Loading...
HomeMy WebLinkAbout101-09 RESOLUTIONRESOLUTION NO. 101-09 A RESOLUTION APPROVING AN AGREEMENT WITH McCLELLAND CONSULTING ENGINEERS, INC. FOR AIRPORT ENGINEERING SERVICES. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby approves an Agreement with McClelland Consulting Engineers, Inc. for airport engineering services. A copy of the Agreement, marked Exhibit "A," is attached hereto and made a part hereof. 4�ge,9PP►P,9,, ^�0 °(m o 1 �1f0, mwn�� a m 'c'_' 1 1fp,„ mom-v a v m� : o a'23(61: � m a FAYETTEVI LLE a 4 ��ak4NsJ` A'#$ G'D3Ga° tt PASSED and APPROVED this 5th day of May, 2009. APPROVED: B 0 ELD JO AN, Mayor ATTEST: By: `-1i ; ; `iifi ? SON RA E. SMITH, City Clerk Treasurer CITY OF FAYETTEVILLE AGREEMENT FOR ENGINEERING SERVICES STATE OF ARKANSAS COUNTY OF WASHINGTON This Agreement entered into and executed this 5th day of Mav 2009, by and between the City of Fayetteville acting by and through its Mayor hereinafter called the CITY OF FAYETTEVILLE and McClelland Consulting Engineers, Inc. with offices in Fayetteville, Arkansas, hereinafter called MCE, is intended to endure for a minimum period of three years from the time of its formal execution, extendable by contract amendment to not more than five years. WITNESSETH: Whereas, the CITY OF FAYETTEVILLE is planning to effect improvements to Drake Field, Fayetteville's municipal airport; and Whereas the CITY OF FAYETTEVILLE'S forces are fully employed on other urgent work that prevents their early assignment to the aforementioned work; and Whereas MCE'S staff is adequate and well qualified and it has been determined that its current work load will permit completion of the plans for the various projects on schedule; Now therefore, it is considered to be in the best public interest for the CITY OF FAYETTEVILLE to obtain assistance of MCE'S organization in connection with said engineering services. In consideration of the faithful performance of each party of the mutual covenants and agreements set forth hereinafter, it is mutually agreed as follows: W:IDRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 1 SECTION I - EMPLOYMENT OF ENGINEER The CITY OF FAYETTEVILLE agrees to employ MCE to perform, and MCE agrees to perform, professional engineering services in connection with the projects set forth in the Sections to follow; and the CITY OF FAYETTEVILLE agrees to pay and MCE agrees to accept, as specified in the Sections to follow as full and final compensation for work accomplished in the specified time. SECTION II - DESCRIPTION OF THE PROJECTS The services provided by MCE are anticipated to include but not necessarily be limited to studies, investigations, reports, funding applications, design services, preparation of construction drawings and specifications, bidding services, and engineering services during construction related to: • Additional T -Hangar Unit Expansion(s). • 60x60 Small Corporate Hangars. • East Side Corporate Aprons. • East Side Parallel Taxiway Extension. • Runway Extension Projects to South. • Individual Corporate Hangars and Parking Aprons. • GA Parking Aprons and Sunscreen Development. • Airport Security Improvement Projects. • Runway 16 RSA Project continuation. • Extension of Lancaster Drive. • Airport Layout Plan Sheet Updates • Maintenance and Rehabilitation of Pavements. • Airfield Marking • Airfield Lighting. These services, when requested by the CITY OF FAYETTEVILLE, will be described in specific Task Orders to this AGREEMENT FOR ENGINEERING SERVICES. W:\DRAKE FIELDICONTRACTS12009-20I312009-ENGAGR.doc 2 Additional services a may be included as determined by the CITY OF FAYETTEVILLE by executing Amendments to this BASIC AGREEMENT or by specific Task Orders. Such additional services may include: other projects identified by the Master Plan update, completing air spacing forms; topographic surveys; developing city -required drainage plans; formulating Large Scale Development Plans; performing utility searches, when applicable; and other airport related tasks which are outside the basic scope of services. SECTION III — INFORMATION & SERVICES The CITY OF FAYETTEVILLE will furnish any specifications, standards and other information that may relate to the project including GPS survey data. Aerial mapping data will be provided, free of charge, to MCE on magnetic media. SECTION IV - SERVICES TO BE FURNISHED BY THE ENGINEER MCE will provide the preliminary study, design, construction administration, and construction inspection services necessary to complete the following tasks under this Contract. A. Develop a schedule for each project upon the receipt of the notice to prepare a Task Order for each project. B. Attend preliminary conferences alone or with CITY OF FAYETTEVILLE representative, local officials, State and Federal agencies, utility companies and others regarding the proposed project, its general design, functions and