF , 2010. ATTEST: COMPANY SECRETARY BUSINESS ADDREIST/ 2 % u 5✓ (4) m ootp"e_ 42 7 Z2o4i CITY OF FAYETTEVILLE, YETTEV,.L,E, ARKAt SAS Sandra Smith, City Clerk �ONT BY NAME AND TITLE AGI its 1i,•.?” City of Fayetteville, AR Bid 10-63, Construction — Police Department Lighting Upgrades Page 2 of 2 John Coleman Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 11/2/2010 City Council Meeting Date Agenda Items Only Division Action Required: Sustainability Department Bid 10-63 -- Staff recommends approval of Bid 10-63 to King Electric for a total not to exceed $45,140 for lighting improvements on the Police Building. 45,140.00 Cost of this request 2240.9240.5801.00 Account Number 09011.0010 Project Number Budgeted Item X 250,000.00 Category / Project Budget Energy Efficiency and Conservation Program Category / Project Name 46,022.46 Energy Efficiency and Conservation Funds Used to Date Program / Project Category Name 203,977.54 Energy Block Grant Remaining Balance Fund Name Budget Adjustment Attached Departm� Director Finance and Internal Services Director to 4 -Da /0—/t/40 Date 1G--li-760 Date -/S• Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received Ordit4 -1 0 PO 2:54 R C V D Clerk's Office 067 Comments: Revised January 15, 2009 THE CITY OF FAYETTEVILLE, ARKANSAS CORRESPONDENCE 113 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8272 TO: FROM: Thru: DATE: SUBJECT: Mayor Jordan John Coleman, Sustainability Director -SC, Don Marr, Chief of Staff October 14, 2010 Police Department Bid 10-63 — Energy Retrofit Description Using funds from the Energy Efficiency and Conservation Block Grant as part of the American Recovery and Reinvestment Act (ARRA), the City has awarded bids to cover both lighting and heating and air conditioning (HVAC) retrofits on the Police Department building. Bid 10-63 was awarded to King Electric for an amount not to exceed $45,140 after receiving four bids on the project. This contract focuses on lamp replacement throughout the facility that will provide better functional lighting as well as greater energy efficiency. Environmental Impact The Police Building has a total Energy Use Index (EUI) of 99.6 MBtus per square foot per year (see attached audit analysis). This project is expected to drop the EUI to 80 or by about 20 percent. Budget Impact Bid 10-63 was awarded for an amount not to exceed $45,140 and will be paid for exclusively by Energy Efficiency and Conservation Block Grant funding as obtained by the City of Fayetteville in September 2009. Currently, the Police Building's Energy Cost Index rating is $1.56 per square foot per year or $38,000 in average utility costs. The lighting and HVAC bids are expected to reduce energy costs by 20 percent which equates to $7,661.16 per year. New equipment will also account for reduced maintenance costs as well allowing City maintenance staff to focus on other priorities. RESOLUTION NO. A RESOLUTION AWARDING BID #10-63 AND AUTHORIZING A CONTRACT WITH KING ELECTRICAL CONTRACTORS, INC. IN THE AMOUNT OF $45,140.00 FOR THE PURCHASE AND INSTALLATION OF LIGHTING IMPROVEMENTS FOR THE POLICE DEPARTMENT BUILDING BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #10-63 and authorizes a contract, a copy of which is attached as Exhibit "A," with King Electrical Contractors, Inc. in the amount of $45,140.00, for the purchase and installation of lighting improvements for the Police Department building. PASSED and APPROVED this 2nd day of November, 2010. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer Energy Audit Analysis Vim. •` �:x $ 33,542 $ 4,771 $ - $ 38,314 Mitel $ 1.37 $ 0.19 1.56 * Data from DOE EIA CBECS 2003 Census 2,031.42 415 n/a 2,446 1 2 3 4 5 6 7 25,001 to 50,000 sf Office Occ. Built 1980-1989 West South Central 20 to 49 Employees Fewer than 4,000 HDD Fayetteville, AR Facility 0.908 1.397 1.346 1.026 1.089 1.157 1.37 $ 0.215 $ 0.180 $ 0.220 $ 0.142 $ 0.269 $ 0.186 $ 0.19 $ 0.015 $ 1.138 $ 0.130 ' $ 1.707 $ 0.008 $ 1.573 $ 0.001 $ 1.168 $ 0.025 $ 1.382 $ 0.003 $ 1.346 $ - $ 1.56 40.38 58.90 60.69 49.76 47.68 47.53 82.7 29.76 22.03 28.16 19.91 35.95 22.75 16.9 n/a 7.50 11.96 11.23 3.70 11.92 6.80 77.64 92.89 100.08 73.37 95.55 77.07 99.6 D Annual Fuel Cost Other NG 0% 12% 0° Elec Use 88% Annual Consumption NG Other 17% 0% Elec 83% ADDITIONAL GRAPH AREA (AS REQ'D) $4,500 $4,000 $3,500 $3,000 $2,500 $2,000 $1,500 $1,000 $500 $- Monthly Fuel Cost 0 o m m m m 0 0 0 99 li o Z O U Q 0 0 0 0 0 Elec NG Other Monthly Electric Demand 0 0 0 co 0 0 0 ,Z m 0 0 0 m a m 140.0 120.0 100.06 80.0 60.0 - 40.0 20.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Monthly Electric Load Factor 0 0 0 0 0 0 0 0 0 0 CO 0 .6 ,t v o 0 0. o' c15. O vJ 120 100 80 2 60 2 40 20 0 Monthly NG Consumption LL 00 N o O Z o m a o, Q 0 0 0 0 -NG - Baseline 250 200 150 800 2 50 0 Monthly Electric Consumption D 0000000000 o Z 0 • 63 ¢' 2 c 2 -Elec - Baseline M0 0 0 Monthly Other Fuel Consumption tL N m m m rn m m m 0 0 0 0 0 0 o Z O to 0, m 0 0 2 -Other - Baseline $1.80 $1.60 $1.40 $1.20 $1.00 $0.80 $0.60 $0.40 $0.20 $- Energy Cost Index Benchmark 0 V MINE 19 vIll / ■ Ell MUNN III II II III ■..I:■ I- I III ■F' ■ 2 3 4 5 6 Category No. (From Above) l7 Electric ECI O Gas ECI 00ther ECI 7 110.0 100.0 90.0 80.0 > 70.0 60.0 • 50.0 2 40.0 30.0 20.0 10.0 Energy Use Index Benchmark o�■%4.. -%.(w® `: Ar„,■® •� r�%■ r•• -U - /■ ■ ,, ■ ■ ■ • t9. I• •® I• ®. . 1111 - ...._ I.0 I•� ■0. U0) ■ ■IIIIIIIIIIIIIIIIIIIIIIIIII° MENNIMIll MI 2 3 4 5 6 Category No. (From Above) El Electricity EUI O Gas EUI 12 Other EUI 7 x aye evile ARKANSAS BID: 10-63 DATE: 10/13/10 TIME: 2:00 PM CITY OF FAYETTEVILLE Bid 10-63, Construction - Police Department Lighting Upgrades 1 Fleming Electric, Inc. Total Turn -Key Bid Amount $71,745.71 2 Industrial Electrical Contractors, Inc. $47,286.86 3 King Electrical Contractors $45,140.00 4 Multi -Craft Contractors, Inc. $54,750.00 *NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. CERTIFIED: �-' �r�✓ (0/6./0 P. VICE, PURCH MGR WITNESS DA City of Fayetteville Bid 1063, Construction - Police Department Lighting Upgrades Bid Form ITEM# DESCRIPTION UNIT QTY. UNIT PRICE 1 COMPLETE PROJECT TURN -KEY AS SPECIFIED L.S. 1.00 5�)1 , TOTAL BASE BID PRICE Addenda # Name Date 1 a..Lf '. lo -x. $ 45; ma ray Ave, 7.14305‘,..11. 0 our r go/1a,45 The Bidder shall state the price bid in words and figures (written in ink or typed) for each pay item, and the total bid. In case of conflict between words and figures, the words, unless obviously incorrect, shall govern. Bidder understands that the Owner reserves the right to award the total project, or to reject any or all bids and to waive any informalities in the bidding. Bidder agrees that this Bid shall be good and wit not be withdrawn for a period of 60 calendar days after the scheduled closing time for receiving bids. Respectfully submmA t�ittj, Firm Name �/✓gyp CJcc-kr/ L By `�" r'.6 Address 21 —[ J 6%-, 00/x_,- 1, as ma *G City FAr. 4G .11 %t State E -Mail l/A✓GS t�(//LLgC1Cc�✓/G. ✓fit:! Phone# e174)'14 y3-19°0.4 "" Arkansas State Contractor's License Number: 0o635?O LI 1 1 •"A Contractor's License is required to bid this project. This project requires a five (5) percent bid bond at time of bid opening. After contract award, a one hundred (100) percent performance and payment bond is required along with proof of insurance before construction begins. City of Fayetteville, AR " Bid 10-63. Construction - Police Department Lighting Upgrades Page 6 of 47 oAv4 k- . APtil BID BOND Conform with The American Institute of Architects, A.I.A. Document No. A-310 KNOW ALL BY THESE PRESENT'S, That we, King Electrical