Loading...
HomeMy WebLinkAbout72-07 RESOLUTIONRESOLUTION NO. 72-07 A RESOLUTION TO APPROVE A CHANGE IN THE BUILDING ELEVATIONS AND MATERIALS PREVIOUSLY APPROVED BY THE CITY COUNCIL AS REQUIRED IN ITS CONTRACT WITH BIOBASED REALTY, LLC. WHEREAS, BioBased Realty, LLC, BioBased Technologies, LLC and BioBased Systems, LLC. agreed in paragraph 13 of its contract with the City of Fayetteville that "(e)ach building's general design (including construction materials) shall be presented to the City Council for its approval prior to the building's construction"; and WHEREAS, the City Council previously approved such general design and construction materials, but BioBased wishes to alter the design and materials and thus has presented its new design and material list to the City Council and seeks its approval for such altered design and materials. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the new general design (including building materials) presented by BioBased and agrees those can be substituted for the previous design and materials. The new design and materials list is attached as Exhibit A.r`p,,,,,, nryry RR,� £9'G\iY O �' ^ C'� ft • ZU• •� :FAYETTEVILLE: PASSED and APPROVED this 17`h day of April, 2007. APPROVED: ATTEST: By: i /i DA OODY, Mayor By: 'Q)Otn- -u-' 0 0 N. ou GTON C,,,, SONDRA SMITH, City Clerk/Treasurer Jeremy Pate *v for 'Ss? Submitted By City of Fayetteville Staff Review Form City Council Agenda Items or Contracts 20 -Mar -07 City Council Meeting Date Planning 9/7 7047 7 g-07 6rweetza LLC Operations Division Department Action Required: ADM 07-2477: Administrative Item (BIOBASED, 638): Submitted by McClelland Engineers for property located at the southeast corner of Cato Springs Road and Razorback Road. Pursuant to the real estate sales contract (Ordinance No. 4787) between the City of Fayetteville and BioBased Realty, LLC, all elevations/building materials shall be presented to the City Council for its approval prior to building construction. The request is for City Council review and approval of the modified building elevations/materials. $0.00 Cost of this request n/a Account Number n/a Project Number Budgeted Item n/a Category/Project Budget n/a Funds Used to Date n/a ' Remaining Balance Budget Adjustment Attached n/a Program Category / Project Name n/a Program / Project Category Name n/a Fund Name Department Direc or City Attor 32407 Finance and Internal Service Director Date Mayor Date Previous Ordinance or Resolution # n/a Original Contract Date: n/a • Original Contract Number: n/a Received in City CI Received in Mayor's Office Comments: TINS 4 4//7/9 6 Tbke - �/a/o7 (nt wr b% 4,3M? (eu/tpl it 44 glo/r City Council Meeting of March 20, 2007 Agenda Item Number CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Gary Dumas, Director of Operations From. Jeremy Pate, Director of Current Planning Date: March 02, 2007 Subject: BioBased (ADM 07-2477) BACKGROUND Planning Staff recommended in favor of and the Subdivision Committee approved a major modification of the approved large scale development for BioBased on March 01, 2007, finding that the revised building elevations depict a structure that is well articulated and in compliance with the requirements set forth under commercial design standards. DISCUSSION Pursuant to the real estate sales contract (Ordinance No. 4787) between the City of Fayetteville and BioBased Realty, LLC, all elevations/building materials shall be presented to the City Council for its approval prior to building construction. Since the building elevations and materials have changed from that which the City Council originally approved, they need to be reviewed again. The original contract language reads as follows: Prior to closing, Biobased Realty in conjunction with BioBased Technologies/BioBased Systems will provide the City of Fayetteville with a Master Plan layout of the property acceptable to the City Council. BioBased Realty or BioBased Technologies/BioBased Systems shall take all reasonable action to ensure that any minor possible odor or pollution emissions do not affect surrounding areas. BioBased agrees to build in scrubbers to proect air quality where reasonably appropriate. Each building's general design (including construction materials) shall be presented to the City Council for its approval prior to the building's construction. Normal city developmental requirements such as Large