impact. C. Provide surveying, mapping, and related services as required to prepare Right- of-Way/Easement documents for the "CITY OF FAYETTEVILLE'S" use in acquisition activities. W:IDRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 3 D. Provide all field survey data from field work for designing the project and this shall be tied to the "CITY OF FAYETTEVILLE'S" GPS control network. E. Obtain, interpret and evaluate geotechnical data for pavement design and embankment stability. F. Conduct preliminary design and prepare preliminary construction limits, required right of way, ownership map, perform all needed stability analyses, design of detours where needed, and preparation of maintenance of traffic plans detailing needed signing and striping during construction, as well as for permanent application after the completion of street construction. G. Conduct final designs to prepare construction plans and specifications including final construction details and quantities, special provisions, cost estimates, make final field inspection with CITY OF FAYETTEVILLE, make any needed plan changes as a result of the final field inspection and all other work required to advertise and receive bids. H. Furnish plans to all utility companies affected by the project and shall conduct a coordination meeting among all affected utility companies to enable them to develop utility agreements regarding any necessary utility relocations. I. Prepare Contract Documents (Plans, Specifications, and Estimates). These documents shall be in accordance with sound engineering principles. MCE shall coordinate closely with the FAA's Airports Development Office to provide copies of the Plans and Specifications and cost estimates for review as required by the FAA. When projects are FAA -funded, detailed Specifications shall be developed using FAA "Standards for Specifying Construction for Airports" AC 150/5370-10, or other appropriate standards approved for use by the FAA. MCE will obtain a W:IDRAKE FIELD ICONTRACTS12009-201312009-ENGAGR.doc 4 specimen copy of the General Provisions and applicable prevailing wage rates from the FAA and the Arkansas Department of Labor for incorporation into the Specifications for the proposed project. J. Assist the CITY OF FAYETTEVILLE in advertising, answering bid questions, receiving of bids on the various phases of work, evaluating bids received, recommending award of bids, and award of construction contracts. K. Establish benchmarks for elevation control and locate horizontal work to Fayetteville's GPS Control System and provide construction reference points for alignment of the project components. L. Provide construction administration during the construction process including attending pre -construction conferences, visiting the site at least once per month, reviewing Shop Drawings and samples, assisting with Change Orders, preparing monthly Contractor Pay Estimates, and preparing final "Record Drawings". M. Provide construction inspection on either a full time or an as -needed basis during construction as required by each Task Order. The street and parking projects will be designed and constructed to meet local standards in accordance with the CITY OF FAYETTEVILLE'S adopted criteria. These designs shall be based on Standard Specifications for Highway Construction 1996 or 2003 Edition of the AHTD and latest special provisions and City of Fayetteville Specifications except that metric units will not be used. The design concept with regard to street alignment, pavement section, geometrics, detours, right-of-way, and utility relocation shall be submitted by MCE and approved by the CITY OF FAYETTEVILLE prior to beginning design work. W:IDRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 5 SECTION V - COORDINATION WITH OWNER As each Task Order is developed and approved the scope of engineering services and fees will be finalized. MCE shall hold conferences throughout the design of the project with representatives of the CITY OF FAYETTEVILLE to the end that the design, as perfected, shall have full benefit of the CITY OF FAYETTEVILLE'S knowledge and be consistent with the current policies and construction practices of the CITY OF FAYETTEVILLE. The CITY OF FAYETTEVILLE reserves the right to accept or reject any or all plans, but this stipulation will not relieve MCE of responsibility for the design of the project. SECTION VI - OFFICE LOCATION FOR REVIEW OF WORK Review of the work as it progresses under this Agreement shall be made at the CITY OF FAYETTEVILLE'S office. SECTION VII - PRELIMINARY SUBMISSION MCE shall submit three (3) sets of preliminary plans for each submittal at 35%, 65%, and 95%, and meet with the CITY OF FAYETTEVILLE'S staff following each submittal. SECTION VIII - FINAL SUBMISSION The final submission for the construction contract shall consist of the following: A. One (1) copy of all design