HomeMy WebLinkAbout138-08 RESOLUTIONRESOLUTION NO. 138-08
A RESOLUTION AUTHORIZING THE ENGINEERING DIVISION TO
APPLY FOR AND ACCEPT A GRANT FROM THE ARKANSAS NATURAL
RESOURCES COMMISSION FOR WATER QUALITY SAMPLING,
ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR TSS,
NITROGEN AND PHOSPHORUS AT THE MALLY WAGNON ROAD
BRIDGE ON THE WEST FORK OF THE WHITE RIVER; AND APPROVING
A BUDGET ADJUSTMENT RECOGNIZING THE GRANT REVENUE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby authorizes
the Engineering Division to apply for and accept a grant from the Arkansas Natural Resources
Commission for water quality sampling, analysis and annual load determinations for TSS,
nitrogen and phosphorus at the Mally Wagnon Road Bridge on the West Fork of the White
River.
Section 2. That the City Council of the City of Fayetteville,
budget adjustment recognizing the grant revenue.
PASSED and APPROVED this 1st day of July, 2008.
APPROVED s ATTEST:
By
DAN COODY, Mayo
Arkansas hereby approves a
rV� G\j Y 9,c :,G -p
a L,. • -P
- AYET
•FTEVILLE:.
:�.•
By:' ^^ +''• ori uONiG��.
SO DRA E SMITH, City Clerk/Treasurer
J. Randy Young, PE
Executive Director
Arkansas Natural
Resources Commission
101 East Capitol, Suite 350
Little Rock, Arkansas 72201
http://www.anrc.arkansas.gov/
Phone: (501) 682-1611
Fax: (501) 682-3991
E-mail: anrc@arkansas.gov
MEMORANDUM
TO: Mayor Dan Coody
City of Fayetteville
FROM: Earl T. Smith, Jr , P E
Chief, Water Resour ' • ge It Division
DATE: June 17, 2008
RE' SUB GRANT AGREEMENT (SGA 243)
Water Quality
Mike Beebe
Governor
RECEIVED
JUN 1 9 2008
CITY OF FAYLITEVILLE
MAYOR'S OFFICE
Please review and sign the above referenced Sub Grant Agreement and return both originals to
this office A fully executed copy will be returned to you for your files.
An envelope is enclosed for your convenience.
ETS:lab
Enclosure
An Equal Opportunity Employer
SUB -GRANT AGREEMENT # SGA 243
BETWEEN
ARKANSAS NATURAL RESOURCES COMMISSION
AND
CITY OF FAYETTEVILLE
WATER QUALITY SAMPLING, ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR
NUTRIENTS AND SOLIDS AT THE
WASHINGTON COUNTY ROAD 195 BRIDGE ON THE WEST FORK OF THE WHITE
RIVER.
GRANT # F0455C999610316.1 S
PROJECT 08.113
SECTION 1. - PURPOSE
The purpose of this Sub -Grant Agreement is to establish the responsibilities of the Arkansas Natural
Resources Commission (Commission) and the City of Fayetteville (City) necessary to complete a
cooperative nonpoint source pollution prevention project.
This project is to continue water quality sampling, water sample analysis and annual pollutant
load calculations at the Washington County road 195 bridge on the West Fork of the White
River.
SECTION 2. - GENERAL
The Commission is the recipient of a grant from the US Environmental Protection Agency (EPA) to be used
for implementation of the project. A requirement of the grant is that state and local funds also be secured
The following is a summation of funding requirements:
SUMMARY OF FUNDS
Source
Amount
Funds provided to the City of Fayetteville
EPA (997) —
$45,765
ANRC (2RG-04)
$
TOTAL FUNDS
$45,765
CC 336485 FSC3808
Funds provided by the City of Fayetteville (Cash or In -Kind)
$34,524
TOTAL MATCH
$34,524
TOTAL PROJECT COST
$80,289
SECTION 3. — CITY RESPONSIBILITIES
1. Provide personnel, supplies, and other resources necessary for completion of the project as outlined
in the attached scope of work.
2. Abide by all conditions of US EPA Assistance Agreement. The Administrative Conditions of the
grant are attached and incorporated by reference
3. Complete all milestones, tasks, and outputs as outlined in the project workplan in a timely manner.
4. Provide Quarterly Reports to the Commission within 15 days of the end of September, December,
March, and June; including Progress Reports, Supporting Documentation, MBEIWBE Expenditures,
and other matters required by the Commission.
5. Participate in an annual project evaluation and provide a report to the Commission on significant
accomplishments and other information as required by the Commission resulting from this project.
An Annual Evaluation Report will be submitted to the Commission by October 1St of each year.
6. Maintain financial records acceptable to the Commission. Submit to the Commission an annual
audit of funds that have been provided under this agreement.
7. Request payment for services provided in accordance with the attached schedule of payments.
Requests will be made no more than quarterly and will be accompanied by the required project
progress report.
8. Provide funds to the project as scheduled in the summary of funds and in the project work -plan.
SECTION 4. - COMMISSION RESPONSIBILITIES
1. Administer the grant in accordance with US EPA regulations.
2. Make semi-annual reports to Region 6 of the US EPA on progress of the project.
3. Include activities of the project in its annual report on nonpoint source management to US EPA.
4. Provide payment in a timely and efficient manner for work performed in accordance with the
attached schedule of payments.
5. Provide personnel, supplies and resources for completion of the project as outlined in the attached
scope of work.
6. Abide by conditions of US EPA Assistance Agreement.
7, Make periodic inspections of the work to determine if it meets the requirements of the EPA
Assistance Agreement.
2
8. The project will be assessed at the end of the first year by the Nonpoint Source (NPS) Staff. The
NPS Staff will determine if the project is on schedule and all milestones, tasks, and outputs as
outlined in the project workplan have been accomplished in a timely manner. Funding for the
following year(s) of this project will be contingent upon satisfactory completion of tasks, by the
completion date(s) as outlined in the schedule of tasks and outputs.
SECTION 5. - ITIS FURTHER AGREED:
1. Employees of all parties will cooperate fully with each other in such a manner as to maintain and
enhance the image of all parties and any other agencies assisting the prosect.
