HomeMy WebLinkAbout227-09 RESOLUTIONRESOLUTION NO. 227-09 A RESOLUTION TO APPROVE AN AGREEMENT BETWEEN THE CITY OF FAYETTEVILLE AND SWEETSER CONSTRUCTION, INC. FOR THE CONSTRUCTION OF DOC MASHBURN PARK IN THE AMOUNT OF $64,199.00 PLUS A 15% CONTINGENCY OF $9,630.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves an agreement between the City of Fayetteville and Sweetser Construction, Inc. for the construction of Doc Mashburn Park in the amount of $64,199.00 plus a 15% contingency of $9,630.00. PASSED and APPROVED this 17th day of November, 2009. APPROVED: By: ATTEST: A/A-- By: OAAOL0-) 11171:6`") LIONELD JO , Mayor SONDRA E.$I��yjty Clerk/Treasurer `` .• �n • •%3- E :FAYETTEVILLE: %,9�,y11? NSPoJ •'`� AGREEMENT BETWEEN CITY OF FAYETTEVILLErAND CONTRACTOR 11 THIS AGREEMENT is dated as of the 'day of in the year 2009 by and between the City of Fayetteville, Arkansas (hereinafter called CITY OF FAYETTEVILLE) and Sweetser Construction, Inc. (herein after called CONTRACTOR). CITY OF FAYETTEVILLE and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of the construction and installation of a 20' square pavilion with two picnic tables, one bike rack, an entry sign, sidewalks for ADA accessibility to the new amenities and one ADA parking space. Additionally, the project includes all associated site preparation, grading, drainage improvements and site restoration at Doc Mashburn Park and all items indicated in the Drawings and Specifications. Article 2. ENGINEER. The Project has been designed by: City of Fayetteville Parks and Recreation Department 1455 South Happy Hollow Road Fayetteville, Arkansas 72701 will be hereinafter called PARKS AND RECREATION DEPARTMENT PROJECT MANAGER and who is to act as CITY OF FAYETTEVILLE's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME. 3.1. The Work for Construction of Doc Mashburn Park shall be substantially completed within 90 consecutive calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.6 & C of the General Conditions within 130 consecutive calendar days after the date when the Contract Time commences to run. 3.2. Liquidated Damages. CITY OF FAYETTEVILLE and CONTRACTOR recognize that time is of the essence of the Agreement and that CITY OF FAYETTEVILLE will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by CITY OF FAYETTEVILLE if the Work is not completed on time. Accordingly, instead of requiring any such proof, City of Fayetteville and Bid #09-64, Construction of Doc Mashburn Park Agreement Page 1 of 7 1 CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by CITY OF FAYETTEVILLE, CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. CITY OF FAYETTEVILLE shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the following Schedule of Values pursuant to paragraphs 4.1 and 4.2 below: 4.1. For all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2. PAYMENT ITEMS Sweetser Construction, Inc. ITEM# DESCRIPTION UNIT EST. OTY. UNIT PRICE TOTAL 1 Mobilization (not to exceed 5% of pro e 3 bid) L.S. 1.00 51,800.00 51,800.00 2 Site Preparation - including erosion control, concrete washout and construction entranoe L.S. 1.00 54500.00 54,500,00 3 Grading - including approx. 170 CY of excavation and all drainage improvements on west side of site L.S. 1.00 55,350.00 55,350.00 4 Concrete Sidewalk (4" Thickness) • complete in place per deSalts S.Y. 161,00 63600 55,798.00 5 Demolition, Disposal & Replacement of Existing Concrete ADA Ramp (approx. 3.5 SY) and Four Sections of Concrete Sidewalk (approx. 9 SY) - including detectable warning L.S. 1.00 51,170.00 51 170,00 6 Concrete Pavilion Slab (5" Thickness) - complete in place per details S.Y. 55.00 544.00 $2420,00 7 20' Square Pavilion - complete in place per manufacturers instructions E.A. 1.00 515,500.00 515,500.00 8 TPicnictables- completeinplacepermanufacturersinstrucsons E.A. 2.00 51,600.00 53,200.00 9 Entry Sign • complete in place per details L.S. 1.00 56,600.00 56,600.00 10 Concrete ADA Accessible Parking Space - complete in place per details L.S. 1.00 58,323.00 58,323.00 11 Bike Rack - complete in place per details and manufacturers instructions E.A. 1.00 5600.00 5600.00 12 Site Restoration - including topsoil, fescue seed & straw A.C. 1.15 65,600.00 56,440.00 13 Detention Area Restoration - including straw whatties and erosion matting L.S. 1,00 52,500-00 52,500.00 TOTAL CONTRACT AMOUNT 564,999.00 As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.6 of the General Conditions. Bid #09-64, Construction of Doc Mashburn Park Agreement Page 2 of 7 Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in the General Conditions. 