HomeMy WebLinkAbout202-08 RESOLUTIONRESOLUTION NO. 202-08
A RESOLUTION APPROVING AMENDMENT #1 TO THE AGREEMENT
FOR PROFESSIONAL ENGINEERING SERVICES WITH McCLELLAND
CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $29,290.00 FOR
DESIGN SERVICES FOR THE MT. SEQUOYAH PRESSURE PLANE
IMPROVEMENTS; APPROVING THE ELEVATED STORAGE TANK
PLACEMENT; AND APPROVING A $20,000.00 CONTINGENCY.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby approves
Amendment 1/1 to the Agreement for Professional Engineering Services with McClelland
Consulting Engineers, Inc. in the amount of $29,290.00 for design services for the Mt. Sequoyah
Pressure Plane Improvements. A copy of Amendment #1, marked Exhibit "A," is attached
hereto and made a part hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves
the elevated storage tank placement.
Section 3. That the City Council of the City of Fayetteville, Arkansas, hereby approves a
contingency in the amount of $20,000.00.
PASSED and APPROVED this 6th day of November, 2008.
APPROVED:
By:
DAN COODY, Mayor
ATTEST:
By:
...`"ky-OVTR
'‘c)\G\ -•\S ,
-••
�SG ,
G Y ° •-
•
: FAYETTEVI LLE:
tt
%..9J 94;KANSPS J=`:
WNP A/Jk0MJT lgYt ige/tal riV9tY,'
Deputy City Clerk
AMENDMENT NO. 1
To
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
Between
CITY OF FAYETTEVILLE, ARKANSAS
And
McCLELLAND CONSULTING ENGINEERS, INC.
FAYETTEVILLE, ARKANSAS
For The
MOUNT SEQUOYAH PRESSURE PLANE IMPROVEMENTS PROJECT
June 12, 2008
The October 5, 2004 Agreement between the CITY OF FAYETTEVILLE and
McCLELLAND CONSULTING ENGINEERS, INC. is hereby amended to provide for
including current billing rates for engineering and geotechnical services, and to adjust the
total estimated compensation for previously approved engineering services from
$142,310 to $171,600. The updated billing rates and estimated billing amounts are
further defined in Appendix A to this Amendment No. 1.
All other provisions, covenants, recitals, terms and conditions of the Agreement,
which are not expressly amended herein, shall remain in full force and effect.
The parties hereby have executed this Amendment No. 1 on this date, the 6 44
day of foo, 2008.
By:
By:
By:
CITY OF
,J
Mayor
ATTEST:
YETT VILLE.ARKANSAS
/(try/CYatYV Deputy City Clerk
01 Ofre.cf0.
• ova
•23:
;FAYETTEVILLE:
% 144
'<s•9RANSP• �
J
X1/1111..... 1
McClelland Consulting Engineers, Inc.