2. Any advertisements or information released regarding the project must reference the contributions
of the Commission and EPA.
3. Any and all equipment purchased by US EPA Assistance Agreement or Commission funds will be
properly identified reflecting who provided funding for the equipment.
4. Any and all equipment and supplies purchased by US EPA Assistance Agreement or Commission
funds will be surrendered to the Commission if the terms of this agreement are not met.
Equipment purchased by US EPA Assistance Agreement or Commission funds requires the
Commissions' approval prior to disposition.
5. The Sub -grantee will be required to participate in the Commissions' annual project review meeting
and any other meetings and/or conferences the Commission deems necessary.
6. The Commission may terminate this agreement with a 30 -day written notice at any time if it is
determined by the Commission's Executive Director that the work is not within the terms and
condition of this agreement including the project workplan and other grant requirements, or if the
EPA determines that the work is not within the grant requirements.
7. This Sub -Grant Agreement will expire September 1, 2009.
8. The project duration will be 1 year(s), beginning- July 1, 2008 to June 30, 2009.
9. Final Report and Invoice are due no later than July 31, 2009.
3
Acceptance of this agreement is evidenced by signature below.
CITY OF FAYETTEVILLE
By:
Dan Coody, Mayor
ARKANSAS NATURAL RESOURCES COMMISSION
Date:
By: Date:
J. Randy Young, Executive Director
4
SUB -GRANT AGREEMENT # SGA 243
BETWEEN
ARKANSAS NATURAL RESOURCES COMMISSION
AND
CITY OF FAYETTEVILLE
WATER QUALITY SAMPLING, ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR
NUTRIENTS AND SOLIDS AT THE
WASHINGTON COUNTY ROAD 195 BRIDGE ON THE WEST FORK OF THE WHITE
RIVER.
GRANT # F0455C999610316-1S
PROJECT 08 -113
SECTION 1. - PURPOSE
The purpose of this Sub -Grant Agreement is to establish the responsibilities of the Arkansas Natural
Resources Commission (Commission) and the City of Fayetteville (City) necessary to complete a
cooperative nonpoint source pollution prevention project.
This project is to continue water quality sampling, water sample analysis and annual pollutant
load calculations at the Washington County road 195 bridge on the West Fork of the White
River.
SECTION 2. - GENERAL
The Commission is the recipient of a grant from the US Environmental Protection Agency (EPA) to be used
for implementation of the project. A requirement of the grant is that state and local funds also be secured
The following is a summation of funding requirements:
SUMMARY OF FUNDS
Source
Amount
Funds
provided to the City of Fayetteville
EPA
(997) —
$45,765
ANRC (2RG-04)
$
TOTAL FUNDS
$45,765
CC 336485 FSC3808
Funds provided by the City of Fayetteville (Cash or In -Kind)
$34,524
TOTAL MATCH
$34,524
TOTAL PROJECT COST
$80,289
SECTION 3. — CITY RESPONSIBILITIES
1. Provide personnel, supplies, and other resources necessary for completion of the project as outlined
in the attached scope of work.
2. Abide by all conditions of US EPA Assistance Agreement. The Administrative Conditions of the
grant are attached and incorporated by reference.
3. Complete all milestones, tasks, and outputs as outlined in the project workplan in a timely manner.
4. Provide Quarterly Reports to the Commission within 15 days of the end of September, December,
March, and June; including Progress Reports, Supporting Documentation, MBEWBE Expenditures,
and other matters required by the Commission.
5. Participate in an annual project evaluation and provide a report to the Commission on significant
accomplishments and other information as required by the Commission resulting from this project.
An Annual Evaluation Report will be submitted to the Commission by October 151 of each year.
6. Maintain financial records acceptable to the Commission. Submit to the Commission an annual
audit of funds that have been provided under this agreement.
Request payment for services provided in accordance with the attached schedule of payments.
Requests will be made no more than quarterly and will be accompanied by the required project
progress report.
8. Provide funds to the project as scheduled in the summary of funds and in the project work -plan.
SECTION 4. - COMMISSION RESPONSIBILITIES
1. Administer the grant in accordance with US EPA regulations.
2. Make semi-annual reports to Region 6 of the US EPA on progress of the project.
3. Include activities of the project in its annual report on nonpoint source management to US EPA.
4. Provide payment in a timely and efficient manner for work performed in accordance with the
attached schedule of payments.
5. Provide personnel, supplies and resources for completion of the project as outlined in the attached
scope of work.
6. Abide by conditions of US EPA Assistance Agreement.
7. Make periodic inspections of the work to determine if it meets the requirements of the EPA
Assistance Agreement.
2
8. The project will be assessed at the end of the first year by the Nonpoint Source (NPS) Staff. The
NPS Staff will determine if the project is on schedule and all milestones, tasks, and outputs as
outlined in the project workplan have been accomplished in a timely manner. Funding for the
following year(s) of this project will be contingent upon satisfactory completion of tasks, by the
completion date(s) as outlined in the schedule of tasks and outputs.
SECTION 5. - ITIS FURTHER AGREED:
Employees of all parties will cooperate fully with each other in such a manner as to maintain and
enhance the image of all parties and any other agencies assisting the project.
2. Any advertisements or information released regarding the project must reference the contributions
of the Commission and EPA.
3. Any and all equipment purchased by US EPA Assistance Agreement or Commission funds will be
properly identified reflecting who provided funding for the equipment.
4. Any and all equipment and supplies purchased by US EPA Assistance Agreement or Commission
funds will be surrendered to the Commission if the terms of this agreement are not met.
Equipment purchased by US EPA Assistance Agreement or Commission funds requires the
Commissions' approval prior to disposition.
5. The Sub -grantee will be required to participate in the Commissions' annual project review meeting
and any other meetings and/or conferences the Commission deems necessary.
6. The Commission may terminate this agreement with a 30 -day wntten notice at any time if it is
determined by the Commission's Executive Director that the work is not within the terms and
condition of this agreement including the project workplan and other grant requirements, or if the
EPA determines that the work is not within the grant requirements.
7, This Sub -Grant Agreement will expire September 1, 2009.
