A RESOLUTION TO APPROVE CHANGE ORDER #1 OF THE
CONTRACT WITH TIME STRIPING, INC. IN THE AMOUNT
OF $7,500.00 AND TO APPROVE A BUDGET ADJUSTMENT
OF $7,500.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: The City Council of the City of Fayetteville, Arkansas hereby approves
Change Order #1 of the contract with Time Striping, Inc. to increase the contract in the amount
of $7,500.00 to pay for an increase of the amount of reflective beads in the paid as required by
new FAA regulations.
Section 2: The City Council of the City of Fayetteville, AR hereby approves the attached
budget adjustment of $7,500.00.
PASSED and APPROVED this 20th day of November, 2007.
APPROVED.
By:
DA COODY, Mayo
ATTEST:
By:
S
a,.' 01 Y •
O,c •L,p%
C.)• •
;FAYEETEVILLE;
-9 •9/ ICANSP. J�
l;',///4*Cr� ..
SONDRA E. SMITH, City Clerk/Treasurer
NAME OF PROJECT:
OWNER:
CHANGE ORDER
Order No. 1
Date: Nov 2 2007
Agreement Date: October 2, 2006
Airfield Pavement Restripinq
City of Fayetteville
CONTRACTOR: Time Striping, Inc.
The following changes are hereby made to the CONTRACT DOCUMENTS:
1. Adjust project cost for Bid Item No. 3 to Change the Type III beads from 71bs/Sf to 10 Lbs/SF. The revised bid price is this
item is $ 38,000 00. Add cost of $4,000.00 to contract.
2. Adjust project cost for Bid Item No. 4 to Change the Type III beads from 7lbs/Sf to 10 Lbs/SF and delete the Striping for
Taxiway "G" and add the enhanced Taxiway Striping at all 10 Taxiway Hold line locations. The revised bid price for this item
is $ 17,500.00. Add cost of $2 500.00 to contract.
3. Adjust project cost for Bid Item No. 3 to Change the Type 111 beads from 7lbs/Sf to 10 Lbs/SF. The revised bid price 's this
item is $ 2,000.00. Add cost of $1 000.00 to contract.
Justification:
1. The Project Specification stated 7 lbs per gallon of paint instead of the required 10 lbs for the Type 111 glass beads. The
enhanced taxiway markings are required for the airport per recent letter from FAA. The striping on Taxiway "G" is only two
years old and is n very good condition and to save money on this project this area is deleted.
CONTRACT PRICE prior to this Change Order:
Increase in Contract Price.
CONTRACT PRICE Including this Change Order:
Substantial Completion Time Prior to This Change Order:
Final Completion Time Prior to This Change Order:
Net Time Change Resulting From This Change Order:
Current Contract Completion Dates Including This Change Order:
Final Completion:
$ 59.000.00
$ 7,500.00
$ 66,500.00
60 Calendar Days
60 Calendar Days
0 Calendar Days
December 27, 2007
Change to CONTRACT TIME:
The CONTRACT TIME will be (increased)(desreased) by 0 calendar days.
The date for completion of all work will be December 27, 2007
Approvals Required:
To be effective this Order must be approved by the Owner if it changes the scope or objective or the PROJECT, or as
may otherwise be required by the GENERAL CONDITIONS.
Requested by:
Recommended by:
Approved by:
ime yang, nc.
Con Iting/4
o aye evil e
ineers, Inc.
w:\20071072150 DRAKE FIELD\CHANGE ORDERS\C-ORDER-1.DOC
Date
2-67
]7- z -O7
Date
A,
Date
City of Fayetteville, Arkansas
Budget Adjustment Form
Budget Year
2007
Department: General Govemment
Division: Aviation & Economic Development
Program: Airport Capital Expenditures
Date Requested
11/20/2007
Adjustment Number
Project or Item Added/Increased:
$7500.00 in the Contract Services account
Project or Item Deleted/Reduced:
None. To recognize $7500.00 grant funding from the
Arkansas Department of Aeronautics.
Justification of this Increase:
Will provide for Enhanced Taxiway Markings, and
increased reflectivity of markings as specified by FAA
Advisory Circular 150/5340-1J.
Justification of this Decrease:
Department of Aeronautics has commited grant funding up
to $73,448 for this project
Increase Expense Budget (Decrease Revenue Budget)
Account Name Account Number Amount Project Number
Contract services
Account Name
5550 3960 5315 00 7,500 06021 1
Decrease Expense Budget (Increase Revenue Budget)
Account Number Amount
Project Number
State grants 5550 0955 6805 00 7,500 06021 1
Approval Signatures
Requested By
'07 ger
67
Department Director
Fina(rce &t I te' - I Servi es Director
or
1'!S 1.7
ta:
//-�o
D+ e
(/ S
Date
h - 6c-67
Date
2//4
Date
Budget Office Use Only
Type: A B C E
Posted to General Ledger
Posted to Project Accounting
Entered in Category Log
Initial Date
Initial Date
Initial Date
Ray M. Boudreaux
Submitted By
City of Fayetteville
Staff Review Form
City Council Agenda Items
or
Contracts
11/20/2007
City Council Meeting Date
Aviation & Economic Development General Government
Division
Action Required:
e-t✓5
No20/0
ituo
Department
Action Required: Approve Change Order #1 to the contract with Time Striping Inc. Contact: Kevin Tucker, PO Box
1236, Van Buren AR 72957, 479-806-3411, Fax 501-505-8674, in the amount of $7500. Approve a Budget
Adjustment.
