Loading...
HomeMy WebLinkAbout14-09 RESOLUTIONRESOLUTION NO. 14-09 A RESOLUTION APPROVING AMENDMENT NO. 2 TO THE CONTRACT WITH GARVER ENGINEERS, LLC IN AN AMOUNT NOT TO EXCEED $217,587.00 FOR CONSTRUCTION PHASE SERVICES FOR MOUNT COMFORT ROAD IMPROVEMENTS FROM I-540 TO ALPINE AVENUE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby approves Amendment No. 2 to the contract with Garver Engineers, LLC in an amount not to exceed $217,587.00 for construction phase services for Mount Comfort Road Improvements from I-540 to Alpine Avenue. A copy of the Amendment, marked Exhibit "A," is attached hereto and made a part hereof. PASSED and APPROVED this 20th day of January, 2009 APPROVED: ATTEST: ,"‘\,\%51)WeRll AS S `'• % FU° • p: t ;FAYETiEVILLE: :. %9s,.7). ANSA` SONDRA E. SMITH, City Clerk/Treasurer IN TESTIMONY OF WHICH this instrument has been executed on behalf of GARVER ENGINEERS, and has been executed on behalf of the CITY OF FAYEI I'EVILLE, in three (3) counterparts, each of equal force, on the day and year first above written. CITY OF FAYETTEVILLE GARVER ENGINEERS, LLC By: Brock Hoskins Title: M Ourk Title: Vice President ATTEST: C_ &Ov`�`^' d `- - 1, g7sp 59rdrr, E. Singh ,,,`��,R...,4sG, 64CL i< TrRasuru a�G; GAS Y O c •, ps `( 0�U•• ;A . • c:FAYETTEVILLE: :- e qh' QA. �i s KA14S• ° J,,. Contract Amendment No. 2 Mt. Comfort Road ATTEST. /la 4 of 4 0605-1200 APPENDIX A-2 CITY OF FAYETTEVILLE MOUNT COMFORT ROAD IMPROVEMENTS FEE SUMMARY Traffic Studies Schematic Study Signalization Design Surveys - Design Surveys - Property Drainage Study Environmental Handling and Documentation Conceptual Design Preliminary Design Final Design Property Acquisition Documents Contractor Procurement Assistance Services Construction Phase Services - Contract No. 1 Original Contract Amendment No. 1 Amendment No. 2 $29,080 $0 $0 $49,500 $0 $0 $0 $37,500 $0 $97,100 $0 $0 $0 $42,300 $0 $0 $0 $0 $0 $0 $0 $104,020 $0 $0 $0 S260,300 $0 $0 $261,800 $0 $0 S100,950 $0 $0 $14,000 $0 $0 $0 $217,587 Total $29,080 $49,500 $37,500 $97,100 $42,300 $0 $0 $104,020 $260,300 $261,800 $100,950 $14,000 $217,587 Subtotal NTE Fee Subcontracted Services Geotechnical Services Record Research ARKUPS - Utility Locates Estimated Subcontract Fees $279,700 $22,750 $0 $17,600 S716,850 $40,350 so $0 $a SO $217,587 $0 so $0 so $1,214,137 $22,750 $0 $17,600 $40,350 Total NTE Fee $320,050 $716,850 $217,587 $1,254,487 APPENDIX A-2 • CONSTRUCTION PHASE SERVICES - ROADWAY 8 8 8 2 8 • R s 8 8 e 8 a - 8 0 8 8 8 8 8 8 A 8 8 0 8 • 8 8 • R 0 8 a 8 8 8 e e 8 8 8 8 y 8 1 0 • 8 e a 8 co • 8 • 1 8 8 8 z • • 1 1 1 1 1 1 1 1 Y 1 1 1 1 1 1 1 1 1 1 a 1 1 1 i 1 Px to 1 j 1 1 S 1 1 1 1 0 0 8 8 a 8 8 8 8 8 a 8 s 8 0 8 8 7 a 8 a a a 8 8 8 § a 8 8 1 a 0 8 0 8 s B 8 8 8 E e 8 8 8 6 8 8 E S a S 8 a 8 1 r. 8 8 8 8 8 8$ a • • E a g 6 8 8 8 8 8 ` 8 8 s E a hid REEi 6 8 a 0 • Ron Petrie Submitted By or City of Fayetteville Staff Review Form City Council Agenda Items or Contracts 1/20/2009 City Council Meeting Date Engineering Division Action Required: frog Garver jY mfc Operations Department A resolution authorizing execution of Amendment No. 2 to the Engineering Contract with Garver Engineers, LLC in an amount not to exceed $217,587 for construction phase services for Mount Comfort Road, Contract 1, from 1-540 to Alpine. 217,587.00 Cost of this request 4520.9520.5809.00 Account Number 06035.1600 Project Number Budgeted Item X 23,992,298.00 Category / Project Budget Transportation Bond Improvements Program Category / Project Name 8,297,846.68 Street Improvements Funds Used to Date Program / Project Category Name 15,694,451.32 2006A Sales Tax Construction Remaining Balance Fund Name Budget Adjustment Attached Department u'rector City Attorney 0. 1231.06 Date 7 - Date t-2-09 Finance .nd Internal Sery • Director Date Comments: ate Previous Ordinance or Resolution # RES 154-06 Original Contract Date: Original Contract Number: �t FQ Received in City Clerk's Offic& o 9/19/2008 1051 Id— 1—O c, Received in Mayor's Office City Council Meeting of January 20, 2009 CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Gary Dumas, Director of Operations From: Ron Petrie, City Engineer Date: December 31, 2008 Subject: A resolution authorizing execution of Amendment No. 2 to the Engineering Contract with Garver Engineers, LLC in an amount not to exceed $217,587 for construction phase services for Mount Comfort Road, Contract 1, from 1-540 to Alpine. RECOMMENDATION: Staff recommends approval of a resolution authorizing execution of Amendment No. 2 to the Engineering Contract with Garver Engineers, LLC in an amount not to exceed $217,587 for construction phase services for Mount Comfort Road, Contract 1, from 1- 540 to Alpine. BACKGROUND: Mount