HomeMy WebLinkAbout46-09 RESOLUTIONRESOLUTION NO. 46-09 A RESOLUTION TO APPROVE AN AGREEMENT FOR STORM DEBRIS MONITORING SERVICES WITH SOLID RESOURCES, INC. IN THE AMOUNT OF $483,690.00, PLUS A CONTINGENCY IN THE AMOUNT OF $96,914.00 WHEREAS, the City of Fayetteville solicited Requests for Proposals for Storm Debris Monitoring Services as required by the Federal Emergency Management Administration (FEMA); and WHEREAS, a Selection Committee including an alderman and numerous city staff painstakingly reviewed several applicants and eventually voted by an approved rating system to select Solid Resources, Inc. as the most qualified, capable, and affordable applicant to best supply Storm Debris Monitoring Services for the citizens of Fayetteville. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the selection of Solid Resources, Inc. for Storm Debris Monitoring Services for the City of Fayetteville. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves the Agreement For Storm Debris Monitoring Services (attached as Exhibit "A") with Solid Resources, Inc. in the amount of $483,690, plus a contingency of $96,914.00. PASSED and APPROVED this 18th day of February, 2009. APPROVED ELD J AN, Mayor ATTEST: 4., . • • • • • • . 4*.A. •'cjiTY 0,4-* • • •P : • rc,S •-xls _ . • -_-_ = :FAYETTEVILLE: T.; -?•.▪ -crp, 1,• 4;41-7 ; () 44444 mod, 444444 By:aj,i,A1)-6) NAfie SO D E. SMITH, City Clerk/Treasurer AGREEMENT For STORM DEBRIS MONITORING SERVICES Between CITY OF FAYETTEVILLE, ARKANSAS And SOLID RESOURCES, INC.. THIS AGREEMENT is made as of February 8 , 2009, by and between City of Fayetteville, Arkansas, acting by and through its Mayor (hereinafter called CITY OF FAYETTEVILLE) and SOLID RESOURCES, INC. (hereinafter called SOLID RESOURCES, INC.). CITY OF FAYETTEVILLE is in need of Debris Management and Monitoring Services for its Right of Way debris removal. Contract responsibilities include but are not limited to monitoring vegetative storm debris removal and tree trimming & removal within public lands and rights of way, and debris disposal site monitoring. Therefore, CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. in consideration of their mutual covenants agree as follows: SOLID RESOURCES, INC. shall serve as CITY OF FAYETTEVILLE's monitoring consultant in those assignments to which this Agreement applies, and shall give consultation and advice to CITY OF FAYETTEVILLE during the performance of SOLID RESOURCES, INC.'s services. SECTION 1 - AUTHORIZATION OF SERVICES 1.1 Services on any assignment shall be undertaken only upon written Authorization of CITY OF FAYETTEVILLE and agreement of SOLID RESOURCES, INC. 1.2 Assignments may include services described hereafter as Basic Services or as Additional Services of SOLID RESOURCES, INC. 1.3 Changes, modifications or amendments in scope, price or fees to this contract shall not be allowed without a formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, costs, fees, or delivery schedule. S1ormDebrisMonitoringServicesContractFeb09 1 2/18/2009 SECTION 2- BASIC SERVICES OF SOLID RESOURCES, INC. 2.1 Provide Fixed Site Debris Monitors and Field Debris Monitors and Debris Monitoring Supervision and Management to assist the City of Fayetteville with ice storm debris removal services. SOLID RESOURCES, INC. will provide: 2.2 Fixed Site Debris Monitors SOLID RESOURCES, INC. will provide trained personnel to oversee the inspection of the disposal or unloading sites by providing the monitoring, verification of load capacity, and documentation at designated temporary disposal sites. Services include: 2.2.1 Provide trained disposal site monitor and inspection personnel 2.2.2 Complete record of contract haulers' cubic yardage and other record keeping as may be needed on the provided load ticket 2.2.3 Initial each load ticket before permitting truck to proceed from the check-in area to the tipping area 2.2.4 Remain in contact with debris management/dispatch center or supervisor 2.2.5 Perform other duties as directed by the dispatch/staging operation, debris management project manager, or designated City personnel 2.2.6 Accurately measure load hauling compartments and accurately compute volume capacity in cubic yards. Document and record measurements and computations 2.3 Field Debris Monitors SOLID RESOURCES, INC. will perform roving on-site, street -level work area inspections of debris cleanup and collection. SOLID RESOURCES, INC. will provide loading site (field) monitors to inspect and control debris collection utilizing manifest load tickets. Services include: 2.3.1 Provide field monitor personnel at designated areas to check and verify information on debris removal. 