HomeMy WebLinkAbout07-09 RESOLUTIONRESOLUTION NO. 07-09
A RESOLUTION APPROVING A CONTRACT WITH GOODWIN
& GOODWIN, INC. IN THE AMOUNT OF $1,543,600.00 FOR
CONSTRUCTION SERVICES FOR TIEOVER AND CUTOVER OF
THE WEST SIDE WASTEWATER COLLECTION SYSTEM, WSIP
SUBPROJECT WL -9, BID #0863; AND APPROVING A 5%
PROJECT CONTINGENCY IN THE AMOUNT OF $77,000.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas,
hereby approves a contract with Goodwin & Goodwin, Inc. in the amount of
$1,543,600.00 for construction services for tieover and cutover of the West Side
Wastewater Collection System, WSIP Subproject WL -9, Bid #0863. A copy of the
contract, marked Exhibit "A," is attached hereto and made a part hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas,
hereby approves a 5% Project Contingency in the amount of $77,000.00.
PASSED and APPROVED this 6th day of January, 2009.
APPROVE
L e NELD
ATTEST -
By:
AN, Mayor
SONDRA E. SMITH, City Clerk/Treasurer
1
City of Fayetteville, Arkansas
Water and Wastewater Department
David Jurgens, Director
PROJECT MANUAL
FOR
CONTRACT NO.WL-9
Fayetteville Wastewater System Improvements Project,
Westside Collection System Non -Critical Cutover Plan WL -1,
WL -2, WL -3, & WL -4
RLF PROJECT NUMBER CS -050803-03
FAYETTEVILLE WASTEWATER SYSTEM
IMPROVEMENT PROJECT
•
ENGINEER
RJN Group, Inc.
26 E. Meadow, Suite 8
Fayetteville, AR 72701
RJN Project No. 18187502
In Association With
McClelland Consulting Eng. Inc.
P.O. Box 1229
Fayetteville, AR 72702
SEPTEMBER 2008
l}s•TE
ARI SAS
* * *
REGISTERED
PROFESSIONAL
A ENGI#NEEFt
'.VA No. 8589 1!'
'kris
OWNER
City of Fayetteville
Water and Wastewater
113 W. Mountain Street
ayetteville, Arkansas 72701
fl
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00900 - ADDENDUM NO. 3:
•
Issued to All Bid Document Holders of Record
Date: September 24, 2008
Project Name: Wastewater System Improvements Project
Contract Name: Westside Collection System
Non -Critical Cutover Plan WL -1, WL -2, WL -3, and WL -4
Contract No.: WL -9
RLF Project No.: CS -050803-03
This Addendum forms a part of the Contract described above. The original Contract Documents
and any prior Addenda remain in full force and effect except as modified by the following which
shall take precedence over any contrary provisions in the prior documents.
ADDENDUM NO. 3.
CONSTRUCTION DRAWINGS:
SHEET 7 OF 19:
1. Change Note 3 to read:
Pinch valve shall be a 24 -inch red valve series 5200e, with limitorque on/off electric
actuator as recommended by the valve manufacturer. Valve shall be coated for direct
bury service and EMO torque tube extension. SDR of existing PVC pipe shall be
verified by the contractor prior to installing pinch valve.
2. Change Note 5 to read:
Install 2-1" electrical buried conduits approximately 90 linear feet each from valve vault
to the lift station to terminate at a location specified by OMI.
SPECIFICATIONS:
DOCUMENT 00400 — BID FORM:
3. Replace the entire SECTION 00400 — BID FORM with the attached SECTION
00400 — BID FORM (17 Pages).
DOCUMENT 01270 — UNIT PRICES:
4. Page 01270-8. Paragraph 1.01.A.26.: Change to read:
Bid Item No 26 — Project NC -19 — For the unit price bid per each provide all
labor, equipment, and materials to excavate and install a 4.0' diameter manhole 0-
00900 -WL -9
-00900-W L-9 ADDENDUM No. 3.0oc 00900-1
DOCUMENT 00900 - ADDENDUM NO.: (CONTINUED)
6 feet in depth over an existing force main; cut out the existing force main inside
the manhole; retrieve, label with MH location, and deliver all coupons to the
City; including all traffic control; permits; excavation at all depths; rock
excavation; backfill; compaction; top soil; surface restoration including all types
of paved surfaces; sodding and seeding to match existing vegetation; trench
excavation and safety systems; all testing; and any other item necessary for a
complete project.