5.1. Progress Payments. CITY OF FAYETTEVILLE shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02. All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, Tess the aggregate of payments previously made and less such amounts as PARKS AND RECREATION DEPARTMENT PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.6.5 & 14.02.D of the General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, and if the character and progress of the Work have been satisfactory to CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, CITY OF FAYETTEVILLE, on recommendation of PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to CITY OF FAYETTEVILLE as provided in paragraphs 14.02.6.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), Tess such amounts as PARKS AND RECREATION DEPARTMENT PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.B & C of the General Conditions, CITY OF FAYETTEVILLE shall pay Bid #09-64, Construction of Doc Mashburn Park Agreement Page 3 of 7 the remainder of the Contract Price as recommended by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in said paragraphs 14.07.E & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce CITY OF FAYETTEVILLE to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data." 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, or furnishing of the Work. 6.3. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. CONTRACTOR is aware of the general nature of work to be performed by CITY OF FAYETTEVILLE and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Bid #09-64, Construction of Doc Mashburn Park Agreement Page 4 of 7 Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. CONTRACTOR has given PARKS AND RECREATION DEPARTMENT PROJECT MANAGER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between CITY OF FAYETTEVILLE and CONTRACTOR concerning the Work consist of the following: 7.1. This Agreement (pages 1 to 7, inclusive). 7.2. Performance and Payment Bonds, (Exhibits A and B respectively). 7.3. Certificates of Insurance, (Exhibit C). 7.4. General Conditions (pages 1 to 42, inclusive). 7.5. Supplementary Conditions (pages 1 to 13 inclusive). 7.6. Specifications consisting of Divisions 1 through 31 as listed in table of contents thereof. 7.7. Addenda numbers 1 and 2, inclusive. 7.8. One set of drawings (not attached hereto) consisting of: a cover sheet and additional sheets numbered two through seven with each sheet bearing the following general title: Construction of Doc Mashburn Park. 7.9. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.9.1. Notice to Proceed 7.9.2. All written amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. Bid #09-64, Construction of Doc Mashburn Park Agreement Page 5 of 7 Article 8. MISCELLANEOUS. 8.1. Terms used in the Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3. CITY OF FAYETTEVILLE and CONTRACTOR each binds itself, it partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8.4. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intention of the stricken provision. 8.5. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 8.6. Freedom of Information Act. City contract and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, CONTRACTOR will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.) Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. Bid #09-64, Construction of Doc Mashburn Park Agreement Page 6 of 7 IN WITNESS WHEREOF, CITY OF FAYETTEVILLE and CONTRACTOR have signed this Agreement in quadruplicate. One counterpart each has been delivered to CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, and two counterparts have been delivered to CONTRACTOR. All portions of the Contract Documents have been signed, initialed, or identified by CITY OF FAYETTEVILLE and CONTRACTOR or identified by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER on their behalf. This Agreement will be effective on Date of The Agreement). CITY OF FAYETTEVILLE: 2009 (which is the Effective [CORPORATE SE1 RIVTREq''!. 1.6 V. .70 z ;FAYETTEVILLE: .a.i '�9s . kANS . J Address for giving notices I /3 tAL&t MgaidaL v (Jakektaft. 