Scale Development standards, etc. shall still be required. BUDGET IMPACT None. • • • i_. RESOLUTION NO. A RESOLUTION TO APPROVE A CHANGE IN THE BUILDING ELEVATIONS AND MATERIALS PREVIOUSLY APPROVED BY THE CITY COUNCIL AS REQUIRED IN ITS CONTRACT WITH BIOBASED REALTY, LLC. WHEREAS, BioBased Realty, LLC, BioBased Technologies, LLC and BioBased Systems, LLC. agreed in paragraph 13 of its contract with the City of Fayetteville that "(e)ach building's general design (including construction materials) shall be presented to. the City Council for its approval prior to the building's construction"; and WHEREAS, the City Council previously approved such general design and construction materials, but BioBased wishes to alter the design and materials and thus has presented its new design and material list to the City Council and seeks its approval for such altered design and materials. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the new general design (including building materials) presented by BioBased and agrees those can be substituted for the previous design and materials. The new design and materials List is attached as Exhibit A. PASSED and APPROVED this 20th day of March, 2007. APPROVED: ATTEST: By: By: DAN COODY; Mayor SONDRA SMITH, City Clerk/Treasurer ... �. aeevile )ARKANSAS THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE ADM 07-2477 Page 1 SC Meeting of March 01, 2007 TO: Fayetteville Subdivision Committee Members FROM: Jesse Fulcher, Current Planner THRU: Jeremy Pate, Director of Current Planning DATE: February 28, 220^077 Updated March 01, 2007 125 W. Mountain St - Fayetteville, AR 72701 Telephone: (479) 575-8267 ADM 07-2477: Administrative Item (BIOBASED, 638): Submitted by MCCLELLAND ENGINEERS for property located at the SE CORNER OF CATO SPRING AND RAZORBACK RD. The property is zoned 1-1, HEAVY COMMERCIAL, LIGHT INDUSTRIAL. The request is for a major modification to the approved large scale development (LSD 06-2105). BACKGROUND • Planner: JESSE FULCHER Project Description: The subject property is located at the southeast comer of Cato Springs Road and Razorback Road. The property has multiple structures on site which formerly housed the City's Water and Sewer Operations Center. The site is surrounded by various zoning districts, including RMF -24, C-1, C-2 and I-1. The Subdivision Committee approved the large scale development proposal on June 15, 2006. Proposal: The applicant requests the following modification to the approved Large Scale Development. 1. Modified building elevations. 2. A larger building (approximately 2,000 sq. ft.) with a modified parking design, including a fire truck turn around at the end of the parking lot. DISCUSSION The proposed modifications to the approved large scale development and architectural plans have been determined a major modification. In the event that a developer wishes to make major modifications to an approved development, such modifications shall be submitted to the Subdivision Committee or Planning Commission for approval, if they meet all applicable codes. The layout of the development, including parking and building locations are almost identical to that which was approved under the original large scale development. The necessity for a major modification is due to the fact that the building elevations are significantly different that those reviewed and approved with the large scale development. K:IReports120071SC Repor8103-0/-0714DM 06-2477 /Biabased).doc ADM 07-2477 Page 2 RECOMMENDATION Recommendation: Staff recommends approval of ADM 07-2477, finding that the proposal meets all aspects of the Unified Development Code for large scale developments. Additionally, staff finds that the proposed building elevations are well articulated and meet the minimum requirements set forth under commercial design standards and therefore staff is recommending approval with the following conditions: 1. All other conditions of approval from the approved large scale development (LSD 06- 2105) shall remain in force. 