8. The project duration will be 1 year(s), beginning- July 1, 2008 to June 30, 2009.
9. Final Report and Invoice are due no later than July 31, 2009.
3
Acceptance of this agreement is evidenced by signature below.
CITY OF FAYETTEVILLE
By:
Dan Coody, Mayor
ARKANSAS NATURAL RESOURCES COMMISSION
Date:
7 Aity
By: Date:
J. Randy Young, Executive Director
4
SCOPE OF WORK
PROJECT 08-113
WATER QUALITY SAMPLING, ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR
NUTRIENTS AND SOLIDS AT THE
WASHINGTON COUNTY ROAD 195 BRIDGE ON THE WEST FORK OF THE WHITE
RIVER.
INTRODUCTION
A water quality sampling station was installed at the Washington County road 195 bridge on the
West Fork of the White River just above the confluence of the three main forks of the Upper
White River in 2002. This station is coordinated with a USGS gauging station at the same
location. This station is instrumented to collect samples at sufficient intervals across the
hydrograph to accurately estimate the flux of total suspended solids, nitrogen and phosphorus
into the upper end of Beaver Lake from the West Fork of the White River. The West Fork is
listed on Arkansas' 1998 303d list as impaired from sediment. The Upper White was designated
as the states highest priority watershed in the 1999 Unified Watershed Assessment. Accurate
determination of stream nutrients and sediment is critical for future determinations of TMDLs,
effectiveness of best management practices and trends in water quality. This proposal is for
continuation of sampling and load determination for the period from July 1, 2008 to June 30,
2009.
SCOPE
This proposal is for sampling station installation, water quality sampling, water sample analysis
and annual pollutant load calculations at the Washington County Road 195 Bridge on the West
Fork of the White River. The parameters measured from collected samples will be nitrate -
nitrogen, ammonia -nitrogen, total nitrogen, total phosphorus, dissolved reactive phosphorus,
turbidity, conductivity, sulfate chloride and total suspended solids. In addition turbidity,
conductivity and pH will be measured in-situ and recorded in thirty -minute intervals. The City of
Fayetteville will be the contractor with Arkansas Natural Resources Commission (ANRC) for the
319 grant. They will be responsible for contractual relationships and payment to the sub-
contractor. The City of Fayetteville will also be responsible for providing the entire match for the
project. Nelson Engineering will be the sub -contractor. The sub -contractor will be responsible
for all remaining tasks of the project including• writing the QAPP, collecting samples and
analyzing the data from the water quality sampling station, computing the annual load for all
parameters and reporting quarterly and annually to the City of Fayetteville and ANRC.
5
METHODS
There are twelve significant storms during a year on average. Each storm will require an
average of three composite samples The budget is based on composite sampling, collection
and analysis for twelve storms and twenty-six grab samples. This is the estimated analytical
cost. Actual costs will be born by the sub -contractor regardless of the number of samples
collected. (All significant storm events will be sampled) All samples will be analyzed for Nitrate
Nitrogen (NO3-N), Ammonia Nitrogen (NH4-N), Total Nitrogen (TN), Total Phosphorus (TP),
Soluble Reactive Phosphate (SRP) and Total Suspended Solids (TSS), turbidity, conductivity,
sulfate and chloride. Nelson Engineering will collect all samples and all samples will be analyzed
by the AWRC Water Quality Lab or another ADEQ certified lab using standard field and
laboratory QA/QC procedures.
The sampler will be configured to take flow -weighted composite samples. The sampler will
begin sampling after the stage has risen above a set trigger level. It will take a discrete sample
after a fixed volume of water has passed. The discrete samples will be composited by
combining equal volumes of each into a single composite sample for analysis The discrete
samples will be collected for compositing before all twenty-four bottles are filled or within forty-
eight hours after the first sample. Storms will be sampled in this manner as long as the stage is
above the trigger level. The trigger level will be four feet Grab samples will be taken every two
weeks. The data collected at this site will be used to calculate total pollutant loads and mean
concentrations for the year. All data will be reported with field and laboratory QA/ QC data.
A YSI sonde will be used to collect data on turbidity and conductivity. The sonde is SDI -12
compatible and works in conjunction with the USGS DCP located on site. The data is measured
and logged every 30 minutes and transferred to the USGS office every 4 hours along with other
USGS stage and flow data
The responsibilities of the sub -contractor include project management and coordination, QAPP
plan writing, sample collection, field maintenance, sample analyses, quality control, data
compilation, data interpretation and report writing.
Quarterly progress and quality assurance reports and a yearly written report will be prepared
for this project. The report will detail the sampling results for the year as well as total calculated
loads for the water quality parameters measured. Trends in water quality will be investigated
and reported as soon as sufficient data becomes available. The report will be presented
annually to the City of Fayetteville and ANRC. Payment of the sub -contract will be a lump sum,
25% of the total each quarter after submission of the quarter reports and a payment invoice
from the sub -contractor to the City.
Budget totals:
Requested federal funds:
$80,289
$45,765(57%)
Required matching funds (or in-kind match): $34,524(43%)
6
WATER QUALITY
WASHINGTON
Schedule of Payments
Project FY 08-113
SAMPLING, ANALYSIS AND ANNUAL LOAD
NUTRIENTS AND SOLIDS AT THE
COUNTY ROAD 195 BRIDGE ON THE WEST
RIVER.
CITY OF FAYtIIEVILLE
113 WEST MOUNTAIN
FAYETTEVILLE,AR 72701
DETERMINATIONS FOR
FORK OF THE WHITE
Item
Description
Budgeted
Units
Unit Cost
Total Payment
1Quarterly
and QA Reports
4
$10,000
$40,000
2Final
Report
1
$5,765
$5,765
Total
$45,765
7
WATER QUALITY
WASHINGTON
Schedule of MATCH
Project FY 08-113
SAMPLING, ANALYSIS AND ANNUAL LOAD
NUTRIENTS AND SOLIDS AT THE
COUNTY ROAD 195 BRIDGE ON THE WEST
RIVER.