2.3.2 Monitor collection activity of trucks. SiormDebrisMonitoringServicesCont1actFeb09 2 2/18/2009 2.3.3 Issue manifest load tickets at loading site for each load. 2.3.4 Check the area for safety considerations such as — downed power lines, children playing in area, meeting traffic control needs, safe operation of trucks and equipment. 2.3.5 Ensure only eligible ice storm related vegetative (trees, limbs, and brush) debris is collected. No non -vegetative debris is authorized to be collected. No non -ice storm damage related debris is authorized to be collected 2.3.6 Perform a pre -work inspection of areas to check debris piles to identify covered utility meters, transformers, fire hydrants, mail boxes, etc. to help prevent damage from loading equipment and to look for potential problems. 2.3.7 Should damages occur to utility components, driveways, road surfaces, private property, vehicles, etc., document the damage with photos. If possible, collect information about owner, circumstances of the damage (who, what, when, where) and report to your supervisor. 2.3.8 Ensure the work area is clear of debris to the specified level before equipment moves to a new loading area. 2.3.9 Accurately measure load hauling compartments and accurately compute volume capacity in cubic yards. Document and record measurements and computations. 2.3.10 Properly monitor and record performance and productivity of debris removal crew. 2.3.11 Remain in constant contact with debris management/dispatch center or supervisor. 2.3.12 Ensure that loads are contained properly before leaving the loading area. 2.3.13 Ensure only eligible debris is collected for loading and hauling. 2.3.14 Ensure only debris from approved public areas is loaded for removal. 2.3.15 Perform other duties from time to time as directed by the debris management project manager or designated City debris management personnel. StormDcbrisMonitoringServicesContraciFeb09 3 2/18/2009 2.4 Senior Technician/Field Supervisor/Emergency Operations Manager SOLID RESOURCES, INC. will provide project management to oversee debris monitoring activities in the field. Services will include: 2.4.1 Oversight and Supervision of Monitor field activity. 2.4.2 Scheduling of Monitoring resources and deployment timing. 2.4.3 Communication and coordination with City personnel. 2.4.4 Make suggestions to improve the efficiency of collection and removal of debris. 2.4.5 Coordinate daily activities and future planning. 2.4.6 Remain in contact with debris management/dispatch center or supervisor. 2.4.7 Identify, address, and troubleshoot any questions or problems that could impact work area safety and eligibility. 2.4.8 Accurately measure load hauling compartments and accurately compute volume capacity in cubic yards. Document and record measurements and computations. Document truck hauling compartment condition using digital photographs. Prepare a master log book of all hauling equipment used by the City's debris removal SOLID RESOURCES, INC.. 2.4.9 Compile, reconcile and document daily in an electronic spreadsheet format all eligible debris hauled by the City of Fayetteville's debris removal SOLID RESOURCES, INC.. SECTION 3 - ADDITIONAL SERVICES OF SOLID RESOURCES. INC. 3.1 General If authorized in writing by the CITY OF FAYETTEVILLE Mayor and the City Council and agreed to in writing by SOLID RESOURCES, INC., SOLID RESOURCES, INC. shall furnish or obtain from others Additional Services of the following types that are not considered normal or customary Basic Services. The scope of Additional Services may include: StormDebrisMonitoringServicesContractFeb09 4 2/18/2009 3.1.1 Administrative Assistance Provide Contract and Project administration to the degree authorized by CITY OF FAYETTEVILLE. 3.1.2 Preparing to serve or serving as a witness for CITY OF FAYETTEVILLE in any litigation or other proceeding involving the Project. 3.1.3 Extra Services 3.1.3.1 Services not specifically defined heretofore that may be authorized by CITY OF FAYETTEVILLE. 