Page 01270-8. Paragraph 1.01.A.29.: Change to read:
Bid Item No. 29 — 51 Unit cost work as directed by the City. Measurement and
payment are defined in Divisions 2 and 3.
DOCUMENT 02531— SANITARY SEWER MANHOLES, FRAMES, AND COVERS
6. Page 02531-3. Paragraph 2.02.A.4.a.: Change to read:
a. 22 inches clear. Contractor is responsible for verifying opening
dimensions of delivered product prior to installation. Installed rings and
covers that are less than 22 inches clear will be replaced, including MH
inserts, at the contractor's expense.
7. Page 02531-3. Add Paragraph 2.03.A.8: to read:
8. All points of precast manholes shall be wrapped with Infi-Shield by
Sealing Systems, Inc., or approved equal.
00900 -WL -9 ADDENDUM No. 3.Doc 00900-2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00900 - ADDENDUM NO.: (CONTINUED)
Thomas A. Harris, P E
RJN Group, Inc.
12160 Abrams Road, Suite 400
Dallas, Texas 75243
The seal appearing on this
document was authorized by
Thomas A. Harris, P E No 8589
on 09/24/2008
•
•
yATtk
e:t
ARIgSAS
REGISTERED
PROFESSIONAL
.1 ENGINEER 0 .
oy
ACKNOWLEDGEMENT
The undersigned acknowledges receipt of this Addendum and the Bid submitted is in
accordance with information, instructions and stipulations set forth herein.
Bidder:
By:
Date:
AD NDUM APPROVED BY:
Water and W. tewater e ctor
City of Fayetteville, AR
END OF SECTION 00900
00900 -WL -9 ADDENDUM No. 3.noc
00900-3
ti
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 -BID FORM
Project Name Wastewater System Improvements Project
Contract Name: Westside Collection System Non -Critical Cutover Plan
WL -1, WL -2, WL 3, & WL 4
Contract No.: WL -9
RLF Project No.: CS -050803-03
BID TO:
Owner:
BID FROM:
Bidder:
The City of Fayetteville, Arkansas
113 West Mountain Street
Fayetteville, Arkansas 72701
ARTICLE 1 - INTENT
1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an
agreement with Owner in the form included in the Contract Documents to perform
and furnish all Work as specified or indicated in the Contract Documents for the Bid
price and within the Bid time indicated in this Bid and in accordance with the other
terms and conditions of the Contract Documents.
ARTICLE 2 - TERMS AND CONDITIONS
2.01 Bidder accepts all of the terms and conditions of the Invitation to Bid and
Instructions to Bidders, including without limitation those dealing with the
disposition of Bid security. This Bid will remain subject to acceptance for 90 days
after the day of Bid opening. Bidder will sign and deliver the required number of
counterparts of the Agreement with the Bonds and other documents required by the
Bidding Requirements within 15 days after the date of Owner's Notice of Award.
00400 -Bid Form - Revised 09/24/08.doc 00400 —1
DOCUMENT 00400 —BID FORM (continued)
ARTICLE 3 - BIDDER'S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents, as more fully set forth in the Agreement,
that:
A. Bidder has examined and carefully studied the Bid Documents, and the
following Addenda, receipt of all which is hereby acknowledged:
Number Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost, progress,
performance, and furnishing of the Work.
Bidder is familiar with and is satisfied as to all federal, state, and local Laws
and Regulations that may affect cost, progress, performance, and furnishing
of the Work.
Bidder has carefully studied all: (1) reports of explorations and tests of
subsurface conditions at or contiguous to the Site and all drawings of
physical conditions in or relating to existing surface or subsurface structures
at or contiguous to the Site; and (2) reports and drawings of a hazardous
environmental condition, if any, at the Site. Bidder acknowledges that such
reports and drawings are not Contract Documents and may not be complete
for Bidder's purposes. Bidder acknowledges that Owner and Engineer do
not assume responsibility for the accuracy or completeness of information
and data shown or indicated in the Bid Documents with respect to
Underground Facilities at or contiguous to the Site.
E. Bidder has obtained and carefully studied (or assumes responsibility for
having done so) all such additional or supplementary examinations,
00400 — Bid Form - Revised 09/24/08 00400 — 2
DOCUMENT 00400 —BID FORM (continued)
investigations, explorations, tests, studies, and data concerning conditions
(surface, subsurface, and Underground Facilities) at or contiguous to the Site
or otherwise which may affect cost, progress, performance, or furnishing of
the Work or which relate to any aspect of the means, methods, techniques,
sequences, and procedures of construction to be employed by Bidder and
safety precautions and programs incident thereto.
