HomeMy WebLinkAbout139-09 RESOLUTIONRESOLUTION NO. 139-09
A RESOLUTION TO APPROVE TASK ORDER NO. 1 FOR ENGINEERING
SERVICES BY McCLELLAND CONSULTING ENGINEERS FOR RUNWAY
16 SAFETY IMPROVEMENTS IN THE AMOUNT OF $231,100.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves
Task Order No. 1 for engineering services by McClelland Consulting Engineers for Runway 16
safety improvements in the amount of $231,100.00.
PASSED and APPROVED this 16th day of June, 2009.
APPROVED:
ATTEST:
By:
0S NDRA E. SMITH, City Clerk/Treasurer
,N1VR h
,.,o.Y•C1.
050p,�
.^
tla
E- : FAYETTEVILLE :
•
9'•7../CANSP. J=S
Ray M. Boudreaux
Submitted By
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
5/19/2009
City Council Meeting Date
Agenda Items Only
Aviation
Division
Action Required:
Transportation
Department
1) A Resolution to approve Task Order #1 with McClelland Consulting Engineers, Inc. for Airport engineering
services. Contact info: Wayne Jones, P.E., PO Box 1229, Fayetteville AR 72702-1229, 479-443-2377, Fax 479-443-
9241, wjones@mcclelland-engrs.com.
231,096.00
Cost of this request
5550.3960.5314.00
Account Number
07039 3
Project Number
Budgeted Item
partment Di -ctor n
a. ....c.D,fA______
223,467.00
Category / Project Budget
197, 667.30
$
Correct Runway 16 RSA
Program Category / Project Name
Avi/ED Imp
Funds Used to Date Program / Project Category Name
25,799.70
Airport Fund
Remaining Balance Fund Name
Budget Adjustment Attached
City Atto
ei„
Finance and Internal Services Director
5:/®9
Date
r -o9
Date
5-K-2001
Date
X
204-07, 182 -OE
Previous Ordinance or Resolution # 227-08
Original Contract Date: 5/5/2009
Original Contract Number:
NEW
Comments:
360 ntl y potted i f IYCLIVC jam/ /47j
nuary 1 , 2 09
lo�� d /a-1 o o -1//,/0,3 u/461
ira
e ICY I
ARKANSAS
City Council Meeting of: May 19, 2009
Agenda Item Number:
AVIATION DIVISION
FAYETTEVILLE EXECUTIVE AIRPORT = DRAKE FIELD
CITY COUNCIL AGENDA MEMO/STAFF CONTRACT REVIEW MEMO
TO: Mayor Jordan
THRU: Chief of Staff
THRU: Staff/Contract Review Committee
THRU: Terry Gulley, Transportation D.
FROM: Ray M. Boudreaux, Aviation Direc
DATE: May 1, 2009
SUBJECT: Approve Task Order #1 with McClella ' d Consulting Engineers for
Construction Phase Services associated with the Runway 16 Safety Area
Improvements. Approve Budget Adjustment. Signature of the Mayor.
RECOMMENDATION: Approve Task Order #1 with McClelland Consulting Engineers for
Construction Phase Services associated with the Runway 16 Safety Area Improvement Project.
Signature of the Mayor.
BACKGROUND: This Task Order to the McClelland Consulting Engineers Service Contract is
for the Construction Phase Services including inspection, testing and project administration for
the project. The Project is fully funded by the FAA/AIP and will improve the safety of the public
transiting Highway 71 South and the safety of aircraft utilizing the airport. Upon completion of
this project, the north end safety area will meet FAA Standards.
BUDGET IMPACT: This project is fully funded through the FAA/AIP and the Arkansas
Department of Aeronautics.
Attachments: Staff Review
Budget Adjustment
Contract
4500 SOUTH SCHOOL AVENUE, SUITE F • AIRPORT TERMINAL BUILDING • FAYETTEVILLE AR 72701
479.718.7642 • 479.718.7646 FAX • www.accessfayetteville.org/governmenttaviation
airport economic development@ci_fayetteville.ar.us
RESOLUTION NO.