Contractors, Inc. as Principal; hereinafter called the Principal, and the The Gray,CasuaIty & Surety Company of P. O. Box 6202, Metairie, Louisiana , a corporation duly organized under the laws of the State of Louisiana Cit of Fayetteville Arkansas as Surety, hereinafter called the Surety, are held and firmly bound iiitt(r stain of Five Percent of Amount of Bid as Obligee, hereinafter called the Obligee,. Dollars (S 5% of Bid ), for the payment of which sum Will and try to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally. firmly by these presents. WHEREAS, the .Principal has submitted a bid for Bid 10-63 - Police Departinent,Lighting Upgrade NOW. THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the .faithful performance of such Contract and for the prompt payment of labor and material f rnished. in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof bevA•een the amount specified in said bid and such larger amount for which the Obligee may in good Faith contract with another party to perforin the Work covered by said bid, then this obligation shall be melt and void, otherwise to remain in full force and effect. Signed and sealed this 13th day of October , 2010 King Electrical Contractors, Inc. (Seal) Principal nom ualt & Sure C Pamela K. Hays Attorn in -Fact gIT z( �I c., U_ ~ _ I- H 0 z 0) r w m p ° cc iu e x m' z cr o. m 2 a 0c a m N 5 a cc tu 0 a n x I- N w z1 m 0 Z w F a CE. zn u) I- m U e w F. cc W 0 c m 0 0 2 < Z N Lu W m iJ- %IA HAS A TRUE WATERMARK, VISIBLE FIBERS, AND A MICROPRINT BORDER • THIS DOCUMENT IS NOT AUTHENTIC UNLESS IT HAS A TRUE WATERMARK, VISI a,- m n z n x 0 x z m 0 m ao. -i x c'. 0 c E` z rn z 0 .i a m z Z. cn =i v' rn' v m C m v m a z y W m -n co m n z G a o W 0 o m X vi 0 O c N z O C S rn z 0 c z THE GRAY INSURANCE COMPANY , THE GRAY CASUALTY & SURETY COMPANY GENERAL KNOW ALL BY THESE PRESENTS, THAT The Gray Insurance organized,and existing under the laws of Louisiana, and having William H. Griffin, Matthew K. Cashion, Jr.,Judy Schoggen each of the Companies named above its true and-lawful Attomey(s)-in-Fact, bonds, or other writings obligatory in the nature of a bond, as surety, regulation, contract or otherwise, provided that no bond or undertaking amount of $10,000,000. This Power of Attorney is granted and is signed by facsimile under Directors of both The Gray Insurance Company and The Gray Casualty 2003 "RESOLVED, that the President, Executive Vice President, authorized to execute a power of Attorney qualifying the attorney `bonds, undertakings, and all contracts of surety, and that each or Attorney, and to attach the seal of the Company; and it is FURTHER RESOLVED, that the signature of such officers to any certificate relating thereto by facsimile, and any such Power be bindingupon the Company now and in the future when so, affixed P P Y attached. IN WITNESS WHEREOF, The Gray Insurance Company and The • affixed, and these presents to be signed by their authorized officers ; sO..R.A.Ne By: - ;= SEAL Michael T. Gray yy , —•— f ` President, The Gray Insurance •-e-.... and Executive Vice President, ' The Gray Casualty & Surety State of Louisiana ss: Parish of Jefferson On this 30th day of June, 2003, before me, a Notary Public, personally Executive Vice President of The Gray Casualty & Surety Company, Casualty & Surety Company, personally known to me, being duly the seals of the companies as officers of, and acknowledged said „„ , yp 8:f."44: .,,'how,. '• `° 1 ,. 1t;,. = =*i .,. €* t Aed Ai ,,,P PUBU� 'fie `%,-14......„„ .• ..0..�'' "., F 1.0,u n'n, a .., I Mark M. Manguno, Secretary of The Gray Insurance Company forgoing is a true and correct copy of a Power of Attorney given IN WITNESS WHEREOF, I have set my hand and affixed the seals -../—,— 'to air �.� ':i c{ to .0 ;•: SEAL,a el SEAL i sol. — `i ,,}s, _. a * .. ...