F. Bidder does not consider that any additional examinations, investigations,
explorations, tests, studies, or data are necessary for the determination of this
Bid for performing and furnishing of the Work in accordance with the times,
price, and other terms and conditions of the Contract Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and
others at the Site that relates to Work for which this Bid is submitted as
indicated in the Contract Documents.
H. Bidder has correlated the information known to Bidder, information and
observations obtained from visits to the Site, reports, and drawings identified
in the Contract Documents, and all additional examinations, investigations,
explorations, tests, studies, and data with the Contract Documents.
I. Bidder has given Engineer written notice of all conflicts, errors, ambiguities,
or discrepancies that Bidder has discovered in the Contract Documents, and
the written resolution thereof by the Engineer is acceptable to Bidder.
I. The Contract Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performing and furnishing the
Work for which this Bid is submitted.
K. This Bid is genuine and not made in the interest of or on behalf of any
undisclosed person, firm, or corporation and is not submitted in conformity
with any agreement or rules of any group, association, organization, or
corporation; Bidder has not directly or indirectly induced or solicited any
other Bidder to submit a false or sham bid; Bidder has not solicited or
induced any person, firm, or a corporation to refrain from bidding; and
00400 — Bid Form - Revised 09/24/08 00400 — 3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
Bidder has not sought by collusion to obtain for himself any advantage over
any other Bidder or over Owner.
L. Bidder will perform the Work in compliance with all applicable trench safety
standards set forth in Occupational Safety and Health Administration
(OSHA) Part 1926 — Subpart P — Excavations.
ARTICLE 4 - BID PRICE
Bidder will complete the Work in accordance with the Contract Documents for the following
prices:
Unit Price Schedule:
BASE LUMP SUM BID ITEMS
_
Non -Critical
1
.4.
. CONTRACTIWL-9
Cutover Plan WL-1WL-2,
BID SCHEDULE,
w.
ry
_,
WL -3 And WL -4 .
=y
a
ITEMEST.
NUMBER
QTY.
UNIT
t
y
UNIT PRICE
TOTAL
" DESCRIPTION
1.
1
LS
Mobilization (Not to Exceed 5% of All
Other Contract Items)
($ )
($ )
Dollars/LS
Words
2.
1
LS
Erosion Control and BMP
($ )
($ )
Dollars/LS
Words
3.
1
LS
Project NC -1
($ )
($ )
Dollars/LS
Words
00400 — Bid Form - Revised 09/24/08
00400 — 4
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
�� r
`. CONTRACTOWL
«- s' Non -Critical Cutover
c , * t, t" BID
Plan
_WL-ij
SCHEDgULE
--
9
WL 2, WL -3
And WL -4
::.--
�;,
- ,
ITEM '
NUNIBER
"EST
. QTY .
UNIT
%DESCRIPTION
`UNIT
PRICE.
TOTAL
,
4.
1
LS
Project NC -2
($
)
($ )
Dollars/LS
Words
5.
1
LS
Project NC -3
($
)
($ )
Dollars/LS
Words
6.
1
LS
Project NC -4
($
)
($ )
Dollars/LS
Words
7.
1
LS
Project NC -5
($
)
($ )
Dollars/LS
Words
8.
1
LS
Project NC -6
($
)
($ )
Dollars/LS
Words
00400 — Bid Form - Revised 09/24/08 00400 — 5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
-
, = Non -Crit
• CONTRACTIWL
cal Cutover Plait WL",0WL
9 ,
2, WL -3, And WL -4
s
14
`' . a, ,
BID SCHEDU�L^E
ITEM
NUMBER
EST.k
QTY.':
UNIT,
- - DESCRIPTION
`
UNIT PRICE
F^ $
TOTAL "
9.
1
LS
Project NC -6 Pinch Valve
($ )
($ )
Dollars/LS
Words
10.
1
LS
Project NC -7
($ )
($ )
Dollars/LS
Words
11.
1
LS
Project NC -7 Lift Station Demo
($ )
($ )
Dollars/LS
Words
12.
1
LS
Project NC -8
($ )
($ )
Dollars/LS
Words
13.
1
EA
Project NC -8 Junction Box #1
($ )
($ )
Dollars/EA
Words
00400 — Bid Form - Revised 09/24/08 00400 — 6
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
< .
- ' Non -Critical
0.
