HomeMy WebLinkAbout232-08 RESOLUTIONRESOLUTION NO. 232-08
A RESOLUTION APPROVING A CHANGE ORDER TO THE
CONTRACT WITH WILSON ESTES POLICE ARCHITECTS IN THE
AMOUNT OF $5,200.00 FOR RE -DESIGN FEES FOR VALUE
ENGINEERING CHANGES TO THE DISTRICT COURT BUILDING
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby
approves a change order to the contract with Wilson Estes Police Architects in the
amount of $5,200.00 for re -design fees for value engineering changes to the District
Court Building.
PASSED and APPROVED this 16th day of December, 2008.
APPROVED:
By
DAN COODY, Mayor
ATTEST:
By:
ixetto
`%a ooa111K%TR ,/9fn
E9
a°G
et*. °�a :G ° \T Y p SG'�,
. c. �.
• �
�1
ems. •
2FAYETTEVILLE:
,SCATS"' tilk.
4444 VnroN � %%
SONDRA E. SMITH, City Clerk/Treasurer
AIA Document G802Th — 2007
Amendment to the Professional Services Agreement
Amendment Number: 002
TO: Lynn Hyke
(Owner or Owner's Representative)
In accordance with the Agreement dated: June 23, 2005
BETWEEN the Owner.
(Name and address)
City of Fayetteville
113 W. Mountain Street
Fayetteville, Arkansas 72701
and the Architect:
(Name and address)
Wilson Estes Police Architects, Subchapter S Corporation
5799 Broadmoor
Suite 520
Mission, Kansas 66202
for the Project:
(Name and address)
Fayetteville District Court & Prosecutor Facility
Fayetteville Arkansas
Authorization is requested
® to proceed with Additional Services.
0 to incur additional Reimbursable Expenses.
As Follows:
Incorporation of Value Engineering items into the construction documents. Revise Architectural precast panels to
masonry veneer over metal studs. Scope includes recalculation of structural design to accomodate lateral building
forces that were previously resolved thru the use of the precast panels. Design of a "perforated shear wall" will be
utilized to resolve these forces.
The following adjustments shall be made to compensation and time.
(Insert pmvisions in accordance with the Agreement, or as otherwise agreed by the parties.)
Compensation:
Sum of $5200.00
Time:
No change to construction time
AIA Document G802' - 2907 (formerly G6o6rr - 2000). Copyright 02000 and 2007 by The American Institute of Architects. All rights reserved.
WARNING: This Ale Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of this AIA
Document, or any porton of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
This document was produced by AIA software at 11:49:44 on 11/11/2008 under Order No.1000374840_1 which expires on 11/7/2009. and is not for resale.
User Notes: (1329477103)
1
SUBM
10
D BY:
AA4A
(Signatur
James Est
(Printed n
Princi aI
me an
itle)
Il I 0
(Date)
AGREED
(Signa ure
Dan Coody, Mayor
(Printed name and title)
/ct///F /0Y
(Date)
Attest:
cill
Sonda Smith, City Clerk
4
rratto
oittlt7IIIgyyyv
�e•‘ cRK/TR�''r..
OGS •SGS
SLa .001Y0;•,10
•rt -c) '%▪ 03
FAYETTEVILLE:
'P f(ANS;•.„Ss•▪ '
.04.1NG IONtiiiii
.
AIA Document G8021w —2007 (formerly G6061a-2000). Copyright 02000 and 2007 by The American Institute of Architects. All rights reserved.
WARNING: This AlAe Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'
Document, Of any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the ire.
This document was produced by AIA software at 11:49:44 on 11/11/2008 under Order No.1000374840 1 which expires an 11!7/2009. and is not for resale.
User Notes: (1329477103)
2
Judge Rudy Moore
Submitted By
City of Fayetteville
Staff Review Form
City Council Agenda Items
or
Contracts
16 -Dec -08
CIty.Council Meeting Date
District Court
Division
Action Required:
Pg6,
/ zi4166
d3oZ
LOi/&e n Esis
p/iae /lrehtcts
District Judge
Department
Approval of an addition to the Wilson Estes contract for re -design features due to value engineering. Cost of this
change order is $5200.00
5,200
Cost of this request
4470.9470.5314.03
$
4,227,321
Category / Project Budget
3,761,734
Account Number Funds Used/Encumbered to Date
04008.0801
465,587
Project Number Remaining Balance
Budgeted Item
1
XX
Budget Adjustment Attached
District CourUProsecutor Facility
Program Category / Project Name
District Court
Program / Project Category Name
Sales Tax Cap. Improvement
Fund Name
Departmen'Dir o
City Attorney
//—d1 kr
Date
( +/ot
Finance and Internal Service Director
1-25-67
Date
I 15
Mayor Date
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
RES 06-1917
11/7/2006
1055
Received in Mayor's Office
•
Comments:
•
CONTRACT REVIEW MEMO
To: Mayor Dan Coody and City Council
From: Rudy Moore, District Court Judge
Date: November 24, 2008
Subject: Approval of a change order with Wilson Estes Police Architects for $5200.00
RECOMMENDATION
I recommend approval of a change order to the contract with Wilson Estes Police Architects for the
LEED District Court design change.
BACKGROUND
Kinco Contractors were awarded the contract for construction of the LEED District Court Building.
in October 2008. Value engineering changes were negotiated and agreed upon by the architect, the
contractor and the City. There was a change to the facade of the building from pre -cast concrete to
brick resulting in a savings of $ 50,000.00. This change resulted in re -design fees of $5200.00.
DISCUSSION
The additional service request is the redesign fee associated with the modification of the building
skin from Architectural pre -cast concrete to brick veneer over metal studs on the East and North
sides of the building. The fee for the additional services will include revision of drawings and
recalculation of the building's structural system. Please see the attached letter of further explanation
from Wilson Estes.
BUDGET IMPACT
Budget is available and is detailed on the Staff Review form.
LEED Court Bldg. Council memo Nov. 20.doc
•
RESOLUTION NO.
A RESOLUTION APPROVING A CHANGE ORDER TO THE
CONTRACT WITH WILSON ESTES POLICE ARCHITECTS IN THE
AMOUNT OF $5,200.00 FOR RE -DESIGN FEES FOR VALUE
ENGINEERING CHANGES TO THE DISTRICT COURT BUILDING.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby
approves a Change Order to the contract with Wilson Estes Police Architects in the
amount of $5,200.00 for Re -Design Fees for value engineering changes to the District
Court Building.
PASSED and APPROVED this 16th day of December, 2008.
APPROVED: ATTEST:
By: By:
DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer
1
WILSON ESTES POLICE ARCHITECTS
5799 BROADMOOR, SUITE 520
MISSION, KANSAS 66202
T913 384 1 1 1 5
F9133842292
November 19, 2008
Mr. Lynn Hyke
City of Fayetteville
126 W Mountain St
FayetteviNe, AR 72701 .
RE: Value Engineering Additional Services narrative
Lynn,
Theadditional service request Is the redesign fee associated with the modification of the building skin from
Architectural precast concrete to brick veneer over metal studs on the East and North sides of the building. The accepted value
engineering sum for this modification is $60,000. The additional services fee is $5,200. The fee for additional services will
include revision of drawings and recalculation of the buildings structuralsystem, specifically in regards to the resolution of lateral
loads. The original building design utilized the Architectural precast panels to resolve lateral loads applied to the building e.g.
resist the ability for the building to twist. Metal stud construction Is not as conducive to resisting these lateral loads. We will
engineer a wall system that will be stiff enough to resist the forces and redesign the foundations to transfer these loads down into
the ground. The goal Is to resolve these loads through the use of a'perforated shear wall" and avoid additional steel braced
frames wherever possible.
Regards,
Matt Veasman
Wilson Estes Police Architects
5799 Broadmoor, Suite 520
Mission, Kansas 66202
p. 913.384.1115
f. 913.384.2292
e. MatLVeasman(e),polloearchitects.com
w. ikrww;policearchltects.com
•
1
WILSON ESTES POLICE ARCHITECTS
5799 BROADMOOR, SUITE 520
MISSION, KANSAS 66202
T9133841115
F 91 3 384 2292
November 11, 2008
Mr. Lynn Hyke
City of Fayetteville
125 W Mountain St
Fayetteville, AR 72701
RE: Value Engineering Additional Services
Lynn,
As we had discussed, I have included 2 signed copies of the AIA A802 document. Please have the copies signed by
the mayor, and forward one copy back to me for my records. I will follow up with a statement as to where we are at on billing,
when I can get the information put together. Kinco is ready to go with getting these drawings in and priced so the quicker we can
get this turned around the better.
Regards,
Matt Veasman
Wilson Estes Police Architects
5799 Broadmoor, Suite 520
Mission, Kansas 66202
p. 913 384.1115
f. 913.384.2292
e. Matt.Veasman(a policearchitects.com
w. www.policearchitects.com
Clarice Pearman - Res. 232-08
From:
To:
Date:
Subject:
CC:
Attachments:
Clarice Pearman
Stockalper, Dena
12.19.08 5:22 PM
Res. 232-08
Audit
Audit
Page 1 of 1
Dena:
Attached is a copy of the above resolution passed by City Council regarding Wilson Estes Police Architects change order. I am
forwarding to you one of two signed agreements. Please let me know if there is anything else needed for this item. Have a
good day.
Thanks.
Clarice
file://C:\Documents%20and%20Settings\cpearman.000\Local%20Settings\Temp\XPgrpwise\494BD872F... 12.19.08
4