7,500.00
Cost of this request
5550.3960.5315.00
Account Number
06021 1
Project Number
Budgeted Item
X
$ 12 ,(At-k�
Budget
Airfield Re -striping
Program Category / Project Name
$ rl Avi/ED Imp
Fundis sed to Date Program / Project Category Name
Remaining Balance
Budget Adjustment Attached
X
Airport
Fund Name
City Attorney
Finance and Internal Service Director
Mayor
Comments:
Date
Previous Ordinance or Resolution # 174-07
7 Original Contract Date:
1-6 —D)
Date
/2
Date
Original Contract Number:
10/02/07
2012
City Council Meeting of: November 20, 2007
Agenda Item Number:
CITY COUNCIL AGENDA MEMO/STAFF CONTRACT REVIEW MEMO
TO: Mayor and Members of the City Co
THRU: Staff/Contract Review Committee
FROM: Ray M. Boudreaux, Director, Aviation and E4onomic Development
DATE: November 5, 2007
SUBJECT: Approval of Change Order #1 to Airfield Pavement Restriping
Project.
RECOMMENDATION: Approve Change Order #1 to the pavement restriping project at Fayetteville
Municipal Airport, Drake Field.
BACKGROUND; The Fayetteville Municipal Airport, Drake Field Board was written up during the
annual Certification Inspection for pavement markings being faded and non -reflective. A project was
designed and bid under Task Order #2, August 14 2007 with McClelland Consulting Engineers which
contains funding for design, bidding services and construction oversight of the project. Task Order #2
was approved by City of Fayetteville Contract Review Committee. The contract was awarded to Time
Striping, and approval was granted to the airport to apply and receive State Aeronautics Grant funds to
complete the protect by the City Council Resolution October 2, 2007. The State Aeronautics Commission
approved a 100% grant in the amount of $73,448.00 to complete the project.
DISCUSSION: The project was bid including type 3 reflective beads at the rate of 7 lbs per gallon of
paint applied. The contractor brought up a change to the FAA Advisory Circular that requires 10 lbs of
beads per gallon of paint applied. Type three beads are $2.60 per pound. The Advisory Circular
150/5340-1J which was published September 29, 2007 required that the taxiway stripes be enhanced
leading up to the hold line at all Part 139 airports to further combat runway incursions. The enhanced
markings were not in our project. It was briefed at the Airports Conference, October 24 and 25 and a
letter from the Regional Manager was received October 23 encouraging all part 139 airports in the
Region to install the new stripes (FAA letter attached). We agree that the project needs to be
additionally changed to include the enhanced markings. We cut some paint that is still in very good
condition, added the cost of the new enhanced taxiway striping, and added the cost of the additional
three pounds of beads per gallon which increases the cost of the project by $7,500.
BUDGET IMPACT: A portion of the Change Order is offset by Grant Funds in the amount of the
contingency, $3,498.00. The remainder will use existing project budget from the Airport Fund Balance.
Attachments: Staff Review Form
Change Order #1
Budget Adjustment
Letter from FAA Airports Regional Manager
Aviation and Economic Development Department
Fayetteville Municipal Airpon, Drake Field
4500 South School Avenue, Suite F
Fayetteville, Arkansas 72701
Ray M. Boudreaux, Director
RESOLUTION NO.
A RESOLUTION TO APPROVE CHANGE ORDER #1
OF THE CONTRACT WITH TIME STRIPING, INC.
IN THE AMOUNT OF $7,500.00 AND TO APPROVE
A BUDGET ADJUSTMENT OF $7,500.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: The City Council of the City of Fayetteville, Arkansas hereby approves
Change Order #1 of the contract with Time Striping, Inc. to increase the contract in the amount
of $7,500.00 to pay for an increase of the amount of reflective beads in the paid as required by
new FAA regulations.
Section 2: The City Council of the City of Fayetteville, AR hereby approves the attached
budget adjustment of $7,500.00.
PASSED and APPROVED this 20th day of November, 2007.