CONTRACT
VVL-9
WL -2, WL -3, And WL
-.
•
•`>
-
ter
Cutover,: Plan WL -1;
'
-4
BID SCHEDULE
$d
4T EM -
NUMBER
' EST
QTY.
UNIT
,
UNIT
PRICE
r
..
TOTAL
y :".
`:?DESCRIPTION
14.
1
LS
Project NC -9
($ )
($ )
Dollars/LS
Words
15.
1
LS
Project NC -10
($ )
($ )
Dollars/LS
Words
16.
1
LS
Project NC -11
($ )
($ )
Dollars/LS
Words
17.
1
LS
ProjectNC-12
($ )
($ )
Dollars/LS
Words
18.
1
LS
ProjectNC-13
($ )
($ )
Dollars/LS
Words
00400 — Bid Form - Revised 09/24/08 00400 — 7
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 -BID FORM (continued)
00400 — Bid Form - Revised 09/24/08 00400 — 8
y
g CONTRACT
WL 9
Non-Ctittcal
J '
Cutover Plan
'BID SCHEDULE
WL
1 WL 2, WL' -3
-
'at
And WL -4,
-
ITEM
' NUMBER'
EST;-
QTY.
UNIT
TOTAL
-DESCRIPTION
JUNIT
PRICE
19.
1
LS
Project NC -14
($ )
Dollars/LS
($ )
Words
20.
1
LS
Project NC -15
($ )
Dollars/LS
($ )
Words
21.
1
LS
Project NC -15 Junction Box
($ )
Dollars/LS
($ )
Words
22.
1
LS
Project NC -15 Lift Station Demo
($ )
Dollars/LS
($ )
Words
23.
1
LS
Project NC -16
($ )
Dollars/LS
($ )
Words
00400 — Bid Form - Revised 09/24/08 00400 — 8
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
..iill CONTRA CT
' ' ` Non -Critical Cutover PIanWL-iI
* ' BID SCIIEDIJLE
_
-a
1W L 9 :
WL -2, WL -3, And
-,
WL.
*
'
-4"
ITEM
NUMBER
i EST
; QTY..
,;;•
UNIT
Y ` y
.. DESCRIPTION
UNIT PRICE,
• TOTAL
24.
1
LS
Project NC -17 Lift Station Refurbishment
($ )
($ )
Dollars/LS
Words
25
1
LS
ProjectNC-18
($ )
($ )
Dollars/LS
Words
26.
19
EA
Project NC -19 4 Ft. Dia. Std. Manhole, 0-
6 Ft. Deep
($ )
($ )
Dollars/EA
Words
27.
30
VF
Project NC -19 4 Ft. Dia. Manhole Extra
Depth, Over 6 Ft. Deep
($ )
($ )
Dollars/VF
Words
28.
1
LS
Project NC -20 Fish Ladder
($ )
($ )
Dollars/LS
Words
00400 — Bid Form - Revised 09/24/08
00400 — 9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
ADDITIONAL BID ITEMS
The following bid items are to be used for additional work that is not shown on the
construction drawings to be completed at the direction of the City and are not considered
payment for work under the lump sum bid items.
00400 — Bid Form - Revised 09/24/08 00400 — 10
..
Non
CONTRACT
Plan WL
SCHEDIDI.E
N -I
WL 9 "-
-1 WL -2, WL -3, And WL -4
1
_
, , • ,,
1
..
-Critical
Cuiover
¢ID
tea,
ITEM
NUMBER
EST
QTY
UNIT
a 'DESCRIPTION
:
UNIT PRICE
TOTAL._':
29.
1
EA
4 Ft. Dia. Std. Manhole, 0-6 Ft. Deep
($ ,
($ )
Dollars/EA
Words
30.
1
EA
4 Ft. Dia. Drop Manhole, 0-6 Ft. Deep
($ )
($ )
Dollars /EA
Words
31.
20
VF
4 Ft. Dia. Manhole Extra Depth, Over 6
Ft. Deep
($ )
($ )
Dollars /VF
Words
32.
1
EA
5 Ft. Dia. Std. Manhole, 0-6 Ft. Deep
($ )
($ )
Dollars/EA
Words
00400 — Bid Form - Revised 09/24/08 00400 — 10
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
Non
1 fi,
Critical
CONTRACTVWL
Cutover
ti BID-.��S��}C;HEDi(s,JLE
+CrJim
Plan WL -I;
If
9
And WL -4 `
..