A RESOLUTION TO APPROVE TASK ORDER NO. 1 FOR
ENGINEERING SERVICES BY McCLELLAND CONSULTING
ENGINEERS FOR RUNWAY 16 SAFETY IMPROVEMENTS IN
THE AMOUNT OF $231,100.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves
Task Order No. 1 for engineering services by McClelland Consulting Engineers for Runway 16
safety improvements in the amount of $231,100.00.
PASSED and APPROVED this 16th day of June, 2009.
APPROVED: ATTEST:
By: By:
LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer
RESOLUTION NO.
A RESOLUTION TO APPROVE TASK ORDER NO. 1 FOR
ENGINEERING SERVICES BY McCLELLAND CONSULTING
ENGINEERS FOR RUNWAY 16 SAFETY IMPROVEMENTS IN
THE AMOUNT OF $231,100.00 AND TO APPROVE A BUDGET
ADJUSTMENT OF $231,096.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves
Task Order No. 1 for engineering services by McClelland Consulting Engineers for Runway 16
safety improvements in the amount of $231,100.00 and approves a budget adjustment in the
amount of $231,096.00.
PASSED and APPROVED this 19th day of May, 2009.
APPROVED: ATTEST:
By: By:
LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer
City of Fayetteville, Arkansas
Budget Adjustment Form
Budget Year
2009
Department: General Government
Division: Aviation & Economic Development
Program: Airport Capital Expense
Date Requested
5/19/2009
Adjustment Number
Project or Item Ada ed/Increased:
$231,096 in the rafessional Services account
Project or Item De - ted/Reduced:
None. To rec•gnize grant revenue from the DOT/FAA and
Arkansas 1 -partment of Aeronautics.
k4e4-- C-djusfnuu/J(AA
7"&v,"2,v-c_s
Justification of this Increase:
Will provide for construction admini ation and
observation, materials testing, baselin staking and
record drawings for the Runway 16 RS Improvement
project.
Account Name
Inc
Acco
Justification of this Decrease:
The project expense will be 100% reimbursed with federal
and state grant funding.
or w
4-0 6ucqdasi
ase Budget
nt Number
Amount
Project Nuu ber
Professional Services
Account Name
5550 3960 5314 00 231,096 070039 3
Decrease Bud t
Account Numbe. Amount Project Number
Runway 16 Safety Area 5550 0955
6820 36 219,541 070039 3
State Grants on Federal P ojects 5550 0955
Divi ion Head
Budget Director
Departmenf/birectof
Date
/— Oy
Date
Finance Direr Date
Chief of.Staff Date
6803 '0 11,555 070039
B • get & Research Use Only
Type: A
Requested By
General Ledger Date
Posted to General Ledger
V.090403
C D E
itial Date
Saj 6At)ij. az,
RESOLUTION NO.
A RESOLUTION TO APPROVE TASK ORDER NO. 1 FOR
ENGINEERING SERVICES BY McCLELLAND CONSULTING
ENGINEERS FOR RUNWAY 16 SAFETY IMPROVEMENTS IN
THE AMOUNT OF $231,100.00 AND TO APPROVE A BUDGET
ADJUSTMENT OF $231,096.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves
Task Order No. 1 for engineering services by McClelland Consulting Engineers for Runway 16
safety improvements in the amount of $231,100.00 and approves a budget adjustment in the
amount of $231,096.00.
PASSED and APPROVED this 196` day of May, 2009.
