Loading...
HomeMy WebLinkAbout195-07 RESOLUTIONRESOLUTION NO. 195-07 A RESOLUTION APPROVING CONTRACT AMENDMENT NO 1 TO THE CONTRACT WITH McCLELLAND CONSULTING ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $74,690.50 FOR PERMITTING SUPPORT, EASEMENT DOCUMENT PREPARATION, ELECTRICAL DESIGN AND RELATED SERVICES ASSOCIATED WITH THE COLLEGE AVENUE IMPROVEMENTS PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 1 to the Contract with McClelland Consulting Engineers, Inc. in an amount not to exceed $74,690 50 for permitting support, easement document preparation, electrical design and related services associated with the College Avenue Improvements Project. A copy of Amendment No. 1, marked Exhibit "A" is attached hereto and made a part hereof. PASSED and APPROVED this 20th day of November, 2007. APPROVED. By ATTEST: By. SONDRA E. SMITH, City Clerk/Treasurer AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES COLLEGE AVENUE IMPROVEMENTS — PHASE I FROM ROCK STREET TO MAPLE STREET ARKANSAS HIGHWAY AND TRANSPORTATION DEPARTMENT PERMITTING, EASEMENT DOCUMENTATION AND ELECTRICAL DESIGN SERVICES The Agreement for Professional Engineering Services executed on December 5th, 2006 for the Survey and Preliminary Design of the College Avenue Improvements — Phase I in Fayetteville, Arkansas is hereby amended. This Amendment entered into and executed on the date indicated beneath the signature blocks, by and between the City of Fayetteville (hereinafter "City of Fayetteville") and McClelland Consulting Engineers, Inc (hereinafter "McClelland") changes the authorized Scope of the Project, and the Fees and Payments, due to the requested increase in scope of services on the College Avenue Improvements — Phase I. The scope of amendment one includes the creation of engineering documents to the level necessary to obtain construction approval from the Arkansas Highway and Transportation Department (hereinafter "AHTD") the creation of' easement documentation (sidewalk and temporary construction easements anticipated) and the production of electrical engineering documents for the installation of proposed streetlights and associated wiring. The Agreement lists the Scope of Services for: 1. AHTD Permitting Services 2. Easement Documentation (Sidewalk Easements and Temporary Construction Easements Anticipated) 3. Electrical Engineering Services The purpose of this Amendment No. 1 is to authorize McClelland to complete the AHTD Permitting the creation of easement documentation (sidewalk and temporary construction easements anticipated) and Electrical Design Services as defined in the Agreement and hereinafter, and to establish compensation for these services. FY062191 Amendment No. 1 (11/01/07) 1 SECTION 2 — BASIC SERVICES OF MCCLELLAND McClelland is hereby authorized to complete AHTD Permitting the creation of easement documentation (sidewalk and temporary construction easements anticipated) and Electrical Design Phase Services as defined under Section 2.2 of the Agreement, to include the creation of engineering documents only to the level necessary to obtain construction approval from the Arkansas Highway and Transportation Department (hereinafter "AHTD") the creation of easement documentation (sidewalk and temporary construction) based upon the existing parcel information and the production of electrical engineering documents for the installation of proposed streetlights and associated wiring as defined under Section 2 of the Agreement. From the time the City of Fayetteville issues the Notice To Proceed (NTP), McClelland. will endeavor to execute the project within the following time periods: Task Completion After NTP A. AHTD Permitting, Easement Documentation (Sidewalk and Temporary Construction) and Electrical Design SECTION 6 — PAYMENTS TO MCCLELLAND 120 calendar days (Receipt of AHTD