HomeMy WebLinkAbout42-08 RESOLUTIONRESOLUTION NO. 42-08
A RESOLUTION APPROVING CHANGE ORDER #4 TO THE
CONSTRUCTION CONTRACT WITH BRASFIELD & GORRIE, LLC
IN THE AMOUNT OF $624,521.00 FOR CONSTRUCTION OF THE
HAMESTRING SEWER LIFT STATION.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSASI
Section 1: That the City Council of the City of Fayetteville, Arkansas, hereby
approves Change Order #4 to the construction contract with Brasfield & Gorrie, LLC in
the amount of $624,521.00 for construction of the Hamestring Sewer Lift Station.
c->
\,‘ -t Y 0;• ;Yc.:%
• •(TOS
•
“..) • • i3S
•
F. :FAYETTEVILLE:
33C10:Cts
iiii i i • 4%.4%
.......
PASSED and APPROVED this 4th day of March, 2008.
APPROVED: ATTEST:
By:
DAN COODY, Mayor
By:
Oond,r, &
SONDRA E. SMITH, City Clerk/Treasurer
•
Change Order No, 4 Page 1 of 1
CONTRACT CHANGE ORDER
Contract Schedule
Section Date 2/19/2008
RLF Project No.: CS -050808-03 Owner Project No.: WL -6
Project Name: Hamestring Lift Station Location: Fayetteville, Arkansas
Owner: City of Fayetteville Contractor: Brasfield & Gorrie
Address: 113 West Mountain Address: 3021 7th Avenue South
Fayetteville, AR 72701 Birmingham, AL 35233
THE FOLLOWING CHANGES ARE HEREBY AMENDED INTO THE CONTRACT PLANS AND SPECIFICATIONS:
TEM
DESCRIPTION
DECREASE
INCREASE
I
2
3
4
5
6
Furnish the necessary labor, materials, equipment, tools and
supervision to:
Instill Channel Monster Structure in 48 inch gravity sewer to the
Han.estring Lift Station
Instr II valve actuator on the 30 inch valve on the force main
Instill limit switches on the hydraulic check valves to provide
local shutoff control
$1,9 10
$4,321
$596,278.00
$26,436.00
$4,469.00
$3,569.00
Instill additional controls on the dehumidifiers for electfic heating.
Exclude test & Letter Certification for Harmonic Study
Exclude testing of carbon absorbtion
TOTAL DECREASE AMOUNT
TOTAL INCREASE AMOUNT
NET CHANGE ORDER
$6.23 1.00
$630,752.O0
$624,521.O0
CHANGE TO CONTRACT AMOUNT.
TOTAL AMOUNT
ENGINEERS FINAL
ELIGIBLE AMOUNT
Original Contract Amount
$6 130,00000
Total Previous Change Order(s)
$181,439.00
Net Amount This Change Order
$624521.00
$624 521.00
TOTAL CONTRACT AMOUNT TO DATE
$6.935,960.00
CHANGE TO CONTRACT COMPLETION DATE:
Original Completion Date Wednesday, December 19,2007
Previous Ad ittsted Completion Date Friday, February 15, 2008
(Increase)(Decrease) This Change Order Increase 122 days Calendar Days
NEW CONTRACT COMPLETION DATE: Monday, June 16,2008
RECOMMENDED. GRO
Engin r
2-28-00
Project Manager
BY:
.4 —..•
Signaiure Title Date
ACCEPTED. Brasfield & Carrie, LLC
ontractor
Vret MLE-5313Ctit It
BY: c
Ilittlithict th-Vr6tth.1 Nsalia&kt 1.-2.60-10Z,
Signatur
Title Date
APPROVED: 4
CI o F
BY:
nr
-- ' "if An al 6114--
-3 1 (
,I - ,
Signature fltle
Date
•
BRASFIELD
GORItIE
& GENERAL CONTRACTORS
Hamestring lift Station
Channel Monster Site and Structure Breakdown
2/14/2008
Description Amount
General Requirements $24,753.00
Construction Equipment $84,847.00
Other General Requirements
** Contingency **
Dewatering $25,124.00
Excavation Grding & Backfill $78,280.00
Piling/Casing/Rock Anchors
" No Rock Anchors •"
Roads and Walks
Concrete Paving
Site Improvements
Remove / Replace Fence
Landscaping
Grassing
Concrete Work
Metals - Misc - Hatches
Hatches
Ha nd rail
Grating
Include Bar Screen
565,166.00
$1,433.00
$1,000.00
$120,290.00
$36,541.00
Caulking & Sealants $377.00
Equipment - Process $25,854.00
Instrumentation $23,988.00
Mechanical - Process 556,561.00
Pipe Modifications
Electrical
Baily Electric
Indirect Costs
Sales Tax
PT&I
Builders Risk
Bond
$57,500.00
521,000.00
TOTAL 5622,714.00
BRASFIELD MID GORRIE, LLC
3ozt rut Avenue South Birmingham, Alabama 35133
1':103.348.4000 It: 103.131.1304 34'.; BrasfieldGorrie.com
David Jurgens
Submitted By
City of Fayetteville
Staff Review Form
City Council Agenda Items
or
Contracts
4 -Mar -08
City Council Meeting Date
Wastewater System Improv Proj
Division
Action Required:
ee5
31q/eg
graSkileigerrifj
COP/9
Water/Wastewater
Department
City Administration recommends approval of change order # 4 to the construction contract with Brasfield & Gorrie,
r
LLC., in the amount of .00 for construction of the Hamestring Sewer Lift Station, WL -6, and maintain the
existing $95,194 current! approved contract contingency.
