HomeMy WebLinkAbout171-08 RESOLUTION71.177 RESOLUTION NO. 171-08 A RESOLUTION TO AWARD BID # 08-62 AND APPROVE THE CONTRACT WITH ZACHARY AND ASSOCIATES TO BUILD THE GULLEY PARK AND FINGER PARK PAVILIONS AT A COST OF $76,337.29 WITH A CONTINGENCY OF $11,450.59 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville Arkansas hereby awards Bid #08-62 and approves the contract with Zachary and Associates to build the Gulley Park and Finger Park Pavilions at a cost of $76,337.29 with a contingency of $11,450.59. PASSED and APPROVED this 16th day of September, 2008. APPROVED: By: DAN COODY, Mayor ATTEST: KIl'RF rot te0 YCk.lp ; _U° 6,311;FAYETTEV1LLE° sys fr',.0NSP:e.' '.......G' ,O1A By: SONDRA E. SMITH, City Clerk/Treasurer Section 00 52 13 Agreement • BETWEEN CITY OF FAYETTEVELLE LAND CONTRACTOR THIS AGREEMENT is dated as of the r day of k+ in the year 2008 by and between the City of Fayetteville, Arkansas (hereinafter called C TY OF FAYETTEVILLE) and Zachary & Associates, Inc. (herein after called CONTRACTOR). CITY OF FAYETTEVILLE and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of the construction of pavilions and associated site work at Gulley Park and Finger Park and all items indicated in the Drawings and Specifications. Article 2. ENGINEER. The Project has been designed by City of Fayetteville Parks and Recreation Division 1455 South Happy Hollow Road Fayetteville, Arkansas 72701 will be hereinafter called PARKS AND RECREATION DIVISION PROJECT MANAGER and who is to act as CITY OF FAYETTEVILLE's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. Article 3. CONTRACT TIME. 3.1. The Work for Gulley Park and Finger Park Pavilion Construction shall be substantially completed within 75 consecutive calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.8 & C of the General Conditions within 95 consecutive calendar days after the date when the Contract Time commences to run. 3.2. Liquidated Damages. CITY OF FAYETTEVILLE and CONTRACTOR recognize that time is of the essence of the Agreement and that CITY OF FAYETTEVILLE will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by CITY OF FAYETTEVILLE if the Work is not completed on time. Accordingly, instead of requiring any such proof, City of Fayetteville and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) Page 1 of 7 CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by CITY OF FAYETTEVILLE, CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. CITY OF FAYETTEVILLE shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the following Schedule of Values pursuant to paragraphs 4.1 and 4.2 below: 4.1. For all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2. PAYMENT ITEMS Zachary 8 Associates, Inc. ITEMS DESCRIPTION UNIT EST. OTY. UNIT PRICE Total 1 Mobilisation L.S. 1.00 $2.000.00 $2,000.00 2 _ Bid Bands a Insurance _.. LS, ._ 1.00 _ -$2,200.00. _ $2,200.00 3 _. Ste Preparation - induding erosion control. concrete washout, tree protection fencing. construction entrance and protection of existing sidewalk. L.S. 1.00 ..$2,500.00 $2,500.00 4 _ Demolition and Removal of Existing Pavilion and Slab at Finger Park including sanest of existing 4' sidewalk _ _.. ____.. _. _ _. L.S. 1.00 $1.000.00 ... $1,000.00 5 Extend existing 4' Wide ADA Accessible Concrete Sidewalk (4- Thickness) to match Pavilion Slab. complete in place __. _. _._.__. _ _.. _. _ L.S. 1,00. $193.70 $193.70 _... 6 _.. Site Restoration _ _ __ _ __ _ __ _ __ ___ __ ___ __ __. _L.S.. 1.00 .$1,000.00 $1.000.00 _7._ Unclassified Excavation._. _ _ --. _ CY.. .. _ 16000 __ $15.00 _.$2,400.00 8 Imported Hillside Material • complete in place.... _ C.V. 11000 $15.00 11,650.00 9 Class? Base- compacted in Place _.. _ C.Y, 40.00 $40.00 $1,600.00 10 - Concrete Sidewalk (4' Thirhness) . _.. _ _ _ _. _. _ _ _ _ _ - _ _ S.Y. 47.00 _ $40.00 _ $1.880.00 - 11 - Concrete Pavilion Slab(5'Thickness) _ __. _ - _ _.. _... S,Y, 210.00. $40.00 _..$8,400.00 12 20' x 24' Rectangular. Gable Pavilion, 4.51sendwich pend rwf deck with T1-11 on bottom face _. _ _ __ E.A. 2.00 515,993.75 $31,987.50. __13 Installation of Paysions al Gulley Park and Finger Park per manufacturer's instructions... __.__ _. L.S. 1.00 $6,000.00 .$6,000.00 _. 14 ___. T Picnic tables, complete In place _ . ----------------------------------------E.A... 11.00 $1,082.00.