permit) Compensation for Permitting and Electrical Design Services shall be based upon for Scope of Services indicated above. The estimated manhours and labor rates as applicable for these phases of the project are given on the attached Exhibit "A". The fee shall be based on the Hourly Rates shown on the attached Exhibit "B" and the Total Fee shall be a Not -To -Exceed as follows: Estimated fee for Each Task AHTD Permitting / Electrical Design Services: Easement Documentation Creation: $ 59,690.50 $ 15,000.00 Total (Not -to -Exceed Fee): $ 74,690.50 FY062191 Amendment No. 1 (11/01/07) 2 This Amendment No. 1 authorizes an additional Seventy Four Thousand Six Hundred Ninety and 0.50 dollars ($ 74,690.50 ) to the originally approved One Hundred Eight Thousand One Hundred Eleven dollars ($ 108,111.40 ). This amended Contract Amount ($ 182,801.90) shall not be exceeded without specific written authorization from the City of Fayetteville. All other provisions and conditions of the original Agreement remain in full force and effect. AHTD Permitting, Easement Documentation and Electrical Design shall be completed to conform to the City of Fayetteville's schedule. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR: THE CITY OF FAYETTEVILLE: Attest: FOR: McCLELLAND CONSULTING ENGINEERS, INC.: YI-1444/1/ki Date: (I—Z.-07 Attest: onlimplieff G\-•. � TYSG ,.G\•Oc . •0• .,3 • ;FAYETTEVILLE• 11;eZNG.ON G?o•• FY062191 Amendment No. 1 (11/01/07) 3 2 | | § 44144444 || . 44■■■ . �2»! «#;$-1.2. -.0000 2,. » 115.000.00! § g§ §§� . k k 2 §! . ; W CLERICAL] | 4.0 9 0 ■ . 0 1 553.00 099 o- Z , § || | rr® 40 2= 2.0 § SURV. TECH. 8 : || / 00 1 !| 8 : ENGR. TECH. ] 0 80 2.0 | )|� | §:_ 4.0 2.0 | §|| g :;_ 40 :;§§::; 2 %ea !� 8 ; , . W .. ,. I I TASK DESCRIPTION .I 1 1 (FINAL DESIGN PHASE 0 ( ( Lg0\ * \ | 0 z 2 3 Ie. LAYOUT OF SIDEWALK / TREE PLANTERS 4 IC. GENERAL DEMOLITION PLAN 5 JD. UTILITYAIGHTING/TRAFFIC SIGNAL RELOCATION / IMPROVEMENTS PLANS 8 IE. TREE REMOVAL / PRESERVATION PIAN 7 IF ATTEND MONTHLY PROGRESS MEETINGS WITH CITY (4) 8 IG. PROVIDE WRITTEN RESPONSE TO CRYS REVIEW COMMENTS 9 P1 PROJECT MANUAL AND STANDARD DRAFTING DETAILS 10 II. PAVEMENT MARKING PLAN _.. 11 J. INTERSECTION LAYOUT -- 12 K. COORDINATION WITH UTILITY COMPANIES 13 L. CREATION OF SIDEWALK AND TEMP CONST DOCS (W PARCELS X 5250 EA) CO § § B k a | | § 44144444 Ron Petrie Submitted By City of Fayetteville Staff Review Form City Council Agenda Items or Contracts 11/20/2007 City Council Meeting Date Engineering Division Action Required: Operations Department A resolution approving Contract Amendment No. 1 with McClelland Consulting Engineers, Inc. in an amount not to exceed $74,690.50 for permitting support, easement document preparation, electrical design, and related services associated with the College Avenue Improvement Project. 74,690.50 Cost of this request 4520.9520.5809.00 Account Number 06035.1910 Project Number Budgeted Item X 24,496,473.00 Category / Project Budget College Avenue (Rock to Maple) Program Category / Project Name 2,082,457.43 Street Improvements Funds Used to Date Program / Project Category Name 22,414,015.57 2006A Sales Tax Construction Remaining Balance Fund Name Budget Adjustment Attached Department D ector City Attorney LP," c _ (�...9 Finan ot i3nd Internal Service Director ayor Comments: 102•� Date elkA7 Dat ►t-6-07 Date Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number 1 City Council Meeting of November 20, 2007 CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Gary Dumas, Director of Operations From: Ron Petrie, City Engineer Ve Date: November 2, 2007 Subject: A resolution approving Contract Amendment No. 1 with McClelland Consulting Engineers, Inc. in an amount not to exceed $74,69050 for permitting support, easement document preparation, electrical design, and related services associated with