(0 24.5.2A
622.4 Sal
_§.7.414r00
Cost of this request
4520.9520.5801.00
Account Number
02133.0362
Project Number
Budgeted Item
XX
113,086,082
Category / Project Budget
891150,585
Funds Used to Date
23,9351497
Remaining Balance
Budget Adjustment Attached
Wastewater System Imp Project
Program Category / Project Name
Water and Wastewater
Program / Project Category Name
Water/Sewer
Fund Name
Departmrjt Di
tor
e
City Attorney\
Taut .
Finance and Internal Service Director
Mayor
Comments:
16- Fat V)
Date
2//
Date
-68
Date
Date
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
126-06
18 -Jul -06
1045
TaT"Tettetille
ARKANSAS
CONTRACT REVIEW MEMO
City Council Meeting of 4 March, 2008
To: Mayor Dan Coody
From: David Jurgens, Water and Wastewater Director
Fayetteville Sewer Committee
Date: February 15, 2008
Subject: Approval of change order # 4 to the construction contract with Brasfield & Gorrie, LLC.,
in the amount of $ 0, for construction of the Hamestring Sewer Lift Station, WL -6. Funds
are available withi the WSIP project budget.
ZA1.57-1
RECOMMENDATION
240fra;
City Administration recommends approval of ch nge order # 4 to the construction contract with
Brasfield & Gomm, LLC., in the amount of S4CT2TOO for construction of the Hamestring Sewer
Lift Station, WL -6, and maintain the existing $95,194 currently approved contract contingency.
BACKGROUND
The Hamestring Lift Station (WL -6) pumps over 85% of the wastewater to the new West Wide
Wastewater Treatment Plant, with a capacity of 36 million gallon per day through seven 350
horsepower pumps. The lift station pumps water through the 24" and 30" sewer force mains and is
the single critical pivot point to the City's wastewater system on the west side of town. The lift
station is where 515' Street crosses Hamestring Creek.
In the last four years, there have been two significant failures at the Noland WWTP due to large
items entering the influent pump station. Each of these failures resulted in more than $100,000
damages; one resulted in a substantial overflow. This grinder unit, purchased last month by the
City, will prevent these type failures from occurring on the West Side WWTP system by screening
the flow at the Hamestring lift station.
DISCUSSION
This change order is for two major items. (1) Installation of a Channel Grinder style screening and
grinding unit and the associated concrete vault, electrical system, controls, piping, and other
associated hardware (to save time, the grinder unit was already purchased by the City and is
scheduled to arrive in April) placed on the front end of the lift station. A screen is now required by
Ten State Standards. It was considered but specifically excluded from the design several years ago
to reduce costs. Staff and consultants strongly recommend this screen be installed to protect both
the pump station and the plant from foreign items entering the lift station. (2) An automatic valve
actuator that allows both live operators and the SCADA system to automatically control which force
main the Hamestring lift station pumps into. This will be employed automatically via SCADA
during high flow periods, and by operator control during maintenance activities.
This change order has been reviewed by RJN Group, the Engineer; they recommend approval
BUDGET IMPACT
Funds are available within the WSIP project budget. This proposal would keep the contingency at
the existing approved value of $95, 194.
WL -6 Change Order#4 CCMemoDec07
RESOLUTION NO.
A RESOLUTION APPROVING CHANGE ORDER #4 TO THE
CONSTRUCTION CONTRACT WITH BRASFIELD & GORIE, LLC IN
THE AMOUNT OF $624,521.00 FOR CONSTRUCTION OF THE
HAMESTR1NG SEWER LIFT STATION.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas, hereby
approves Change Order #4 to the construction contract with Brasfield & Gorie, LLC in
the amount of $624,521.00 for construction of the Hamestring Sewer Lift Station.
PASSED and APPROVED this 4th day of March, 2008.
APPROVED: Al kST:
By: By:
DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer
CONTRACT CHANGE ORDER
Change Order No.