7A 70/ *Attest [CORPORATE SEAL] * If a Corporation, atteby the Secretary. Address for giving notices SWEETSER CONSTRUCTION, INC. 590 W. POPLAR FAYETTEVILLE, AR 72703 (If CITY OF FAYETTEVILLE is a public body, attach License No. evidence of authority to sign and resolution or other documents Agent for service of process: authorizing execution of Agreement.) (If CONTRACTOR is a corporation, attach evidence of authority to sign.) Bid #09-64, Construction of Doc Mashburn Park Agreement Page 7 of 7 • CORPORATE RESOLUTION OF BOARD OF DIRECTORS OF SWEETSER CONSTRUCTION I, Sharon Sweetser, certify that I am the secretary and treasurer of Sweetser Construction, a corporation legally organized and existing under and by virtue of the laws of the State of Arkansas, and that I am the custodian of the records and the seal of the corporation; that at a meeting of the board of directors of the corporation duly and legally called and held in accordance with the law and the bylaws of the corporation on the 2r day of December 2004, at which meeting a quorum of the board of directors of the corporation was present, the following resolutions were duly adopted by the board of directors of the corporation and are set forth in the minutes of the meeting, namely: "BE IT RESOLVED, by the board of directors of this corporation that: That Billy Sweetser as President of the Corporation and Sharon Sweetser as Secretary and Treasurer of the Corporation, are authorized to sign any and all contracts, deeds, assurances or any document which may be proper to effectuate the negotiations or transactions of the corporation. That Billy Sweetser as President of the Corporation and Sharon Sweetser as Secretary and Treasurer of the Corporation, any one or jointly are authorized to sign any and all contracts, deeds, assurances or any document which may be proper to effectuate the negations or transactions of the corporation from time to time on behalf of this Corporation. The above resolution will continue in force until express written notice of its rescission or modification has been received. I further certify that the above resolutions have not been in any way altered, amended, or rescinded; they are not in contravention of or in conflict with any of the conditions or provisions of the bylaws or charter of the corporation; and they are now in force and effect. I further certify that the names of all presently qualified and acting officers of the corporation are as follows, and the genuine signature of those presently authorized to sign for the corporation pursuant to the above resolutions appears below, identified by their signature: Billy Swee'er, President Sharon Sweetser, Stary/Treasurer TN WITNESS WHEREOF, I have hereunto set my hand as Secretary of said corporation and have affixed hereto the official seal of the corporation this day of SOL-- d 7 , 2004. L_s44..n Secretary Carole Jones Subntfitte City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 11/17/2009 City Council Meeting Date Agenda Items Only Park Planning Division Action Required: Parks and Recreation Department A resolution awarding Bid #09-64 and approval of a contract with Sweetser Construction, Inc. in the amount of $64,199.00 with a 15.0% project contingency of $9,630.00 for a total project cost of $73,829.00 for the Construction of Doc Mashburn Park. 73,829.00 Cost of this request 150,000.00 2250.9255.5806.00 $ Account Number 02013.0901 Project Number Budgeted Item X Category / Project Budget Neighborhood Park Dev. Program Category / Project Name 242.08 Doc Mashburn Park Funds Used to Date Program 1 Project Category Name 149,757.92 Parks Development Remaining Balance Fund Name Budget Adjustment Attached 4epartment Dire )97on ,GvL) 10--ii-Oi Date 16- 3J-o'k Date I.2o,7 Date 11-2.0 Date City Attorney Finan e and Internal Services Director Chief r 0,4AY' Previous Ordinance or Resolution # 149- 06.) 106- a9 Original Contract Date: Original Contract Number: Received in City Clerk's Office tlog cif ) 41 Comments: Revised January 15, 2009 City Council Meeting of November 17, 2009 Agenda Item Number CITY COUNCIL AGENDA MEMO To: Thru: Mayor Lioneld Jordan and City Council Don Marr, Chief of Staff Connie Edmonston, Parks and Recreation Director From: Carole Jones, Park Planner CA Date: October 30, 2009 RE: Construction of Doc Mashbu i Park RECOMMENDATION A resolution awarding Bid #09-64 and approval of a contract with Sweetser Construction, Inc. in the amount of $64,199.00, with a 15.0% project contingency of $9,630.00 for a total project cost of $73,829.00 for the construction of Doc Mashburn Park. BACKGROUND Doc Mashburn Park contains 1.34 acres and is located at 1582 Fairlane Street east of Fairlane Apartments. The park land is situated in the southeast quadrant of town south of Huntsville Road and west of Happy Hollow Road. The park serves residents within a Y2 - mile radius. Two public meeting were conducted to involve the neighborhood and assess the community's needs and desires for amenities within the park. Based on the findings, a park master plan that included a walking trail around the park perimeter, a pavilion, a playground and a basketball court was designed by Park Staff and presented to the neighborhood (see attached Conceptual Plan). PRAB approved the application request on July 7, 2008. The plan