2. The proposed building elevations shall be reviewed by the City Council pursuant to the contract agreement between the City of Fayetteville and the applicant. Subdivision Committee Action: '1 Approved ❑ Tabled 0 Denied Motion: Myers Second: Bryant Vote: 3-0-0 Meeting Date: March 01, 2007 Comments: K.:I ReporLs110071 SC Reports 103-0/-071ADM 06-2477 (Biobased).doc ADM 07-2477 Page 3 CHAPTER 166: DEVELOPMENT 166.05 Large Scale Development (LSD) (F) Modifications. (1) Minor modifications. The Zoning and Development Administrator may authorize minor modifications in an approved large scale development. Minor modifications shall include, but not be limited to, substitutions of one approved structural type for another or minor variations in placement of buildings in such a way that the overall limits of approved floor area, open space or rooms per acre are not increased. (2) Major modifications. In the event that a developer wishes to make major modifications to an approved development, such modifications shall be submitted to the Subdivisions Committee in a form which compares the approved submission with the desired changes. After submission, the Subdivision Committee shall approve or disapprove the requested modifications at its next meeting. K: IReports120071SC Reporu103-01-071ADM 06-2477 (Biobased).doc FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS 113 West Maintain St. FayetteN iIIe, AR 72701 ENGINEERING DIVISION CORRESPONDENCE 479-575-8206 To: McClelland Consulting Engineers From: Matt Casey P.E. Assistant City Engineer Date: May3l, 2006 Re: Plat Review Comments (May 31, 2006 Tech. Plat Meeting) Development: LSD 06-2105 Bio -Based 1. An assessment is required for improvements to Cato Springs Road for 14' from centerline including curb and gutter, pavement, storm drains and sidewalk. Provide a cost estimate for these improvements. 2. The sidewalk shall be continuous through driveways with a maximum of.2% cross slope and elevated 2% above top of curb. 3. Driveway approaches shall be constructed of Portland Cement Concrete with a broom finish back to the ROW. 4. Easements are required a minimum of 10 feet from each side of water and sewer lines. If the depth is greater than 10' feet the easement will need to increase proportional to the depth of the proposed main. 5. Additional easements may be necessary based on requirements from the Water and Sewer Administrator. MtEMcCLELLAND coNsu TING [ DESIGNED TO SERVE / ENGINEERS, INC P.O. Box 1229 Fayetteville, Arkansas 72702-1229 479-443-2377 FAX 479-443-9241 To: The City of Fayetteville — Planning Staff From: McClelland Consulting Engineers Date: February 1, 2007 Subject: LSD 00-2105 BioBased Campus — Phase I Major Modification to approved LSD plans Due to building changes and site alterations, submitted as a major modification are the enclosed • plans for Biobased Campus — Phase I. Proposed is a stand-alone, two story building consisting of approximately 30,000. square feet (25,418. sf of lab. space and 4,560 sf of office). Associated parking, greenspace, landscaping, utility connections, and grading are very similar to the original review set. Building elevations have changed significantly and are submitted with this package for your review. Please let me know if you have any questions/concems, or need any additional information at this time. Sincerely Michael G(M7) !an McClellanI CI suiting Engineers 479.443.2377 Mmorgan@McClelland-engrs.com ed aj\JY/Te eve ie / ARKANSAS THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE LSD 06-2105 Page 1 SC Meeting of June 15, 2006 TO: Fayetteville Subdivision Committee FROM: Jesse Fulcher, Current Planner Matt Casey, Assistant City Engineer THRU: Jeremy Pate, Director of Current Planning DATE: June 11, 2006 Updated June 15, 2006 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 LSD 06-2105: Large Scale Development (BIO -BASED, 638): Submitted by MCCLELLAND CONSULTING ENGINEERS for property located at SE CORNER OF CATO SPRINGS AND RAZORBACK ROAD. The property is zoned 1-1, HEAVY COMMERCIAL/LIGHT INDUSTRIAL and contains approximately 19.47 acres. The request is for a 28,000 01 office and laboratory with 67 parking spaces. Property Owner: CITY OF FAYETTEVILLE Planner: JESSE FULCHER Findings: Property: The subject property is located at the southeast corner of Cato Springs Road and Razorback Road. The property has multiple structures on-site which formerly housed the City's Water and Sewer Operations Center. The site is surrounded by various zoning districts, including RMF -24, C-1, C-2 and I-1. Table 1 Surrounding Land Proposal: The applicant proposes to construct a 28,000 square foot building with professional office and laboratory space, as well as associated parking. This is the first phase of a multi - phased project. The