APPROVED: ATTEST:
By: By:
LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer
TASK ORDER NO. 1
CONSTRUCTION PHASE SERVICES
For
DRAKE FIELD RUNWAYI6 SAFETY AREA IMPROVEMENTS
STATE OF ARKANSAS
COUNTY OF WASHINGTON
This Task Order is written pursuant to the basic agreement entitled CITY OF
FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on May 5,
2009. The referenced basic agreement pertains to proposed improvements to Drake
Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the
date indicated below the signature block, by and between the City of Fayetteville and
McClelland Consulting Engineers (MCE) sets forth the project description, project
schedule, and engineering fees for construction phase services related to the Runway
16 Safety Area Improvements, Drake Field.
SECTION 1 - PROJECT DESCRIPTION
The project is to consist of the relocation of Highway 71 and Lancaster Drive and the
regarding of the Runway 16 Safety Area. The services to be performed include:
Construction Admin; Observation Services; Construction Materials Testing; and review
fees for State or Federal Agencies.
W:IDRAKE FIELDICONTRACTS12009-20131Task Order 1.doc 1
SECTION 11 - PROJECT SCHEDULE
From the time the City of Fayetteville issues the Notice To Proceed (NTP), McClelland
Consulting Engineers, Inc. will endeavor to execute the project within the following time
periods:
Task Completion After NTP
A. Work Schedules 1 & II 180 calendar days
B. Work Schedules III & IV 180 calendar days
SECTION III - SCOPE OF SERVICES
McClelland Consulting Engineers, Inc. shall, generally, provide those services listed in
the basic agreement which are applicable to this specific Task Order. Specifically, the
project is likely to include:
A. Construction Administration.
B. Construction Observation and
C. Prepare "Record Drawings" at the completion of construction based upon the
Contractor's mark-ups.
D. Construction staking of a baseline.
E. Construction Materials Testing.
SECTION IV - FEES AND PAYMENTS
The following fees are to be paid to McClelland Consulting Engineers, Inc. as
compensation for his services:
A. Construction Administration: Hourly rates, estimated to be $ 31,060.
B. Construction Observation Hourly rates, estimated to be $ 155,100.
W:IDRAKE FIELDICONTRACTS12009-20131Task Order 1.doc 2
C. Record Drawings Hourly rates, estimated to be $ 5,490.
G. Construction Baseline Staking: Hourly rates, estimated to be $ 1,020.
H. Construction Materials Testing:
hourly rates & unit prices, estimated to be $38,426.
Appendix A presents the basis of payments to the ENGINEER.
Appendix B presents hourly rates for personnel anticipated to be assigned to this
project by McClelland Consulting Engineers, Inc.
Appendix C presents hourly rates and Unit Prices to be assigned to this project for the
Construction Materials Testing.
SECTON V - BASIC AGREEMENT IN EFFECT:
Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING
SERVICES shall remain in full force as originally approved and executed.
W:IDRAKE FIELDICONTRACTS12009-20131Task Order 1.doc 3
IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly
executed as of the date and year first herein written.
FOR THE CITY OF FAYETTEVILLE:
By:
Date:
Mayor
G���/i' ,
Attes
FOR McCLELLAND CONSULTING ENGINEERS, INC.:
By: Attest:
President
Date: 5- /
..`' FWTRE4 ,6..
E
`Y OF•�'G�%�
• cn
EZ'') • •.
r • FAYETTEVILLE
••
o ••9� SQA ���
W:IDRAKE FIELD\CONTRACTS12009-20131Task Order 1.doc 4
APPENDIX "A"
BASIS FOR PAYMENTS TO THE ENGINEER
TASK ORDER NO. 1
CONSTRUCTION PHASE ENGINEERING SERVICES
DRAKE FIELD RUNWAY 16 SAFETY AREA IMPROVEMENTS
FAYETTEVILLE MUNICIPAL AIRPORT
CLASSIFICATION
1-1OURLY RATE
PROJECT
DIRECTOR
$155.00
PROJECT
MGR.JENGR.
5143.00
PROJECT
ENGINEER
5115.00
ENGINEERING
TECHNICIAN
$90.00
CAPD
OPER. 1
570.00—
CADD
OPER. 2
$60.00
CADD
OPER. 3
550.00
LICENSED
SURVEYOR
594.00.