• , 101725 POWER OF ATTORNEY Company and The Gray Casualty & Surety Company, corporations duly their principal offices in Metairie, Louisiana, do hereby make, constitute, and appoint and Pamela K. Hays, of Little Rock, Arkansas jointly or severally on behalf of to make, execute, seal:and deliver, for and on its behalf and as its deed, contracts of suretyship as are or may be required or permitted by taw, or contract of suretyship executed under this authority shall exceed the and by the authority of the following Resolutions adopted by the Boards of & Surety Company at meetings duly called and held on the 26th day ofJune, any Vice President, or the Secretary be and each or any of them hereby is named in the given Power of Attorney to execute on behalf of The Company any of them is hereby authorized to attest to the execution of such Power of and the seal of the Company may be affixed to any such Power of Attorney or of Attomey or certificate bearing such facsimile signature or facsimile seal shall with regard to anybond, undertakingor contract of suretyto which it is g Gray Casualty-Surety Company have caused their official seals to be hereinto this 30th day ofJune, 2003. Attest: :7 4441"1/4001"16, fP"t».a sod Mark S. Manguno i SEAL ' Company Secretary, or.. —.— r The Gray Insurance Company, The Gray Casualty & Surety Company . Company. appeared Michael T Gray, President of the Gray Insurance Company and and Mark S. Manguno, Secretary of The Gray Insurance\Company and The Gray sworn, acknowledged that they signed the above Power of Attorney and affixed instrument to be the voluntary act and deed, of their companies. - Lisa-S. Millar, Notary Public, Parish of Orleans State of Louisiana My Commission is for Life and The Gray Casualty & Surety Company, do hereby certify that the above and by the companies, which is still in full force and effect. .. of the Companies this 13th day of October , 2010 • Mark S. Manguno, Secretary The Gray Insurance Company The Gray Casualty & Surety Company i \ P0AI0001 Rev 6/15/2003 514102 6/3012003 - - '\ ualvM3flW.V SVH 11 SS3iNl 011N3HiflW 1ON SI 1N3WI1000 SIHJ • N30NOS 1NIadOttO1W V ONV `Sa381d 3' 1BISIA`NtiVINa31VM3nalV SVH 11d5 City of Fayetteville Bid 10-63, Construction - Police Department Lighting Upgrade Statement of Disclosure - To Be Submitted With ALL Bids This page does not count towards page limitations set forth in this request for proposal or bid. Proposer must disclose any possible conflict of interest with the City of Fayetteville, including, but not limited to, any relationship with any City of Fayetteville employee. Your response must disclose if a known relationship exists between any principal or employee of your firm and any City of Fayetteville employee or elected City of Fayetteville official. If, to your knowledge, no relationship exists, this should also be stated in your response. Failure to disclose such a relationship may result in cancellation of a purchase and/or contract as a result of your response. This form must be completed and returned in order for your bid/proposal to be eligible for consideration. PLEASE CHECK ONE OF THE FOLLOWING TWO OPTIONS, AS IT APPROPRIATELY APPLIES TA Ve1113 C11:11ll1. 1.) NO KNOWN RELATIONSHIP EXISTS 2.) RELATIONSHIP EXISTS (Please explain) PLEASE FILL OUT THE SECTION BELOW AND SUBMIT THIS FORM WITH YOUR BID OR PROPOSAL: 1.) I, as an officer of this organization, or per the attached letter of authorization, am duly authorized to certify the information provided herein are accurate and true; and 2.) My organization shall comply with all State and Federal Equal Opportunity and Non -Discrimination requirements and conditions of employment. I/ IS Printed Name /-6 Signature /0-13-10 Date City of Fayetteville, AR Bid 10-63, Construction — Police