3.2 Contingent Additional Services 3.2.1 If services described under Contingent Additional Services in Paragraph 3.2 are required due to circumstances beyond SOLID RESOURCES, INC.'s control, SOLID RESOURCES, INC. shall notify CITY OF FAYETTEVILLE and request a formal contract amendment approved by the Mayor and the City Council prior to commencing such services. If CITY OF FAYETTEVILLE deems that such services described in 3.2 are not required, CITY OF FAYETTEVILLE shall give prompt written notice to SOLID RESOURCES, INC. If CITY OF FAYETTEVILLE indicates in writing that all or parts of such Contingent Additional Services are not required, SOLID RESOURCES, INC. shall have no obligation to provide those services. SECTION 4- RESPONSIBILITIES OF CITY OF FAYETTEVILLE CITY OF FAYETTEVILLE shall, within a reasonable time, so as not to delay the services of SOLID RESOURCES, INC.. 4.1 Provide full information as to CITY OF FAYETTEVILLE's requirements for the Project. 4.2 Assist SOLID RESOURCES, INC. by placing at SOLID RESOURCES, INC.'s disposal all available information pertinent to the assignment including previous reports and any other data relative thereto. StormnebrisMonitoringScrvicesContracireb09 5 2/18/2009 4.3 Guarantee access to and make all provisions for SOLID RESOURCES, INC. to enter upon public and private property as required for SOLID RESOURCES, INC. to perfortn his services under this Agreement. 4.4 Examine all proposals, and other documents presented by SOLID RESOURCES, INC. and render in writing decisions pertaining thereto. 4.5 The Transportation Manager and the Water & Wastewater Director are the CITY OF FAYETTEVILLE's project representatives with respect to the services to be performed under this Agreement. The Transportation Manager and the Water & Wastewater Director shall have complete authority to transmit instructions, receive information, interpret and define CITY OF FAYETTEVILLE's policies and decisions with respect to materials, equipment, elements and systems to be used in the Project, and other matters pertinent to the services covered by this Agreement. 4.6 Give prompt written notice to SOLID RESOURCES, INC. whenever CITY OF FAYETTEVILLE observes or otherwise becomes aware of any defect in the Project. 4.7 Furnish approvals and permits from all governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project. Pay directly to the governmental authorities the actual filing and permit fees. 4.8 Pay for placement of legal notices and advertisements in newspapers or other publications required by the Project. 4.9 Furnish, or direct SOLID RESOURCES, INC. to provide, necessary Additional Services as stipulated in Section 3 of this Agreement or other services as required. • 4.10 CITY OF FAYETTEVILLE and/or its representative will review all documents and provide written comments to SOLID RESOURCES, INC. in a timely manner. SECTION 5- PERIOD OF SERVICE 5.1 This Agreement will become effective upon the first written notice by CITY OF FAYETTEVILLE authorizing services hereunder. 5.2 The provisions of this Agreement have been agreed to in anticipation of the orderly progress of the Project through completion of the services stated in the Agreement. SOLID StormDebrisMonitoringServicesContractFeb09 6 2/18/2009 RESOURCES, INC. will proceed with providing the authorized services immediately upon receipt of written authorization from CTTY QF FAYETTEVILLE. Said authorization shall include the scope of the services authorized and the time in which the services are to be completed. SECTION 6- PAYMENTS TO SOLID RESOURCES, INC. 6.1 Compensation 6.1.1 Storm Debris Monitoring Services The maximum not -to -exceed amount authorized for this Agreement is $ t...17, 90 00 The CITY OF FAYETFEVILLE shall compensate SOLID RESOURCES, INC. based on a Unit Price basis as described in Appendix A. 6.1.1.1 Subject to the City Council approval, adjustment of the not -to -exceed amount may be made should SOLID RESOURCES, INC. establish and CITY OF FAYETTEVILLE agree that there has been or is to be a significant change in scope, complexity or character of the services to be performed; or if CITY OF FAYETTEVILLE decides to shorten the duration of work from the time period specified in the Agreement for completion of work and such modification warrants such adjustment. Changes, modifications or amendments in scope, price or fees to this Contract shall not be allowed without formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost, fees, or delivery schedule. 