CITY OF FAYETTEVILLE
113 WEST MOUNTAIN
FAYETTEVILLE, AR 72701
DETERMINATIONS FOR
FORK OF THE WHITE
Item
Description
Budgeted
Units
Unit Cost
Total Payment
1Quarterly
and QA Reports
4
$7,500
$30,000
2Final
Report
1
$4,524
$4,524
Total
$34,524
8
Quarterly Project Fund Request
Sub -grant Agreement SGA # 243
WATER QUALITY SAMPLING, ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR
NUTRIENTS AND SOLIDS AT THE
WASHINGTON COUNTY ROAD 195 BRIDGE ON THE WEST FORK OF THE WHITE
RIVER.
Quarter:
CITY OF FAYETTEVILLE
113 WEST MOUNTAIN
FAYETTEVILLE, AR 72701
(From) Date (To) Date
Date Submitted to
ANRC:
Budget: $45,765
Prepared / submitted by:
Total Cost to date: $
Balance: $
Date:
9
Cost th s Quarter
Total Costs to
Date
Item
Description
Budgeted
Units
Unit Cost
Units
this
Quarter
Quarter
Cost
C
Costst
Units this
Quarter)
x x
Total
to Units
Date
Total
Cost
=Unit
Cost
Total
Units
Date)
X
to
1
Quarterly and
QA Reports
4
$10,000
$
$
2
Final Report
1
$5,765
$
$
Earned this Quarter
$
$
Total Cost to date
$
Less Previous Payments
$
Total Amount Due
$
Budget: $45,765
Prepared / submitted by:
Total Cost to date: $
Balance: $
Date:
9
WATER QUALITY
WASHINGTON
Quarter:
Quarterly Match Report
Project FY 07-113
SAMPLING, ANALYSIS AND ANNUAL LOAD
NUTRIENTS AND SOLIDS AT THE
COUNTY ROAD 195 BRIDGE ON THE WEST
RIVER.
CITY OF FAYETTEVILLE
113 WEST MOUNTAIN
FAYETTEVILLE,AR 72701
(From) Date (To) Date
Date Submitted to ANRC:
DETERMINATIONS FOR
FORK OF THE WHITE
Prepared/submitted
by•
10
Date:
Cost this Quarter
Tota
Costs to
Date
Item
Description
Budgete
d Units
Unit
Cost
Units
this
Quarte
r
Quarter
Cost =
(Unit
Cost x
Units this
Quarter)
Total
Units
to
Date
Total
Cost =
(Unit Cost
x Total
Units to
Date)
1
Quarterly Reports
4
$7,500
2
Final Report
1
$4,524
Total Billed
; kr '
e
Total Cost
Less Previous Payments
Total Amount Due
Budget:
$34,524
Total Cost: $
Cash Advance: $0
Balance: $
Prepared/submitted
by•
10
Date:
DO NOT RETURN
X - 98675801 - 0 Page 4
Administrative Conditions
This Assistance Agreement is awarded in accordance with the Federal Grants and Cooperative
Agreement Act of 1977. Areas of substantial EPA involvement, beyond the normal exercise of
performance evaluation and program review, have been detailed in specific output objectives
which resulted from negotiation between EPA and the recipient. These areas are included in the
application for this award and have become a part of this Agreement.
1. The recipient covenants and agrees that it will expeditiously initiate and timely complete the
project work for which assistance has been awarded under this Agreement, in accordance
with all applicable provisions of 40 CFR Chapter 1, Subchapter B. The recipient warrants,
represents, and agrees that it and all its contractors, employees and representatives, will
comply with all APPLICABLE provisions of 40 CFR Chapter 1, Subchapter B,
INCLUDING BUT NOT LIMITED TO the provisions of 40 CFR Parts 31, 32, 34, and
35. This award may be reduced or terminated at such time the recipient fails to comply with
the program objectives, grant award conditions, or Federal reporting requiremepts.
2. Recipient standards of administration, property management, procurement and financial
management, as well as records and facilities of recipients, their contractors and
subcontractors are subject to audit and inspection by the Comptroller General of the United
States and the U.S. Environmental Protection Agency in accordance with Office of
Management and Budget (OMB) Circulares A-87, A-102, A -I 10 and 40 CFR Part 31. The
recipient's standards governing procurement will be in accordance with 40 CFR, Part 31.36
and OMB Circular A-102. The recipient shall maintain a financial management system
which meets the requirements of 40 CFR Part 31.20.
3. In accordance with the requirements contained in Section 6002 of the Resources
Conservation and Recovery Act (RCRA), 42 USC 6962, the recipient is required to purchase
items containing recovered materials. These requirements apply when the recipient
purchases more than $10,000 each Fiscal Year of any item covered by the following
procurement guidelines including: paper and paper products (40 CFR Part 250); lubricating
oil containing re -refined oil (40 CFR Part 252); retread tires (40 CFR Part 253); building
insulation products (40 CFR Part 248) and cement and concrete containing fly ash (40 CFR
Part 249). EPA publication PROCUREMENT GUIDELINES FOR GOVERNMENT
AGENCIES dated December, 1990 (EPA/530-SW-91-011) provides specific •
recommendations for the implementation of these requirements.
4. Pursuant to EPA Order 1000.25, dated January 24, 1990, the recipient agrees to use recycled
paper for all reports which are prepared as a part of this Agreement and delivered to EPA
This requirement does not apply to standard forms which are printed on recycled paper when
available through the General Services Administration.
5. In accordance with 40 CFR Part 31.41, the recipient shall submit an annual Financial
Status Report (FSR), Standard Form 269 or 269A, to:
Grants Team (6MD-RX)
•
U. S. Environmental Protection Agency, Region 6
1445 Ross Avenue
Dallas, Texas 75202-2733
The final Financial Status Report (FSR) is due on or before 90 days after the end of the
budget period. In accordance with Agency policy, all project expenditures reported by the
recipient shall be deemed to include both the Federal and recipient share of the expenditures.
6. The recipient agrees to ensure that all conference, meeting, convention, or training space
funded in whole or in part with federal funds, complies with the Hdtel and Motel Fire Safety
Act of 1990
7. Under the Paperwork Reduction Act of 1980, Office of Management and Budget (OMB)
clearance must be obtained prior to collecting information from 10 or more persons and will
use EPA's name while collecting the information under this project. The term "person"
means an individual, partnership, association, corporation, business, trust, or legal
representative, an organized group of individuals, a State, territorial, or local government or
branch thereof, or a political subdivision of a State, territory, or local government or a branch
of a political subdivision. The EPA Project Officer is responsible for requesting clearance
from OMB.