SURVEY
CREW
5143,00
CLERK
TYPIST
548.00
L'ONSTRUCTION
OBSERVER
565.00
MILEAGE
50.50
DIRECT
EXPENSE
EXTENDED
TOTAL
LINE
TASK DESCRIPTION
A
CONSTR. ADMIN. AND INSPECTION
CONSTR. ADMINISTRATION
6
32
100
600
$17,306.00
CONSTRUCTION OBSERVATION (180 days)
1250
2550
$82525.00
RECORD DRAWINGS
2
8
4
4
8
4
5227.00
$2,745.00
SUBTOTAL, CONSTRUCTION PHASE
6
34
108
4
4
8
0
0
0
4
1250
3150
5227.00
$102,576.00
CONSTR. ADMINISTRATION
6
24
80
400
$13,762.00
CONSTRUCTION OBSERVATION (180 days)
1100
2150
572,575.00
RECORD DRAWINGS
2
8
4
4
8
4
$225,00
$2,743.00
SUBTOTAL, CONSTRUCTION PHASE
6
26
88
4
4
8
0
0
0
4
1100
2550
$225.00
589,080.00
H"
CONSTRUCTION STAKING
0
1
1
0
0
0
0
2
4
0
0'
0
50.00
51,018.00
C
CONSTRUCTION MT'LS TESTING (Estimated To Be)
12
24
533,950.00
538,426,00
GRAND TOTAL, ENGINEERING SERVICES
12
73
221
8
8
16
0
2
4
8
2350
5700
534,402.00
$231,100.00
APPENDIX B
TASK ORDER NO.1
Hourly Rates for Personnel
Fayetteville Municipal Airport
CATEGORY BILLABLE HOURLY
RATE RANGE
Project Director $145 to $160
Project Manager $120 to $150
Project Engineer $90 to $130
Design Engineer II $85 to $110
Design Engineer I $75 to $90
Registered Surveyor $80 to $100
Computer Technician $60 to $85
Senior Engineering Technician/Observer $65 to $75
Engineering Technician/Observer $75 to $95
Junior Engineering Technician $45 to $70
Survey Crew (2 man) $135 to $150
Clerical Support $45 to $55
CADD Technician 111 $65 to $80
CADD Technician 11 $55 to $70
CADD Technician I $45 to $55
Soils Lab Supervisor $60 to $70
Soils Technician 11 $45 to $55
Soils Technician I $35 to $45
W:IDRAKE FIELDICONTRACTS12009-20131Appendix 13 TO 1.doc
APPENDIX C
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
TASK ORDER NO. 1
GENERAL:
Laboratory Field Technician * $ 42.00 per hour
Laboratory Engineering Technician * 50.00 per hour
AHTD-Qualified Technician* 52.00 per hour
Engineering Technician * 60.00 per hour
Senior Engineering Technician 90.00 per hour
Lab Supervisor 60.00 per hour
Mileage 0.50 per mile
Consultation:
Lab Supervisor 60.00 per hour
Field Engineer 90.00 per hour
Project Engineer 100.00 per hour
Project Manager 150.00 per hour
Principal Engineer 155.00 per hour
Lab Report Preparation (per report) 48.00 per hour
SOILS:
AHTD-Qualified Field Technician
Soils Field Technician (1 -hour minimum)
In -Place Compaction Test -Nuclear Gauge ASTM D 2922
Sample Pickup, or Stand-by Time
Nuclear Density Gauge Fee: (per Density Test); [Minimum $15.00 per trip, per project]
Liquid Limit, Plastic Limit, Plasticity index (3 point) ASTM D 4318
Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140
Sieve Analysis -Dry ASTM D 422
Hydrometer Analysis ASTM D 422
Specific Gravity ASTM D 854
Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145
Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99
Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180
Potential Volume Change -Swell Pressure
California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional)
Shrinkage ASTM D 427
Soil Bearing Capacity (Engineering Tech., 2 -hour minimum)
Non -ASTM Procedures Available On Request
CONCRETE:
Concrete Mix Design
Review Concrete Mix Design (Lab Supervisor)
Confirm Concrete Mix Design
Concrete Field Technician * (1 -hour minimum): [For any of the following 6 items:]