6.1_1.2 Monthly statements for each calendar month shall be submitted to CITY OF FAYETTEVILLE or such parties as CITY OF FAYETTEVILLE may designate for Design services consistent with SOLID RESOURCES, INC.'s normal billing schedule. Once established, the billing schedule shall be maintained throughout the duration of the Project. Applications for payment shall be made in accordance with a format to be developed by SOLED RESOURCES, INC. and approved by CITY OF FAYETTEVILLE. Applications for payment shall be accompanied each month by the updated project design schedule as the basis for determining the value earned as the work is accomplished. Final payment for Design services shall be made upon CITY OF FAYETTEVILLE's approval and acceptance with the satisfactory completion of the Design phase for the Project. SionnDebrisMonitoringServicesContractFeb09 7 2/18/2009 6.1.2 Additional Services For authorized Additional engineering services under Section 3, "Additional Services", compensation to SOLID RESOURCES, INC. shall be negotiated at the time Additional services are authorized. 6.2 Statements Statements and progress reports for each calendar month will be submitted to CITY OF FAYETTEVILLE. Statements will be based on SOLID RESOURCES, INC.'s actual cost plus fixed fee amount and justified by the updated progress schedule. 6.3 Payments All statements are payable upon receipt and due within thirty (30) days. If a portion of SOLID RESOURCES, 1NC.'s statement is disputed by CITY OF FAYETTEVILLE, the undisputed portion shall be paid by CITY OF FAYETTEVILLE by the due date. CITY OF FAYETTEVILLE shall advise SOLID RESOURCES, INC. in writing of the basis for any disputed portion of any statement. CITY OF FAYETTEVILLE will make reasonable effort to pay invoices within 30 days of date the invoice is approved, however, payment within 30 days is not guaranteed. 6.4 Final Payment Upon satisfactory completion of the work performed under this Agreement, as a condition before final payment under this Agreement, or as a termination settlement under this Agreement, SOLID RESOURCES, INC. shall execute and deliver to CITY OF FAYETTEVILLE a release of all claims against CITY OF FAYETTEVILLE arising under or by virtue of this Agreement, except claims which are specifically exempted by SOLID RESOURCES, INC. to be set forth therein. Unless otherwise provided in this Agreement or by State law or otherwise expressly agreed to by the parties to this Agreement, final payment under this Agreement or settlement upon termination of this Agreement shall not constitute a waiver of CITY OF FAYETTEVILLE's claims against SOLID RESOURCES, INC. or his sureties under this Agreement or applicable performance and payment bonds, if any. StoranDebrisMonitoringScrvicesContractFeb09 8 2/18/2009 SECTION 7- GENERAL CONSIDERATIONS 7.1 Insurance 7.1.1 During the course of performance of these services, SOLID RESOURCES, INC. will maintain (in United States Dollars) the following minimum insurance coverages: Tyne of Coverage Limits of Liability Workers' Compensation Statutory Employers' Liability $500,000 Each Accident Commercial General Liability Bodily Injury and Property Damage $1,000,000 Each Occurrence $2,000,000 Annual Aggregate Automobile Liability: Bodily Injury and Property Damage $500,000 Each Occurrence $1,000,000 Annual Aggregate SOLID RESOURCES, INC. will provide to CITY OF FAYETTEVILLE certificates as evidence of the specified insurance within ten days of the date of this Agreement and upon each renewal of coverage. 7.1.2 Debris Removal SOLID RESOURCES, INC.s shall be required to provide (or CITY OF FAYETTEVILLE may provide) Owner's Protective Liability Insurance naming CITY OF FAYETTEVILLE as a Named Insured and SOLID RESOURCES, INC. as additional insureds, or, to endorse CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. as additional insured on construction SOLID RESOURCES, INC.'s liability insurance policies covering claims for personal injuries and property damage. Construction SOLID RESOURCES, INC.s shall be required to provide certificates evidencing such insurance to CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. 7.1.3 CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. waive all rights against each other and their officers, directors, agents, or employees for damage covered by property insurance during and after the completion of SOLID RESOURCES, INC.'s services. If the services result in a Construction Phase, a provision similar to this shall be incorporated into all Construction Contracts entered into by CITY OF FAYETTEVILLE, and all construction SOLID RESOURCES, INC.s shall be required to provide waivers of subrogation in favor of CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. for damage or liability covered by any construction SOLID RESOURCES, INC.'s policy of insurance. StormOehrisMonituringServicesCon1ractFeb09 9 2/18/2009 7.2 Professional Responsibility 7.2.1 SOLID RESOURCES, INC. will exercise