calculations. B. The originals of all drawings, specifications and contract documents. All design drawings on magnetic media shall be submitted on disks compatible with AutoCAD Release 2007 software. W:IDRAKE FIELD\CONTRACTS12009-201312009-ENGAGR.doc 6 C. The estimated cost of construction and a detailed estimate of time in calendar days required for completion of the contract. D. Three (3) copies of the final plans for CITY OF FAYETTEVILLE'S use. SECTION IX - ENGINEER RESPONSIBILITY DURING "BIDDING" AND "CONSTRUCTION" PHASES During the "Bidding" phase of the project, MCE shall provide all engineering and administrative services needed to obtain bids for the construction project, evaluate the bids, and consult with and advise the CITY OF FAYETTEVILLE as to the acceptability of the best bidder. During the "Construction" phase of work, MCE shall provide administrative and engineering services including resident construction inspection services to determine whether the Contractor has met the requirements of the design plans and Specifications. MCE shall review the Contractor's progress payment requests based on the actual quantities of • contract items completed and accepted, and shall make a recommendation to the CITY OF FAYETTEVILLE regarding payment. SECTION X - SUBCONTRACTING Prior to entering into fee negotiations, the CITY OF FAYETTEVILLE shall approve selection of all sub -consultants to MCE. The CITY OF FAYETTEVILLE reserves the right to reject without prejudice at his discretion MCE'S selection of firms for any subcontracted tasks. W:IDRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 7 SECTION XI - TIME OF BEGINNING AND COMPLETION MCE shall begin work under each separate Task Order within ten (10) days of notice to proceed and shall complete the plans for the construction contract within the time stipulated in each respective Task Order. The stipulated completion time in each Task Order shall be predicated upon the fact that the CITY OF FAYETTEVILLE will promptly provide all pertinent requested information in its possession, and will conduct reviews/approvals of interim work in an expeditious manner (5 working days per submittal). SECTION XII - FEES AND PAYMENTS A. Engineering Planning and Design Services Preceding Construction: MCE shall provide, as enumerated individually in each respective Task Order, application for funding, engineering study, surveying, geotechnical investigation, design, bidding, and easement preparation services for a specifically stated fee amounts. Each Task Order shall also list fee amount for the individual tasks for the Design Phase Services work scope identified therein. The basis of this fee and justification for the fee shall be contained in an Appendix attached to each Task Order. Adjustment of the fee may be made should MCE establish and the CITY OF FAYETTEVILLE agree that there has been, or is to be, a significant change in scope, complexity or character of the services to be performed; or if the CITY OF FAYETTEVILLE decides to shorten the duration of work from the time period W:IDRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 8 specified in the Agreement for completion of work and such modification warrants such adjustment. Additionally, each Task Order shall contain an Appendix, which covers the classification and salary rate for all personnel anticipated to be assigned to this project by MCE. Payment to MCE by the CITY OF FAYETTEVILLE for Design Phase Services shall be made within 30 days after the date of billing. The amount due will be for services rendered during the previous month. Final payment for Design Phase Services shall be made upon the CITY OF FAYETTEVILLE'S approval and acceptance with the satisfactory completion of the "Design" phase of the project. B. Construction Phase Services: MCE shall provide, as enumerated individually in each respective Task Order, construction administration, construction staking, construction inspection, and construction materials testing for a specifically stated fee amounts. Each Task Order shall also list fee amount for the individual tasks for the Construction Phase Services work scope identified therein. The basis of this fee and justification for the fee shall be contained in an Appendix attached to each Task Order. Adjustment of the fee may be made should MCE establish and the CITY OF FAYETTEVILLE agree that there has been, or is to be, a significant change in scope, complexity or character of the services to be performed; or if W:IDRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 9 the CITY OF FAYETTEVILLE decides to shorten the duration of work from the time period specified in the Agreement for completion of work and such modification warrants such adjustment. Additionally, each Task Order shall contain an Appendix which covers the classification and salary rate for all personnel anticipated to be assigned to this