the College Avenue Improvement Project. RECOMMENDATION: Staff recommends approval of Contract Amendment No. 1 with McClelland Consulting Engineers, Inc. in the amount of $74,690.50 for permitting support, easement document preparation, electrical design, and related services for College Avenue, from Rock Street to Maple Street. BACKGROUND: The College Avenue Improvement Project is included in the Transportation Improvement Bond Program. The project includes sidewalk replacement, tree and landscaping installation, decorative lighting, and removal/reconfiguration of existing driveways to provide better access management and increase safety. No changes to the existing street capacity are planned. DISCUSSION: Under this Contract Amendment, McClelland will provide permitting support, easement document preparation, electrical design, and related services as detailed in the Contract. The services will provide a completed product that the City will use to construct the improvements to College Avenue. The contract amount for this work is $74,690.50. BUDGET IMPACT: The contract amendment amount of $74,690.50 will be paid from the Transportation Improvement Bond Funds. The total amended contract is therefore $182,801.90. 1 RESOLUTION NO. A RESOLUTION APPROVING CONTRACT AMENDMENT NO. 1 TO THE CONTRACT WITH McCLELLAND CONSULTING ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $74,690.50 FOR PERMITTING SUPPORT, EASEMENT DOCUMENT PREPARATION, ELECTRICAL DESIGN AND RELATED SERVICES ASSOCIATED WITH THE COLLEGE AVENUE IMPROVEMENTS PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 1 to the Contract with McClelland Consulting Engineers, Inc. in an amount not to exceed $74,690 50 for permitting support, easement document preparation, electrical design and related services associated with the College Avenue Improvements Project. A copy of Amendment No. 1, marked Exhibit "A" is attached hereto and made a part hereof. PASSED and APPROVED this 20th day of November, 2007. APPROVED: ATTEST: By: By: DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES COLLEGE AVENUE IMPROVEMENTS — PHASE I FROM ROCK STREET TO MAPLE STREET ARKANSAS HIGHWAY AND TRANSPORTATION DEPARTMENT PERMITTING EASEMENT DOCUMENTATION AND ELECTRICAL DESIGN SERVICES The Agreement for Professional Engineering Services executed on December 5th, 2006 for the Survey and Preliminary Design of the College Avenue Improvements — Phase I in Fayetteville, Arkansas is hereby amended This Amendment entered into and executed on the date indicated beneath the signature blocks, by and between the City of Fayetteville (hereinafter "City of Fayetteville") and McClelland Consulting Engineers, Inc (hereinafter "McClelland") changes the authorized Scope of the Project, and the Fees and Payments, due to the requested increase in scope of services on the College Avenue Improvements — Phase I. The scope of amendment one includes the creation of engineering documents to the level necessary to obtain construction approval from the Arkansas Highway and Transportation Department (hereinafter "AHTD") the creation of easement documentation (sidewalk and temporary construction easements anticipated) and the production of electrical engineering documents for the installation of proposed streetlights and associated wiring. The Agreement lists the Scope of Services for: 1. AHTD Permitting Services 2. Easement Documentation (Sidewalk Easements and Temporary Construction Easements Anticipated) 3. Electrical Engineering Services The purpose of this Amendment No. 1 is to authorize McClelland to complete the AHTD Permitting the creation of easement documentation (sidewalk and temporary construction easements anticipated) and Electrical Design Services as defined in the Agreement and hereinafter, and to establish compensation for these services. FY062191 Amendment No. 