itle: President
ATTEST
By:
Title: Vice President
W:\2004\042150 Fay Mt. Sequoyah Water \Amendment\Amendment No. 1 revised 6-12-08.doc Page 1
APPENDIX A
To
AMENDMENT NO. 1
MOUNT SEQUOYAH PRESSURE PLANE
IMPROVEMENTS PROJECT
June 12, 2008
TASK DESCRIPTION
October 2004
Contract
Estimated Fee
Billed to
Date
Amendment
No. 1
Estimated Fee
Public Involvement and Communications
$36,400
$9,632.50
$37,860
Preliminary Engineering Report
$5,200
$5,183.75
$5,200
Surveying for Preliminary Design
$15,250
-
$21,400
Preliminary Geotechnical Services
$7,860
-
$8,710
Preliminary Design Services
$32,000
$16,750.00
$40,900
Final Design
Services
$41,800
-
$52,810
Bidding Services
$3,800
-
$4,720
Direct Expenses
-
$145.83
-
Total Estimated Compensation
$142,310
$31,712.08
$171,600
W:\2004\042150 Fay Mt. Sequoyah Water\Amendment\Appendix A to Amendment No. 1 revised 6-12-08.xls
•
TO
AMENDMENT NO. 1
MOUNT SEQUOYAH PRESSURE PLANE IMPROVEMENTS PROJECT
McClelland Consulting Engineers
2008 Billing Rates
Effective May 20, 2008
CATEGORY
*HOURLY
RATE
Principal Engineer $ 155.00
Sr. Project Manager $ 143.00
Project Manager $ 132.00
Project Engineer IV $ 127.00
Project Engineer 1H $ 115.00
Project Engineer II $ 105.00
Project Engineer I $ 84.00
Landscape Architect IV $ 109.00
Landscape Architect III $ 100.00
Landscape Architect II $ 86.00
Landscape Architect I $ 55.00
Engineering Technician IV $ 90.00
Engineering Technician III $ 84.00
Engineering Technician H $ 65.00
Engineering Technician I $ 53.00
Construction Observer IV $ 90.00
Construction Observer III $ 80.00
Construction Observer III $ 61.00
Construction Observer I $ 44.00
Chief Draftsman $ 70.00
Draftsman II $ 60.00
Draftsman I $ 50.00
Survey Technician $ 77.00
Registered Land Surveyor $ 94.00
Survey (2 -Man or 1-Man/Robotic) Crew $ 143.00
Field Survey - 1 Man $ 72.00
Party Chief $ 66.00
Soils Lab Supervisor $ 60.00
Soils Lab Technician II $ 45.00
Soils Lab Technician I $ 40.00
Office Admin. $ 60.00
Clerk/Typist $ 48.00
Mileage $ 0.50
* Subject to Annual Adjustment
W:12004\042150 Fay Mt. Sequoyah Water\Amendment\Amendment No. 1 Billing Rates revised 6-17-08.xls
•
1
CEMCCLELLAND
CONSULT/NG MATERIALS LABORATORY
DESIGNED 70 SERVE I• ENGINEERS,INC.
P. O. Box 1229
Fayetteville, Arkansas 72702-1229
479-587-1303
Fax 479-443-9241
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
March 2008
GENERAL:
Laboratory Field Technician *
Laboratory Engineering Technician "
AHTD-Qualified Technician'
Engineering Technician *
Senior Engineering Technician
Lab Supervisor
Mileage
Consultation:
Lab Supervisor
Field Engineer
Project Engineer
Project Manager
Principal Engineer
Lab Report Preparation (per report)
SOILS:
AHTD-Qualified Field Technician
Soils Field Technician (1 -hour minimum)
In -Place Compaction Test -Nuclear Gauge ASTM D 2922
Sample Pickup, or Stand-by Time
Nuclear Density Gauge Fee: (per Density Test); [Minimum $15.00 per trip, per project]
Liquid Limit, Plastic Limit, Plasticity Index (3 point) ASTM D 4318
Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140
Sieve Analysis -Dry ASTM D 422
Hydrometer Analysis ASTM D 422
Specific Gravity ASTM D 854
Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145
Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99
Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180
Potential Volume Change -Swell Pressure
Califomia Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional)
Shrinkage ASTM D 427
Soil Bearing Capacity (Engineering Tech., 2 -hour minimum)
Non -ASTM Procedures Available On Request
$ 40.00 per hour
45.00 per hour
50.00 per hour
55.00 per hour
78.00 per hour
60.00 per hour
0.50 per mile
CONCRETE:
Concrete Mix Design
Review Concrete Mix Design (Lab Supervisor)
Confirm Concrete Mix Des.gn
Concrete Field Technician " (1 -hour minimum): (For any of the following 6 items:]
• Concrete Cylinder or Beam Molding ASTM C 31
• Concrete Cylinder or Beam Pickup
• Concrete Slump Test ASTM C 143
• Concrete Air Content Test ASTM C 231 or C 173
• Cement Mortar or Group Sampling
• Stand-by Time
Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138
AHTD-Qualitiied Concrete Technician: (1 -hour minimum), [For any of the foregoing 6 items:]
Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap)
Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped)
* ACI Grade I Concrete Field Testing Technician
C:\data\GEOTECH\fees\MAT-LAB-LTR-H D-March-08.doc
60.00 per hour
85.00 per hour
95.00 per hour
140.00 per hour
150.00 per hour
45.00 per hour
50.00 per hour
40.00 per hour
10.00 each
50.00 each
35.00 per sieve
8.00 per sieve
90.00 each
50.00 each
110.00 each
130.00 each
145.00 each
100.00 each
150.00 each
50.00 each
50.00 per hour
Price on Request
60.00 per hour
Price on Request
40.00 per hour
50.00 each
50.00 per hour
18.00 each
35.00 each
Page 1 of2
•
e k.