Contract
Section
Project No.:
4 Page I of I
Schedule
Date 2/19/2008
RLF Project
Project Name:
Owner:
Address:
No.: CS -050808-03
Owner
Location:
Contractor:
Address:
WL -6
Hamestring Lifi Station
Fayetteville Arkansas
City of Fayetteville
Brasfield & Gome
113 West Mountain
3021 7th Avenue South
Fayetteville, AR 72701
Birmingham. AL 35233
THE FOLLOWING CHANGES ARE HEREBY AMENDED INTO THE CONTRACT PLANS AND SPECIFICATIONS:
ITEM
DESCRIPTION
DECREASE
INCREASE
I
2
3
4
5
6
Fumish the necessary labor, materials, equipment, tools and
supervision to:
Install Channel Monster Structure in 48 inch gravity sewer to the
liamestring Lift Station
Install valve actuator on the 30 inch valve on the force main
Install 'knit switches on the hydraulic check valves to provide
local shutoff control
Install additional controls on the dehumidifiers for electric heating.
Exclude test & Letter Cenilication for liamionic Study
Exclude testing of carbon absorbtion
SI ,910
$4,321
$596,278.00
$26,436.00
$4,469.00
$3,569.00
•
TOTAL DECREASE AMOUNT
TOTAL INCREASE AMOUNT
NET CHANGE ORDER
6,231.00
$630,752.00
$624,521.00
CHANCE TO CONTRACT AMOUNT:
TOTAL AMOUNT
ENGINEERS FINAL
ELIGIBLE AMOUNT
Original Contract Amount
Total Previous Change Order(s)
Net Amount This Change Order
TOTAL CONTRACT AMOUNT TO DATE
$6 130.000.00
5624,521.00
$181 439.00
$624,521.00
$6,935.960.00
CHANGE TO CONTRACT COMPLETION DATE:
19, 2007
Original Completion Date
Previous Adjusted Completion Date
(Increase)(Decrease) This Change Order
NEW CONTRACT COMPLETION DATE:
Wednesday, December
Friday, February 15, 2008
Increase 122 days Calendar Day
Monday, June 16, 2008
RECOMMENDED:
BY:
ACCEPTED:
BY:
A PI'ROVED:
BY:
RJN GROUP
Project Manager 2/19/2007
Engineer
Signature
Brasfield & Gorrie, LLC
Title Date
Contractor
Signature
City of Fayetteville
Tule Date
Owner
Signature
Title
Date
BRASFIELD
GORRIE
a? GENERAL CONTRACTORS
Hamestring Lift Station
Channel Monster Site and Structure Breakdown
2/14/2008
Description Amount
General Requirements 524,753 00
Construction Equipment 584,847.00
Other General Requirements
" Contingency**
Dewatering $25,124 00
Excavation Grding & Backfill 578,280 00
Piling/Casing/Rock Anchors
** No Rock Arichors •*
Roads and Walks
Concrete Paving
Site Improvements
Remove / Replace Fence
Landscaping
Grossing
Concrete Work
Metals - Mtsc - Hatches
Hatches
Handrail
Grating
include Bar Screen
565,166 00
$1,433 00
$1,000 00
$120,290 00
$36,541 00
Caulking & Sealants 5377.00
Equipment - Process 525,854 00
instrumentation 523,988 00
Mechanical - Process 556,561 00
Pipe Modifications
Electrical
Daily Electric
Indirect Costs
Sales Tax
PT&I
Builders Risk
Bond
557,500 00
521,000 00
TOTAL $622,71400
BRASFIELD Mit1 GORRIE, LLD
3tni Tni Avenue South Birmingham. Alabama 35133
N 105.32g 4000 1. -05 ..51 1304 W: BeasfieldCorrie corn
anTZtVile
City Council Meeting of 4 March, 2008
WSIP WL -6 Channel Monster
WL -6 Change (Media CCMemoDec07 photos
1(3.7.08) Clarice Pearman -Res. 42-08
Patti
From:
To:
Date:
Subject:
Attachments:
Clarice Pearman
Jurgens, David
3.7.08 12:42 PM
Res. 42-08
42-08 Brasfield & Gorrie LLC C04.pdf
CC: Audit
David:
Attached is a copy of the above resolution passed by City Council regarding Brasfield & Gorrie. Please let me know if there
Is anything else needed for this item. Have a good weekend.
Thanks.
Clarice
Clarice Buffalohead-Pearman, C.A.M.C., C.M.C.
City Clerk/Treasurer Division
113 West Mountain
Fayetteville, AR 72701
479 575-8309
cpearman@cilayetteville.ar.us
aThte hey -111e
City Council Meeting of 4 March. 2008
WSIP WL -6 Channel Monster
WI2-6 Change Order#4 CCMemoDec07 photos
City Council Meeting of 4 March, 2008