Loading...
HomeMy WebLinkAbout193-07 RESOLUTIONRESOLUTION NO. 193-07 A RESOLUTION APPROVING AN AGREEMENT WITH ARKANSAS WESTERN GAS COMPANY FOR RELOCATION OF GAS UTILITY FACILITIES ON ZION ROAD. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves an agreement with Arkansas Western Gas Company for relocation of gas utility facilities on Zion Road, a copy of which, marked Exhibit "A," is attached hereto and made a part hereof. PASSED and APPROVED this 20th day of November, 2007. APPROV . # ATTEST. By: By: 4 SONDRA E. SMITH, City Clerk/Treasurer DAN COODY, Mayo $G\, 4,4 �Z• OEtoo '•, :U '�: = FAYETTEVILLE: ;NGreN AWG #26159 ARKANSAS WESTERN GAS COMPANY UTILITY CONSTRUCTION/RELOCATION AGREEMENT Property Developer: City of Fayetteville Address: 113 West Mountain Street Fayetteville, AR 72701 Job Location: Zion Road , I ,- THIS AGREEMENT, made and entered into this 20+k day of 1 V 0 °1St kVi , 2007, by and between City of Fayetteville , acting by and through its duly authorized representative, hereinafter referred to as the "Developer," and ARKANSAS WESTERN GAS COMPANY, acting by and through its duly authonzed representative, hereinafter refened to as the "Owner." WITNESSETH: WHEREAS, THE "Developer" proposes to make certain improvements at the location designation as shown above; and as part of the necessary work of such improvements, `Owner" must adjust or relocate certain of its existing facilities, and in connection with such adjustment, or relocation, "Developer" shall participate in the costs of such work to the extent herein agreed upon; and WHEREAS, the proposed improvement necessitates the adjustment and/or relocation of certain facilities of "Owner" as described in the following description of work. Install pipe with all necessary appurtenances to relocate for the proposed Zion Road improvements as planned and presented in the design plans provided by the City of Fayetteville City of Fayetteville will reimburse 48.5% of the actual cost of all materials, contract labor, company labor, equipment hours including Engineering and Inspection costs to Arkansas Western Gas Company. And, such adjustment, relocation or construction being shown in detail in "Owner's" plans, sketches, estimate of cost, and specifications (when applicable) which are attached hereto and made a part hereof; and WHEREAS, the "Developer" desires to implement the herein described utility adjustments or relocations and approve the proposed utility construction of "Owner" by entering into an agreement with said "Owner." NOW, THEREFORE, IT IS HEREBY AGREED: 1. Where applicable hereunder by reason of new utility occupancy or crossing of "Developer's" property, "Developer" hereby grants to "Owner" a right-of-way license and permission to install and operate utility facilities on or across "Developer's" properties as shown on the approved plans or sketch maps attached hereto and made a part hereof, and to execute such easements or right-of-way grants as may be necessary to evidence and record such right of "Owner." Page 1 of 3 2. Where applicable hereunder by reason of new construction on existing utility rights of way, "Owner" hereby grants to "Developer" the right to use for his purposes the lands within the project limits on or across which "Owner" holds a valid property interest antedating "Developer's" rights which were subsequently acquired in the same lands, and which property rights "Owner" shall retain so long as "Owner" (or "Owner's" successors or assigns) continues such use and occupancy and does not abandon, and thereby release, such property interest to "Developer" through facility removal in making said adjustments or by subsequent facility removal for "Owner's" convenience; and the "Developer" hereby agrees that "Owner," by granting said right and by said continued joint use and occupancy, does not waive any future claim for reimbursement for adjustment cost as may be eligible for reimbursement by reason of such prior property interest, nor does "Owner" waive any other legal or property right held under the Law or Constitution of the State or the United States. 3. In the event that future construction, reconstruction, expansion, relocation, rehabilitation, betterment, maintenance, or other work on the facilities owned and operated by either the "Developer" or the "Owner" in the area jointly occupied or used under either or both the above provisions of this Agreement will disturb, detrimentally affect, interfere, or be inconvenient to the facilities or responsibilities of either party, the parties hereto shall reach agreement in writing as to locations, extent, and methods of such work before the work is undertaken. In a case of emergency, and where immediate action is necessary for the protection of the public and to minimize damage to or loss of investment in the property of the "Developer" or the "Owner" either party hereto may, at its own responsibility and risk, make any necessary emergency repairs, and shall notify the other party hereto of such action as soon as practicable. 