project by "MCE". Payment to MCE by the CITY OF FAYETTEVILLE for Construction Phase Services shall be made within 30 days after the date of billing. The amount due will be for services rendered during the previous month. Final payment for Construction Phase Services shall be made upon the "CITY OF FAYETTEVILLE'S" approval and acceptance with the satisfactory completion of the "Construction" phase of the project. SECTION XIII - CHANGES The CITY OF FAYETTEVILLE may at any time, by written order, make changes within the general scope of the contract in the work and services to be performed. If any such change causes an increase or decrease in the cost of, or the time required for, performance of this contract, an equitable increase or decrease shall be made in the upper limit contract amount, including fee or time of required performance, or both, and the contract shall be modified in writing accordingly. W:IDRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 10 Any claim by MCE for adjustment under this clause must be asserted with thirty (30) days from the date of receipt by MCE of the notification of change; provided, however, that the CITY OF FAYETTEVILLE, if it decides that the facts justify such action, may receive and act upon any such claim asserted at any time prior to the date of final payment under this contract. Failure to agree to any adjustment shall be cause for a dispute concerning a question of fact within the meaning of the clause of this contract entitled SECTION XVI - MISCELLANEOUS PROVISIONS, (1) Dispute Resolutions. However, nothing in this clause shall excuse MCE from proceeding with the contract as changed. SECTION XIV - OWNERSHIP OF DOCUMENTS All documents, including original drawings, disks of CADD drawings and cross sections, estimates, specifications, field notes, and data are and shall remain the property of the CITY OF FAYETTEVILLE. MCE may retain reproduced copies of drawings and copies of other documents. The CITY OF FAYETTEVILLE shall not be restricted in the subsequent use of the design, design documents or ideas incorporated in the work. However, MCE shall bear no responsibility for such reuse of the design unless specifically agreed to it writing. SECTION XV - POSTPONEMENT OR CANCELLATION OF THE CONTRACT It is understood that the CITY OF FAYETTEVILLE will have the right to suspend or cancel the work at any time. A. Postponement - Should the CITY OF FAYETTEVILLE, for any reason whatsoever, decide to postpone the work at any time, the CITY OF FAYETTEVILLE will notify MCE, who will immediately suspend work. Should W:IDRAKE HELD ICONTRACTS12009-201312009-ENGAGR.doc 11 the CITY OF FAYETTEVILLE decide during such suspension not to resume the work, or should such suspension not be terminated within a year, the work shall be canceled as hereinafter provided. B. Cancellation - Should the CITY OF FAYETTEVILLE, for any reason whatsoever, decide to cancel or to terminate the use of MCE'S service, the CITY OF FAYETTEVILLE will give written notice thereof to MCE, who will immediately terminate the work. If the CITY OF FAYETTEVILLE so elects, MCE may be instructed to bring a reasonable stage of completion to those items whose value would otherwise be lost. MCE shall turn over all data, charts, survey notes, figures, drawings and other records or information collected or produced hereunder whether partial or complete. Upon such termination of MCE'S services, MCE shall be paid a proportional amount of the total fee, Tess prior partial payments, based on the ratio of work done to the total amount of work to be performed. SECTION XVI - MISCELLANEOUS PROVISIONS A. Dispute Resolution - Any dispute concerning a question of fact in connection with the work and having a financial value of $10,000, or less, shall be referred for determination to the Mayor of the City of Fayetteville whose decisions in the matter shall be final and conclusive. Disputes resulting from claims greater than $10,000 shall be subject to mediation. W:IDRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 12 B. Responsibility for Claims and Liability - MCE shall save harmless the CITY OF FAYETTEVILLE from all claim and liability due to MCE's activities, or those of MCE'S sub -consultants, agents, or employees during the time this contract is in force. C. General Compliance with Laws - MCE shall comply with all Federal, State and local laws and ordinances applicable to the work. MCE shall be a Professional Engineer, licensed in the State of Arkansas. D. Engineer's Endorsement - MCE shall endorse and recommend all plans, Specifications, estimates and engineering data furnished by it. All design shall be checked in accordance with accepted engineering practices. All plan quantities shall be checked and verified. E. That, the Airport Director or his designated representative will direct and coordinate MCE's efforts and will be the source