$11,902.00 _ 15 6' Benches. complete in place_ _ ... - E.A. 2.00 $463.25 $926.50 16 Grills, complete in place .. _. _ E.A. 300 $232.53 $697.59 _ TOTALBIDAMOUNT_______ __ _._.$76,337.29_ ..... _ As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by PARKS AND RECREATION DIVISION PROJECT MANAGER as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.13 of the General Conditions. Page 2 of 7 Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by PARKS AND RECREATION DIVISION PROJECT MANAGER as provided in the General Conditions. 5.1. Progress Payments. CITY OF FAYETTEVILLE shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by PARKS AND RECREATION DIVISION PROJECT MANAGER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02 . All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, less the aggregate of payments previously made and less such amounts as PARKS AND RECREATION DIVISION PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the PARKS AND RECREATION DIVISION PROJECT MANAGER, and if the character and progress of the Work have been satisfactory to CITY OF FAYETTEVILLE and PARKS AND RECREATION DIVISION PROJECT MANAGER, CITY OF FAYETTEVILLE, on recommendation of PARKS AND RECREATION DIVISION PROJECT MANAGER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to CITY OF FAYETTEVILLE as provided in paragraphs 14.02.6.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), less such amounts as PARKS AND RECREATION DIVISION PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.6 & C of the General Conditions, CITY OF FAYETTEVILLE shall pay Page 3of7 the remainder of the Contract Price as recommended by PARKS AND RECREATION DIVISION PROJECT MANAGER as provided in said paragraphs 14.07.B & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce CITY OF FAYETTEVILLE to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data. 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, or furnishing of the Work. 6.3. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that CITY OF FAYETTEVILLE and PARKS AND RECREATION DIVISION PROJECT MANAGER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means methods, techniques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and fumishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. CONTRACTOR is aware of the general nature of work to be performed by CITY OF FAYETTEVILLE and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Page 4 of 7 Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. CONTRACTOR has given PARKS AND RECREATION DIVISION PROJECT MANAGER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by PARKS AND RECREATION DIVISION PROJECT MANAGER is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between CITY OF FAYETTEVILLE and CONTRACTOR concerning the Work consist of the following: 7.1. This Agreement (pages 1 to 7, inclusive). 7.2. Performance and Payment Bonds, (Exhibits A and B respectively). 7.3. Certificates of Insurance, (Exhibit C). 7.4. Documentation submitted by CONTRACTOR prior to Notice of Selection (Exhibit D). 7.5. General Conditions (pages 1 to 42, inclusive). 7.6. Supplementary Conditions (pages 1 to 13 inclusive). 7.7. Specifications consisting of Divisions 1 through 31 as listed in table of contents thereof. 7.8. Addendum number 1, inclusive. 7.9. One set of drawings (not attached hereto) consisting of: a cover sheet and additional sheets numbered two through eight with each sheet bearing the following general title: Gulley Park and Finger Park Pavilions. 7.10. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.10.1. Notice to Proceed 7.10.2 All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). Page 5 of 7 There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. Article 8. MISCELLANEOUS. 8.1. Terms used in the Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3. CITY OF FAYETTEVILLE and CONTRACTOR each binds itself, it partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8.4. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intention of the stricken provision. 8.5. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 8.6. Freedom of Information Act. City contract and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, CONTRACTOR will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.) Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. Page 6of7 IN WITNESS WHEREOF, CITY OF FAYETTEVILLE and CONTRACTOR have signed this Agreement in quadruplicate. One counterpart each has been delivered to CITY OF FAYETTEVILLE and PARKS AND RECREATION DIVISION PROJECT MANAGER, and two counterparts have been delivered to CONTRACTOR. All portions of the Contract Documents have been signed, initialed, or identified by CITY OF FAYETTEVILLE and CONTRACTOR or identified by PARKS AND RECREATION DIVISION PROJECT MANAGER on their behalf. This Agreement will be effective on ote t.»ai.0 14 2008 (which is the Effective Date of The Agreement). CITY OF FAYETTEVILLE: [CORPORATE SEAL] kka• •GSTY pc:;sG U • ,3 ;FAYETTEVILLE: -CP;;-%01• NAA4 co Address for giving notices lla u)Mt /VI cute l'aya%L i270/ B CONTRACTOR PORATE SEAL] ; f `xy`` �`�" a C' , j. , 1 �. : , P. � ..... " If a Corporation, attest by the Secretary. Address for giving notices S2o n- _ oao /oat._ Ate 9z9<C (If CITY OF FAYETTEVILLE is a public body, attach License No. evidence of authonty to sign and resolution or other documents Agent for service of process: authorizing execution of Agreement.) (If CONTRACTOR is a corporation, attach evidence of authority to sign.) Page 7 of 7 CNA 9/30/2008 3:43 PM PAGE 4/006' Fax Server OD% Western Surety Company PERFORMANCE BOND Bond Number: 70593891 KNOW ALL PERSONS BYTHESE PRESENTS, Thatwe Zachary 6 Associates, Inc. a 320 N. Bloomington, Ste. E, Lowell, AR 72745 referred to as the Principal, and Western Surety Company hereinafter as Surety, are held and firmly bound unto City of Fayetteville of 113 W. Mountain. Fayetteville. AR 72701hereinafter Seventy -Six Thousand Three Hundred Thirty -Seven and referred to as the Obligee, in the sum of 00/100 Dollars (5 76,337.00 ), for the payment of which we bind ourselves, our legal representatives, successors and assigns, jointly and severely, firmly by these presents WHEREAS, Principal has entered into a contract with Obligee, dated the 16th day of September 2008 tOr2 Pavilions For Thp r'ity rf Fayp.tpvillp Parks and Rprrpation NOW, THEREFORE, If the Principal shall faithfully perform such contract or shall Indemnify and save harmless the Obligee from all cost and damage by reason of Principal's failure so to do, then this obligation shall be null and void; otherwise it shall remain in full force and effect. ANY PROCEEDING, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work Is located and shall be instituted within two years after Contractor Default or. Within two years alter the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. NO RIGHT OF ACTION shall accrue on this Bond to or for the use of any person or corporation other than the Obligee named herein or the heirs, executors, administrators or successors of the Obligee. SIGNED, SEALED AND,OATED this 30th day or September Forth F4597 SEP -30-2008 15:44 4 .1 2008 Zachary 6 Associates, Inc. (Principal) mit (Seal) MIKE ADR S UTTRELL Attorney -in 93% P.04 CNA 9/30/2008 3:43 PM PAGE 5/006 Fax Server OD% Western Surety Company PAYMENT BOND Bond Number: 70593891 KNOW ALL PERSONS BY THESE PRESENTS, That we Zachary & Associates. Inc. of 320 N. Bloomington, Ste. E, Lowell, AR 72745 referred to as the Principal, and Western Surety Company hereinafter as Surety, are held and firmly bound unto City of Fayetteville of 113 W. Mountain. Fayetteville. AR 72701 hereinafter Seventy -Six Thousand Three Hundred Thirty -Seven and referred to as the Obligee, in the sum of o 0/100 Dollars ($76, 337 . 00 ) for the payment of which we bind ourselves, our legal representatives, successors and assigns, Jointly and severally, firmly by these presents. WHEREAS, Principal has entered into a contract with Obligee dated 16th day of septerter , 2008 for 2 Pavilions For The City of Fayetteville Parks and Recreation copy of which contract is by reference made a part hereof. NOW, THEREFORE, if Principal shall, in accordance with applicable Statutes, promptly make payment to all persons supplying labor and material in the prosecution of the work provided for in said contract, and any and all duly authorized modifications of said contract that may hereafter be made, notice of which modifications to Surety being waived, then this obligation to be void; otherwlse to remain in full force and effect. No suit or action shall be commenced hereunder (a) After the expiration of one (1) year following the date an which Principal ceased work on said contract it being understood, however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof such limitation shaft