Comfort Road Improvements are a part of the Transportation Improvement Bond Program. The project includes major intersection improvements at the I540/Shiloh Drive Intersection, relocation of Shiloh Drive to the west, signalization of 4 intersections along Mount Comfort, and widening of Mount Comfort to 4 lanes from 1 540 to Rupple Road. Under the original contract, and Contract Amendment No. 1, Garver provided traffic studies, design surveys and preliminary and final design services for Mount Comfort Road, from I-540 to west of Rupple Road. The design has been completed by Garver, and bids for construction have been received for contract 1. DISCUSSION: Under this Contract Amendment, Garver will provide construction phase services, to include construction observation services and engineering support during the construction of Contract 1. This proposed amendment also includes reimbursement for a subscription to Poten's Asphalt Weekly Monitor to provide asphalt price index data. The amount of this Contract Amendment will not exceed $217,587. The original contract amount plus amendment 1 was $1,036,900; therefore, the total amended contract amount is $1,254,487. The contract will be paid based on hourly rates for time actually spenfon the project. 1 City Council Meeting of January 20, 2009 BUDGET IMPACT: This contract will be paid from funds available in the Transportation Improvement Bond Program. Total funding required for this item is $217,587. 2 RESOLUTION NO. A RESOLUTION APPROVING AMENDMENT No. 2 TO THE CONTRACT WITH GARVER ENGINEERS, LLC IN AN AMOUNT NOT TO EXCEED $217,587.00 FOR CONSTRUCTION PHASE SERVICES FOR MOUNT COMFORT ROAD IMPROVEMENTS FROM I-540 TO ALPINE AVENUE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby approves Amendment No. 2 to the contract with Garver Engineers, LLC m an amount not to exceed $217,587.00 for construction phase services for Mount Comfort Road Improvements from I-540 to Alpine Avenue. A copy of the Amendment, marked Exhibit "A," is attached hereto and made a part hereof. PASSED and APPROVED this 20th day of January, 2009. APPROVED: ATTEST: By: By: LIONELD JORDON, Mayor SONDRA E. SMITH, City Clerk/Treasurer AMENDMENT TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES CITY OF FAYETTEVILLE FAYETTEVILLE, ARKANSAS CONTRACT AMENDMENT NO. 2 - CONSTRUCTION PHASE SERVICES Mt. Comfort Road Improvements - (Contract No. 1) Alpine Avenue to I-540 This Contract Amendment No. 2, dated �Q'net4 Q.Y Y cAo , 2009 shall amend the original contract between the CITY OF FAYEI 1EVLLE (Fayetteville, Arkansas) and GARVER ENGINEERS, LLC (GARVER), dated September 19, 2006 for proposed improvements to Mt. Comfort Road from Interstate 540 to Rupple Road, referred to in the following paragraphs as the original contract. This Contract Amendment No. 2 adds professional engineering and surveying services for the Construction Phase Services, as described herein. The original contract is hereby modified as follows: SECTION 2 — BASIC SERVICES OF GARVER 2.1 General 2.1.1.4 The Scope of Services to be furnished by GARVER during the Construction Phase is included in Section 2.4 hereafter and made part of this Agreement. 2.4 Construction Phase 2.4.1 The scope of services to be furnished by GARVER during the Construction Phase is described in detail in Section 2.12 of Appendix A as modified hereafter and made part of this Agreement. SECTION 6 — PAYMENT TO GARVER 6.1 Compensation Replace "not to exceed $1,036,900" with "not to exceed $1,254,487". 6.1.7 Construction Phase Services For Construction Phase Services described herein, CITY OF FAYE 1 1 EVILLE shall pay GARVER an amount estimated to be $217,587. Contract Amendment No. 2 Mt. Comfort Road 1 of 0605-1200 APPENDIX A 2.12 Construction Phase Services During the construction phase of work on Contract No. 1, GARVER ENGINEERS will accomplish the following: 1. Issue a Notice to Proceed letter to the Contractor and attend preconstruction meeting. 2. Review the Contractor's progress payment requests based on the actual quantities of contract items completed and accepted, and will make a recommendation to the CITY OF FAYETTEVILLE regarding payment. 3. Attend progress/coordination meetings with CITY OF FAYETTEVILLE/Contractor. 4. Prepare for and attend utilities coordination meeting. 5. Provide coordination with a construction materials testing firm. 6. Evaluate and respond to construction material submittals and shop drawings. Corrections or comments made by GARVER ENGINEERS on the shop drawings during this review will not relieve Contractor from compliance with requirements of the drawings and specifications. The check will only be for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The Contractor will be responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and performing his work in a safe and satisfactory manner. 7. Maintain a set of working drawings and prepare and furnish record drawings. 8. Provide part-time resident construction observation services for the 360 -calendar -day construction contract performance time. The proposed fee is based on approximately 4 hours per day, 5 days per week, during the 360 -calendar -day construction contract performance time. If the construction time extends beyond the time established in this agreement or if the CITY OF FAYETTEVILLE wishes to increase the time or frequency of the observation, the CITY OF FAYETTEVILLE will pay GARVER ENGINEERS an additional fee agreed to by the CITY OF FAYETTEVILLE and GARVER ENGINEERS. 9. Provide up to 130 hours of survey crew for staking utilities or others features, verifying contractor's layout and record drawings as requested by the CITY OF FAYETTEVILLE. 10. When authorized by the CITY OF FAYETTEVILLE, prepare change orders for changes in the work from that originally provided for in the construction contract documents. If redesign or substantial engineering or surveying is required in the preparation of these change order documents, the CITY OF FAYEI 1EVILLE will pay GARVER ENGINEERS an additional fee (unless changes are required due to the fault of GARVER ENGINEERS) to be agreed upon by the CITY OF FAYETTEVILLE and GARVER ENGINEERS. 11. Participate in final project inspection, prepare punch list, review final project closing documents, and submit final pay request. 12. Subscribe to Poten's Asphalt Weekly Monitor for two years starting the month the project is advertised to bid. Construction observation services will be provided by GARVER ENGINEERS Resident Project Representative, who will provide or accomplish the following: • Consult with and advise the CITY OF FAYE1 IEVILLE during the construction period. Contract Amendment No. 2 Mt. Comfort Road 2 of 0605-1200 • Coordinate with the firm providing construction materials quality assurance testing under separate contract with the CITY OF FAYETTEVILLE. • Maintain a file of quantities incorporated into the work, test reports, certifications, shop drawings and submittals, and other appropriate information. • Maintain a project diary which will contain information pertinent to each site visit including date and weather conditions, names of important visitors, construction work in progress and location, size of Contractor's work force and equipment in use, number of hours worked by Contractor's forces, and substance of important conversations with the Contractor. Engineer will provide copies to CITY OF FAYETTEVILLE weekly. In performing construction observation services, GARVER ENGINEERS will endeavor to protect the CITY OF FAYETTEVILLE against defects and deficiencies in the work of the Contractor(s); but GARVER ENGINEERS cannot guarantee the performance of the Contractor(s), nor be responsible for the actual supervision of construction operations or for the safety measures that the Contractor(s) takes or should take. However, if at any time during construction GARVER ENGINEERS observes that the Contractor's work does not comply with the construction contract documents, GARVER ENGINEERS will immediately notify the Contractor of such non- compliance and instruct him to correct the deficiency and/or stop work, as appropriate for the situation. GARVER ENGINEERS will also record the observance, the discussion, and the actions taken. If the Contractor continues without satisfactory corrective action, GARVER ENGINEERS will notify the CITY OF FAYE1 IEVILLE immediately, so that appropriate action under the CITY OF FAYETTEVILLE's contract with the Contractor can be taken. 2.13 Project Deliverables Add the following items to the list of project deliverables. 10. Two copies of approved shop drawings/submittals from the Contractor. 11. One hard copy set of Record Drawings. 2.14 Extra Work Delete Item 1, "Construction Phase Services" from list of extra work. APPENDIX A-2 — Fee Summary Fee summary is replaced in its entirety with the attached Fee Summary. Contract Amendment No. 2 Mt. Comfort Road 3 of 4 0605-1200 Clarice Pearman - Res. 14-09 From: To: Date: Subject: CC: Attachments: Clarice Pearman Petrie, Ron 1.23.09 3:41 PM Res. 14-09 Audit Audit Page 1 of 1 Ron: Attached is a copy of the above resolution passed by City Council regarding Garver Engineers, LLC. I am forwarding via interoffice mail one of two signed agreements. Please let me know if there is anything else needed for this item. Have a good weekend. Clarice file://C:\Documents%20and%20Settings\cpearman.000\Local%20Settings\Temp\XPgrpwise\4979E529FA... 1.23.09