Loading...
HomeMy WebLinkAbout196-07 RESOLUTIONRESOLUTION NO. 196-07 A RESOLUTION TO APPROVE CHANGE ORDER #1 OF THE CONTRACT WITH TIME STRIPING, INC. IN THE AMOUNT OF $7,500.00 AND TO APPROVE A BUDGET ADJUSTMENT OF $7,500.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: The City Council of the City of Fayetteville, Arkansas hereby approves Change Order #1 of the contract with Time Striping, Inc. to increase the contract in the amount of $7,500.00 to pay for an increase of the amount of reflective beads in the paid as required by new FAA regulations. Section 2: The City Council of the City of Fayetteville, AR hereby approves the attached budget adjustment of $7,500.00. PASSED and APPROVED this 20th day of November, 2007. APPROVED. By: DA COODY, Mayo ATTEST: By: S a,.' 01 Y • O,c •L,p% C.)• • ;FAYEETEVILLE; -9 •9/ ICANSP. J� l;',///4*Cr� .. SONDRA E. SMITH, City Clerk/Treasurer NAME OF PROJECT: OWNER: CHANGE ORDER Order No. 1 Date: Nov 2 2007 Agreement Date: October 2, 2006 Airfield Pavement Restripinq City of Fayetteville CONTRACTOR: Time Striping, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Adjust project cost for Bid Item No. 3 to Change the Type III beads from 71bs/Sf to 10 Lbs/SF. The revised bid price is this item is $ 38,000 00. Add cost of $4,000.00 to contract. 2. Adjust project cost for Bid Item No. 4 to Change the Type III beads from 7lbs/Sf to 10 Lbs/SF and delete the Striping for Taxiway "G" and add the enhanced Taxiway Striping at all 10 Taxiway Hold line locations. The revised bid price for this item is $ 17,500.00. Add cost of $2 500.00 to contract. 3. Adjust project cost for Bid Item No. 3 to Change the Type 111 beads from 7lbs/Sf to 10 Lbs/SF. The revised bid price 's this item is $ 2,000.00. Add cost of $1 000.00 to contract. Justification: 1. The Project Specification stated 7 lbs per gallon of paint instead of the required 10 lbs for the Type 111 glass beads. The enhanced taxiway markings are required for the airport per recent letter from FAA. The striping on Taxiway "G" is only two years old and is n very good condition and to save money on this project this area is deleted. CONTRACT PRICE prior to this Change Order: Increase in Contract Price. CONTRACT PRICE Including this Change Order: Substantial Completion Time Prior to This Change Order: Final Completion Time Prior to This Change Order: Net Time Change Resulting From This Change Order: Current Contract Completion Dates Including This Change Order: Final Completion: $ 59.000.00 $ 7,500.00 $ 66,500.00 60 Calendar Days 60 Calendar Days 0 Calendar Days December 27, 2007 Change to CONTRACT TIME: The CONTRACT TIME will be (increased)(desreased) by 0 calendar days. The date for completion of all work will be December 27, 2007 Approvals Required: To be effective this Order must be approved by the Owner if it changes the scope or objective or the PROJECT, or as may otherwise be required by the GENERAL CONDITIONS. Requested by: Recommended by: Approved by: ime yang, nc. Con Iting/4 o aye evil e ineers, Inc. w:\20071072150 DRAKE FIELD\CHANGE ORDERS\C-ORDER-1.DOC Date 2-67 ]7- z -O7 Date A, Date City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 2007 Department: General Govemment Division: Aviation & Economic Development Program: Airport Capital Expenditures Date Requested 11/20/2007 Adjustment Number Project or Item Added/Increased: $7500.00 in the Contract Services account Project or Item Deleted/Reduced: None. To recognize $7500.00 grant funding from the Arkansas Department of Aeronautics. Justification of this Increase: Will provide for Enhanced Taxiway Markings, and increased reflectivity of markings as specified by FAA Advisory Circular 150/5340-1J. Justification of this Decrease: Department of Aeronautics has commited grant funding up to $73,448 for this project Increase Expense Budget (Decrease Revenue Budget) Account Name Account Number Amount Project Number Contract services Account Name 5550 3960 5315 00 7,500 06021 1 Decrease Expense Budget (Increase Revenue Budget) Account Number Amount Project Number State grants 5550 0955 6805 00 7,500 06021 1 Approval Signatures Requested By '07 ger 67 Department Director Fina(rce &t I te' - I Servi es Director or 1'!S 1.7 ta: //-�o D+ e (/ S Date h - 6c-67 Date 2//4 Date Budget Office Use Only Type: A B C E Posted to General Ledger Posted to Project Accounting Entered in Category Log Initial Date Initial Date Initial Date Ray M. Boudreaux Submitted By City of Fayetteville Staff Review Form City Council Agenda Items or Contracts 11/20/2007 City Council Meeting Date Aviation & Economic Development General Government Division Action Required: e-t✓5 No20/0 ituo Department Action Required: Approve Change Order #1 to the contract with Time Striping Inc. Contact: Kevin Tucker, PO Box 1236, Van Buren AR 72957, 479-806-3411, Fax 501-505-8674, in the amount of $7500. Approve a Budget Adjustment. 