development will utilize the existing curb -cut, however it will be constructed to current ordinance standards. Request: The request is for Large Scale Development approval of the submitted site plans for the proposed office/laboratory building and new parking facilities. K: I Reports 120061 SC Repo ris 106-15-061 LSD 06-2105 (Bio -based/. doc Direction from Site Land Use Zoning North Residential C-1, Neighborhood Commercial South Residential C-2, Thoroughfare Commercial East Retail I-1 West Vacant RMF -24, Residential 24 Units/Acre Proposal: The applicant proposes to construct a 28,000 square foot building with professional office and laboratory space, as well as associated parking. This is the first phase of a multi - phased project. The development will utilize the existing curb -cut, however it will be constructed to current ordinance standards. Request: The request is for Large Scale Development approval of the submitted site plans for the proposed office/laboratory building and new parking facilities. K: I Reports 120061 SC Repo ris 106-15-061 LSD 06-2105 (Bio -based/. doc LSD 06-2105 Page 2 Right-of-way being dedicated: 45' from centerline right-of-way for Cato Springs Road along the project frontage; Razorback Road currently has adequate right-of-way to meet Master Street Plan requirements of 55' from centerline. Adjacent Master Street Plan Streets: Cato Springs Road (Minor Arterial); Razorback Road (Local Street) Water/Sewer: Water and sewer are available to the site and will be extended to the facilities. Tree Preservation: Existing Canopy: 2.1% Preserved Canopy: 2.1% Required Canopy: 2.1% Mitigation: None required. Recommendation: Staff recommends approval of LSD 06-2105 with the following conditions of approval: Conditions of Approval: 1. Planning Commission determination of Commercial Design Standards for the proposed office/laboratory building. Staff finds that the proposed structure and industrial style with metal siding, EIFS and native stone is well articulated and provides good transition and compatibility with surrounding industrial development. The City Council has also approved a conceptual Master Plan of this development, which the present project seems to be following. THE SUBDIVISION COMMITTEE FOUND IN FAVOR OF THE PROPOSED ELEVATIONS, FINDING THAT THE BUILDING WAS IN COMPLIANCE WITH THE REQUIREMENTS SE7 FORTH UNDER COMMERCIAL DESIGN STANDARDS. 2. Planning Commission determination of street improvements. Staff recommends that street improvements be assessed for paving 14' from' centerline with curb, gutter, storm drainage and a 6' sidewalk along the property's Cato Springs Road frontage, to tie into the state improvements for Razorback Road. The assessment shall be submitted prior to building permit: THE SUBDIVISION COMMITTEE FOUND IN FAVOR OF THE RECOMMENDED ASSESSMENT FOR STREET IMPROVMENTS ALONG CATO SPRINGS ROAD. 3. Per the conditions of approval for the vacation of right-of-way (VAC 06-2068) within the subject property, the following items are required. If any utility work is performed as part of the development and any of these lines changed, abandoned, or rerouted, then easement requirements would change accordingly, as they would for any development. Easements shall be dedicated by easement plat. a. The north -south 12" waterline requires a 25' wide easement centered on the pipe. b. The 6" waterline running west from the 12", between the two buildings requires a 20' easement centered on the pipe and extending 10' past the end of the pipe. This requirement also applies to the 6" line running north from the westbound 6" line. K:IReports120061.SC Reports106-15-061LSD 06-2105 (Bio-based).doc LSD 06-2105 Page 3 c. The 24" waterline running east -west parallel to the south property line requires a 50' easement centered on the pipe. Much of this easement is in the 1475 Cato Springs lot. d. The north -south sewer line running down the driveway needs to have a 20' wide easement centered on the pipe. This easement must be extended to the south property line. • e. All other water and sewer mains on the lot must have a 20' wide easement centered on the pipes. These easement shall extend 10' beyond the end of the line at dead end manholes or dead ends of pipes. f. There needs to be an easement extended southwest from the dead end manhole on the west end of the east -west sewer line. This easement should be situated such