4. "Owner" shall inform "Developer," in writing, three days or more in advance of the date work is to be started, and shall keep the "Developer " informed of progress and activity related to the work being performed, and shall furnish written notice when the work is completed. 5. "Developer" agrees that the cost of the utility adjustment and/or construction provided for hereunder shall be paid to "Owner" as follows "Owner" agrees that 'Developer" will only pay actual cost of adjustment should actual cost be less than $ 47.500.00 . If actual cost exceeds $ 47.500.00 , the "Developer" will pay the actual cost. Exhibit "A" is cost estimate as submitted to City of Fayetteville. 6. "Owner" shall accept as full payment for work hereunder the amount developed or accumulated as eligible actual and related indirect costs in accordance with "Owner's" accounting procedure, which is the Uniform System of Accounts prescribed by the Arkansas Public Service Commission. "Owner" further agrees to retain said cost records and accounts for inspection and audit for a period of not less that one (1) year from the date of final payment. 7 "Owner" shall be responsible for any and all hazards to persons, property, and traffic, and shall save the "Developer" harmless in all respects from any and all losses, damages, or injuries caused by any negligent act or omission by "Owner's" employees or agent performing work under this Agreement or future maintenance or servicing work on facilities constructed under this Agreement; and "Owner" shall, in completing said work, perform clean up and restoration of appearances of the work area including disposal of surplus materials and debris, so as not to leave the work area in an unsafe or unsightly condition. Page 2 of 3 l 8. If requested by "Owner" in writing, "Developer" shall make intermediate progress payments in amounts not exceeding ninety percent (90%) of eligible billed costs, and no more often than monthly intervals, for work hereunder upon receipt of statements in two (2) copies for periodic and unpaid costs, provided the herein estimated reimbursable amount is $2,000.00 or more, and that no such intermediate payment shall be construed as final settlement for any item included in any intermediate billing. 9. "Owner" shall, within six (6) months after completion of the adjustment and acceptance thereof by the "Developer," prepare and submit to "Developer" a detailed complete (including intermediate billings, if any) and final bill rn two (2) copies and covering the total cost for the adjustment of "Owner's" facilities. 10. The "Developer," upon receiving from "Owner" the final billing documents complete as listed next above, shall pay "Owner" for the eligible actual cost, less all prior payments, if any, for making the adjustments in "Owner's" facilities as agreed herein. "Developer" shall pay "Owner" within thirty (30) days after such billing documents are received. If "Developer" fails to pay within said time, the amount due shall bear interest at the rate of 10 percent per annum until paid. "Developer" shall have the right to inspect and audit the books of account of "Owner" during normal business hours of "Owner" at any time within the tune limit set forth in Paragraph 6 to determine the correctness of "Owner's" billing. "Owner" agrees to refund any and all amounts paid in payments found in the audit to exceed the total amount eligible for work hereunder. 11. It is mutually agreed by the parties hereto that the provisions of this Agreement pertaining to relative property rights, nght-of-way occupancy permission, access for servicing when applicable and joint use of rights of way shall continue in full force and effect from the date of execution, and shall be perpetually binding upon each party's legal representatives, successors or assigns. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed rn duplicate by their duly authorized representatives the date first herein above written. "OWNER" "DEVELOPER" ARKANSAS WESTERN GAS COMPANY City of ayettevil Its: Senior Vice -President Its: Mayor Attest: Att O-ne tuu Its: Secretary Its: City Clerk Page 3 of 3 11/4%%‘"%1;i TR1"''1.,, • P.V. •p c r. E :FAYETTEVILLE: F. -as- . �. •-1.` Ve''ti;NGT15; ,�° • :ARKANSAS WESTERN GAS COMPANY 'OPINION OF PROBABLE COST {AWG JOB 026159 _-- Zion Road Fa ttevllte, AR - - ---.._ • • .-1 Item Quantity Unit Unit Price Total i .MATERIALS -.....