of instructions to MCE and shall have the authority to interpret the CITY OF FAYETTEVILLE's policy as necessary to maintain MCE's work schedule and to administer the BASIC AGREEMENT. F. That, the CITY OF FAYETTEVILLE shall make available to MCE all technical data in the CITY OF FAYETTEVILLE's possession, including maps, surveys, borings, and other information required by MCE and relating to his work. G. That, the estimates of cost for the Projects provided for herein are to be prepared by MCE through exercise of his experience and judgment in applying presently available cost data, but it is recognized that MCE has no control over cost of labor and materials conditions, so he cannot warrant that the project construction costs will not vary from his cost estimates. W:IDRAKE FIELD\CONTRACTS12009-201312009-ENGAGR.doc 13 H. That, MCE's direct expenses are defined as the costs incurred on or directly for the Project, other than the Salary and General Overhead Costs. Such direct expenses shall be computed on the basis of actual purchase price for items obtained from commercial sources plus a 5% mark-up. Direct expenses shall include, but not be limited to, necessary transportation costs, including mileage at MCE's current rate per mile when MCE's own automobiles are used, meals and lodging, laboratory tests, and reproduction charges. I. That, in Geotechnical investigation work and in determining subsurface conditions for the Project, the characteristics may vary greatly between successive test point and sample intervals. MCE will perform this work in accordance with generally accepted soils engineering practices and makes no other warranties, expressed or implied, that conditions actually encountered in the field may not vary from those found during the investigation work. J. That, the CITY OF FAYETTEVILLE, shall pay for all costs of publishing advertisements for bids and for obtaining permits and licenses that may be required by local, State, or Federal authorities and shall secure the necessary land, easements and rights-of-way as described by MCE. K. That, in the event of any legal or other controversy requiring the services of MCE in providing expert testimony in connection with the Project, except suits or claims by third parties against the CITY OF FAYETTEVILLE arising out of errors or omissions of MCE, the CITY OF FAYETTEVILLE shall pay MCE for services rendered in regard to such legal or other controversy, on a basis to be negotiated. W:IDRAKE FIELD\ CONTRACTS12009-20 1312009-ENGAGR. doc 14 L. That, visits to the construction site and observations made by MCE as part of his services shall not relieve the construction Contractor(s) of his obligation to conduct comprehensive inspections of the work sufficient to ensure conformance with the intent of the Contract Documents, and shall not relieve the construction contractor(s) of his full responsibility for all construction means, methods, techniques, sequences, and procedures necessary for coordinating and completing all portions of the work under the construction contract(s) and for all safety precautions incidental thereto. M. That, MCE, when called for in specific Task Orders, shall provide an on-site Resident Inspector and will make reasonable efforts to guard the CITY OF FAYETTEVILLE against defects and deficiencies in the work of the contractor(s) and to help determine if the construction contract has been fulfilled. The Resident Inspector's day-to-day observation will not, however, cause MCE to be responsible for those duties and responsibilities which belong to the construction contractor(s) and which include, but are not limited to, full responsibility for the techniques and sequences of construction and the safety precautions incidental thereto, and for performing the construction work in accordance with the Contract Documents. The Resident Inspector shall have the authority to reject both unsatisfactory workmanship and materials. His primary duties are as follows: 1. Check construction activities to determine compliance with the Plans and Specifications. Inform the Contractor and CITY OF FAYETTEVILLE of any work that is in noncompliance. 2. Check that all testing required by the Specifications is performed. W:IDRAKE FIELDICONTR4CTS12009-201312009-ENGAGR.doc 15 3. Visit the testing laboratory to determine if it has the equipment and qualified personnel necessary to conduct the tests required by the Specifications. 4. Review test reports and certificates for conformance with the Specifications. 5. Maintain a file of test reports and certifications. 6. Inform the Contractor of deficiencies in order that corrections can be made and retesting performed prior to covering any substandard work with additional material. 7. Document quantities of materials used on the project by actual measurements and computations in a field notebook or computer printouts retained in a folder. 