7,500.00 Cost of this request 5550.3960.5315.00 Account Number 06021 1 Project Number Budgeted Item X $ 12 ,(At-k� Budget Airfield Re -striping Program Category / Project Name $ rl Avi/ED Imp Fundis sed to Date Program / Project Category Name Remaining Balance Budget Adjustment Attached X Airport Fund Name City Attorney Finance and Internal Service Director Mayor Comments: Date Previous Ordinance or Resolution # 174-07 7 Original Contract Date: 1-6 —D) Date /2 Date Original Contract Number: 10/02/07 2012 City Council Meeting of: November 20, 2007 Agenda Item Number: CITY COUNCIL AGENDA MEMO/STAFF CONTRACT REVIEW MEMO TO: Mayor and Members of the City Co THRU: Staff/Contract Review Committee FROM: Ray M. Boudreaux, Director, Aviation and E4onomic Development DATE: November 5, 2007 SUBJECT: Approval of Change Order #1 to Airfield Pavement Restriping Project. RECOMMENDATION: Approve Change Order #1 to the pavement restriping project at Fayetteville Municipal Airport, Drake Field. BACKGROUND; The Fayetteville Municipal Airport, Drake Field Board was written up during the annual Certification Inspection for pavement markings being faded and non -reflective. A project was designed and bid under Task Order #2, August 14 2007 with McClelland Consulting Engineers which contains funding for design, bidding services and construction oversight of the project. Task Order #2 was approved by City of Fayetteville Contract Review Committee. The contract was awarded to Time Striping, and approval was granted to the airport to apply and receive State Aeronautics Grant funds to complete the protect by the City Council Resolution October 2, 2007. The State Aeronautics Commission approved a 100% grant in the amount of $73,448.00 to complete the project. DISCUSSION: The project was bid including type 3 reflective beads at the rate of 7 lbs per gallon of paint applied. The contractor brought up a change to the FAA Advisory Circular that requires 10 lbs of beads per gallon of paint applied. Type three beads are $2.60 per pound. The Advisory Circular 150/5340-1J which was published September 29, 2007 required that the taxiway stripes be enhanced leading up to the hold line at all Part 139 airports to further combat runway incursions. The enhanced markings were not in our project. It was briefed at the Airports Conference, October 24 and 25 and a letter from the Regional Manager was received October 23 encouraging all part 139 airports in the Region to install the new stripes (FAA letter attached). We agree that the project needs to be additionally changed to include the enhanced markings. We cut some paint that is still in very good condition, added the cost of the new enhanced taxiway striping, and added the cost of the additional three pounds of beads per gallon which increases the cost of the project by $7,500. BUDGET IMPACT: A portion of the Change Order is offset by Grant Funds in the amount of the contingency, $3,498.00. The remainder will use existing project budget from the Airport Fund Balance. Attachments: Staff Review Form Change Order #1 Budget Adjustment Letter from FAA Airports Regional Manager Aviation and Economic Development Department Fayetteville Municipal Airpon, Drake Field 4500 South School Avenue, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director RESOLUTION NO. A RESOLUTION TO APPROVE CHANGE ORDER #1 OF THE CONTRACT WITH TIME STRIPING, INC. IN THE AMOUNT OF $7,500.00 AND TO APPROVE A BUDGET ADJUSTMENT OF $7,500.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: The City Council of the City of Fayetteville, Arkansas hereby approves Change Order #1 of the contract with Time Striping, Inc. to increase the contract in the amount of $7,500.00 to pay for an increase of the amount of reflective beads in the paid as required by new FAA regulations. Section 2: The City Council of the City of Fayetteville, AR hereby approves the attached budget adjustment of $7,500.00. PASSED and APPROVED this 20th day of November, 2007. APPROVED: ATTEST: By: By: DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer 0 U.S. Department of Transportation Federal Aviation Administration October 18, 2007 Airports Division Southwest Region Arkansas Louisiana, New Mexico, Oklahoma, Texas Mr. Ray Boudreaux Aviation & Economic Development Director Drake Field - Fayetteville Airport 4500 South Scholl Avenue, Suite A Fayetteville, AR 72701 Dear Mr. Boudreaux: 2601 Meacham Bbd Fort Worth, Texas 76137 