8. The Federal share of allowable expenditures chargeable to this assistance project will be
financed by the EPA AUTOMATED CLEARING HOUSE (EPA-ACH) PAYMENT
SYSTEM.
The recipient will strictly adhere to the accounting and reporting procedures described in the
EPA-ACH Recipient's Manual for the duration of the project. Four conditions should receive
special attention:
a. Cash drawdowns will be made only as actually needed for disbursements.
b. The recipient will provide timely reporting of cash disbursements and balances through
semi-annual submission of a Federal Cash Transactions Report (SF -272) to:
Federal Cash Transactions Report Coordinator
General Accounting Team (6MD-RG)
U.S. Environmental Protection Agency, Region 6
1445 Ross Avenue
Dallas, Texas 75202-2733
c. The recipient will impose the same standards of timing and reporting on secondary
recipients, if any.
d. When a drawdown under the EPA-ACH Payment System occurs, the recipient must show
the Assistance Agreement Number(s) under "Financial Data" on the EPA-ACH Payment
Request Form.
9. The recipient agrees to comply with the requirements of EPA's Program for Utilization of
Small, Minority and Women's Business Enterprises in procurement under assistance
agreements:
a. The recipient accepts the applicable FY 2000 Minority Business Enterprise
(MBE)/Women's Business Enterprise (WBE) "fair share" goals/objectives negotiated with
EPA as follows:
MBE: CONSTRUCTION - 33%; SUPPLIES - 1.1%; SERVICES - 0.9%; EQUIPMENT - 1.1%
WBE: CONSTRUCTION - 4.5%; SUPPLIES - 5.2%; SERVICES - 7.5%; EQUIPMENT - 5.2%
b. (1) The recipient agrees to ensure, to the fullest extent possible, that at least the applicable
"fair share" objectives of Federal funds for prime contracts or subcontracts for supplies,
construction, equipment or services are made available to organization owned or controlled
by socially and economically disadvantaged individuals, women and Historically Black
Colleges and Universities.
(2) For assistance agreements related to research under the Clean Air Act Amendments of
1990, the recipient agrees to ensure, to the fullest extent possible, that at least the applicable
"fair share" objectives of Federal funds for prime contracts or subcontracts for supplies,
construction, equipment or services are made available to organizations owned or controlled
by socially and economically disadvantaged individuals, women, disabled Americans,
Historically Black Colleges and Universities, Colleges and Universities having a student
body in which 40% or more of the students are Hispanic, minority institutions having a
minority student body of 50% or more, and private and voluntary organizations controlled by
individuals who are socially and economically disadvantaged.
c. The recipient agrees to include in its bid documents the applicable "fair share" objectives
and require all of its prime contractors to include in their bid documents for subcontracts the
negotiated "fair share" percentages.
d. The recipient agrees to follow the six affirmative steps or positive efforts stated in 40
CFR, Section 30.44(b), 40 CFR Section 31.36(e), or 40 CFR Section 35.6580, as appropriate,
and retain records documenting compliance.
e. The recipient agrees to submit an EPA form 5700-52A "MBE/WBE Utilization Under
Federal Grants, Cooperative Agreements and Interagency Agreements" beginning with the
Federal fiscal year quarter the recipient receives the award and continuing until the project is
completed. These reports must be submitted to the Regional MBE/WBE Coordinator within
30 days of the end of the Federal Fiscal quarter (January 30, April 30, July 30, and October
30). For assistance awards for continuing environmental programs and assistance awards
with institutions of higher education, hospitals and other non-profit organizations, the
recipient agrees to submit an EPA form 5700-52A to the Regional MBE/WBE Coordinator
by October 30 of each year.
f. If race and/or gender neutral efforts prove inadequate to achieve a "fair share" objective,
the recipient agrees to notify EPA in advance of any race and/or gender conscious action it
City of Fayetteville, Arkansas
Budget Adjustment Form
Budget Year
2008
Department:
Division:
Program:
Date Requested
7/1/2008
Adjustment Number
Project or Item Added/Increased:
$45,765 is requested in the Drainage/Phase 2
Stormwater Mgmt project.
Project or Item Deleted/Reduced:
None. To recognize $45,765 in EPA Grant Revenue.
Justification of this Increase:
The funding is for the Water Quality Sampling, Analysis
and Annual Load Determinations for Nutrients and Solids
at the Washington County Road 195 Bridge on the West
Fork of the White River Grant.
Justification of this Decrease:
Increase Expense Budget (Decrease Revenue Budget)
Account Name Account Number Amount Project Number
Bridge & drainage improve
Account Name
4470 9470 5817 00 45,765 08059
Decrease Expense Budget (Increase Revenue Budget)
Account Number Amount
• Federal grants -Capital 4470 0947 4309 00
Project Number
45,765 08059 1
A s .rova atures
Requested By
Date
6.30-a.
Date
Finance & Internal Services Director
Mayor
6 -3o -or
Date
Date
Budget Office Use Only
Type: A B C (D /
Posted to General Ledger
Posted to .Project Accounting
Entered in Category Log
Initial Date
Initial Date
Initial Date
City of Fayetteville
City Council Agenda Items
July 1, 2008
City Council Meeting Date
Engineering Operations
Division Department
agreement with a subcontractor for a grant for water quality sampling, analysis and annual load determinations for
TSS, nitrogen, and phosphorus at the Mally Wagnon Road Bridge on the West Fork of the White River and utilizing
in -kind match through staff time and current projects.