8. Maintain a diary, which should contain daily entries made and signed by the Resident Observer. Each entry should include the following, plus any additional pertinent data: (A) Date and weather conditions. (B) Names of important visitors. (C) Construction work in progress and location. (D) Size of Contractor's work force and equipment in use. (E) The substance of important conversations with the Contractor concerning conduct, progress, changes, test results, interpretations of Specifications or other details. 9. Submittal of FAA Form 5370-1, Construction Progress and Inspection Report, or equivalent form to the appropriate FAA field office. The frequency of submittal shall be established at the Pre - Construction Conference. W:\DRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 16 N. It is further agreed that the CITY OF FAYETTEVILLE, the Federal Aviation Administration, the Comptroller General of the United States, or any of their duly authorized representatives, shall have access to any books, documents, papers, and records of MCE which are directly pertinent to the work hereunder, for the purpose of making audit, examination excerpts and/or transcriptions. Records under this Section shall be maintained and made available during performance on FAA grant work under this AGREEMENT and until three years from date of final FAA grant payment for the project. In addition, those records which relate to any "dispute" appear under an FAA grant agreement, or litigation, or the settlement of claims arising out of such performance, or costs or items to which an audit exception has been taken, shall be maintained and made available until three years after the date of resolution of such appeal, litigation, claim or exception. O. in accordance with Executive Order 11246, entitled "Equal Employment Opportunity", as amended by Executive Order 11375, and as supplemented in Department of Labor Regulations, MCE agrees that he will not discriminate against any employee or applicant for employment because of race, religion, age, color, sex, or national origin. P. In executing this AGREEMENT, MCE acknowledges that he has visited the site of the work, that he is familiar with the conditions and characteristics of the site, and that he fully understands the nature, extent and character of the project and the time limitations placed thereupon. He further states that he has discussed the proposed work with the representatives of the CITY OF FAYETTEVILLE. Q. MCE hereby assures that he has and will comply with the Title VI and DBE requirements set forth in Exhibit "C", hereinafter. W:\DRAKE FIELDICONTRACTS12009-201312009-ENGAGR.doc 17 R. MCE hereby states that he has performed planning and design engineering on previous through his laboratory facilities, he has previously performed pertinent work on other airport projects, as well as other projects of a similar nature, and that he has the staff and capabilities to perform the work described herein, in a professional and timely manner. S. Exhibit A, CERTIFICATION OF MCE, is attached to, and made a part of this AGREEMENT FOR ENGINEERING SERVICES, per requirement of the FAA. T. MCE will provide the Federal Aviation Administration with three (3) copies of the updated Airport Layout Drawing at the conclusion of each AIP project. U. MCE will perform the duties of the "consultant" set forth in the CONSTRUCTION MATERIALS QUALITY CONTROL PROGRAM, attached hereafter as Exhibit B. SECTION XVII - SUCCESSORS AND ASSIGNS The CITY OF FAYETTEVILLE and MCE each binds itself and its partners, successors, executors, administrators, and assigns to the other party of this Agreement, except as above, neither the CITY OF FAYETTEVILLE nor MCE shall assign, sublet or transfer its interest in this Agreement without written consent of the other. Nothing herein shall be construed as creating any possible personal liability on the part of any officer or agent of any public body which may be party hereto. SECTION XVIII - COVENANT AGAINST CONTINGENT FEES MCE warrants that it has not employed or retained by company or person, other than a bonafide employee working solely for MCE, to solicit or secure this contract, and that it has W:IDRAKE FIELD \CONTRACTS12009-201312009-ENGAGR.doc 18 not paid or agreed to pay any company or person, other than a bonafide employee working solely for MCE, any fee, commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warranty, the CITY OF FAYETTEVILLE shall have the right to annul this contract without liability. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be o,} ry,, `til etoiTRS1sov� Y�O°•G'.� a =Ca(�= e13— : FAYETTEVILLE LLE a Wm C)°9,QA• \rG TOtioev"�� executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE B Date: m1 , �j c'oeer ATTEST: FOR McCLELLAND CONSULTING ENGINEERS, INC. By:/� President Date: W:IDRAKE FIELD\CONTRACTS12009-201312009-ENGAGR.doc eiyato 19