The Federal Aviation Administration (FAA) and the aviation industry have been working together to reduce the risk of runway incursions for many years. We have some successes, but we still have room for improvement and need your help. On August 15, 2007, the FAA Administrator put out a Call to Action to the aviation industry. She asked the aviation mdustry to partner with the FAA to reach consensus on a manageable number of short, medium, and long-term initiatives. These initiatives would be to further improve the safety of operations at our airports and reduce runway incursions. Recall that all airports with 1.5 million or more enplanements are required to install the new enhanced taxiway centerline markings at runway entrances by June 2008. The group of airports that met with FAA agreed to fulfill this commitment within 60 days of the August 15, 2007 meeting. On August 22, 2007, the FAA Administrator sent a letter to Airports Council International informing them of the initiative's call to action. This letter extended the commitment to all Part 139 Certificated airports. We encourage all Southwest Region Part 139 airports to complete the increased marking standards in accordance with AC 150/5340-1J within the next 60 days. We would also like you to establish mandatory recurrent training for all employees (including employees of tenants and contractors) to ensure all operators in the movement area do not cause vehicle/pedestrian deviations. We know this is a monumental effort, but we sincerely need your prompt action to assure your airport and the airports in our national system are implementing these critical items uniformly. We have also determined that enhanced markings are eligible under the Airport Improvement Program. We will work with your team to make appropriate adjustments to your capital plans. One of our FAA Airport Certification Inspectors will contact you within the next two weeks to discuss your progress or your ability to meet this goal. We are wilting to work and do whatever we can to help you implement these important initiatives. Should you have any concerns or questions about this requirement, please contact Joseph G. Washington at 817-222-5620. Sincerely, r), Kelvin L. Solco N Manager, Airports Divisio 2 4/29/2005 AC 150/5340-11 APPENDIX 3. ENHANCED MARKINGS FOR RUNWAY HOLDING POSITION. 1. GENERAL Enhanced taxiway markings are intended to provide additional visual cues to taxiing pilots to help them identify the location of the runway holding position. This appendix provides standards for these enhanced markings and guidance, including examples, on where to use the enhanced markings. The figures included in this appendix are not drawn to scale. 2. APPLICABILITY. The guidelines and standards contained in this appendix for enhanced taxiway markings may be used as a runway incursion prevention initiative. They may be used in combination or separately with existing taxiway markings. However, all intersections at an airport must use the same combination of markings. 3. ENHANCED TAXIWAY CENTERLINE MARKINGS. See Notes 1 and 2 6— Y (15-30cm) 150'(45.72 m) 6' (1524 an) 6' (15.24 cm) Note 1: Regardless of whether the centerline is 6 inches or 12 inches (15 or 30 cm) wide, the dashed lines provided by the enhancements will always be 6 inches (15 cm) in width. Note 2: The taxiway centerline might have to be shifted either right or left so the enhancement does not go over a taxiway centerline light. Figure C-1. Enhanced Taxiway Centerline Markings 47 J(L'EMeCLELND CONSULTING ENGINEERS, INC / DESIGNED TO SERVE / 1810 N. College Avenue P.O. Box 1229 Fayetteville, Arkansas 72703 / 72702-1229 PHONE: 479-443-2377 FAX: 479-443-9241 November 5, 2007 Mr. Ray Boudre Airport Depa en City of Fa - eville 113 - : Mountain Fay- eville, AR 72701 RE: Airfield Pavement Restriping Fayetteville Municipal Airport, Drake Field NOV 0 5 2007 A. Dear Mr. Boudreaux: Enclosed please find four (4) copies of Change Order No. 1 for this project. If there are any questions regarding this change order, please contact us. Sincerely, M LLAND CONS TING ENGINEERS, INC. yne Vice Present Enclosure: Change Order No. 1 (4 copies) W:12007'072150 Drake Field\Corres\bourdreaux-1105 wpd. (11.27.07) Clarice Pearman - Res. 196-07 From: To: Date: Subject: Attachments: Clarice Pearman Boudreaux, Ray 11.27.07 11:04 AM Res. 196-07 196 07 Time Striping Inc CO1.pdf CC: Audit; Fell, Barbara Ray: Attached is a copy of the above resolution passed by City Council, November 20, 2007. I am forwarding to you three of four signed change orders. Also, I will forward your budget adjustment to Budget & Research. Have a good day. Thanks. Clarice Page