4470-9470-5817
Account Number
$ 708,731.00
Category / Project Budget
$ 268,082.60
Funds Used to Date
$ 440,648.40
Remaining Balance
Drainage/Phase 2 Stormwater Mgmt
Bridge and Drainage Improvements
Capital Improvement Const
Original Contract Number:
City Attorn y /V✓ Date
Received in City Clerk's Offi•
`P __ Q •-` 6 -t1-o8 (p-1
Finance and Internal Service Director Date
Received in Mayor's Office ENTERED
C7lzzl 8 BlZ%�
1,-L�
nna,, Date
City Council Meeting of July 1, 2008
CITY COUNCIL AGENDA MEMO
To: Mayor and City Council
Thru: Gary Dumas, Director of Operations
Ron Petrie, City Engineer Fhf
From: Sarah Wrede, Staff Engineer
Date: June 13, 2008
Subject: A resolution to apply for a grant through the Arkansas Natural Resources
Commision in a proposed partnership agreement with a subcontractor for a grant for
water quality sampling, analysis and annual load determinations for TSS, nitrogen, and
phosphorus at the Mally Wagnon Road Bridge on the West Fork of the White River and
utilizing in -kind match through staff time and current projects.
RECOMMENDATION .
Staff recommends approval of a partnership agreement with a subcontractor for a grant
for water quality sampling, analysis and annual load determinations for TSS, nitrogen,
and phosphorus at the Mally Wagnon Road Bridge on the West Fork of the White River.
BACKGROUND
Marc Nelson, working with the Arkansas Water Resources Center, installed a water
quality sampling station at the Mally Wagnon Road Bridge on the West Fork of the
White River just above the confluence of the three main forks of the Upper White River
in 2002. This station is coordinated with a USGS gauging station at the same location,
and is instrumented to collect samples at sufficient intervals across the hydrograph to
accurately estimate the flux of total suspended solids, nitrogen and phosphorus into the
upper end of Beaver Lake from the West Fork of the White River. The West Fork is
listed on Arkansas' 1998 303d list as impaired from sediment. The Upper White was
designated as the states highest priority watershed in the 1999 Unified Watershed
Assessment. Accurate determination of stream nutrients and sediment is critical for future
determinations of Total Maximum Daily Loads (TMDLs), effectiveness of best
management practices and trends in water quality. The Arkansas Water Resources Center
chose to stop funding this project. Mark Nelson, through Nelson Engineering, wrote the
proposal in order to continue the record of water quality monitoring. This proposal is for
continuation of sampling and load determination for the period from July 1, 2008 to June
30, 2009 and includes the purchase of new sampling equipment.
City Council Meeting of July 1, 2008
DISCUSSION:
This proposal is for water quality sampling, water sample analysis and annual pollutant
load calculations at the Washington County Road 195 Bridge (Mally Wagnon Road
Bridge) on the West Fork of the White River. The parameters measured from collected
samples will be nitrate -nitrogen, ammonia -nitrogen, total nitrogen, total phosphorus,
dissolved reactive phosphorus, turbidity, conductivity, sulfate chloride and total
suspended solids. In addition turbidity, conductivity and pH will be measured in -situ and
recorded in thirty -minute intervals.
The City of Fayetteville will be the contractor with Arkansas Natural Resources
Commission (ANRC) for the 319 grant. The City will be responsible for contractual
relationships and payment to the sub -contractor, purchasing sampling equipment, which
is reimbursable through the grant, and providing the match for the project. The sub-
contractor will be responsible for all remaining tasks of the project including: writing the
Quality Assurance Project Plan (QAPP), collecting samples and analyzing the data from
the water quality sampling station, computing the annual load for all parameters and
reporting quarterly and annually to the City of Fayetteville and ANRC.
The proposed project costs are $45,765 federal and $34,524 of in kind match from the
City of Fayetteville for a total of $80,289. The grant was originally planned to use the
Nutrient Reduction Plan as the total match. However ANRC decided that the only
allowable portion of the Nutrient Reduction Plan to use as match would be the
stakeholder meetings and staff time spent on Nutrient Reduction Plan related work. The
match for the stakeholder meetings and staff time will make up $9155.00. Project
administration will make up $5000 of the match. The additional match to make up the
difference will be provided by the West Fork EPA through their Annual Watershed
Outreach and Clean-up of the West Fork of the White River. These forms of in -kind
match have been approved by ANRC.
BUDGET IMPACT
Currently, there is $440,648.40 remaining in the Drainage Study/Phase 11 Stormwater
Management account that has been designated for use to fund projects that improve
stonnwater quality in the City of Fayetteville. The grant includes the purchase -of sample
collection and analysis equipment in the amount of $14,000. This equipment must be
purchased at the beginning of the project and is reimbursable once the grant is awarded.
2
RESOLUTION NO.
A RESOLUZION AUTHORIZING THE
APPLY FOR GRANT FROM THE ARF
COMMISSION QR WATER QUALIT
ANNUAL LOAD DETERMINATION
PHOSPHORUS AT T MALLY WAG 0
FORK OF THE WHITE ER.
ENGINEERING DIVISION TO
SAS NATURAL RESOURCES
SAMPLING, ANALYSIS AND
FOR TSS, NITROGEN AND
N ROAD BRIDGE ON THE WEST
BE IT RESOLVED B THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council o e City of Fayetteville, Arkansas hereby authorizes
the Engineering Division to apply for a gr om the Arkansas Natural Resources Commission
for water quality sampling, analysis and I load determinations for TSS, nitrogen and
phosphorus at the Mally Wagnon Road Bri ge on e West Fork of the White River.
PASSED and APPROVED this l" Iday of July,
APPROVED: I ATTEST:
By:
DAN COODY, Mayor
By:
SONDRA E. SMI", City Clerk/Treasurer
WATER QUALITY SAMPLING, ANALYSIS AND ANNUAL LOAD
DETERMINATIONS FOR NUTRIENTS AND SOLIDS AT THE
WASHINGTON COUNTY ROAD 195 BRIDGE ON THE WEST FORK OF THE
WHITE RIVER.
INTRODUCTION
A water quality sampling station was installed at the Washington County road 195 bridge
on the West Fork of the White River just above the confluence of the three main forks of
the Upper White River in 2002. This station is coordinated with a USGS gauging station
at the same location. This station is instrumented to collect samples at sufficient intervals
across the hydrograph to accurately estimate the flux of total suspended solids, nitrogen
and phosphorus into the upper end of Beaver Lake from the West Fork of the White
River. The West Fork is listed on Arkansas' 1998 303d list as impaired from sediment.