that the house on the southwest lot can have a main run to it from the manhole. If the house area is split off as a separate lot, there must be a sewer main that runs to it. Currently, the service line from the house ties to the dead end manhole and can be identified by the cleanouts located every 100'. This service no longer meets requirements if the house becomes part of a separate lot. The new main need not follow the path of the existing sewer line (which is a service, as the house is on the same platted lot as the two brick buildings). It simply needs to tie to the service at the property line. g. The adequacy of the water and sewer systems must be evaluated for any new development. All sewer services must be placed, as they do not meet current plumbing codes. Water service lines on both sides of the meter loop may need to be replaced; they are also required to meet current plumbing codes. h. Any utility work performed under contract shall go through the standard review, approval and inspection process administered by the City Engineer's office. 4. Incorporate the following plat revisions: a. Change 20' parking stalls to 19' in length. 5. Right-of-way dedication in the amount of 45' from centerline along Cato Springs Road shall occur prior to building permit. 6. Razor and/or barbed wire fences are prohibited if visible from street right-of-way or a residence. All fencing shall be reviewed by Planning Staff to ensure compliance with applicable codes. 7. With future development of the site, a view -obscuring fence or view -obscuring vegetation, or a combination of the two shall be required between the proposed commercial/industrial use and the adjacent residential property to the south. 8. Prior to building permit, a cost estimate for all required landscaping is to be submitted to the Landscape Administrator for review. Once approval is gained, a guarantee is to be issued (bond/letter of credit/cash) for 150% of the cost of the materials and installation of the plants. This guarantee will be held until the improvements are installed and inspected, at the time of Certificate of Occupancy. K:IReporls120061SC Reporls106-15-061LSD 06-2/05 (Rio-basedf.doc LSD 06-2105 Page 4 Standard Conditions of Approval: 9. All freestanding and wall signs shall be permitted by a separate sign permit application prior to installation. Signs are not allowed to be placed in utility easements. 10. All exterior lighting is required to comply with the City's lighting ordinance. A lighting plan and cut -sheets of the proposed exterior light fixtures shall be required to be approved by Planning Staff prior to building permit. 11. Plat Review and Subdivision comments (to include written staff comments provided to the applicant or his representative, and all comments from utility representatives: AR Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications). 12. Provide a CD containing the proposed Large Scale Development drawings in AutoCad or similar digital format. 13. Staff approval of final detailed plans, specifications and calculations (where applicable) for grading, drainage, water, sewer, fire protection, streets (public and private), sidewalks, parking lot(s) and tree preservation. The information submitted for the plat review process was reviewed for general concept only. All public improvements are subject to additional review and approval. All improvements shall comply with City's current requirements. 14. All existing utilities below l2kv shall be relocated underground. All proposed utilities shall be located underground. 15. Large scale development shall be valid for one calendar year. 16. Prior to the issuance of a building permit the following is required: a. Grading and drainage permits b. An on-site inspection by the Landscape Administrator of all tree protection measures prior to any land disturbance. b. Separate easement plat for this project that shall include the tree preservation area and all utility easements. c. Project Disk with all final revisions d. - One copy of final construction drawings showing landscape plans including tree preservation measures submitted to the Landscape Administrator. e. Completion of all required improvements or the placement of a surety with the City (letter of credit, bond, escrow) as required by Section 158.01 "Guarantees in Lieu of Installed Improvements" to guarantee all incomplete improvements. Further, all improvements necessary to serve the site and protect public safety must be completed, not just guaranteed, prior to the issuance of a Certificate of Occupancy. Additional conditions: 17. 