was approved by the neighborhood and PRAB on August 4, 2008 (see attached PRAB minutes). On August 5, 2008, the City Council passed Resolution Number 149-08 authorizing Parks and Recreation to apply for a grant from Arkansas Department of Parks and Tourism (see attached resolution). On May 19, 2009, the City Council passed Resolution Number 106-09 authorizing Parks and Recreation to accept a grant from Arkansas Department of Parks and Tourism in the amount of $50,000 (see attached resolution). The development of the park was also approved in the 2008 Capital Improvement Plan. Funding in the amount of $100,000 was approved from Neighborhood Park Development funds. Because of the associated cost, the development of this park was phased. Phase I includes the construction and installation of playground equipment for children ages 2-5 years and 5-12 years, a pavilion with two picnic tables, a bicycle rack, and associated sidewalks. DISCUSSION The project was advertised on October 9 and October 16, and bids were opened on October 28, 2009. Eight vendors including Sweetser Construction, Inc. Goodwin & Goodwin, Inc., N.E.C., Inc., Alpha Building Corporation, Danny Robinson Construction, LLC, Benchmark Construction, Natural Builders, Inc., and Keith Capps Landscape & Excavation, Inc. submitted bids. Sweetser Construction, Inc. was the low bid in the Page 1 of 2 A City Council Meeting of November 17, 2009 Agenda Item Number amount of $64,199.00. If approved, the construction of the project is anticipated to begin in December 2009 and be completed in May 2010. BUDGET IMPACT This project is funded with Neighborhood Park Development funds ($100,000) and Arkansas Department of Parks and Tourism Outdoor Recreation Grant funds ($50,000). Total project cost including a 15.0 % contingency is $73,829.00. The annual maintenance cost for the developed park (1.34 acres) is anticipated to be $2,700. Attachments: Doc Mashburn Park (formerly called Fairlane Park Land) Conceptual Plan PRAB Minutes July 7, 2008 PRAB Minutes August 4, 2008 Resolution No. 149-08 Resolution No. 106-09 Bid Tabulation Sheet Contract Agreement Signed by Contractor Purchase Requisition Page 2 of 2 IF RESOLUTION NO. A RESOLUTION TO APPROVE AN AGREEMENT BETWEEN THE CITY OF FAYETTEVILLE AND SWEETSER CONSTRUCTION, INC. FOR THE CONSTRUCTION OF DOC MASHBURN PARK IN THE AMOUNT OF $64,199.00 PLUS A 15% CONTINGENCY OF $9,630.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves an agreement between the City of Fayetteville and Sweetser Construction, Inc. for the construction of Doc Mashburn Park in the amount of $64,199.00 plus a 15% contingency of $9,630.00. PASSED and APPROVED this 3rd day of November, 2009. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer II DRAFT AGREEMENT BETWEEN CITY OF FAYETTEVILLE AND CONTRACTOR THIS AGREEMENT is dated as of the day of in the year 2009 by and between the City of Fayetteville, Arkansas (hereinafter called CITY OF FAYETTEVILLE) and Sweetser Construction, Inc. (herein after called CONTRACTOR). CITY OF FAYETTEVILLE and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of the construction and installation of a 20' square pavilion with two picnic tables, one bike rack, an entry sign, sidewalks for ADA accessibility to the new amenities and one ADA parking space. Additionally, the project includes all associated site preparation, grading, drainage improvements and site restoration at Doc Mashburn Park and all items indicated in the Drawings and Specifications. Article 2. ENGINEER. The Project has been designed by: City of Fayetteville Parks and Recreation Department 1455 South Happy Hollow Road Fayetteville, Arkansas 72701 will be hereinafter called PARKS AND RECREATION DEPARTMENT PROJECT MANAGER and who is to act as CITY OF FAYETTEVILLE's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME. 3.1. The Work for Construction of Doc Mashburn Park shall be substantially completed within 90 consecutive calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.B & C of the General Conditions within 130 consecutive calendar days after the date when the Contract Time commences to run. 3.2. Liquidated Damages. CITY OF FAYETTEVILLE and CONTRACTOR recognize that time is of the essence of the Agreement and that CITY OF FAYETTEVILLE will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by CITY OF FAYETTEVILLE if the Work is not completed on time. Accordingly, instead of requiring any such proof, City of Fayetteville and Bid #09-64, Construction of Doc Mashburn Park Agreement Page 1 of 7 CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by CITY OF FAYETTEVILLE, CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. CITY OF FAYETTEVILLE shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the following Schedule of Values pursuant to paragraphs 4.1 and 4.2 below: 4.1. For all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2. PAYMENT ITEMS SweetserConstruction, Inc. ITEMit DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL 1 Mobilization (not to exceed 5% of project bid) L.S. 1.00 51,800.00 51,800.00 2 Site Preparation - including erosion control, concrete washout and construction entrance L.S. 1.00 54,500.00 84,500.00 3 Grading - including approx. 170 CY of excavation and all drainage improvements on west side of site L.S. 1.00 $5,350.00 55,350.00 4 Concrete Sidewalk (4" Thickness) - complete in place per details S.Y. 161,00 536.00 55,796.00 5 Demolition, Disposal & Replacement of Existing Concrete ADA Ramp (approx. 3.5 SY) and Four Sections of Concrete Sidewalk (approx. 9 SY) - including detectable warning L.S. 1.00 51,170,00 81,170.00 6 Concrete Pavilion Slab (5" Thickness) - complete in place per details S.Y. 55.00 544.00 52,420.00 7 20' Square Pavilion - complete in place per manufacturers instructions E.A. 1.00 $15,500,00 $15,500.00 8 7' Picnic tables - complete in place per manufacturers instructions E.A. 2.00 51,600,00 $3,200.00 9 Entry Sign • complete in place per details L.S. 1.00 56,600.00 56,600.00 10 Concrete ADA Accessible Parking Space - complete in place per details L.S. 1.00 58,323.00 $8,323.00 11 Bike Rack - complete in place per details and manufacturers instructions E.A. 1.00 5600.00 5600.00 12 Site Restoration - including topsoil, fescue seed & straw A.C. 1,15 55,600.00 56,440.00 13 Detention Area Restoration - including straw whattles and erosion matting L.S. 1.00 52,500.00 $2,500.00 TOTAL CONTRACT AMOUNT $64,199.00 As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.B of the General Conditions. Bid #09-64, Construction of Doc Mashburn Park Agreement Page 2 of 7 Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in the General Conditions. 5.1. Progress Payments. CITY OF FAYETTEVILLE shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02. All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, Tess the aggregate of payments previously made and less such amounts as PARKS AND RECREATION DEPARTMENT PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, and if the character and progress of the Work have been satisfactory to CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, CITY OF FAYETTEVILLE, on recommendation of PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to CITY OF FAYETTEVILLE as provided in paragraphs 14.02.B.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), less such amounts as PARKS AND RECREATION DEPARTMENT PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.B & C of the General Conditions, CITY OF FAYETTEVILLE shall pay Bid #09-64, Construction of Doc Mashburn Park Agreement Page 3 of 7 the remainder of the Contract Price as recommended by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in said paragraphs 14.07.B & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce CITY OF FAYETTEVILLE to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data." 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that . may _ affect cost, _progress, performance, or furnishing of the Work. 6.3. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. CONTRACTOR is aware of the general nature of work to be performed by CITY OF FAYETTEVILLE and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Bid #09-64, Construction of Doc Mashburn Park Agreement Page 4 of 7 Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. CONTRACTOR has given PARKS AND RECREATION DEPARTMENT PROJECT MANAGER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between CITY OF FAYETTEVILLE and CONTRACTOR concerning the Work consist of the following: 7.1. This Agreement (pages 1 to 7, inclusive). 7.2. Performance and Payment Bonds, (Exhibits A and B respectively). 7.3. Certificates of Insurance, (Exhibit C). 7.4. General Conditions (pages 1 to 42, inclusive), 7.5. Supplementary Conditions (pages 1 to 13 inclusive). 7.6. Specifications consisting of Divisions 1 through 31 as listed in table of contents thereof. 7.7. Addenda numbers 1 and 2, inclusive. 7.8. One set of drawings (not attached hereto) consisting of: a cover sheet and additional sheets numbered two through seven with each sheet bearing the following general title: Construction of Doc Mashburn Park. 7.9. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.9.1. Notice to Proceed 7.9.2. All written amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. Bid #09-64, Construction of Doc Mashburn Park Agreement Page 5 of 7