The Upper White was designated as the states highest priority watershed in the 1999
Unified Watershed Assessment. Accurate determination of stream nutrients and sediment
is critical for future determinations of TMDLs, effectiveness of best management
practices and trends in water quality. This proposal is for continuation of sampling and
load determination for the period from July 1, 2008 to June 30, 2009.
SCOPE
This proposal is for sampling station installation, water quality sampling, water sample
analysis and annual pollutant load calculations at the Washington County Road 195
Bridge on the West Fork of the White River. The parameters measured from collected
samples will be nitrate -nitrogen, ammonia -nitrogen, total nitrogen, total phosphorus,
dissolved reactive phosphorus, turbidity, conductivity, sulfate chloride and total
suspended solids. In addition turbidity, conductivity and pH will be measured in -situ and
recorded in thirty -minute intervals. The City of Fayetteville will be the contractor with
Arkansas Natural Resources Commission (ANRC) for the 319 grant. They will be
responsible for contractual relationships and payment to the sub -contractor. The City of
Fayetteville will also be responsible for providing the entire match for the project. Nelson
Engineering will be the sub -contractor. The sub -contractor will be responsible for all
remaining tasks of the project including: writing the QAPP, collecting samples and
analyzing the data from the water quality sampling station, computing the annual load for
all parameters and reporting quarterly and annually to the City of Fayetteville and ANRC.
METHODS
There are twelve significant storms during a year on average. Each storm will require an
average of three composite samples. The budget is based on composite sampling,
collection and analysis for twelve storms and twenty-six grab samples. This is the
estimated analytical cost. Actual costs will be born by the sub -contractor regardless of the
number of samples collected. (All significant stonn events will be sampled) All samples
will be analyzed for Nitrate Nitrogen (NO3-N), Ammonia Nitrogen (NH4-N), Total
Nitrogen (TN), Total Phosphorus (TP), Soluble Reactive Phosphate (SRP) and Total
Suspended Solids (TSS), turbidity, conductivity, sulfate and chloride. Nelson Engineering
will collect all samples and all samples will be analyzed by the AWRC Water Quality
Lab or another ADEQ certified lab using standard field and laboratory QA/QC
procedures.
The sampler will be configured to take flow -weighted composite samples. The sampler
will begin sampling after the stage has risen above a set trigger level. It will take a
discrete sample after a fixed volume of water has passed. The discrete samples will be.
composited by combining equal volumes of each into a single composite sample for
analysis. The discrete samples will be collected for compositing before all twenty-four
bottles are filled or within forty-eight hours after the first sample. Stones will be sampled
in this manner as long as the stage is above the trigger level. The trigger level will be four
feet. Grab samples will be taken every two weeks. The data collected at this site will be
used to calculate total pollutant loads and mean concentrations for the year. All data will
be reported with field and laboratory QA/ QC data.
A YSl sonde will be used to collect data on turbidity and conductivity. The sonde is SDI -
12 compatible and works in conjunction with the USGS DCP located on site. The data is
measured and logged every 30 minutes and transferred to the USGS office every 4 hours
along with other USGS stage and flow data.
The responsibilities of the sub -contractor include project management and coordination,
QAPP plan writing, sample collection, field maintenance, sample analyses, quality
control, data compilation, data interpretation and report writing.
Quarterly progress and quality assurance reports and a yearly written report will be
prepared for this project. The report will detail the sampling results for the year as well as
total calculated loads for the water quality parameters measured. Trends in water quality
will be investigated and reported as soon as sufficient data becomes available. The report
will be presented annually to the City of Fayetteville and ANRC. Payment of the sub-
contract will be a lump sum, 25% of the total each quarter after submission of the quarter
reports and a payment invoice from the sub -contractor to the City.
West Fork Budget
BUDGET sub -contract
Proposed to (Sponsor):
ANRC
UA Lead Investigator.
Marc Nelson
Proposed Project Pedod:
7/1/08-6/30/09
1011212007 12:31
YEAR 1
Grant
UA
Non UA
I. PERSONNEL COSTS
#
PERSON
-MONTHS
Request
Cost Share
Cost Share
A. SALARIES & WAGES
CAL
AY I
SMR
10,000
PI acad or cal year salary
Pl summer salary
Co -PI:
_
Co -PI:
Co -PI:
Ndassifed: Trost 3000, Cash 2000
5,000
Classified: 3039 Speak, 2018 Parker
GRA(s) cost basis:
mo.@
0
Hourly non-student(s) cost basis:
hrs®
0
Undergraduate(s) cost basis:
h
0
Sub -total S&W
15,000
B. FRINGE BENEFITS
UA RATE
P1, academic year
24.536%
2,454
0
PI, summer
17.434%
0
0
Co-Pt1
27.134%
0
0
Co-PI2
0
0
Co-PI3
0
0
non -classified personnel
24.536%
1,227
0
Classified
29.410%
0
0
GRA
3.594%
0
0
Hourly non -student
8.399%
0
0
Hourly undergraduate
0.393%
0
0
Sub -total FR
3,681
0
Total Salaries and Benefits
II. TRAVEL
18,681
0
A. Domestic Travel
500
B. Foreign Travel
Ill. EQUIPMENT (capitalized at $2500 threshold)
IV. GRA TUITION (Per University Policy)
V. SUBCONTRACT(S)
VI. OTHER DIRECT COSTS
A. Materials and Supplies: battenes,tubing,dist.
500
B. Publication of Research
C. Communication Costs
0. Other. Sample collection and analyses
14.000
Total Other Direct Costs
14,500
0
Vlll. TOTAL DIRECT COSTS
33,681
0
Modified Total Direct Costs (MTDC)
33,661
0
F & A COST MTDC x Rate Rate:
35.00%
11,788
sub -contract AWRC I
45,469
0
29,301
additional match needed by City of Fayetteville
Project administration City of Fayetteville
$5000
total project costs
I
45,469
total match
34,301
O
z
O
Q
z
w
C
C
Q
O
J
Q
z
z
C
z
Q
Co
}
a
a
C9
z
� L
}Q j
Y
)
W O
QL.