reasonable skill, care, and diligence in the performance of SOLID RESOURCES, INC.'s services and will carry out its responsibilities in accordance with customarily accepted professional engineering practices. CITY OF FAYETTEVILLE will promptly report to SOLID RESOURCES, INC. any defects or suspected defects in SOLID RESOURCES, INC.'s services of which CITY OF FAYETTEVILLE becomes aware, so that SOLID RESOURCES, INC. can take measures to minimize the consequences of such a defect. CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. further agree to impose a similar notification requirement on all construction SOLID RESOURCES, INC.s. CITY OF FAYETTEVILLE retains all remedies to recover for its damages caused by any negligence of SOLID RESOURCES, INC. 7.2.2 In addition, SOLID RESOURCES, INC. will be responsible to CITY OF FAYETTEVILLE for damages caused by its negligent conduct during its activities at the Project Site to the extent covered by SOLID RESOURCES, INC.'s Commercial General Liability and Automobile Liability Insurance policies as specified in Paragraph 7.1.1. 7.3 Changes CITY OF FAYETTEVILLE shall have the right to make changes within the general scope of SOLID RESOURCES, INC.'s services, with an appropriate change in compensation and schedule only after Fayetteville City Council approval of such proposed changes and, upon execution of a mutually acceptable amendment or change order signed by the Mayor of the CITY OF FAYETTEVILLE and the President or any Vice President of SOLID RESOURCES, INC. 7.4 Termination 7.4.1 This Agreement may be terminated in whole or in part in writing by either party in the event of substantial failure by the other party to fulfill its obligations under this Agreement through no fault of the terminating party, provided that no termination may be effected unless the other party is given: 7.4.1.1 Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate, 7.4.1.2 An opportunity for consultation with the terminating party prior to termination. StormnebrisMon itoringServicesContractFeb09 10 2/18/2009 7.4.2 This Agreement may be terminated in whole or in part in writing by CITY OF FAYETTEVILLE for its convenience, provided that SOLID RESOURCES, ThC. is given: 7.4.2.1 Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate, 7.4.2.2 An opportunity for consultation with the terminating party prior to termination. 7.4.3 If termination for default is effected by CITY OF FAYETTEVILLE, an equitable adjustment in the price provided for in this Agreement shall be made, but 7.4.3.1 No amount shall be allowed for anticipated profit on unperformed services or other work, 7.4.3.2 Any payment due to SOLID RESOURCES, INC. at the time of termination may be adjusted to cover any additional costs to CITY OF FAYETTEVILLE because of SOLID RESOURCES, INC.'s default. 7.4.4 If termination for default is effected by SOLID RESOURCES, INC., or if termination for convenience is effected by CITY OF FAYETTEVILLE, the equitable adjustment shall include a reasonable profit for services or other work performed. The equitable adjustment for any termination shall provide for payment to SOLID RESOURCES, INC. for services rendered and expenses incurred prior to the termination, in addition to termination settlement costs reasonably incurred by SOLID RESOURCES, INC. relating to commitments which had become firm prior to the termination. 7.4.5 Upon receipt of a termination action under Paragraphs 7.5.1 or 7.5.2 above, SOLID RESOURCES, INC. shall: 7.4.5.1 Promptly discontinue all affected work (unless the notice directs otherwise), 7.4.5.2 Deliver or otherwise make available to CITY OF FAYETTEVILLE all data, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by SOLID RESOURCES, INC. in performing this Agreement, whether completed or in process. 7.4.6 Upon termination under Paragraphs 7.5.1 or 7.5.2 above CITY OF FAYETTEVILLE may take over the work and may award another party an agreement to complete the work under this Agreement. StormDebrisMoniioringServicesContractFeb09 11 2118/2009 7.4.7 If, after termination for failure of SOLID RESOURCES, INC. to fulfill contractual obligations, it is determined that SOLID RESOURCES, INC. had not failed to fulfill contractual obligations, the termination shall be deemed to have been for the convenience of CITY OF FAYETTEVILLE. In such event, adjustments of the agreement price shall be made as provided in Paragraph 7.5.4 of this clause. 