be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. (b) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project, or any part thereof, is situated, or in the United States District Court for the district in which the project, or any part thereof, is situated, and not elsewhere. The amount of this bond, shall be reduced by and to the extent of any payment or payments made in good faith hereunder. SIGNED, SEALED AND DATED this SEP -30-2008 15:44 • 30th day of September 2003 Western Sure 93% P.05 CNA 9/30/2008 3:43 PM PAGE 3/006 Fax Server Western Surety Company POWER OF ATTORNEY - CERTIFIED COPY Bond No. 7 05 938 91 Know All Mn By These Presents, that WESTERN SURETY COMPANY, a corporation duly organized and existing under the laws of the State of South Dakota, and having its principal office in Sioux Palle, South Dakota (the'Company'1, does by these presents make, constitute and appoint MIKE _ADRIAN LUTTRELL its true and lawful attorney(!) -in -fat. with full power and authority hereby confessed, to execute, acknowledge and deliver for and on its behalf as Surety, bonds for: Principal: Zachary & Associates, Inc. Obligee: City of Fayetteville 1 mount $500,000.00 and to bind the Company thereby as fully and to the same stent as if such bonds were signed by the Senior Vice President, sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said attorney(s}in-fact may do within the above stated limitations. Said appointment is made under and by authority of the following bylaw of Western Surety Company which remains in full force and effect. 'Section 7. All bonds, polities, undertakings, Powers of Attorney or other obligation. of the corporation shall be executed in the corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vire President or by such ether officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or aganta who shall have authority to issue bonds, policies, or undertaking! in the name of the Company. The corporate seal is not necessary for the validity of any bunds, policies, undertakings, Powers of Attorney or other obligatiora of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." All authority hereby conferred shall expire and terminate, without notice, unless used before midnight of 2009 , but until such time shall be irrevocable and in full farce and effect. In Witness Whereat Western Suety Company has caused these presents to be signed by its Senior Vice President, Paul T. Bruflat, and its co qa, i to be affixed this 30th day of September 2008 iaC Ti. * WEST SURE COMPANY Sap89014\4 ftsiVi FIT i ) F �S A rtr ST � 6LrnTHf A co��T v ss IA On this 30th day of September ,in the yaar 2009 ,bafore me, a notary public,personaily appeared Paul T. Brufiat, who being to me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of WESTERN SURETY COMPANY and aekmowledged said instrument to be the voluntary act and deed of said corporation. May 15 Paul T. Bmflaf(9etier Vice President •MMM.M..•.i.M • • D. KRELL NOTRPV maLICa�=!= SOWN CM07011 Ili •....w s....,.... • My Commission Expires November 30, 2012 Mary Public - South Dakota I the undersigned officer of Western Surety Company, a stock corporation of the State of South Dakota, do hereby certify that the attached Power of Attorney is in full farce and effect and in irrevocable, and furthermore, that Section 7 of the bylaws of the Company as set forth in the Power of Attorney is now in force. In testimony whereat I have hereunto set my hod and seal of Western Surety Company this 30th day of September 2008 Form F5S069•2005 SEP -30-2008 15:43 s 93% P.03 CNA 9/30/2008 3:43 PM PAGE 6/006 Fax Server ACKNOWLEDGMENT OF SURETY STATE OF Arkansas (Attorney -in -Fact) Bond No. 70523991 COUNTY OF Vlashi ng ton On this Ciiirlday of epie,+.,.ber , before me, a notary public in and for said County, personally appeared MIKE ATIRTAN 1 UTTRET,T to me personally known and being by me duly sworn, did say, that he is the Attorney -in -Fact of WESTERN SURETY COMPANY, a corporation of Sioux Falls, South Dakota, created, organized and existing under and by virtue of the laws of the State of South Dakota, that the said instrument was executed on behalf of the said corporation by authority of its Board of Directors and that the said MIKE ADRIAN LUTTRELL acknowledges said instrument to be the free act and deed of said corporation and that he has authority to sign said instrument without affixing the corporate seal of said corporation. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my official seal at .. '`" , - Soringdale Arkansas the day and yeaiinstabovewritten M mmission expires ci, d Notary Public CC!! ,,:, - nun 106-4-2000 - SEP -30-2008 15:44 93V. P.06 1! NOTICE TO PROCEED TO: Zachary & Associates, inc. DATE October 1, 2008 PROJECT: Construction of Gulley Park and Finger Park Pavilions You are hereby notified to commence WORK in accordance with the Contract dated on September. 16. .2008 and you are to substantially complete the WORK within seventy-five consecutive calendar days thereafter and have the Work complete and ready for final payment within twenty consecutive calendar days thereafter. The date for Substantial completion is therefore December 15. 2008. The date for final completion is therefore January 5, 2009. CITY OF FAYETTEVILLE, ARKANSAS City of Fayetteville By: Carole Jones P E Park Planner ACCEPTANCE OF NOTICE Receipt of the above NOTICE TO PROCEED)_s hereby acknowledged (8477 R - this the is day of (5=-o ss -02, 2008. By: Title: Carole 0 :s City of Fayetteville Staff Review Form City Council Agenda Items Contracts 16 -Sep -08 City Council Meeting Date Conniemohston Parks and Recreation Operations ubmitted By Division Action Required: Department A resolution awarding Bid #08-62 and approval of a contract with Zachary & Associates, Inc. in the amount of $76,337.29 with a 15.0% project contingency of $11,450.59 for a total project cost of $87,787.88 for the construction of Gulley Park and Finger Park Pavilions. $87,788 Cost of this request 2250.9255.5806.00 Account Number 05001.0801 (Gulley) 02013.0805 (Finger) Project Number Budgeted Item x $137,0001 Category/Project Budget Funds Used to Date $137,000 Remaining Balance Budget Adjustment Attached Neighborhood Park Development Program Category / Project Name Park Improvements Program / Project Category Name Parks Development Fund Name Department 11 'rector 6 29 o Previous Ordinance or Resolution # Date Original Contract Date: City Attorney .VIC20A q . LL Finance and Internal Service Director Mayo Date 9-'znog Date Date Original Contract Number: Received in City Clerk's 0 Fa6i-OS en Received in Mayors Office oR • Comments: City Council Meeting of Septemberl 6, 2008 Agenda Item Number CITY COUNCIL AGENDA. MEMO To: Mayor Dan Coody and City Council Thru: Gary Dumas, Operations Director .64 Connie Edmonston, Parks an Recreation Dire r From: Carole Jones, Park Planner Date: August 29, 2008 RE: Construction of Gulley Park iid Finger Park Pavilions RECOMMENDATION A resolution awarding Bid #08-62 and approval of a contract with Zachary & Associates, Inc. in the amount of $76,337.29, with a 15.0% project contingency of $11,450.59 for a total project cost of $87,787.88 for the construction of Gulley Park and Finger Park Pavilions. BACKGROUND Citizens are requesting large pavilions similar to Walker Park's pavilion to hold social events such as birthday parties, family/friend gatherings and such. A new pavilion at Gulley Park for $67,000 is in the 2008 budget. Staff felt a better bid would be received by requesting two pavilions on the same bid. The existing pavilion at Finger Park will be replaced with a new, larger pavilion. On June 2, 2008, the PRAB approved a budget adjustment of $70,000 for the Finger Park Pavilion project from the SW Park Land Dedication Fund in 2008. The realloction of funds was approved by the City Council on June 17, 2008. DISCUSSION The project was advertised on August 8 and 22, and bids were opened on August 29, 2008. Six vendors including Zachary & Associates, Inc., Arkoma Playgrounds & Supply, Noland Construction, Pick -It Construction, Inc., Tomlinson Asphalt Co., Inc and Perme Excavating submitted bids Zachary & Associates, Inc. was the low bid in the amount of $76,337.29. If approved, the construction of the project will begin in October 2008 and will be completed in January 2009. BUDGET IMPACT This project is funded with Park Land Dedication Funds from the Southwest Park District ($70,000) and the Northeast Park District ($67,000). Total project cost including a 15.0% contingency is $87,787.88. The annual maintenance cost for the project is anticipated to be negligible. Attachments: PRAB Minutes June 2, 2008 Bid Tabulation Sheet Contract Signed by Contractor Purchase Requisition Page 1 of 1 i Davidson said after voting on item six, PRAB now needed to vote on