L
` LL
O
w
L
O
R
C,
w
O
> OO OO m o O OO 0
j(•SJ N r O
$9 U) EA I-
•0
fA Is IsNH3
o
EO C O
i+ > f9
N 69
W
O
O
O O O O
EOr r0i v a .-
Z
a)
O. . •O
r EA fA
69
>
a C a
W w W >
a,LL U W LL U
w O m o
O > U) Li o = ai ! a
O _ n w 21E E W
Q C ti m N (� C y c O N
0 O v m 'D v
f/) C C E J Co m C N N U N W
O
a O.LL U)OI > IU tiOD 2a
C )
m f
y Y
m O L
U a U 0
C Y L w W E N i O
> t > U O
CO L W o O W m N
> o > o O c C T
• O O .c O) v) O O C
L TON E U C E N j a l0 CL C
O
O E c a Q c w ° O'
O 'O m O a) m w
O d Y '� O O) O) O
w ~ C
L a; o Y oy I- '0 o M-
0
0 a n c
_0 N aci m m
.CCD m m a) d w
U) o° D a m c 10 O O E a c i0
O) C •C •C_ goo 3 G
Y COO Y O C a> C m O C C D- C O •C C
C C
�U) 30 `o a >�aCL a ae02 wQ
> cc§
& & %
I-
>
E
Ca
tIJ
O
] J , (
z
) $9€9_
0 §)
2 {,
'1)
\§ /
)§G{§ \
\Oa-OrO&3
N
C)
\2
z 2 § )
}
rfl
\ ; \ § a ) / 0
\%) #} , } o
�2\ k_ \ \\ 5
% ) .) 7 E0
/k\ \\ 0 \\ wz
k
in
A
/
B
k
42
City Council Meeting of July 15, 2008
CITY COUNCIL AGENDA MEMO
To: Mayor and City Council
Thru: Gary Dumas, Director of Operations
Ron Petrie, City Engineer
From: Sarah Wrede, Staff Engineer
Date: June 27, 2008
Subject: Resolution to accept a grant through the Arkansas Natural Resources Commision in a
proposed partnership agreement with a subcontractor for a grant for water quality
sampling, analysis and annual load determinations for TSS, nitrogen, and phosphorus at
the Mally Wagnon Road Bridge on the West Fork of the White River and utilizing in -kind
match through staff time and current projects.
RECOMMENDATION
Staff recommends approval of a resolution authorizing acceptance of a grant including a partnership
agreement with a subcontractor for water quality sampling, analysis and annual load determinations
for TSS, nitrogen, and phosphorus at the Mally Wagnon Road Bridge on the West Fork of the
White River.
BACKGROUND
On July 1, 2008, the City Council approved a resolution to apply for a grant through the Arkansas
Natural Resources Commision in a proposed partnership agreement with a subcontractor for a grant
for water quality sampling, analysis and annual load determinations for TSS, nitrogen, and
phosphorus at the Mally Wagnon Road Bridge on the West Fork of the White River and utilizing in -
kind match through staff time and current projects.
DISCUSSION:
The City of Fayetteville will be the contractor with Arkansas Natural Resources Commission
(ANRC) for the 319 grant. The City will be responsible for contractual relationships and payment to
the sub -contractor, purchasing sampling equipment, which is reimbursable through the grant, and
providing the match for the project. The sub -contractor will be responsible for all remaining tasks
of the project including: writing the Quality Assurance Project Plan (QAPP), collecting samples and
analyzing the data from the water quality sampling station, computing the annual load for all
parameters and reporting quarterly and annually to the City of Fayetteville and ANRC.
The proposed project costs are $45,765 federal and $34,524 of in kind match from the City of
Fayetteville for a total of $80,289. The grant was originally planned to use the Nutrient Reduction
Plan as the total match. However ANRC decided that the only allowable portion of the Nutrient
Reduction Plan to use as match would be the stakeholder meetings and staff time spent on Nutrient
Reduction Plan related work. The match for the stakeholder meetings and staff time will make up
$9155.00. Project administration will make up $5000 of the match. The additional match to make
up the difference will be provided by the West Fork EPA through their Annual Watershed Outreach
and Clean-up of the West Fork of the White River. These forms of in -kind match have been
approved by ANRC.
City Council Meeting of July 15, 2008
BUDGET IMPACT
Funds are available in the Drainage Study/Phase 11 Stormwater Management account that has been
designated for use to fund projects that improve stormwater quality in the City of Fayetteville. The
grant includes the purchase of sample collection and analysis equipment in the amount of $14,000.
This equipment must be purchased at the beginning of the project and is reimbursable once the
grant is awarded.
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE ENGINEERING DIVISION TO
APPLY FOR AND ACCEPT A GRANT FROM THE ARKANSAS NATURAL
RESOURCES COMMISSION FOR WATER QUALITY SAMPLING,
ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR TSS,
NITROGEN AND PHOSPHORUS AT THE MALLY WAGNON ROAD
BRIDGE ON THE WEST FORK OF THE WHITE RIVER; AND APPROVING
A BUDGET ADJUSTMENT RECOGNIZING THE GRANT REVENUE.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby authorizes
the Engineering Division to apply for and accept a grant from the Arkansas Natural Resources
Commission for water quality sampling, analysis and annual load determinations for TSS,
nitrogen and phosphorus at the Mally Wagnon Road Bridge on the West Fork of the White
River.
Section 2. That the City Council of the City of Fayetteville. Arkansas hereby approves a
budget adjustment recognizing the grant revenue.
PASSED and APPROVED this 151 day of July, 2008.
APPROVED:
By:
ATTEST:
By:
DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer
(7.8.08) Clarice Pearman - Res. 138-08 Page 1
From: Clarice Pearman
To: Petrie, Ron
Date: 7.8.08 5:10 PM
Subject: Res. 138-08
Attachments: 138-08 Ark Natural Resources Commission Grant.pdf
CC: Audit; Fell, Barbara
Ron:
Attached is a copy of the above resolution regarding the Arkansas Natural Resources Commission grant. I am forwarding
to Budget & Research your budget adjustment for this Item. I will also forward to you both of the agreements. Please be
sure that signed agreement once signed by the state office is returned to the city clerk's office. If anything else needed for
this item please let me know. Have a good day.
Thanks.
Clarice