MCEMc S LTND
CONSULTING MATERIALS LABORATORY
I DESIGNED •TD SERVE •I ENGINEERS, INC
P. O. Box 1229
Fayetteville, Arkansas 72702-1229
479-587-1303
Fax 479-443-9241
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
March, 2008
CONCRETE (Continued):
Spare Cylinders Specimens Processed but not Tested
Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum)
Flexural Strength of Concrete Beams ASTM C 78 or C 293
Spare Beam Specimens Processed but not Tested
Compressive Strength of Grout Cubes
Compressive Strength of Cement Mortar Cubes
Concrete Coring (3" or 41:
Core Machine & Lab Technician
Additional Lab Technician, as required
Compressive Strength of Concrete Cores (3" or 4")
Other Core Sizes
Aggregate Sieve Analysis:
Dry Sieve ASTM C 136
Wet Sieve ASTM C 117
Fineness Modules
Decantation
Deleterious Materials
Specific Gravity and Absorption of Aggregate ASTM C 127 & C 128
Dry Rodded Unit Weight of Aggregate ASTM C 29
Sodium or Magnesium Sulfate Soundness (5 cycles) ASTM C 88
Additional Cycles
ASPHALT:
Asphalt Mix Design (Marshall Design Method)
Review Asphalt Mix Design (Sr. Engr. Technician)
Asphalt Field Technician
In -Place Compaction Test -Nuclear Gauge (Lab Technician)
Sample Pickup
Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids,
Percent Voids in Mineral Aggregate (3 specimens per test)
Extraction including percent Bitumen and Aggregate Gradation
Laboratory Density of Cored Plugs including Depth Measurement
Asphalt Coring (3" or 4"):
Core Machine & Lab Technician
Additional Lab Technician, if required
Sample Pickup
FIREPROOFING:
Unfit Weight, Bonding Strength, Thickness and Sampling
(actual time required for Lab Technicians)
Report Preparation (Lab Supervisor)
STRUCTURAL STEEL:
Bolt Torque Testing: Lab Technician(s)
Field Engineer
Pneumatic Torque Wrench Calibration (twice per day)
Visual Weld Inspection Field Engineer
Services not Listed are Available on Request
All prices am subject to revision each year
C:\data\G EOTEC H\fees\MAT-LAB-LTR-HD-March-08.doc
15.00 each
60.00 per hour
50.00 each
40.00 each
40.00 each
25.00 each
75.00 per hour
40.00 per hour
40.00 each
Price on Request
8.00 each
35.00 each
25 00 each
35.00 each
60.00 each
90.00 each
75.00 each
350.00 each
50.00 each
Price on Request
78.00 per hour
40.00 per hour
40.00 per hour
400.00 each
325.00 each
30.00 each
75.00 per hour
40.00 per hour
40.00 per hour
45.00 per hour/Tech.
60.00 per hour
45.00 per hour
95.00 per hour
50.00 each
95.00 per hour
Page 2 of 2
Shannon Jones
Submitted By
City of Fayetteville
Staff Review Form
City Council Agenda Items
or
Contracts
4 -Nov -08
City Council Meeting Date
Engineering
Division
Action Required:
Water & Wastewater
Department
Approval of Amendment No. 1 to the engineering services agreement with McClelland Consulting Engineers in the
amount of $29,290, for design services for the Mt. Sequoyah Pressre Plane Improvements, approval of the elevated
storage tank placement, and approval of a $20,000 contingency.