• Concrete Cylinder or Beam Molding ASTM C 31
• Concrete Cylinder or Beam Pickup
• Concrete Slump Test ASTM C 143
• Concrete Air Content Test ASTM C 231 or C 173
• Cement Mortar or Group Sampling
• Stand-by Time
Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138
AHTD-Qualified Concrete Technician: (1 -hour minimum), [For any of the foregoing 6 items]
Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap)
Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped)
* ACI Grade I Concrete Field Testing Technician
52.00 per hour
42.00 per hour
10.00 each
50.00 each
35.00 per sieve
8.00 per sieve
90.00 each
50.00 each
110.00 each
130.00 each
145.00 each
100.00 each
150.00 each
50.00 each
60.00 per hour
Price on Request
60.00 per hour
Price on Request
42.00 per hour
50.00 each
52.00 per hour
18.00 each
35.00 each
W:IDRAKE FIELOlCONTRACTS1009-2013VWPENDIX C TOI.DOC Page 1 or 2
APPENDIX C
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
TASK ORDER NO, 1
CONCRETE (Continued):
Spare Cylinders Specimens Processed but not Tested
Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum)
Flexural Strength of Concrete Beams ASTM C 78 or C 293
Spare Beam Specimens Processed but not Tested
Compressive Strength of Grout Cubes
Compressive Strength of Cement Mortar Cubes
Concrete Coring (3" or 4"):
Core Machine & Lab Technician
Additional Lab Technician, as required
Compressive Strength of Concrete Cores (3" or 4")
Other Core Sizes
Aggregate Sieve Analysis:
Dry Sieve ASTM C 136
Wet Sieve ASTM C 117
Fineness Modules
Decantation
Deleterious Materials
Specific Gravity and Absorption of Aggregate ASTM C 127 & C 128
Dry Rodded Unit Weight of Aggregate ASTM C 29
Sodium or Magnesium Sulfate Soundness (5 cycles) ASTM C 88
Additional Cycles
ASPHALT:
Asphalt Mix Design (Marshall Design Method)
Review Asphalt Mix Design (Sr. Engr. Technician)
Asphalt Field Technician
In -Place Compaction Test -Nuclear Gauge (Lab Technician)
Sample Pickup
Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids,
Percent Voids in Mineral Aggregate (3 specimens per test)
Extraction including percent Bitumen and Aggregate Gradation
Laboratory Density of Cored Plugs including Depth Measurement
Asphalt Coring (3" or 4"):
Core Machine & Lab Technician
Additional Lab Technician, if required
Sample Pickup
FIREPROOFING:
Unit Weight, Bonding Strength, Thickness and Sampling
(actual time required for Lab Technicians)
Report Preparation (Lab Supervisor)
STRUCTURAL STEEL:
Bolt Torque Testing: Lab Technician(s)
Field Engineer
Pneumatic Torque Wrench Calibration (twice per day)
Visual Weld Inspection Field Engineer
Services not Listed are Available on Request
All prices are subject to revision each year
WMAKE FIL01CONTF ACTS520O-2013WPPENDIX C T01.60C4m
15.00 each
60.00 per hour
50.00 each
40.00 each
40.00 each
25.00 each
80.00 per hour
42.00 per hour
40.00 each
Price on Request
8.00 each
35.00 each
25.00 each
35.00 each
60.00 each
90.00 each
75.00 each
350.00 each
50.00 each
Price on Request
90.00 per hour
42.00 per hour
42.00 per hour
400.00 each
325.00 each
30.00 each
80.00 per hour
42.00 per hour
42.00 per hour
50.00 per hour/Tech.
60.00 per hour
50.00 per hour
100.00 per hour
50.00 each
100.00 per hour
Page 2 of 2