HomeMy WebLinkAbout28-08 RESOLUTIONRESOLUTION NO. 28-08 A RESOLUTION AWARDING BID #08-16 AND APPROVING A CONTRACT WITH KINCO CONTRACTORS, LLC IN THE AMOUNT OF $240,784.72 FOR THE INSTALLATION OF SIX (6) TRAIL BRIDGES FOR SCULL CREEK TRAIL; AND APPROVING A 15% PROJECT CONTINGENCY IN THE AMOUNT OF $36,117.71. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #08-16 and approves a contract with Kinco Contractors, LLC in the amount of $240,784.72 for the installation of six (6) trail bridges for Scull Creek Trail. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a 15% project contingency in the amount of $36,117.71. PASSED and APPROVED this 19th day of February, 2008. APPROVED: By: ATTEST: By:eTtoacn DAN COODY Mayor SONDRA E. SMITH, City Clerk/Treasurer & .. C, Y 0,c .G u •••• •"3 - E FAYETTEVILLE: 2. 7- • •�' %9s' :QkAN9SY J�'c� ", Gn ne,� G� DOCUMENT 00500 CONTRACT THIS AGREEMENT, made and entered into on the 19 t A day of �-e-b Kua r 2008, by and between Kinco Constructors, LLC herein called the Contractor, and the Ci Fayetteville, Arkansas, hereinafter called the Owner. WITNESSETH: That Kinco Constructors, LLC, for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville, Arkansas as follows: That Kinco Constructors, LLC shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Scull Creek Trail Bridges, dated January, 2008. Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond Payment Bond General Conditions Supplementary Conditions Specifications 10 Drawings (Bound Separately) 2. That the City of Fayetteville, Arkansas hereby agrees to pay to Kinco Constructors, LLC for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States, the amount of Two Hundred Forty Thousand, Seven Hundred Eighty Four and 72/100 Dollars ($240,784.72) 3. The Work will be substantially completed within 90 days after the date when the Contract Time commences to run as provided in the Notice to Proceed. 4. Liquidated Damages: The City of Fayetteville, Arkansas and Kinco Constructors, LLC recognize that time is of the essence of this Agreement and the City of Fayetteville, Arkansas will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville, Arkansas if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville, Arkansas and Kinco Constructors, LLC agree that as liquidated damages for delay (but not as a penalty) Kinco Constructors, LLC shall pay the City of Fayetteville, Arkansas Three Hundred ($300 00) for each day that expires after the time specified in Paragraph 3 for Substantial Completion. FY072125 Scull Creek Trail Bridges 00500 - 1 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville, Arkansas shall make partial payments to Kinco Constructors, LLC on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by Kinco Constructors, LLC, LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville, Arkansas until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville, Arkansas. 6. That upon submission by Kinco Constructors, LLC of evidence satisfactory to the City of Fayetteville, Arkansas that all payrolls, material bills, and other costs incurred by Kinco Constructors, LLC in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by Kinco Constructors, LLC of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville, Arkansas. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville, Arkansas shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, Kinco Constructors, LLC shall, at its expense, within 5 days after the receipt of notice from the City of Fayetteville, Arkansas, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville, Arkansas. In such event, no further payment to Kinco Constructors, LLC shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the City of Fayetteville, Arkansas. 8. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 9. This Contract shall be governed by the law of the State of Arkansas. 10. Freedom of Information Act. The City of Fayetteville, Arkansas contracts and documents prepared while performing City of Fayetteville, Arkansas contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, Arkansas, Kinco Constructors, LLC will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of information Act (A.C.C.$25-19-101 et. Seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. FY072125 Scull Creek Trail Bridges 00500 - 2 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL: WITNESSES: lllllll tikkqTResq • • S TEST: •A. • •G�SY 0,: ••,p• S 3 •p- FAYETTEVILLE: D\-0Lik) ItPA, O'KANI; ......co %%%%%%%%%%%%%%% as to fo 6fivA FY072125 Scull Creek Trail Bridges KINCO CONSTRUCTORS, LLC CO .:l 'C JR v Title CITY OF FA A TTEVILLE, ARKANSAS By4 Li Mayor Attorney for Owner. 00500 - 3 Matt Mihalevich Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 2/19/2008 City Council Meeting Date Agenda Items Only Engineering Division Action Required: 2-S o8' %fl (anYi2ttht LL t 41g, &d - or -/(D 5.44. 1✓ra:L ,8n,tdgt4u Operations Department Approval of a resolution awarding Bid # 08-16 and approving a contract with in the amount of $ for the complete installation of the 6 trail bridges for Scull Creek Trail; and approving a 15% project contingency in the amount of $ Cost of this request 4520-9520-5814.05 Account Number 06036 / 1 Project Number Budgeted Item X 790,547.75 Category / Project Budget 52,972.75 Funds Used to Date $ 737,575.00 Remaining Balance Budget Adjustment Attached Transportation Bond Trail Improvements Program Category / Project Name Trail Improvements Program / Project Category Name Sales Tax 2006A Construction Fund Fund Name 1111.6.11.1 Department Director Date ir City Attorney DL Finance and Internal Service Director Mayor Date Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Comments: Revised April 16, 2007 Matt Mihalevich Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 2/19/2008 City Council Meeting Date Agenda Items Only Engineering Division Action Required: Operations Department Approval of a resolution awarding Bid # 08-16 and approving a contract with Kinco Contractors, LLC. in the amount of $240,784.72 for the complete installation of the 6 trail bridges for Scull Creek Trail; and approving a 15% project contingency in the amount of $36,117.71. $ 276,902.43 Cost of this request 4520-9520-5814.05 Account Number 06036 / 1 Project Number 790,547.75 Transportation Bond Trail Improvements Category / Project Budget 52,972.75 Program Category / Project Name Trail Improvements Funds Used to Date Program / Project Category Name 737,575.00 Sales Tax 2006A Construction Fund Remaining Balance Fund Name Budgeted Item X Budget Adjustment Attached Department Director Date City Attorney Date Finance and Internal Service Director Date Mayor Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in City Clerk's Office Received in Mayor's Office Comments: Revised April 16, 2007 Wttev!lle ARKANSAS City Council Meeting of February 19, 2008 Agenda Item Number CITY COI ACM AGENDA MEMO To: Mayor and City Council Thru: Gary Dumas, Director of Operations Ron Petrie, City Engineer From: Matt Mihalevich, Trails Coordinator Date: February 11, 2008 Subject: Scull Creek Trail Bridges — Installation Only, Bid #08-16 RECOMMENDATION • Approval of a resolution awarding Bid # 08-16 and approving a contract with Kinco Contractors, LLC. in the amount of $240,784.72 for the complete installation of the 6 trail bridges for Scull Creek Trail; and approving a 15% project contingency in the amount of $36,117.71. BACKGROUND As construction of Scull Creek Trail continues to progress, a total of 6 pedestrian trail bridges are necessary to complete the trail from Mud Creek Trail south to Frisco Trail. in an effort to reduce cost, the fabrication and delivery of the bridges was bid directly by the City as Bid #08-15 (Scull Creek Trail Bridges — Equipment Only) and will delivered to the individual bridge sites to be installed by the contractor of Bid #08-16. Under Bid #08-16 the contractor will be responsible for the excavation and construction of concrete bridge abutments at each of the 6 bridge locations along with stream bank stabilization work to protect the abutments from flood events. Once the abutments are complete, the contractor will install the prefabricated bridges (provided by the City) and pour a concrete deck with 15 foot approach slabs on each side. The City trails crew will then complete the trail by paving up to the approach slabs on each side. The individual bridges and lengths are listed below along with a map of the bridge locations on page 2. Bridge Name Span Length CMN Bridge Dr. Bridge 62 feet Ash St. Bridge 64 feet Sycamore St Bridge 38 feet Bridge Name Span Length Bernice Dr. Bridge 50 feet Cleveland St. Bridge 50 feet Frisco St. Bridge 80 feet DISCUSSION The style of bridges will match the recently installed Town Branch Bridge and will be fabricated from Weathering Steel which will never require painting or any maintenance. RESOLUTION NO. A RESOLUTION AWARDING BID #08-16 AND APPROVING A CONTRACT WITH KINCO CONTRACTORS, LLC IN THE AMOUNT OF $240,784.72 FOR THE INSTALLATION OF SIX (6) TRAIL BRIDGES FOR SCULL CREEK TRAIL; AND APPROVING A 15% PROJECT CONTINGENCY IN THE AMOUNT OF $36,117.71. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #08-16 and approves a contract with Kinco Contractors, LLC in the amount of $240,784.72 for the installation of six (6) trail bridges for Scull Creek Trail. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a 15% project contingency in the amount of $36,117.71. PASSED and APPROVED this 19th day of February, 2008. APPROVED: ATTEST: By: By: DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer The installation of the bridges was advertised on January 18t and 25th, 2008 as bid number 08-16 with official bids on February 8th, 2007. The official bid tab will be attached. BUDGET IMPACT Funds for the installation of the bridges outlined above has been budgeted as part of the trails portion of the Transportation Bond Program. Sufficient funding is available for this contract. BRIDGE LOCATIONS MAP SCULL CREEK TRAIL Page 2 i h g 15f 8»88888 !og"Sga . 59,870.00 I 888_8888~8 0Rn »-SNNa �gggg 5800.00 I 88888~ raffia foga M 51,210.00 1 88"88 Lgng� MNM 522,000.00 I 88 H 215,980.00 I Es 88888888 N g s x 52,000.001 k 55,500.00 1 e N 8N88 $QQn«'o a««ea C 88 8G C a 57300.00 1 8 «a« 88 522,000.00 1 88 Cr:f±nN 4 00'555 8888 .1 8CG 1522,000.00 1 8 gn 8 00'Sff 88888 SFN C8C8 »» 522,000.00 G 8 «sa C C C C G «Nw C 8888 nrf NQ 8 8Ei MIDLAND CONSTRUCTION, INC. yyy BpFpi,Q8Qp8pp8p8 g gY._SS «»aS fn 57,259.001 8888 oo sa.s f»g 57.03335 I 88 4tR p8p8R888888y8psi8Q8QQ8QR88888 -ssa»aa»^^»«a_a«»»�x» f. rn. eann n8Eaa.S 3$g"'88S 1 54,760.00 1 g8gp8p88p8p882 b3:�,$8:1..g aaasas»x 1— 53,400.001 14,000.00 8 n R » 1 888888 gkE 585.00 888888.888888888888888888888 .»ssa«$a««'a»a$8ag�»»a88» 514.00 „8 327.00 1 88888888 snp»ansa 4 48888888888888888888888888888p4 gmggSS«'r'3Sg«eg258$' - » -- N $g55�8Q55� n41-71a gQy .a4..= » yp Naaa a°m°$eff'88 -a.ia- N QQ » gg 54,002.00.1 888 anB n -imr: N $3,000.00 1 8 S $3(!10.0 80888888 nnnga»gig .ia - N » a 52,800.00 8 X n 53,000.00 8 r 8 n g c 888888888888888888880 §a§mxa«8fsa« .i_ __ 3^ _ a«$�n N 530.00 _ » 53,000.00 1 8888888888888888888888 a« _ Bag» _ aanaaam«aa�k nn BENCHMARK CONST. OF NWA $sq 1§ 511,000.00I s8Q8888g8.8R8pn88g88`.8ae %$ »»sane-sans=saaa.nn= g a 8$ g f n a g$ c= o �n $ a a 8 54,700.00 53,553.781 888ar.88888n8888888888 '40 ^s«« g w$ E 'eowr',_•Er ❑s«s»as-x« „ e, q$ a e«& ssa« g Q R4. - n k 888888 !HUH .no388Sg 547.00 .aft«a m8888 536.85 1 88888,so8808 §ES.4RnnNngg«AiSga5.Qf0«»!naa.S.n.'�n p88;$88888«f888_8R=888 Naf KINCO CONSTROCTORS, LLCI 888Q8888888888888 gik -« CR aa«ananann-a FImk E.»§.§. 53,799.97 888»88 $e8$g -- - 53,000.00 '888a8888a88888888888 gIkkoAP a =naa -a IWAR na^na^°na a=gkgg N»n 5300.0 '" S tt y 8 888888v.88 g_u§k§i »» as 511,000.00 1 Se8888a888888 . .4 �x-..PSAB»'»o » »n » 53,000.00_ 574.96 88888888:888888888888 �I -4". G`ASRga»L{paarnAM'i » 4 a n I nnnnnnHUyn2w i”t1 tinnynnHbynnyUU4>JWn U< H 2 C eee _ 82.75 f,'9"__-i-n_ 28 1 66.7 I 22 8 25 .__^S=rorg„n88 I 200 1 8 l'8 6 11 Mobilization and Demobilization ( Lmited m 5% of Bid) eu g'e11 g Clino & Grubbing (5 Bridge Sltea) _1 6i <- a g g 6"Cetaete Bridge Deck for CMN Bridge I s 8 P 2 I Native Stone Ripnp for Channel Widening at CMN Bridge 6 1 m Ash Street Bridge Installation (Bridge Supplied by Ciry)__ AEI 5b5i li8W g myg-afl F Sb am Sy ro» ummg FS g gggggg U £ 8* 4E n Native Stone Ripnp for Sycamore Sten Bridge Site Removal of 30 SY Asphalt & 35 LF of Curb and Gutta _ E = F gf W 2" Asphalt Pavement Repair b 0 Bernice Drive Bridge Abutments I Bernice Drive Bridge Installation (Bridge Supplied by City) 16" Concrete Bridge Deck for Benin Drive Bridge Native Stone Ripnp for Bernice Drive Bridge Site rg ei < em II Ci SS E 3 r Concrete Bridge Deck for Cleeland Shat Bridge RnsininR Walls for Cleeland Stat Bridge _ Native Stone Rinrao for Cleveland Street Bridge Site € € . [Frisco Stat Bridge Instillation (80 R.) (Bridge Supplied by City) and b-`j` $Syg 2,t1” eAg c° vU8 mygei sg r 2 2 IUndacut and Backfill (Field Measured) P 514cm E<_.1 gfig 8 D s d sc 1Sue Erosion & Storm Water Control i1 Itailr,pad ROW ISpecial insurance for Risco Bridge Work vritl ✓ E _Ne.nern -^^+ I 5' 1 20 21 «A«r 26 «..ane.,.,»^.,nn",Se<:3 45 e O LL R= ag 1 CROSSLAND HEAVY PONTRArTORR Extended 1 8 k 888888888«888$'r8'e888$$g.$$$g.8$$s$$$$$$$$$$$e g^e$kgng8gg §IIP FII =§I§gIWA Fg$$ $8 E. 3 A. i o $gn$g HE .'E- » 1528,000.00 p$$ 8 » SI Ip00.00 I 888$8888y$8$_8s8888g88888gss agiiB�'r'��nIS�'r$Trg—«gEEERREg » »» » 67,1" 513000.00 88888888888888888 .YBK«»»»LS$ » AS'" —8 er » 1 16,200.00 I NJ. LEE CONST. CO. $8s00$8rv$888RRS$$$ ggBR$8gR5g$fn_-t 7i^ aae»arms» as 888$$8$$$88$s$$R$RR$88888 >I 188-ag%E» 85« »as "a» S8�p55M�8_8 «»«»s$x» $7,20000 888 g$$ R S € 888588888888888888888888888888 »aa.“ 3»" 3»" » aa" asi"" 542.00 888 3«" I 526.00 I 8 I 533.00 I 8888888 » I $1,600.00 0 » APACIMcCLINTON ANCHOR 1 8$8$$8ssgsssss88g$8 Rsgksseass,�;�na$ig» ^f2Ss o:x0Al=_ __ 52,977.00 1 8888888888 »sO_•OO r2»»»tt_"4,4 $»»& 521,000.00 88 FA » 511,560.00 gg »w »» 56,62500 8888$$ §_aaaaa a»=»FS 5600.00 s S e 3 EkkEE15akEna4 88888880088888888888888888888888888888888888888 J =ARSB EE1g§A'.mY2EVa »$«L.a5E„gg TOMLINSON ASPHALT Cr) 0 i 888$$$ U§§§43 58,540.00 I 88 »» 521,000.00 88 ,« $3,296.00 1 88888838888888888$888888888888888 »"""R«"8�$§6$�.»"�,8kaeg$m:YZ 5 $ 5oP 88S _ » 3 E g 88.888$88S8888S888.88S888888888008 §01§§a_„3$�$»EF$$5E„„E'.",88$og828 aR" "y 525,000.00 88.88.888888888 »»»».,^8=»388 "8» E yy»ya n J y«y*-`y»" n ...1 n N N 2 n ?cd N yoU.'`.y,' J J N Vii r/�) J b N J v.»-+V"S1""."�'y»" n J c. J 3 J N yy"� J n N 6 ) U Z F N 6 6 N J Q �y yy4.», J n I_ 28 n 1 LOI L 340 300 = s a d & F. B Q Demobilizationfl Stabilization and Demobilization ( Limited to 5% of Bid) Constriction Control layout Gr _ Clearing & Grubbing (5 Bridge Sian) _ CMN Bridge Abutments _ I s g m o qq' & zm u 6^ Concrete Bridge Deck for CMN Bridge 1s m "2 w a 3 Native Stone Riprap for Channel Widening at CMN Bridge Ash Sheat Bridge Abutments r amt �5� o 2 in �mo� y�oF S 44 1 Z 1a '3 Native Steele Riprep for Channel Widening al Ash Steel Bridge &a mm` n s E 8IILA m 772 5 » 16" Concrete Bridge Deck for Sycamore Street Bridge m H g w T Removal of 30 SY Asphalt & 35 LF of Curb and Gutter _ I z s s � E - F 2" Asphalt Pavement Repair _ Concrete Curb & Gutter Bernice Drive Bridge Abutments Bernice Drive Bridge Installation (Bridge Supplied by City). _ m� >= �m 3 c,E i.3 ma .oz Cleveland Street Bridge Abutments _ i a s w m 1 % w v 0 6" Concrete Bridge Deck for Cleveland Street Bridge Reaming Walls for Cleveland Sten Bridge NBI G ,3 a Friers Bridge Abutments _ _I ;, ., ca m a = c m 'm 'n p r 16" Concrete Bridge Deck for Cleveland Seem Bridge rS Id a, ali s -tag E 161- 2g -8-/ Mm.b `X m 'G .. mi F u 16"Concrete Approach Slabs err _ E dP F 'Seeding. Fertilizer & Mulch w wr - U E\ o _ 'Special lmm uncpf0TEriscn o Bridge Work wi Railload ROW -- m F .k s 2J 25 26 27 28 32 34— 35 39 40 41 42 1 • Finance & Internal Services Director. Budget Manager: IT Manager: Dispatch Manager: Utlllhes Manager: Other. Revised 6/17/03 Special Instructions: Per Bid #08-16 and Res* CD fv V O) O W N A + 'Requester: • Ginnv Armenian 0T Vendor #: 16924 City Of Fayetteville Shipping/Handling Bridge Installation for Scull Creek Trail Development (P� O0 _ O Quantity !Vendor Name: KInco Construction r LOT Unit of Issue O! N N A O VV V Unit Cost g O 0 O O 0 O 0 yA O 0 00106 O O $0.00 0 p O O 0 M V A V N [Extended Cost 1 4620.9620.6814.06 Account Numbers Requester's Employee #: 2283 N v 1 N Ol r v E 8 ft Fob Point a. OD �N N0 Y GP K N N pa .4 14 N m Q C N A O VN r N\\}1� O Ci W J V coR c b O 8 ry, m O P m t Divison He va iva� ry �J,/ < -I 1P g al 0 d O <C P m_ IN Z t C c as d rob; uogislnbeN < O •2\ \ Quotes Attached eg: No: X w x D0 9 A CID Z C N ± m b N O co T 6 D P P m_ MCEMND CONSULTING ENGINEERS, INC. /!D£SION£D17OIS£RVE1/ 1810 N. College Avenue P.O. Box 1229 Fayetteville, Arkansas 72703 / 72702-1229 PHONE: 479-443-2377 FAX: 479-443-9241 February 13, 2008 Mr. Matt Mihalevich Trails Coordinator City of Fayetteville 113 W. Mountain St. Fayetteville, -AR 72701 Re: Scull Creek Trail Bridges Dear Mr. Mihalevich: I have enclosed four (4) signed contracts for this project form Kinco Constructors, LLC to be included in the City Council Packet. If there are any questions, please contact us. Sincerely, LLAND C ULTING ENGINEERS, INC. Enclosure: Contract (4 copies) W:120071072125 Fay Scull Creek Trail Britlges\Correspontlenceellatl-0213wpdwj From: Clarice Pearman To: Mihalevich, Matt Date: 2.29.08 3:38 PM Subject: Res. Nos. 27-08 & 28-08 CC: Audit Matt: Sorry for the delay and inconvenience I was out with the "bug." Attached are copies of the above resolutions passed by City Council for your bridges. I will forward to Purchasing your requisitions for these items. Also, I will forward to you via interoffice mail three of four original signed agreements. Please let me know if there is anything else needed for these items. Have a good weekend. Thanks. Clarice (2.29.08) Clarice Pearman - Res. Nos. 27-08 & 28-08 Page From: Clarice Pearman To: Mihalevich, Matt Date: 2.29.08 3:38 PM Subject: Res. Nos. 27-08 & 28-08 CC: Audit Matt: Sorry for the delay and inconvenience I was out with the "bug." Attached are copies of the above resolutions passed by City Council for your bridges. I will forward to Purchasing your requisitions for these items. Also, I will forward to you via interoffice mail three of four original signed agreements. Please let me know if there is anything else needed for these items. Have a good weekend. Thanks. Clarice --- (2.29.08 Clarice Pearman - Re: Res. Nos. 27-08 & 28-08 Page 1 From: Matt Mihalevich To: Clarice Pearman Date: 2.29.08 3:40 PM Subject: Re: Res. Nos. 27-08 & 28-08 Clarice, there was no attachment. Also, I wanted to let you know while you were out, Amber sent me the resolution for the bridge manufacture only with Thompson Culvert Company. So I only need the Kinco Resolution. Thanks, Matt »> Clarice Pearman 2/29/2008 3:38 PM »> Matt: Sony for the delay and inconvenience I was out with the "bug? Attached are copies of the above resolutions passed by City Council for your bridges. I will forward to Purchasing your requisitions for these items. Also, I will forward to you via interoffice mail three of four original signed agreements. Please let me know if there is anything else needed for these items. Have a good weekend. Thanks. Clarice Matt Mihalevich Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements City Council Meeting Date Agenda Items Only Engineering Division Action Required: Operations Department Staff requests approval of Change Order #2 to Contract #2028 with Kinco Constructors, LLC in the amount of $2,980.97, to the original contract amount of $240,784.72, for the addition of drilled pier foundations for the Frisco Bridge on Scull Creek Trail. 2,980.97 Cost of this request 4520-9520-5814.05 Account Number 06036 / 1 Project Number Budgeted Item X ment it ((At City Attorney Q. - 825,975.00 Transportation Bond Trail Improvements $ Category / Project Budget 560,957.47 Program Category / Project Name Trail Improvements Funds Used to Date Program / Project Category Name 265 017 53 Sales Tax 2006A Construction Fund Remaining Balance Budget Adjustment Attached Finance and Internal Service Director ayor 6 -9 -os Date d6 Date Fund Name Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Comments: Revised April 16, 2007 Wane -Ole KI�N51�5 MEMO To: Gary Dumas, Director of Operations�& City Clerk Thru: Ron Petrie, City Engineer Y�+t"at From: Matt Mihalevich, Trails Coordinator Date: June 6, 2008 Subject: Scull Creek Trail Bridges, Frisco Bridge - Change Order #2 for Kinco Constructors. Recommendation: Staff requests approval of change order #2 with Kinco Constructors, Inc. in the amount of $2,980.97, to the original contract amount of $240,784.72 for drilled pier foundations for the Frisco Bridge on Scull Creek Trail. A 15% project contingency in the amount of $36,117.71 was approved by Resolution #28-08 which included the award of Bid #08-16 and contract with Kinco Constructors. Background: The foundation type for Frisco Trail was bid as a spread footing, however based on geotechnical investigation of the soil type, the engineers have recommended using a drilled pier foundation type instead of the spread footing. This change in footing type results in a $2,980.97 increase in the contract price. Discussion: The proposed change order of $2,980.97 falls within the approved 15% contingency of $36,117.71 Budget Impact: If approved, the change order will use $2,980.97 from transportation bond program for trail development. NAME OF PROJECT: OWNER. CHANGE ORDER Order No. Date: Agreement Date: Scull Creek Trail Bridges City of Fayetteville 2 June 3, 2008 February 19, 2008 CONTRACTOR: Kinco Constructors, LLC. The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Revise the Frisco Bridge Abutments to use a Drilled Pier foundation system. Justification: Add cost of $2,980.97 to contract. 1. The project was bid using the footing foundation system for the Frisco Bridge Abutments. However, the Geotechnical Investigation recommended a Drilled Pier foundation system and the Bridge designer has competed the abutment design using the drilled pier foundation system. CONTRACT PRICE prior to this Change Order: Increase in Contract Price. CONTRACT PRICE Including this Change Order: Substantial Completion Time Prior to This Change Order: Final Completion Time Prior to This Change Order: Net Time Change Resulting From This Change Order: Current Contract Completion Dates Including This Change Order Final Completion: $ 240 784.72 $ 2.980.97 $ 243,765.69 90 Calendar Days 90 Calendar Days 0 Calendar Days August 10, 2008 Change to CONTRACT TIME: The CONTRACT TIME will be (increased)(decreased) by 0 calendar days. The date for completion of all work will be August 10 2008 Approvals Required: To be effective this Order must be approved by the Owner if it changes the scope or objective or the PROJECT, or as may otherwise be,regyllred by theGENERAL CONDITIONS. Requested by: Recommended by: Approved by: Kinco ConstructorsL ndCo Cit f Fayett mile W:\2007\072125 Fay Scull Creek Trail Bridges \Corresponde Date ate Date 6 MayorDate RESOLUTION NO. 28-08 A RESOLUTION AWARDING BID #08-16 AND APPROVING A CONTRACT WITH KINCO CONTRACTORS, LLC IN THE AMOUNT OF $240,784.72 FOR THE INSTALLATION OF SDC (6) TRAIL BRIDGES FOR SCULL CREEK TRAIL; AND APPROVING A 15% PROJECT CONTINGENCY IN THE AMOUNT OF $36,117.71. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #08-16 and approves a contract with Kinco Contractors, LLC in the amount of $240,784.72 for the installation of' six (6) trail bridges for Scull Creek Trail. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a 15% project contingency in the amount of $36,117.71. PASSED and APPROVED this 19"' day of February 2008. APPROVED: By: DAN COODY Mayor AIIEST: By: 1y�'"'_ SONDRA E. SMITH, City Clerk/Treasurer