49,290.00
Cost of this request
5400.5700.5314.02
Account Number
04036-1
Project Number
Budgeted Item
XX
2,195,181.00
Category/Project Budget
116,631.87
Funds Used to Date
2,078,549.13
Remaining Balance
Budget Adjustment Attached
Mt Sequoyah Press Plane Imprvmt
Program Category / Project Name
Water and Wastewater
Program / Project Category Name
Water/Sewer
Fund Name
Depa
11
I
t i ector
City Atto ney
•pci a . C6 -4•9 ---
Finance and Internal Service Director
Date
,61-2,, /or
io-tt-og
Date
Mayor
Comments:
Date
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
193-05
4/16/2003
900
Received in ' k s Office
FgEFR
ye .yi.,e
CITY COUNCIL AGENDA MEMO
City Council Meeting of November 4, 2008
To: Fayetteville City Council
Thru: Mayor Dan Coody
David Jurgens, Water & Wastewater Director
Fayetteville Sewer Committee
From: Shannon Jones, Water & Wastewater Engineer
Date: October 10, 2008
5�
Subject: Approval of Amendment No. 1 to the engineering services agreement with McClelland
Consulting Engineers in the amount of $29,290, for design services for the Mt. Sequoyah Pressre
Plane Improvements, approval of the elevated storage tank placement, and approval of a $20,000
contingency.
RECOMMENDATION
Staff recommends approval of Amendment No. 1 to the engineering services agreement with
McClelland Consulting Engineers in the amount of $29,290, for design services for the Mt.
Sequoyah Pressure Plane Improvements, approval of the elevated storage tank placement, and
approval of a $20,000 contingency.
BACKGROUND
The original design contract was awarded to McClelland Consulting Engineers in October, 2004 to
evaluate and design the water storage tank and related piping and pump stations in the Mt. Sequoyah
water pressure plane. This contract does not include construction phased services.
DISCUSSION
This amendment covers increased hourly rates and the potential for increased work, including but
not limited to attendance at public meetings, by McClelland Consulting Engineers relating to the
design and bidding phase work for this project. There will be a future amendment for construction
phase inspection services.
BUDGET IMPACT
There is currently $2 078,549 in the impact fee fund and $128,549 in the Water/Sewer fund are
budgeted for this project.
McClel CCMemo AmedmentI May08
RESOLUTION NO.
A RESOLUTION APPROVING AMENDMENT #1 TO THE AGREEMENT
FOR PROFESSIONAL ENGINEERING SERVICES WITH McCLELLAND
CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $29,290.00 FOR
DESIGN SERVICES FOR THE MT. SEQUOYAH PRESSURE PLANE
IMPROVEMENTS; APPROVING THE ELEVATED STORAGE TANK
PLACEMENT; AND APPROVING A $20,000.00 CONTINGENCY.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby approves
Amendment #1 to the Agreement for Professional Engineering Services with Mcclelland
Consulting Engineers, Inc in the amount of $29,290.00 for design services for the Mt Sequoyah
Pressure Plane Improvements. A copy of Amendment #1, marked Exhibit "A," is attached
hereto and made a part hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves
the elevated storage tank placement.
Section 3. That the City Council of the City of Fayetteville, Arkansas, hereby approves a
contingency in the amount of $20,000.00.
PASSED and APPROVED this day of November, 2008.
APPROVED: ATTEST:
By: By:
DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer
Clarice Pearman - Res. 202-08
From:
To:
Date:
Subject:
CC:
Attachments:
Clarice Pearman
Jones, Shannon
11.1 3.08 1:32 PM
Res. 202-08
Audit
Audit
Page 1 of 1
Shannon:
Attached is a copy of the above resolution passed by City Council regarding McClelland Consulting Engineers. I will forward to
you via interoffice mail two of three original agreements. Please let me know if there is anything else needed for this item.
Thanks.
Clarice
file://C:\Documents%20and%20Settings\spearman.000\Local%20Settings\Temp\XPgrpwise\491 C2C7FF... 11.13.08