Department Lighting Upgrade Page 40 of 40 ave evi le AAKANSAS .d ac cessfayetteville arg. THE CITY OF FAYETTEVILLE, ARKANSAS Bid 10-63, Addendum 1 Bid 10-63, Construction — Police Department Lighting Upgrades City of Fayetteville - Purchasing Division 113 W. Mountain - Room 306 Fayetteville, AR 72701 Phone: 479.575.8220 E -Mail: aforen@ci.fayetteville.ar.us Date: Friday, October 08, 2010 To: All interested parties From: Andrea Foren, CPPB, Purchasing Agent Notice: This addendum is hereby made a part of the bid documents to the same extent as though it were originally included therein. Bidders should indicate their receipt of same in the appropriate blank listed herein. Failure to do so may subject vendor to disqualification. Addendum should be attached to the inside cover of the bidding documents, signed, and dated. The following addendum and any attached drawings, schedules, details and/or specifications shall become a part of the contract documents dated titled LIGHTING UPGRADE, FAYETTEVILLE POLICE BUILDING. 1. ELECTRICAL 1.1. AT SHEET E1.1, MAKE THE FOLLOWING CHANGES TO THE LIGHT FIXTURE SCHEDULE: 1.1.1. FIXTURE X01 LED EXIT SIGN SHALL BE CHANGED TO: LAMP WATTS (1), VOLTS (120), LOAD VA (1), LAMP TEMP (NA), MANUFACTURER (ASTRALITE INC.), MODEL (LG -M- U -R -W -EM -SD), MOUNTING (CEILING). 1.1.2. FIXTURE SO1 ELEVATOR PIT LIGHT SHALL BE CHANGED TO: LAMP WATTS (32), VOLTS (120), LOAD VA (32), LAMP TEMP (4100), MANUFACTURER (LUMARK), MODEL (PLVS-W-GG-32-UNV), MOUNTING (WALL). END OF ADDENDUM Page 1 of 1 Acknowledge Addendum #1: Printed Name: i ✓I f r i Signature: .---"C> /'"Z/ Title:i%/C/, J•c.^ Date: /0.13 -l0 Company: 4K41:.5 t/rch✓_ Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain - Fayetteville, AR 72701 KING ELECTRICAL CONTRACTORS 2145 W MOORE LANE FAYETTEVILLE ARKANSAS 72704 Phone (479)443-0006 Fax (479)443-1719 WARRANTY/GUARANTEE Project: Fayetteville Police Lighting Upgrade King Electrical Contractors hereby, guarantees and warrant all defects in labor and material provided by this subcontractor, on the above referenced project for a period of one year. All wiring does meet or exceed applicable NEC and NFPA standards. By signing this agreement the subcontractor hereby warrants the work stated above. Period of warranty starts from the date of substantial completion. Signed:�,v / Title: irsr l �, Date: /B-/3-,'® State of Arkansas, County of Washington, Swom to and Subscribed before me this \_'\,‘ day of NOTARY PUBLIC " EXPIRES \\- - ap�� ,,.,;p,.,,: ALTA J. DAVIS +�Ye % MY COMMISSION # 12368693 :,kms; EXPIRES: November 17, 2018 4,ZAW Washington County City Of Fayetteville ^l Purehase Order 'qu s w M s Requisition No.: Date: 10/14/2010 (Not S Purchas-e-pr r r-, xis P -Cards shall be used when° possible If a vendor does not accept P Gard ;please note at theGb4oiaOp' (Call x25f with q 9'.4., !I P O Number: hxpected Delivery Date Ali PO, Requestshailbe scanned.(o the;Purciiasi. g a mail Purchasing@c 04(41040lle4ar ids ,. , ,„ „j, Vendor # Vendor Name: King Electric Mail Yes: No: Address: 2145 W Moore Lane Fob Point: Taxable Yes:_ No: Quotes Attached Yes:_x_ City: Fayetteville State: AR Zip Code: 72701 Ship to code: Divison Head Approval: Requester: John Coleman Requesters Employee #: 2974 Extension: 272 Item Description Quantity Unit of Issue Unit Cost Extended Cost Account Numbers Project/Subproject # Inventory # 1 2 3 4 5 6 7 8 9 10 Bid 10-63 - Police Energy Retrofit 1 EA 45,140.00 $45,140.00 2240.9240.5801.00 9011.001 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Shipping/Handling Lot $0.00 Special Instructions: Subtotal: $45,140.00 - Tax: $0.00 Total: $45,140.00 Approvals: Mayor: Department Director: Purchasing Manager: Finance & Internal Services Director: Dispatch Manager: Budget Manager: Utilities Manager: Chief Of Staff: Other: