Loading...
HomeMy WebLinkAbout217-09 RESOLUTIONRESOLUTION NO. 217-09 A RESOLUTION TO APPROVE BID IN THE AMOUNT OF $64,210.00 FROM JOE PERME CONSTRUCTION FOR REHABILITATION AND INCREASED ENERGY EFFICIENCY OF A CITY OWNED BUILDING AT 1932 S. GARLAND AVENUE WHEREAS, Community Development Block Grant funds from the 2009 American Recovery and Reinvestment Act were requested by and granted to the City for energy efficiency rehabilitation of a city owned building at 1932 S. Garland Avenue. Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the bid in the amount of $64,210.00 from Joe Perme Construction for rehabilitation and increased energy efficiency of a city owned building at 1932 S. Garland Avenue. PASSED and APPROVED this 20th day of October, 2009. APPROVED: By: By: ATTEST: ``�....R......s,, U A E FAYETTEVILLE: •�: '%9,•'9RKANSpS � %yN GJ %?tiCIA-4, Ccs NELD J S '. i AN, Mayor SONDRA E. SMITH, City Clerk/Treasurer ad of- arca&4itO Yolanda Fields Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements to -2o -b9 City Council Meeting Date Agenda Items Only Community Services Division Action Required: Development Services Department CDBG - Recovery Act Project (Res 184-09) Approval of P.O. for a Energy Efficiency Rehabilitation project on a CDBG Public Facility Building located at 1932 S. Garland Ave $64,210.00 Cost of this request 2180.4990.5390.27 Account Number 09029 - 0903 Project Number $ 65,000.00 Category / Project Budget Program Category / Project Name Funds Used to Date Program / Project Category Name 65,000.00 Community Development Remaining Balance Fund Name Budgeted Item x Budget Adjustment Attached Department Dir • City A • mey , Finance and Internal Services Director Date Date a0 -1-2&t7 Date /0-9-09 Date Dae Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in City Clerk's Office Comments: Staff recommends approval of P.O. for Energy Efficiency Rebilitation Project Revised January 15, 2009 CITY COUNCIL AGENDA MEMO To: Mayor and City Council �Q Thru: Jeremy Pate, Development Services Department ti ri ector0� From: Yolanda Fields, Community Services Date: October 7, 2009 Subject: CDBG Public Facility Program — Approval of PO for Energy Efficiency Rehabilitation Project RECOMMENDATION Staff recommends approval of PO for this project, located at 1932 South Garland Ave. BACKGROUND The property located at 1932 S. Garland Ave was acquired with Community Development Block Grant (CDBG) funds. This property is a part of the CDBG Public Facility Program. Properties acquired with CDBG are made available through an application process to non — profits that provide services to low / mod residents in the City Of Fayetteville. Improvements to this project will the energy efficiency of the building. Improvement to be made • Windows and Roof repairs • Gutters and Sub -flooring needs to be replaced • HVAC and Plumbing, Electrical upgrades • Replace Siding ,Soffit and Fascia around the building • Some interior patch and paint work DISCUSSION This project will create 20 temporary jobs that will complete the various components of this facility rehabilitation. This property is a part of the CDBG Public Facility Program and will be made available for use by a local non-profit. The number of jobs to be created or maintained by this process can not be determined at this time. The lease process will begin upon completion of the rehabilitation process. BUDGET IMPACT Project cost is approximately $64,210.00. RESOLUTION NO. A RESOLUTION TO APPROVE BID IN THE AMOUNT OF $64,210.00 FROM JOE PERME CONSTRUCTION FOR REHABILITATION AND INCREASED ENERGY EFFICIENCY OF A CITY OWNED BUILDING AT 1932 S. GARLAND AVENUE WHEREAS, Community Development Block Grant funds from the 2009 American Recovery and Reinvestment Act were requested by and granted to the City for energy efficiency rehabilitation of a city owned building at 1932 S. Garland Avenue. Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the bid in the amount of $64,210.00 from Joe Perme Construction for rehabilitation and increased energy efficiency of a city owned building at 1932 S. Garland Avenue. PASSED and APPROVED this 20th day of October, 2009. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 2009 Department: Operations Division: Community Resources Program: Public Facilities & Improvements Date Requested 8/3/2009 Adjustment Number Project or Item Added/Increased: Increase Sang Avenue account by $60,000.'Increase Head Start Rehab account by $47,702. Increase Domestic Violence Shelter account by $65,000. Project or Item Deleted/Reduced: None - increase in revenue from CDBG-R grant Justification of this Increase: Allocation of CDBG-R grant amount Justification of this Decrease: Account Name Increase Budget Account Number Amount Project Number SCtL a ete.6/ hind" pay - Account Name Decrease Budget Account Number Amount Project Number vtsto udget Dir or Dat for Fina 4 ireas or/ Chicvp Director e Datg Date _ASA_ Date c -3-2:0o Date .143 o Date •v Budget & Research Use Only V.090403 Type: A B C D 13 Requested By General Ledger Date Posted to General Ledger Initial Date • • It T. F E • • • • .34 t. 312. Fr • Ii f,IIL, na ..M i vi‘ L•_ iR l$ 14 ill ` I �I'7 .1•l: tl t31 �� •:..4 ,`Ff �44� (r4.i t,' +, a W. 7.• f M` r t c > SI k. i .y 1 {, f•4 a'{ t• r i• c' Tb , i 1" O O O ▪ - ▪ 1r. 1 ti• t V . • •1 I ): ♦ � i l...•o '� r a • ! 1.1 { ry % J 1 A II � q� 1' a s is . 17l i r ° E F rt...• .E•E r t� {•� P PI. } 4 r i• 1 S Pt 7. Er , %. 1, a. a• yl t .11 a 121 .41 • C t r li' t :Li: P 'tIlli t l l l..l M { T • t 1. 4 �t ,y. 1 rt' --' i tl•at : � l r -1•11:::: T s.E ,e7.11.. t� J ▪ 1 i 1(,. t ::: :. ::::.' : 1 L .11-1:-: ' ,4 4 47 i 0 r411; A iii l. ,� !r.. `,' :,a▪ te`••I a ilt. .. t!: y. :44: ... ...,•t..• '�1• i. I: �. } -• ` PCZ ;St' e6 • ti 1 r E t , T 1 +_ • 04.. It1 Z f t t' i t e 9 xt S.s .+ 'tY t�, 41.4 �; �'ri xr i'N N. r r 1 •. • 1• • ."Ff It` i•. ryr ij Y2 .... f •r a ;E E, tk -1 4. . L..Y:.t. t,ty''�-I. r; O_ -•_"ns ri .i ,.. �u. t.V.. Ems .... a�.Y>1>,'. • • • O a N 5 0 0, CD m 0 c z 0 m N N 0, 8 O ca co omy r N c V ID • Budget Adjustment Detail 03 0 c v tvL.e ARKANSAS COMMUNITY SERVICES DIVISION Summary of Attachments Document Identification Code Document Name • (A) Receipt Of Bids • (B) Standard Bid Proposal Form • (C) Public Facility Rehabilitation Project • (D) Funding Approval / Agreement with HUD / Approval a Budget Adjustment • (E) CDBG — R Substantial Amendment 2008 Action Plan • (F) Budget Adjustment # 09 - 238 113 W MOUNTAIN ST I FAYETTEVILLE AR 72701 I PHONE 479.575.8260 I FAX 479.444.3445 Summary of Attachments 'ITh c Ont (II ll n Ity resources CITY Of FAYETTEVILLE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM RECEIPT OF BIDS OWNER(S): lel L ADDRESS: \Q t,CJ�•,Gvz4Cv 4,. PROJECT TITLE: -12 5)' .�""J 1^ �� �� p 6).t. � !�,� BID CLOSING DAY/DATE/TIME 1�`Ot-v W \ "l.' l_E:(J9 PROJECT No: btk'L3 -67 CONTRACTOR: ioe?erYYThe Cot ton BID AMOUNT: (Ara 10 0 CONTRACTOR: CONTRACTOR: CONTRACTOR: CONTRACTOR: Certified by: Witness: Alt BID AMOUNT: BID AMOUNT: BID AMOUNT: BID AMOUNT: t $a..L - Date. k.g• ' 07 Date: 3 �`- "Helping to Build a Better Community Community Resources Division stTh community resources C11 Of FAYETTEVILLE • B COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM STANDARD BID PROPOSAL FORM PROJECT NUMBER: 02123-0902 DATE ISSUED: February 23, 2009 DATE AND TIME OF OPENING: Monday, March 9, 2009 OWNER'S NAME: City of Fayetteville PROJECT ADDRESS: 1932 S. Garland, Fayetteville AR 72701 *In blanks below please quote price for each item and the total for project at the bottom. MY TOTAL BID PRICE FOR THIS PROJECT IS $ �/ Z J OQ l Upon signing this Bid, the bidder certifies that they have viewed the property, read and agree to the requirements set forth in this bid proposal, including specifications, terms and standard conditions, and pertinent information regarding the articles bcing bid on, and agree to fumish these articles at the prices stated. Complete Business Address: Name of Finn: J�� ler,. ( 5eeasi-, ;,t Phone # Street address or P O Box )% 74( S, Igor ( a City/State/ZipCode F4„y*{-1e,,1tei fix %L7c:.1, C7S doe( -((of Printed Name: De_ e ie. Signature: '` Title: 6<Gde /4 ace _ /PSY 113 W MOUNTAIN ST I FAYETTEVILLE AR 72701 I PHONE 479.575.8260 I FAX 479.444.3445 Revised(01-2008) FormCR121 Popo 1 of 1 A: Windows SSo rN G: Electrical -3") 60 c -c -d B: Roof Z to `- H: Siding Soffit & Fascia JO, caSo to C: Gutters / j$Oo w 1: Ramp Replacement with Porch $ , rj 00' D: Sub Floor Repair e-gon e J: Interior Patch and Paint Jcf 7•. E: HVAC �j W 15,i ter K: Clean Up a,v "' F. Plumbing 2,-gCri°li- .> MY TOTAL BID PRICE FOR THIS PROJECT IS $ �/ Z J OQ l Upon signing this Bid, the bidder certifies that they have viewed the property, read and agree to the requirements set forth in this bid proposal, including specifications, terms and standard conditions, and pertinent information regarding the articles bcing bid on, and agree to fumish these articles at the prices stated. Complete Business Address: Name of Finn: J�� ler,. ( 5eeasi-, ;,t Phone # Street address or P O Box )% 74( S, Igor ( a City/State/ZipCode F4„y*{-1e,,1tei fix %L7c:.1, C7S doe( -((of Printed Name: De_ e ie. Signature: '` Title: 6<Gde /4 ace _ /PSY 113 W MOUNTAIN ST I FAYETTEVILLE AR 72701 I PHONE 479.575.8260 I FAX 479.444.3445 Revised(01-2008) FormCR121 Popo 1 of 1 tr - Ni . community resources CITY OF FAYETTEVILLE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM PUBLIC FACILITY REHABILITATION PROJECT Scope of Project: Windows, Roof repair, Gutters, Sub Floor repair, HVAC, Plumbing upgrades, Electrical upgrades, Siding Soffit & Fascia, Porch, Interior patch and paint Owner's Name: City of Fayetteville Phone: 575-8270 Project Location: 1932 S. Garland, Fayetteville, AR 72701 Project /1: 02123-0902 Administrator: Ricky Williams Phone: 575-8270 Fax: 444-3445 Contractors Description of Work Minimum requirement for bidder. Proof of current Arkansas Residential Contractor's license. Proof of Insurance. GENERAL: The contractor will be responsible for all aspects of the construction, installation, and repairs - as stated in the Scope of Work - at 1932 S. Garland Fayetteville,•Arkansas. Each bidder will be responsible for a complete inspection of the City property. All the distances, measurements, and listed materials should be verified before submitting your bid. The requirements listed here — in the description of work - are general requirements and it will be the responsibility of the winning bidder to assure the City of Fayetteville that the finished project is in compliance with all applicable codes and standards. The contractor's duties include, but are not limited to, the following: 1) Purchasing of all materials. 2) Supervision of all employees and subcontractors. 3) Coordination with the City of Fayetteville CDBG Administrator, and The Ctty of Fayetteville Code Compliance Office. 4) Project Design. 5) Clean up and restoration of all lawns, planters, walking and driving surfaces to their original condition. 113 W MOUNTAIN ST 1 FAYETTEVILLE AR 72701 I PHONE 479.575.8260 I FAX 479.444.3445 C ttThi NIL r community resourcesCITY OF FAYEITEVILLE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM SPECIFIC: A: WINDOWS A-1 Remove the existing windows in former office on Westside (the broken window). A-2 Replace the windows in the office with maintenance free, single hung (or sliders) double paned, insulated, solid vinyl windows with half screens. (2 Windows Total) Note: It will be the responsibility of the contractor to ensure that where required by code that at least 1 window in bedrooms without a separate exit meet emergency egress requirements. B: ROOF B-1 Replace + - 10' of missing ridge cap at peak of roof. It will be the responsibility of the contractor to return to its original condition any interior or exterior surfaces damaged during the installation process. C: GUTTERS C-1 Repair existing Aluminum Seamless Gutters. C-2 Gutters should include downspouts and match the siding trim in color. D: SUB FLOOR REPAIR D-1 . Repair / replace subfloor in Southside bathrooms totally, and else ware as needed. This includes joists, subfloor material. E: HVAC E-1 Upgrade existing HVAC units to fit size of building and per code. • E-2 Minimum warranty on heating and cooling unit: one year labor, 5 years parts, and 20 years on the heat exchanger. E-3 A complete load calculation and design of the duct layout. Note: The load calculation and duct layout design shall be submitted with and will be considered an integral part of the contractors bid. E-4 'Repair/Replace any existing duct work and registers as needed. 113 W MOUNTAIN ST I FAYETTEVILLE AR 72701 I PHONF 470.575 R2A/1 I FAX dA Add Adds : rTh ,r,r,r community resources CITY OF FAYETTEVILLE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM E-5 All HVAC work will be performed under the supervision of a contractor or subcontractor holding a Class A and/or Class 13 Arkansas HVACR License. It will be the responsibility of the contractor to retum to its original condition any interior or exterior surfaces damaged during the installation process. F: PLUMBING F-1 Repair all clogged/blocked drains. F-2 Replace any supply lines as needed. F-3 Repair/Replace and damaged or leaking pipes, shutoffs, connections, or fittings as needed. F-4 Check all drains for proper venting. F-5 Repair any leaks undemcath the house. F-6 Check Toilets to make sure it is seated properly, replace wax ring, and repair rotten sub - floor if needed. G: ELECTRICAL G-1 Install GFCI outlets above the counter in the kitchen, in the bathrooms, and where required by code. Check existing GFCI outlets for proper installation. G-2 Check and replace any outlets/receptacles/switches that are not grounded. G-3 The receptacles that serve the refrigerator, smoke detectors, clothes dryer and hot water heater shall be on designated circuits. G-4 Check/repair/replace smoke detectors as required by code. G-5 In coordination with the HVAC contractor, the electrical upgrade will also include any wiring, disconnects, switches, circuits, receptacles in order to upgrade/install the furnace and AC compressor. G-6 Check and replace any faulty/obsolete wiring. NOTE: It will be the responsibility of the contractor to replace any aluminum wires found in the branch circuits with copper wires. It will be the responsibility of the contractor to repair and bring back to their original conditions any interior or exterior surfaces damaged while installing or repairing any part of the electrical system. All electrical work shall be performed by an Arkansas State Licensed Electrician with adherence to the current National Electrical Code and CI 113 W MOUNTAIN CT 1 FAYFTTFVII I F AP 797M 1 PIJl1Mr .170 S7S 09A0 1 [AY A10 AAA el AA t=� 1 . "Th t 1 community resources CITY OF FAYETTEVILLE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM all current codes adopted by the City of Fayetteville. 11: SIDING SOFFIT & FASCIA 11-1 Install vinyl siding on house, repair any damaged surfaces prior to installation. Siding shall be Dutch lap dbl. 4 or 4.5" with a min.042 thickness. Color to be determined by owner. 11-2 A complete siding install will include outside and inside corner trim, starter strip, J channel, F channel, window trim, and any other related trim. H-3 Repair/ replace wood fascia around perimeter of house and wrap with aluminum coil metal. H-4 Install new vinyl soffit and any applicable porch ceilings. I: REPLACE RAMP ON NORTH SIDE WITH PORCH AND STEPS 1-1 Tear out existing plywood ramp. 1-2 Install porch with steps and handrails to code. J: INTERIOR PATCH AND PAINT J-1 Patch existing holes in walls and ceilings and paint with specified color. K: CLEAN UP K-1 All new, used, and excess construction materials related to the Scope of Work and any change order(s) belongs to the contractor and shall be removed from the property by the contractor as needed during the project. K-2 The Inside work shall be left "broom clean." K-3 All recyclable materials shall be recycled L: OTHER L-1 All work shall be performed in a workmanlike manner according to common construction practices, according to the specifications set forth in the Community Resources Program's General Specification Manual and with adherence to City, State, and National Codes. L-2 All work or materials which arc not directly noted in the Scope of Work but are necessary for the proper carrying out of the obvious intentions thereof are to be understood as 113 W MOUNTAIN ST I FAYETTEVILLE AR 72701 I PHfNF A74 575 Rohn 1 FAX 470 did '1445 rTh 'r,i community resources CITY OF FAYETTEVILLE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM implied work and will be provided for by the contractor as if specifically described or drawn. L-3 Any damage to the dwelling or property, caused by the contractor, his/her worker(s) or delivery person and or vehicles during the project shall be repaired to like new condition. L-4 All plumbing work shall be performed by a State Licensed Plumbing Contractor with adherence to the current Arkansas Plumbing Code. L-5 All Electrical work shall be performed by a State Licensed Electrical Contractor with adherence to the current National Electrical Code. L-6 All Heating and Cooling work shall be performed under the supervision of a licensed HVAC contractor. CI 113 W MOUNTAIN ST 1 FAYFTTFVII I F AR 727tH 1 PI4 lMF A7O STS A°An 1 CAV A70 AAA 'IA AR RESOLUTION NO. 184-09 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE THE FUNDING APPROVAUAGREEMENT WITH TIIE U S DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT TO ACCEPT 2009 AMERICAN RECOVERY AND REINVESTMENT ACT FUNDING OF COMMUNITY DEVELOPMENT BLOCK GRANT -R (CDBG-R) IN THE AMOUNT OF $172,702.00; AND APPROVING A BUDGET ADJUSTMENT RECOGNIZING THE GRANT REVENUE. BE IT RESOLVED BY THE CITY COUNCIL OF TILE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby authorizes the Mayor to execute the Funding Approval/Agreement with the U.S. Department of Housing and Urban Development to accept 2009 American Recovery and Reinvestment Act funding of Community Development Block Grant -R (CDBG-R) in the amount of $172,702.00. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment recognizing the grant revenue. PASSED and APPROVED this 15' day of September, 2009. APPROVED: By: I . NELD J 1j t 5 AN, Mayor ATTEST: L_ SMITH, City Cl 1 `•@ s%.y t▪ er tri P. ;FAYETTEVILLE; g'41 •'4.4GTON too D E Community Development Block Grant 2008 Action Plan Proposed Substantial Amendment Community Development Block Grant Recovery (CDBG-R) Community Services Division Helping to Build a Better Community THE CDBG-R SUBSTANTIAL AMENDMENT A. SPREADSHEET FOR REPORTING PROPOSED CDBG-R ACTIVITIES See attachment A. B. CDBG-R INFORMATION BY ACTIVITY (Complete for each activity) Activity 1 (1) Activity Name: Energy Efficiency Rehabilitation - 818 N Sang (2) Activity Narrative: The building at 818 N Sang is owned by the City of Fayetteville and leased through the CDBG Public Facility Lease Program. The lease program allows area nonprofits to lease a City Public Facility building at a cost of $1 per year. The tenant is chosen through a competitive process that evaluates factors such as the percentage of program beneficiaries that are low- and moderate - income and how many of the CDBG National Objectives are met. The property at 818 N Sang needs to have some rehabilitation done in order to make it more energy efficient. CDBG-R funds in the amount of $60,000.00 are going to be utilized to remove the existing roof and replace it with a more energy efficient roof. The current roof has Leakage problems and is not energy efficient. The roof rehabilitation will remove the existing roof. The new roof deck will have 4" insulation and will be covered with a white membrane. 2 Jurisdiction(s): Fayetteville, Jurisdiction Web Address: • httni/www.ac AR - . CDBG-R Contact Person: Yolanda Fields Address: 113 W Mountain Fayetteville AR 72701 Amendment I le.ora/govemmentJcommunitcresourccs/CDBG- DRAFT.cfin Telephone: Fax: Email: vfieldsna,ci. -479-575-8290-• 479-444-3445 favettevi l le. ar. us httn://www.accessfavettevi R/CDBG-R Substantial A. SPREADSHEET FOR REPORTING PROPOSED CDBG-R ACTIVITIES See attachment A. B. CDBG-R INFORMATION BY ACTIVITY (Complete for each activity) Activity 1 (1) Activity Name: Energy Efficiency Rehabilitation - 818 N Sang (2) Activity Narrative: The building at 818 N Sang is owned by the City of Fayetteville and leased through the CDBG Public Facility Lease Program. The lease program allows area nonprofits to lease a City Public Facility building at a cost of $1 per year. The tenant is chosen through a competitive process that evaluates factors such as the percentage of program beneficiaries that are low- and moderate - income and how many of the CDBG National Objectives are met. The property at 818 N Sang needs to have some rehabilitation done in order to make it more energy efficient. CDBG-R funds in the amount of $60,000.00 are going to be utilized to remove the existing roof and replace it with a more energy efficient roof. The current roof has Leakage problems and is not energy efficient. The roof rehabilitation will remove the existing roof. The new roof deck will have 4" insulation and will be covered with a white membrane. 2 The decision to utilize CDBG-R funds for this type of project is multi -fold. Improving energy efficiency is one of the activities supported by the Recovery Act and also by HUD. This project will create tcmporary jobs to do the actual rehabilitation work. This project will also promote the retention of existing jobs. Our community has had two local nonprofits announce that they will be closing their doors due to lack of funding. The CDBG Public Facility Lease Program through provision of low cost building space and the further savings that will be derived through increased energy efficiency allow tenant nonprofits to utilize the rent and building expense savings to operate their programs and retain staff members. Organizations that provide services to low- and moderate -income individuals and families are always important to a community and in tLe a.uz. art eeeII li c l.liuuate it is ingpuativc drat effon is nmde to retain these oaganications. (3) Jobs Created: This project will create 6 temporary Jobs that will remove the existing roof and replace it with a more energy efficient roof. The current tenant of this building is going to be vacating the building in July. A competitive application process that evaluates among other things job creation or retention activities will be utilized to determine who the new tenant will be. The City of Faycttevillc Community Services Division has already been approached by organizations who are interested in the space. (4) Additional Activity Information (energy efficiency and conservation): The use of white reflective membranes on roofs has been shown to reduce peak energy demand and control energy costs. They also improve the thermal efficiency of the roof insulation. (5) Responsible Organization: City of Faycttevillc Community Services Division 113 W Mountain St Fayetteville AR 72701 Contact Yolanda Fields, Community Services Director 479-575-8290 vfields@ci. fayettcvi I Ie.ar.us 3 Activity 2 (1) Activity Name: Energy Efficiency Rehabilitation — 1932 S Garland (2) Activity Narrative: The building at 1932 S Garland is owned by the City of Fayetteville and leased through the CDBG Public Facility Lease Program. The lease program allows area nonprofits to lease a City Pnhlir. Facility huilding at a cost of $1 per year Tbe-ten»nt-is chosen through a competitive process that evaluates factors such as the percentage of_pr_ogram_beneficiaries_that_arelow.=and.____. moderate -income and how many of the CDBG National Objectives are met. The property at 1932 S Garland had been occupied by the same nonprofit for more than 20 years. That agency received funding to construct a new facility and the property at 1932 S Garland is currently unoccupied. The property requires some rehabilitation work to repair some problem areas and to make it more energy efficient for the next tenant. CDBG-R funds in the amount of $65,000.00 are going to be utilized to complete a number of upgrades to the facility. The rehabilitation will include: window replacement; roof, gutter and subfloor repair; HVAC energy efficient upgrade; plumbing repair; electrical upgrade and siding. The decision to utilize CDBG-R funds for this type of project is multi -fold. Improving energy efficiency is one of the activities supported by the Recovery Act and also by HUD. This project will create temporary jobs to do the actual rehabilitation work. This project will also promote the retention of existing jobs. Our community has had two local nonprofits announce that they will be closing their doors due to lack of funding. The CDBG Public Facility Lease Program through provision of low cost building space and the further savings that will be derived through increased energy efficiency allow tenant nonprofits to utilize the rent and building expense savings to operate their programs and retain staff members. Organizations that provide services to low- and moderate -income individuals and families are always important to a community and in the current economic climate it is imperative that effort is made to retain these organizations. (3) Jobs Created: This project will create 20 temporary jobs that will complete the various components of this facility rehabilitation. The building is currently unoccupied pending the necessary renovation and energy efficiency upgrades being done. A competitive application process that evaluates among other things job creation or retention activities will be utilized to determine who the new tenant will be. The City of Fayetteville Community Services Division has already been approached by organizations who are interested in the space. (4) Additional Activity Inforrnation (energy efficiency and conservation): All aspects of the renovation that can increase energy efficiency will. Replacement windows will be double -paned and insulated. HVAC replacement will ensure greater energy efficiency 4 than the current system. Plumbing and electrical upgrades will provide for more efficient use of water and electricity. Finally the upgrade to insulated vinyl siding will also provide a more energy efficient facility. The combination of all these upgrades will contribute to reduced energy use and expense to the next tenant. (5) Responsible Organization: • City of Fayetteville Community Services Division 113 W Mountain 5t Fayetteville -AR 72701 Contact Yolanda Fields, Community Services Director 479-575-8290 vficlds(@,,ci.favettevi Ile. ar.us Activity 3 (1) Activity Name: Energy Efficiency Rehabilitation — 2052 S Garland (2) Activity Narrative: The building at 2052 S Garland is owned by the City of Fayetteville and currently leased through the CDBG Public Facility Lease Program to the Fayetteville Head Start Program. The lease -'-__program allows area nonprofits, such as Head Start, to lease a City Public Facility building at a cost of $1 per year: The tenant is chosen through a competitive process that evaluates factors such as the percentage of program beneficiaries that are low- and moderate -income and how many of the CDBG National Objectives are met. The property at 2052 S Garland needs to have some rehabilitation done in order to make it more energy efficient. CDBG-R funds in the amount of $47,702.00 are going to be utilized to upgrade to more energy efficient lighting and to replace water heaters and HVAC with energy efficient models. The current lighting system is extremely outdated and inefficient. The building currently utilizes two non -energy efficient water heaters that will be replaced with one new system that is 96% efficient. The existing HVAC systems will be upgraded with new air handlers and a heat pump system and repair/insulation work will be done on the duct work. The decision to utilize CDBG-R funds for this type of project is multi -fold. Improving energy efficiency is one of the activities supported by the Recovery Act and also by HUD. This project will create temporaryjobs to do the actual rehabilitation work. This project will also promote the retention of existing jobs. Our community has had two local nonprofits announce that they will be closing their doors due to lack of funding. The CDBG Public Facility Lease Program through provision of low cost building space and the further savings that will be derived through increased energy efficiency will allow the current tenant to utilize the rent and building expense 5