7.5 Delays In the event the services of SOLID RESOURCES, INC. are suspended or delayed by CITY OF FAYETTEVILLE or by other events beyond SOLID RESOURCES, INC.'s reasonable control, SOLID RESOURCES, INC. shall be entitled to additional compensation and time for reasonable costs incurred by SOLID RESOURCES, INC. in temporarily closing down or delaying the Project. 7.6 Rights and Benefits SOLID RESOURCES, INC.'s services will be performed solely for the benefit of CITY OF FAYETTEVILLE and not for the benefit of any other persons or entities. 7.7 Dispute Resolution 7.7.1 Scope of Paragraph: The procedures of this Paragraph shall apply to any and all disputes between CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. which arise from, or in any way are related to, this Agreement, including, but not limited to the interpretation of this Agreement, the enforcement of its terms, any acts, errors, or omissions of CITY OF FAYETTEVILLE or SOLID RESOURCES, INC. in the performance of this Agreement, and disputes concerning payment. 7.7.2 Exhaustion of Remedies Required: No action may be filed unless the parties first negotiate. If timely Notice is given under Paragraph 7:8.3, but an action is initiated prior to exhaustion of these procedures, such action shall be stayed, upon application by either party to a court of proper jurisdiction, until the procedures in Paragraphs 7.8.3 and 7.8.4 have been complied with. S1ormDebrisMonitoringServicesContractFcb09 12 2/18f2009 7.7.3 Notice of Dispute 7.7.3.1 For disputes arising prior to the making of final payment promptly after the occurrence of any incident, action, or failure to act upon which a claim is based, the party seeking relief shall serve the other party with a written Notice; 7.7.3.2 For disputes arising within one year after the making of final payment, CITY OF FAYETTEVILLE shall give SOLID RESOURCES, INC. written Notice at the address listed in Paragraph 7.14 within thirty (30) days after occurrence of any incident, accident, or first observance of defect or damage. In both instances, the Notice shall specify the nature and amount of relief sought, the reason relief should be granted, and the appropriate portions of this Agreement that authorize the relief requested. 7.7.4 Negotiation: Within seven days of receipt of the Notice, the Project Managers for CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. shall confer in an effort to resolve the dispute. If the dispute cannot be resolved at that level, then, upon written request of either side, the matter shall be referred to the President of SOLID RESOURCES, INC. and the Mayor of CITY OF FAYETTEVILLE or his designee. These officers shall meet at the Project Site or such other location as is agreed upon within 30 days of the written request to resolve the dispute. 7.8 CITY OF FAYETTEVILLE represents that it has sufficient funds or the means of obtaining funds to remit payment to SOLID RESOURCES, INC. for services rendered by SOLID RESOURCES, INC. 7.9 Publications Recognizing the importance of professional development on the part of SOLID RESOURCES, INC.'s employees and the importance of SOLID RESOURCES, INC.'s public relations, SOLID RESOURCES, INC. may prepare publications, such as technical papers, articles for periodicals, and press releases, pertaining to SOLID RESOURCES, INC.'s services for the Project. Such publications will be provided to CITY OF FAYETTEVILLE in draft form for CITY OF FAYETTEVILLE's advance review. CITY OF FAYETTEVILLE shall review such drafts promptly and provide CITY OF FAYETFEVILLE's comments to SOLID RESOURCES, INC. CITY OF FAYETTEVILLE may require deletion of proprietary data or confidential information • from such publications, but otherwise CITY OF FAYETTEVILLE will not unreasonably StormDebrisMonitoringServicesContractFcb09 13 2118/2009 withhold approval. The cost of SOLID RESOURCES, INC.'s activities pertaining to any such publication shall be for SOLID RESOURCES, INC.'s account. 7.10 Indemnification 7.10.1 CITY OF FAYETTEVILLE agrees that it will require all construction SOLID RESOURCES, INC.s to indemnify, defend, and hold harmless CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. from and against any and all loss where loss is caused or incurred or alleged to be caused or incurred in whole or in part as a result of the negligence or other actionable fault of the SOLID RESOURCES, 1NC.s, or their employees, agents, SubSOLID RESOURCES, INC.s, and Suppliers. 