the $31,000 from the Mountain Ranch Trail Construction. Bitler wanted to know the footage and width of the trail. Jumper said it was 1,791 feet long and 12 feet wide. P. Jones said he was going to recuse from the vote, because he works with the contractor. PRAB Motion: Hatfield motioned to accept the staff recommendation on item five. Biendara seconded the motion. Motion passed 5-0-0 by voice vote. 6. SW Park Land Dedication Budget Adjustment Request: Connie Edmonston, Parks & Recreation Director The Southwest Park Land Dedication Fund is required to expend $126,634 by the end of 2008. The Park Planners have been very busy in addition to their Park projects, working on the plans of the Downtown Square project, as well as serving as the Urban Forester during the vacancy of this position. These duties were not known when the budget was created in August of 2007 for 2008 expenditures. The current Wilson Park trail renovation project, which includes the addition of lights, has a dedicated budget of $217,000 in 2008. It would be difficult to spend $126,634 by the end of 2008 as complete plans and specifications are necessary to bid the project. A topographical survey of Wilson Park is in the process of being completed and an Electrical Engineer will be hired to design the trail lights. Since this project began, it has become apparent the $217,000 will not be enough to renovate the trail and provide lights. The $69,000 attributed to redirecting the trail across the swimming pool parking lot and installing a bridge that would move the trail around the perimeter of the softball field to the Castle area will be combined with the trail renovation/lighting project. Staff suggests to proceed with the planning documents for Wilson trail/light project, but move $75,000 from this project to projects that could be completed by December 2008. In the 2009 capital projects, we would make it a high priority to provide enough funds to complete the Wilson Trail/light project. In addition, Staff will have a better estimate of how much it will cost to complete this project. Staff is also requesting other adjustments to the Southwest Fund due to projects having contingency funds left and the addition of the Mountain Ranch Project request above. Harmony Pointe Park will cost $2,904 less than proposed. The remaining $4,000 will complete a park entry sign. PRAB Minutes June 2, 2008 4 2. Wilson Pool Rock Wall will cost $15,000 with the Parks Maintenance Staff demolishing the existing structure which is a savings of $15,000. 3. Citizens are requesting large pavilions similar to Walker Park's pavilion to hold social events such as birthday parties, family/friend gathers and such. A new pavilion at Gulley Park is in the budget for 2008 and staff believes a better bid will be received by requesting two pavilions on the same bid. Finger Park needs a new, larger pavilion and is a project that could be completed this year. The budget for the Finger Park pavilion would be $70,000. In summary, Staff is requesting the following projects to be approved for the SW Park Land Dedication Fund in 2008. If this is approved by PRAB, it will need to go before City Council for final approval. Projects Complete in 2008 Continue into 2009 Harmony Pointe Park Entry Sign: $ 4,000 Wilson Park Trail/Lights $13,000 $129,000 Wilson Park Trail/Walk Bridge $ 69,000 Wilson Pool Rock Wall $15,000 Mountain Ranch Trail $31,000 Finger Park Pavilion $70 000 $133,000 ($126,634 required to be completed in 2008) See Park Land Dedication Budget Adjustment forms. Staff Recommendation: Approval of proposed SW Park Land Adjustment. Bitler asked if the Wilson Park Trail and Bridge would be done before the pool opening next year in 2009. Edmonston said yes, and it will be high priority. Bitler wanted to know the anticipated total cost amount that will be required to complete the project. Edmonston said that Parks will have that figure after the electrical contractor is hired. C. Jones said it would be over $100,000. Bitler wanted to know how much money is in the developmental fund. Edmonston said that each year it is a little over a million dollars. Davidson asked what would happen if Parks doesn't spend it. Would it go back to the developers? PRAB Minutes June 2, 2008 5 Edmonston said yes, but that's never happened. Bitler asked if Finger Park was used much by citizens. Edmonston said that some