'VI 2, WL=3,
fi..
ITEM
;NUMBER"
EST .
'QTY.
UNIT
,. DESCRIPTION
,
- 'TOTAL
UNIT PRICE
33.
1
EA
5 Ft. Dia. Drop Manhole, 0-6 Ft. Deep
($ )
($ )
Dollars/EA
Words
34.
10
VF
5 Ft. Dia. Manhole Extra Depth, Over 6
Ft. Deep
($ )
($
Dollars /VF
Words
35.
20
LF
12" Sewer pipe and embedment
($ )
($ )
Dollars /LF
Words
36.
40
LF
8" Sewer pipe and embedment
($ )
($ )
Dollars /LF
Words
37.
40
SY
Asphalt Surface Restoration
($ )
($ )
Dollars /SY
Words
00400 — Bid Form - Revised 09/24/08 00400 —11
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
r:
CONTRACT};WL 9 - •
' Non -Critical Cutover Plan WL
-1 WL -2, WL -3, And WL -4 _ ;
• BID SCHEDiii
LE
ULE
ITEM
`NUMBER
ESTt
QTY.,
UNIT
:
+.
UNIT PRICE1...
.,
.. DESCRIPTION
TOTAL .
38.
40
SY
Concrete Surface Restoration
($ )
($ )
Dollars /SY
Words
39.
20
SY
Sidewalk Replacement
($ )
($ )
Dollars /SY
Words
40.
20
CY
Trench Foundation Material
($ )
($ )
Dollars /CY
Words
41.
10
TN
Granular Backfill, (Class 7 Base)
($ )
($ )
Dollars /TN
Words
42.
10
TN
Riprap
($ )
($ )
Dollars /TN
Words
00400 — Bid Form - Revised 09/24/08 00400 —12
DOCUMENT 00400 —BID FORM (continued)
$' CONTRACT WL -9
ton-Critrcal Cutover, Plan WL 11;WL-2, WL -3 And WL -4
,, , • • ' BID SCHEDULE
T. ITEM
NUMBER•
43.
EST.
QTY...
1
UNIT'
EA
Clay Dam
Words
Dollars /EA
UNIT PRICE"
($ )
TOTAL
($ )
44.
1
EA
Permanent Plug in Exist. Sewer at
Manhole
Dollars /EA
Words
($ )
($ )
45.
1
EA
Temporary Plug in Exist. Sewer at
Manhole
Words
Dollars /EA
($ )
($ )
46.
1
LS
Trench Compaction Tests
Dollars /LS
Words
($ )
($ )
47.
2
EA
Tree Protection
Words
Dollars /EA
($ )
(S )
00400 — Bid Form - Revised 09/24/08 00400 —13
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DOCUMENT 00400 —BID FORM (continued)
CONTRACTIVVL
Non -Critical Cutover Plan WL 1 WL -2
Y - BID SCHEDULE"11
ITEM
• NUMBER
48.
EST.
QTY..
100
UNIT
SY
Hydromulch Seeding
Words
Dollars /SY
UNIT PRICE
($ )
TOTAL
($ )
49.
100
SY
Sod Replacement
Dollars /SY
Words
($ )
($ )
50.
100
LF
Trench Excavation and Safety System
Words
Dollars /LF
($ )
($ )
51.
14,100
LF
Clean and TV 12" Force Main
Dollars /LF
Words
($ )
($ )
BID TOTAL PRICE:
TOTAL PRICE $
Dollars ($ ).
00400 — Bid Form - Revised 09/24/08 00400 —14
DOCUMENT 00400 —BID FORM (continued)
1. Bidder acknowledges that quantities are not guaranteed and final
payment will be based on actual quantities determined as provided in
the Contract Documents.
2. Bidder must provide pipe material as indicated on the plan sheets.
No substitutions of type of pipe will be allowed.
ARTICLE 5 - CONTRACT TIMES
5.01 Bidder agrees that the Work will be substantially completed and completed and ready
for final payment within the number of calendar days indicated in the Agreement.
5.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event
of failure to complete the Work within the times specified in the Agreement.
ARTICLE 6 - BID CONTENT
6.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security, not less than 5% of the Bid total, in the form of a
certified or bank cashier's check or a Bid Bond and in the amount of
Dollars ($
B. Required Bidder's Qualification Statement with supporting data
(DOCUMENT 00140).
C. List of Subcontractors (DOCUMENT 00430)
00400 — Bid Form - Revised 09/24/08 00400 — 15
).