7.11 Notices Any Notice required under this Agreement will be in writing, addressed to the appropriate party at the following addresses: CITY OF FAYE1TEVILLE's address: 113 West Mountain Street Fayetteville, Arkansas 72701 SOLID RESOURCES, 1NC.'s address: 2201 Cantu Court, Suite 119 Sarasota, FL 34232-6254 7.12 Successor and Assigns CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. each binds himself and his successors, executors, administrators, and assigns to the other party of this Agreement and to the successors, executors, administrators, and assigns of such other party, in respect to all covenants of this Agreement; except as above, neither CITY OF FAYETTEVILLE nor SOLID RESOURCES, INC. shall assign, sublet, or transfer his interest in the Agreement without the written consent of the other. 7.13 Controlling Law This Agreement shall be subject to, interpreted and enforced according to the laws of the State of Arkansas without regard to any conflicts of law provisions. StonnDettrisMonitoringServicesContractFeb09 14 2/18/2009 7.14 Entire Agreement This Agreement represents the entire Agreement between SOLID RESOURCES, INC. and CITY OF FAYETTEVILLE relative to the Scope of Services herein. Since terms contained in purchase orders do not generally apply to professional services, in the event CITY OF FAYETTEVILLE issues to SOLID RESOURCES, INC. a purchase order, no preprinted terms thereon shall become a part of this Agreement. Said purchase order document, whether or not signed by SOLID RESOURCES, INC., shall be considered as a document for CITY OF FAYETTEVILLE's internal management of its operations. 7.15 Request for Proposal The Request for Proposal for Storm Debris Monitoring Services is attached as Appendix B. SECTION 8- SPECIAL CONDITIONS 8.1 Additional Responsibilities of SOLID RESOURCES, INC. 8.1.1 CITY OF FAYETTEVILLE's, review, approval, or acceptance of reports and other services furnished hereunder shall not in any way relieve SOLID RESOURCES, INC. of responsibility for the technical adequacy of the work. Neither CITY OF FAYETTEVILLE's review, approval or acceptance of, nor payment for any of the services shall be construed as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement. 8.1.2 SOLID RESOURCES, INC. shall be and shall remain liable, in accordance with applicable law, for all damages to CITY OF FAYETTEVILLE caused by SOLID RESOURCES, 1NC.'s negligent performance of any of the services furnished under this Agreement except for errors, omissions or other deficiencies to the extent attributable to CITY OF FAYETTEVILLE or CITY OF FAYETTEVILLE-furnished data. 8.1.3 SOLID RESOURCES, INC.'s obligations under this clause are in addition to SOLID RESOURCES, 1NC.'s other express or implied assurances under this Agreement or State law and in no way diminish any other rights that CITY OF FAYETTEVILLE may have against SOLID RESOURCES, INC. for faulty materials, equipment, or work. Storm1)cbrisMonitoringServicesContractFeb09 15 2/18/2009 8.2 Remedies Except as may be otherwise provided in this Agreement, all claims, counter -claims, disputes and other matters in question between CITY OF FAYETTEVILLE and SOLID RESOURCES, INC. arising out of or relating to this Agreement or the breach thereof will be decided in a court of competent jurisdiction within Arkansas. 8.3 Audit: Access to Records 8.3.1 SOLID RESOURCES, INC. shall maintain books, records, documents and other evidence directly pertinent to performance on work under this Agreement in accordance with generally accepted accounting principles and practices consistently applied in effect on the date of execution of this Agreement. SOLID RESOURCES, INC. shall also maintain the financial information and data used by SOLID RESOURCES, INC. in the preparation of support of the cost submission required for any negotiated agreement or change order and send to CITY OF FAYETTEVILLE a copy of the cost summary submitted. CITY OF FAYETTEVILLE, the State or any of their authorized representatives shall have access to all such books, records, documents and other evidence for the purpose of inspection, audit and copying during normal business hours. SOLID RESOURCES, INC. will provide proper facilities for such access and inspection. 8.3.2 Records under Paragraph 8.3.1 above, shall be maintained and made available during performance on assisted work under this Agreement and until five years from the date of final payment for the project. In addition, those records which relate to any controversy arising out of such performance, or to costs or items to which an audit exception has been taken, shall be maintained and made available until five years after the date of resolution of such appeal, litigation, claim or exception. 