APPROVED: ATTEST:
By: By:
DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer
0
U.S. Department
of Transportation
Federal Aviation
Administration
October 18, 2007
Airports Division
Southwest Region
Arkansas Louisiana,
New Mexico, Oklahoma,
Texas
Mr. Ray Boudreaux
Aviation & Economic Development Director
Drake Field - Fayetteville Airport
4500 South Scholl Avenue, Suite A
Fayetteville, AR 72701
Dear Mr. Boudreaux:
2601 Meacham Bbd
Fort Worth, Texas 76137
The Federal Aviation Administration (FAA) and the aviation industry have been working
together to reduce the risk of runway incursions for many years. We have some successes,
but we still have room for improvement and need your help.
On August 15, 2007, the FAA Administrator put out a Call to Action to the aviation
industry. She asked the aviation mdustry to partner with the FAA to reach consensus on a
manageable number of short, medium, and long-term initiatives. These initiatives would be
to further improve the safety of operations at our airports and reduce runway incursions.
Recall that all airports with 1.5 million or more enplanements are required to install the new
enhanced taxiway centerline markings at runway entrances by June 2008. The group of
airports that met with FAA agreed to fulfill this commitment within 60 days of the August
15, 2007 meeting.
On August 22, 2007, the FAA Administrator sent a letter to Airports Council International
informing them of the initiative's call to action. This letter extended the commitment to all
Part 139 Certificated airports. We encourage all Southwest Region Part 139 airports to
complete the increased marking standards in accordance with AC 150/5340-1J within the
next 60 days. We would also like you to establish mandatory recurrent training for all
employees (including employees of tenants and contractors) to ensure all operators in the
movement area do not cause vehicle/pedestrian deviations.
We know this is a monumental effort, but we sincerely need your prompt action to assure
your airport and the airports in our national system are implementing these critical items
uniformly. We have also determined that enhanced markings are eligible under the Airport
Improvement Program. We will work with your team to make appropriate adjustments to
your capital plans. One of our FAA Airport Certification Inspectors will contact you within
the next two weeks to discuss your progress or your ability to meet this goal.
We are wilting to work and do whatever we can to help you implement these important
initiatives. Should you have any concerns or questions about this requirement, please
contact Joseph G. Washington at 817-222-5620.
Sincerely,
r), Kelvin L. Solco N
Manager, Airports Divisio
2
4/29/2005 AC 150/5340-11
APPENDIX 3. ENHANCED MARKINGS FOR RUNWAY HOLDING POSITION.
1. GENERAL Enhanced taxiway markings are intended to provide additional visual cues to taxiing pilots to
help them identify the location of the runway holding position. This appendix provides standards for these
enhanced markings and guidance, including examples, on where to use the enhanced markings.
The figures included in this appendix are not drawn to scale.
2. APPLICABILITY. The guidelines and standards contained in this appendix for enhanced taxiway markings
may be used as a runway incursion prevention initiative. They may be used in combination or separately with
existing taxiway markings. However, all intersections at an airport must use the same combination of markings.
3. ENHANCED TAXIWAY CENTERLINE MARKINGS.
See Notes 1 and 2
6— Y
(15-30cm)
150'(45.72 m)
6' (1524 an)
6' (15.24 cm)
Note 1: Regardless of whether the
centerline is 6 inches or 12 inches (15 or
30 cm) wide, the dashed lines provided by
the enhancements will always be 6 inches
(15 cm) in width.
Note 2: The taxiway centerline
might have to be shifted either right
or left so the enhancement does not
go over a taxiway centerline light.
Figure C-1. Enhanced Taxiway Centerline Markings
47
J(L'EMeCLELND
CONSULTING
ENGINEERS, INC
/ DESIGNED TO SERVE /
1810 N. College Avenue
P.O. Box 1229
Fayetteville, Arkansas 72703 / 72702-1229
PHONE: 479-443-2377
FAX: 479-443-9241
November 5, 2007
Mr. Ray Boudre
Airport Depa en
City of Fa - eville
113 - : Mountain
Fay- eville, AR 72701
RE: Airfield Pavement Restriping
Fayetteville Municipal Airport, Drake Field
NOV 0 5 2007
A.
Dear Mr. Boudreaux:
Enclosed please find four (4) copies of Change Order No. 1 for this project.
If there are any questions regarding this change order, please contact us.
Sincerely,
M LLAND CONS TING ENGINEERS, INC.
yne
Vice Present
Enclosure: Change Order No. 1 (4 copies)
W:12007'072150 Drake Field\Corres\bourdreaux-1105 wpd.
(11.27.07) Clarice Pearman - Res. 196-07
From:
To:
Date:
Subject:
Attachments:
Clarice Pearman
Boudreaux, Ray
11.27.07 11:04 AM
Res. 196-07
196 07 Time Striping Inc CO1.pdf
CC: Audit; Fell, Barbara
Ray:
Attached is a copy of the above resolution passed by City Council, November 20, 2007. I am forwarding to you three of
four signed change orders. Also, I will forward your budget adjustment to Budget & Research. Have a good day.
Thanks.
Clarice
Page