citizens use it, and it's getting more usage. Wright said that we need to have bigger pavilions available for people to use. Bitter wanted to know how many pavilions are available in Fayetteville Parks. Edmonston said there are ten pavilions, both large and small. Davidson asked if PRAB needed to recommend this budget adjustment to the City Council. Edmonston said yes, because Parks is trying to plan the budget. Biller said that this is fine, but he is still concerned about not knowing what the Wilson Park project and bridge will cost. C. Jones said she will work on the cost. Bitter wanted to know if that, even if we can't complete the whole project, will Parks consider still doing it. C. Jones said yes, but hopefully the whole project will be done in 2009. Waite commented that he is anxious to get a concrete schedule and get the project done, because he lives in the neighborhood. C. Jones said that it needs to meet ADA standards, if feasible financially. Biendara asked if Parks has any more projects to do. Edmonston said that there is a huge list. Bitter asked how the projects are prioritized. Edmonston replied that they are decided in a staff meeting. C. Jones said that the SW part of town needs a good pavilion. Bitter again asked if the Wilson Park bridge would get done next year. Edmonston said it would be high priority. Hatfield wondered if Parks had considered hiring someone to help. Jumper said that the budget doesn't allow it. Hatfield said that the cost of the project increases every year that it is put off. Edmonston said that Parks doesn't have adequate staff. PRAB Minutes June 2, 2008 6 3/ PRAB Motion: Bitler motioned to make the recommendation to the City Council to adjust the budget for the SW Park land and to accept the Staff recommendation. P. Jones seconded it. Motion passed 6-0-0 by voice vote. 7. Regional Park Update: Connie Edmonston, Park & Recreation Director Edmonston said she hasn't heard anything. Bitler said he was nervous. He's not sure the regional park will happen. Edmonston said that Southpass is tying us up. She will forward the information to Southpass that PRAB is getting anxious. Davidson suggested that we wait until next month to give them a little more time. Edmonston said that the only recourse is to go before the City Council. Davidson said that we need a plan B for Southpass. Edmonston said that the City has made a commitment. Davidson said that PRAB's responsibility is not to have all the eggs in one basket, but to have options. Edmonston said she shared his concerns, and would inform Southpass of all these concerns. 8. Other Business: Edmonston told PRAB that Jeff Coles is leaving Parks in order to accept a promotion as the Assistant Transportation Manager for the City. Wright announced the public meeting for the future park on Fairlane. The meeting is June 18, 2008 at 5:30. C. Jones discussed the Gulley Park Stream Restoration (319 grant). There is a section in the park that is much worse than Red Oak. City Engineering is heading the project. Elk Construction is a specialist in this type of project. They won't remove too many trees. The purpose of this project is to reduce the erosion to improve water quality. Bitter asked if the work would just be in the park boundaries. C. Jones said yes. Davidson wanted to know what PRAB was being asked to do. PRAB Minutes June 2, 2008 7 414. s F85 o w» a- s $ 88 S8 5! 8 8 8 8 88 Og- EA 88 33 0 OO mS» 8 8848S EA u igg `„ $888 2221111 a S 8 'G 888888888888 A"n$_ » S »» -i Pig n» 2 LA gg_y q sgx a 9 S s 88g{ 88g2.S8a Ea» R •.- rnairvvpro I 8 g S 8 w 88885888 gg£mg98 2122»m» I 51Z700.00 8 w 588p x C @ 8 �, 8888 El a8s8S8p8g8g EE E 9.4 - S88 ... 5g & 8 g 8 "88888588888 SlA www REA`ss ww i6788 3a 8 8 S88p88"88102 a01» R88 XPi "w2 8 n 8 I s8 »„ $2,375.001 $2.30200 aa »oc » 53 77100 w.$88 8 sa §d 8 E seri.,' xq»�9xs^E0. 8,xs6 Ec xCS (DY IS 88 n n 8888888'88 gg.4 0 92400 1,000.00 -0.. 888 Baa K' 0 .^. s888888»88 8 9gas_n. . A,8g >. Ys8 51.9995.001 5195A9 H<9400 8 » 888888888888 . "22sa»»»»»»» et....4flig ».xx_ ' UNIT PWCEih 8 Ea Ea a aa 's a SUS a sa"88"8 aa F G 88 8 8 888888888888 jJJ - _i JJo Ow JJY. hilL f 1 £ 10 111 111 Is 98 i Extend existing 4' Wide ADA MceaeidbCmwa.Sbawax N-THWhmal b me¢nnNYan Slap 120' a N' ReWryW W Gable malar, 4.r Peti.1ch panel roof pack with TI -Il on Nipm fate _ry n r mm�eagl� s F85 o w» a- s $ 88 S8 5! 8 8 8 8 88 Og- EA 88 33 0 OO