8.3.3 This right of access clause (with respect to financial records) applies to: 8.3.3.1 Negotiated prime agreements: 8.3.3.2 Negotiated change orders or agreement amendments in excess of $10,000 affecting the price of any formally advertised, competitively awarded, fixed price agreement: 8.3.3.3 Agreements or purchase orders under any agreement other than a formally advertised, competitively awarded, fixed price agreement. However, this right of access does not SlonnDebrisIVIon iloringServicesContractFeb09 16 2/18/2009 apply to a prime agreement, lower tier subagreement or purchase order awarded after effective price competition, except: 8.3.3.3.1 With respect to record pertaining directly to subagreement performance, excluding any financial records of SOLID RESOURCES, INC.; 8.3.3.3.2 If there is any indication that fraud, gross abuse or corrupt practices may be involved; 8.3.3.3.3 If the subagreement is terminated for default or for convenience. 8.4 Covenant Against Contingent Fees SOLID RESOURCES, INC. warrants that no person or selling agency has been employed or retained to solicit or secure this Agreement upon an agreement of understanding for a commission, percentage, brokerage or continent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by SOLID RESOURCES, INC. for the purpose of securing business. For breach or violation of this warranty, CITY OF FAYETTEVILLE shall have the right to annul this Agreement without liability or at its discretion, to deduct from the contract price or consideration, or otherwise recover, the full amount of such commission, percentage, brokerage, or contingent fee. 8.5 Gratuities 8.5.1 If CITY OF FAYETTEVILLE finds after a notice and hearing that SOLID RESOURCES, INC. or any of SOLID RESOURCES, INC.'s agents or representatives, offered or gave gratuities (in the form of entertainment, gifts or otherwise) to any official, employee or agent of CITY OF FAYETTEVILLE, in an attempt to secure an agreement or favorable treatment in awarding, amending or making any determinations related to the performance of this Agreement, CITY OF FAYETTEVILLE may, by written notice to SOLID RESOURCES, INC. terminate this Agreement. CITY OF FAYETTEVILLE may also pursue other rights and remedies that the law or this Agreement provides. However, the existence of the facts on which CITY OF FAYETTEVILLE bases such finding shall be in issue and may be reviewed in proceedings under the Remedies clause of this Agreement. 8.5.2 In the event this Agreement is terminated as provided in Paragraph 8.5.1, CITY OF FAYETTEVILLE may pursue the same remedies against SOLID RESOURCES, INC. as it could pursue in the event of a breach of the Agreement by SOLID RESOURCES, INC. As a StormElebrisMonitoringServicesContractFeb09 17 2/18/2009 penalty, in addition to any other damages to which it may be entitled by law, CITY OF FAYETTEVILLE may pursue exemplary damages in an amount (as determined by CITY OF FAYETTEVILLE) which shall be not less than three nor more than ten times the costs SOLID RESOURCES, INC. incurs in providing any such gratuities to any such officer or employee. 8.6 Arkansas Freedom of Information Act City contracts and documents, including internal documents and documents of subSOLID RESOURCES, INC.s and sub -consultants, prepared while performing City contractual work are subject to the Arkansas Freedom of Information Act (FOIA). If a Freedom of Information Act request is presented to the CITY OF FAYETTEVILLE, SOLID RESOURCES, INC, will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. StormDebrisMonitoringServicesContractFe609 18 2/18/2009 9F0-4, 'At° -zy, IN WITNESS WHEREOF, CITY OF FAYETTEVILLE, ARKANSAS by and through its Mayor, and SOLID.RESOURCES, INC. . , by its Authorized officer have made and executed -this Agreement as of the day and year first above written. CITY OF FA TTEVILL ARKANSAS •,•,`V‘1.1'ClTRII:i.‘, -;"' ollii111111,,,,,, ()\.', • .-Cv",-;' O'3&#'.• :::•.,s., . r \ 1 . L.),C •.41.1. By: :2, • •fsINS• zi, • N-1 0 • • 1311 . .0 I : FAYETTEVILLE : I - • .t. ..e. „.•:V -, ',,,,"' ./A, iG TO "itiiiiiii kkkkkk ATTEST: By: yor Lione dan, Olia4) City Clerk SOLID RESOURCES, INC. By: Title: ATTEST:' By: 405,0e -we -7-, Title: if;c49 b-es.l'den Changes, modifications or amendments in scope, price or fees to this Contract shall not be allowed without formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost, fees, or delivery schedule. END OF AGREEMENT FOR STORM DEBRIS MONITORING SERVICES StarrtillebrisMonitoringServicesContracffeb09 19 2/18/2009