18. K:IReports120061SC Reports106-15-061LSD 06-2105 (Bio-based).doc • LSD 06-2105 Page 5 Subdivision Committee Action: '1 Approval ❑ Forwarded to P.C. ❑ Tabled Motion: Graves Second: Myers Vote: 3-0-0 Meeting Date: June 15, 2006 Comments. The "Conditions of Approval" listed in the report above are accepted in total without exception by the entity requesting approval of this development item. Signature Date K:IReporls110061SC Reporns106-15-061LSD 06-1105 (Bio-based).doc • ORDINANCE NO. 4787 AN ORDINANCE WAIVING THE REQUIREMENTS OP 534.27, (DDE OF•PAM-IT/WEIR AND APPROVING A REAL ESTATE SALES OONIRA,Ca WTIH BIOBASED TECHNOLOGIES IN THE AMOUNT OF $940,000.00 FOR THE PURCHASE OF THE WATER doSBWEROPERATIONS CENTER ON CATO SPRINGS ROAD;. DESIGNATING THE PROCEEDS FOR ECONOMIC DBVBLOPMENTPURPpSES; AND APPROVING A BUDGET ADJUSTMENT NTNG THE DESIGNATION. BE ITORDAIIVBDByTHE QTYCOUNTOFTHECITYOFFAYETIEVI LIi ARKANSAS: the Section 1. That the Cty Councij of the City of Payettevilfe,,Aiicansashereby waives orb of §.3427, Code of Fayetteville, aced . withBioBasedTechnologies int1 amount of $940,00000for t es a Real haseoftilee Sales C Sewer Op ions Center on CatoPie ttace Whereto wed t "A" -and made a Road.A copy of thecaatracthsattad�edherebo N.� •� jJNov Q. ? 2005 d Section 2. That the City Council of the City of Fayetteville, Arkansas hereby �ignates the proceeds of this sale for Economic Development purposes. Section 3. That the City Council of the City of Fayetteville, Arkansas herby approves a Budget Adjustment implementing said designation of proceeds. author izes the n 4 That the City Council of the City of Fayetteville, Arkansas hereby Mayor and City Clerk to execute said contract with BhcBased Tetrallo PASSED and APPROVED this la day of November, 2005. • REAL ESTATE SALES CONTRACT The CSty.of Fayetteville, Arkansas offers to sell and BiaBased Realty, LLC offers to lay, ;abject to obtaining acceptable f and other terms and. conditions set forth in this contract, approximately 19.5 acres including all ofPmoe1765-03017-000and Parod756-15399= 010 except for a oneacre parcel where the Children's House iscamndy located and aright of way easement where rite Children's House driveway is not located. This property is more particularly described in Exhibit "A" attached hereto and made a part hereof SEE ATTACHED EXIBBIT'A" FOR PROPERTY DESCRIPTION • Purchase Price: Subject to the following conditions, BioBased Realty, LLC shall pay for the Property at closing, the total cash payment of Nine Hundred Forty Thousand Dollars ($940,000.00). • Conveyance will be made BioBased Realty by geneal Warranty Deed, except itshall besubject to recorded instruments and easements, if any, Which do not metaially affect the value of the property. Such conveyance shall include mineiat rights owned by the City of Fayetteville. The City of Fayetteville shall furnish a policy of title insurance in the amount of the purchase price from a title insurance company as selected by the City of Fayetteville. The City of Fayetteville shall pay the cost of the title insurance. The City of Fayetteville agrees to allow BioBased Realty, if BloBased Realty so desires, at BioBasedRealty's expense, tosurvey the property. The City ofFayetteville agrees tocure any titleepr+oblemswhich may result f omany diffaraxs between Ole ICCOtded k1 descriptions of the property and the survey description. Said title problems, if any, must be solved prior to dosing tothe satisfaction ofihe City ofFayetteville. The city of Fayetteville shallpmvide at its expense a surveyoflhhe one acre tract for Children House and right of way easement as depicted on Exhibit "B". 6 Taxes and special assessments due on or before dosing shall be paid by the CityofSayettoville. Insurance, general taxes, ad valorem taxes, special assessments and rental payments shall be prorated as of closing. 7.. The closing date shall be within one hundred twenty (120) after approval of this offer by the City Council, which can be extended by went of the Mayor for an additional sixty (60) days. Ifsuch date of dosing fills on a weekend or holiday, it will behddthe following working day 8. Possession of the property shall be delivered to BioBased Realty on the date of dosing. 