1 (11/01/07) 1 SECTION 2 — BASIC SERVICES OF MCCLELLAND McClelland is hereby authorized to complete AHTD Permitting the creation of easement documentation (sidewalk and temporary construction easements anticipated) and Electrical Design Phase Services as defined under Section 2.2 of the Agreement, to include the creation of engineering documents only to the level necessary to obtain construction approval from the Arkansas Highway and Transportation Department (hereinafter "AHTD") the creation of easement documentation (sidewalk and temporary construction) based upon the existing parcel information and the production of electrical engineering documents for the installation of proposed streetlights and associated wiring as defined under Section 2 of the Agreement. From the time the City of Fayetteville issues the Notice To Proceed (NTP), McClelland. will endeavor to execute the project within the following time periods. Task Completion After NTP A. AHTD Permitting, Easement Documentation (Sidewalk and Temporary Construction) and Electrical Design SECTION 6 — PAYMENTS TO MCCLELLAND 120 calendar days (Receipt of AHTD permit) Compensation for Permitting and Electrical Design Services shall be based upon for Scope of Services indicated above. The estimated manhours and labor rates as applicable for these phases of the project are given on the attached Exhibit "A". The fee shall be based on the Hourly Rates shown on the attached Exhibit "B" and the Total Fee shall be a Not -To -Exceed as follows: Estimated fee for Each Task AHTD Permitting / Electrical Design Services: Easement Documentation Creation: $ 59,690.50 $ 15,000.00 Total (Not -to -Exceed Fee)• $ 74,690.50 FY062191 Amendment No. 1 (11/01/07) 2 This Amendment No. 1 authorizes an additional Seventy Four Thousand Six Hundred Ninety and 0.50 dollars ($ 74,690.50 ) to the originally approved One Hundred Eight Thousand One Hundred Eleven dollars ($ 108,111.40 ). This amended Contract Amount ($ 182,801.90 ) shall not be exceeded without specific written authorization from the City of Fayetteville All other provisions and conditions of the original Agreement remain in full force and effect. AHTD Permitting, Easement Documentation and Electrical Design shall be completed to conform to the City of Fayetteville's schedule. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR: THE CITY OF FAYETTEVILLE: By: Date: Attest: FOR: McCLELLAND CONSULTING ENGINEERS, INC.: By\ t Attest: Date: I ``7 01 FY062191 Amendment No. 1 (11/01/07) 3 2 § § J | E | . u»|e! ..., $g 02,145.001 'Issas g-»ai Mi # I| - ( k 1 25.0 1 ; ; 9 1 4- - - �_ | §§_ : ;:_ ; ai | §!: a0 ;_: § SURV. TECH. ! 6 |§ $13700 : ■| S ; & |.P Li ! -0 .. | ||- | 0000 ; R|| 2 0000;_;;=;: ! L2{ : 8.0 I e ; L TASK DESCRIPTOR COLLEGE AVENUE PEDESTRIAN IMPROVEMENTS -Rock St. to Maple St. FINAL DESIGN PHASE FINAL DESIGN OF DRIVES AND PARKING AREAS TO TO BE MODIFIED (FOR AHTD PERMITTING) . LAYOUT OF SIDEWALK/TREE PLANTERS GENERAL DEMOLITION PLAN 0. ILRYALIGHTING/TRAFFIC SIGNAL RELOCATION / IMPROVEMENTS PLANS IE. TREE REMOVAL / PRESERVATION PLAN ATTEND MONTHLY PROGRESS MEETINGS WITH CITY (A) . PROVIDE WRITTEN RESPONSE TO CITY'S REVIEW COMMENTS . PROJECT MANUAL AND STANDARD DRAFTING DETAILS I. PAVEMENT MARKING PLAN IJ. INTERSECTION LAYOUT K. COORDINATION WITH UTILITY COMPANIES E ) ( it § § ( \ TOTAL - FINAL DESIGN PHASE 1 |■ -66 K 0 1 T 6 S s;„ 1 CL 1 ss „ § § J | E r(11.27.07) Clarice Pearman - Res. 195-07 Page 1 From: Clarice Pearman To: Petrie, Ron Date: 11.27.07 11:00 AM Subject: Res. 195-07 Attachments: 195-07 McClelland Consulting Engineers Amd 1.pdf CC: Audit Ron: Attached is a copy of the resolution passed by City Council, November 20, 2007. I am forwarding to you one of two signed agreements. Please let me know if there is anything else needed for this item. Have a good day. Thanks. aarice