9. The City of Fayetteville hereby grants permission for Biollased Realty or their designates to enter the above described property and improvements. for the purpose of inspection and/or surveying. 10. Risk of loss or damage to the property by fire or other casualty occurring up to the time of closing is assumed by the City of Fayetteville. • • 11. The City OfPqettcVillelle shall disclose to Biassed Realty wand all awironmedal hazards of which the city of Fayettevife has actual knowledge. Upon acceptance of all conditions and tams of This Offer and Acceptance, the Cray ofFayetteville than bare the costs of any and all testing for the existence ofenvironmental haaazds,includingPhaseIenvironmentatstudyanda Phase Fly ifnecessaty: Should the existence of environmental hazards be discovered, the City ayettevilleshall either cure such at its expense orBiassed Really may terminate this contract. 12. . _. The Qty of Fayetteville will remove at its expense the existing buildings (not including Chndmn s House) and debris incoordination with BioBased Realty prior toorimmediately after cesmg. . 13. Prior to closing, BioBased Realty in conjunction with BioBased Te hnologies/Biofased . Systems will provide the (Sty of Fayetteville with a Master Plan layout of the propetty aooeptabletot the CityCouncil. BioBased Realty orBioBased TedmologieslBioBasedSystems shall take all atonable actionto &suns that any minor possible odor or pollution ons do not affect suaoaadingareas. BioBased agrees tobuild inscrubbers toprotect air quality *hat . be Back bul(ding'st eraldesign(>ncludingansinictionhnateoials)shall y Coiuhcil for its approval prior to the building's construction. Normal chydevelopmentalrequirements suchasLargeScaleDevelopmentstandards,etc.shallstillbe 14. any portion of the land conveyed by this contract is sold byBioBasedRealty within thecust - Erre yeses dila date of closing, an independent appraisal of the land's value (not to include the value of any balding thereon) shall be performed. BioBased Realty shall pay 75% of the increase in appraised value of the land (witir prorated sales cost deducted) to Bre City of - Fayetteville. BioBased Realty sth1I pay he QtyofPafteviJee 40% ofthe inceaseinappraised value of the land (with prorated sales costs deducted) for any sales ea5 years nail 10 years from the dosing date. 15. BioBased Realty is grantedan option to purchase the remaining acre what Childreds House is located eight years after the closing date. BioBased Realty may exercisethisoption top at any time diningthe year following the eight year period after the dosing date. BioBased Realty and the City agree the price shall be determined at that time as follows: (a) 7hepropaty including improvements thereon shall be appraised by an independent appraiser. (b) BioBased Realty shall receive en offset from the appraisal value using the following formula: .For every full $100,000.00 in annual payroll paid to BioBased Technologies/Systems and related companies' employees working in Fayetteville over the Two Million Dollar annual payroll estimated for 2008, Bioliased Realty shall receive a reduction of $25,000.00 from the appraised value of this. remaining (c) Reductions allowed in paragraph (b) shall not reduce the final price for this acre parcel below $60,000.00. • • (d) The Coy of Fayetteville may sell to BioBased Realty this acne at any mutually • agreeable time prior to the capitation of the eight year period upon tams agreeable to both parties. . 16. This agreement shall begovemed by the laws of the State of Aromas.. 17. This agreement, when executed by both BioBased Realty and the City of Fayetteville shall contain the and tandmgandagree ofdreparties wi6uegpcettothe matters zted to herein supersede all price or contemponmeous agreements, repay and • ding with respect to such matters, and no oral representations or staff shall be considered a part hereof QTY OF BAYETIEVILLE A Manidpal Corporation DAN QOODY . Mayor ' /700S - Attest . BIOBASED REALTY, LLC BIOBASED TECHNOLOGIES, LLC BIO)IAT;® SYSTEMS, LLC TOM MU CEO Date: v0 -a i `G Date: /l Jot/0c Date: 1a a/ --D S 3 • • LS D06-2105 Close Up View BIO -BASED Overview Legend ,00000 0000 Overlay District FLOODWAY 500 YEAR 100 YEAR -- LIMIT OF STUDY — — - BaseLhe Profe 1 Fayetteville I Outside Cry LS006-2105 kid vectoWDB.Footpnnt_2004 Reside -I - atop Overlay District 0 125 250 500 750 1,000 Fe