__._----_....._ ... *----------- 1 f2" Plastic Pipe • Proposed i 1,510 ' L.F 50.50 ' 2 FY x 3/4" Plastic Service Tee 8 Each 55.36 .--- . 3 ,Y Tee Plastic _..._ ' 8 Each 54.00 4 2- Cap Plastic 2 I Each 51.62 _ _._._..._._6-__,2'90degreePlastic ...._._ 10 Each - $4.00_ --*- 6Y Transition Fitting - --.... - _ . 2 . _ .... Each , i----$1051... 7 !2' x 1114" Plastic Reducer --- --- 4 Eachr..... 57.02 8 2' Ancdeless Riser 2 Each -154720 - }- m 9 - -IY High Volume Tee 3 i Each ' $52.67 10 ' 374" Plastic Pipe 500 IL.F. - 50.37 11 11114" TrrwMion Fitting_ 1 -.... Each $8.05 r 12 :3/4" Anodstses Riser . 12 t Eadr $11.11 1313/4" CotwIn 12 Each I $0.70 14 3/4" Continental Service Tee 12 Each 516.83 ' 5201.96 15 !Miscellaneous Fittings 5 ' Lot $1500 r $7500 6 532.00 $3.24. _.._.. 540.00 .. _..... 521.02 528.08 $94.40 ' 5168.01 : 5185.00 • $8.05 • 5133.32' _ $8.40 :CONTRACT LABOR 16 Install Y Plastic Pipe 17 ;Directional Drill Y Plastic Pipe Sub -Total; _ ..__---.-$1,783.34, Stores Exmoor*: 16.00%-- . - $267.50 • TOS Materiels Cost: : _- _ -- $2,050.84 • 1,510 L.F. $18.00 527,180.00: 400 L.F. 1 $25.00 __--.--_---510,000.00 Sub -Total $37,180.00 L- -.-'-- :-. !- 'COMPANYLABOR .._..__ _ 18 Director of Construction 19 StAierintendent --- -20 Inspector --.....-- 21 crew Leader 22 lineman 23 'Serviceman 24 .Mileage EQUIPMENT• 25 Tractor Backhoe -.. 80 Nous ...617.00 , $1,360.00 --- _ 26 .2 -Ton Truck & Trailer -- - 80 Hours 517.00 61,360.00 - _ _ ...: _.. 27 _ _ 1/2 -Ton Pldc�_ 100 :Hours $17.00 --1 i3A80.00_ -.... . 40, Hours _ $35.50 180 Hours 180.... �..... Hours 180 Hours $21.10 . 180 Hours ; $2o.00 30 Hours 520.00 2,000 Mies • 61,420.00 55 355.00 _.$4,965.00 $3,798.00 63,600.00 600.00 , 50.565 _-_.: .__..__._$1.130_00! ss6ass.00 General Overhead • Payroll Overhead' 46.9% $9,911.05 • Total- 130479.05 r t T...Sub-Total,.__......_... ... -. $5780.00 Preliminary Enykwwing • 1 $5,000.00 55 0,00.00 TOTALprsnr,dve.erre.ce rvuw..avy..ILIMAo-011.0 s. horny Enrage* ---600.109.09 i r • OVERHEAD CHARGE d_ 16.0% _ _ _ $12,028.48 TOTAL ESTIMATED OPINION OF PROBABLE COST - TOTAL ESTIMATED REIMBURSEMENT by CITY OF FAYETTEVILLE _ 48.81% TOTAL ESTIMATED COST TO ARKANSAS WESTERN GAS 61.49% AHTD Reimbursement Calculation r '+- 11� Fx 100 • I 46.51% _ _ 1,340 L.F. 592,218.38 $44.732.79 - - 547,485.68, p ARKANSAS WESTERN GAS COMPANY REIMBURSEMENT FACTOR Zion Road Improvements Fayetteville, AR AWG JOB #26159 Zion Road Right of Way Annexed In to the City of Fayetteville in September, 1961 PRIVATE RIGHT OF WAY 1 REIMBURSEABLE SIZE - YEAR - TYPE OF PIPE SHEET # SHEET # r 58W 2" 64W 2' 70W 2"76P 2"79W 2"98P TOTALS 055-057 650 650 055-058 0 360 60 170 100 690 0 TOTALS 650 0 0 0 0 0 650 CRY RIGHT OF WAY 1 NON REIMBURSEABLE SIZE - YEAR - TYPE OF PIPE SHEET # 2' 58W 2' 64W 2" 70W 276P 2"79W 2" 98P TOTALS 055-057 0 055-058 0 360 60 170 100 690 TOTALS 0 0 360 60 170 100 690 REIMBURSEMENT PERCENTAGE FOOTAGE RETIRED ON PRIVATE RNV 650 LF FOOTAGE RETIRED ON HIGHWAY RNV 690 LF TOTAL FOOTAGE RETIRED 1340 48.51% Ron Petrie Submitted By City of Fayetteville Staff Review For City Council Agenda Items or Contracts 11/20/2007 City Council Meeting Date Engineering Division Action Required: ///ZO/d7 /93 olneatz645 Win C=45 Operations Department A resolution to approve an agreement with Arkansas Westem Gas Company for relocation of gas utility facilities on Zion Road. 47,500.00 Cost of this request 4520.9520.5809.00 Account Number 06035.1820 Project Number Budgeted Item X 24,496,473.00 Category / Project Budget 2,082,457.43 Funds Used to Date Zion Road (College to Vantage) Program Category / Project Name Street Improvements Program / Project Category Name 22,414,015.57 2006A Sales Tax Construction Remaining Balance Budget Adjustment Attached Fund Name De .ment hector II.02. o1 Date City Attomey, Date Finannd Internal Service Director or 1%-L-07 Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Comments City Council Meeting of November 20, 2007 CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Gary Dumas, Director of Operations From: Ron Petrie, City Engineer ti Date: November 2, 2007 Subject: A resolution to approve an agreement with Arkansas Western Gas Company for relocation of gas utility facilities on Zion Road. RECOMMENDATION: Staff recommends approval of an agreement with Arkansas Western Gas Company for relocation of the existing gas line on Zion Road, between College Avenue and Vantage Dnve. BACKGROUND: The Zion Road Project is one of the projects to be constructed under the Transportation Bond Program The project consists of widening approximately 2400 feet of Zion Road to 3 lanes from College Avenue to just east of Vantage Drive, installation of an underground storm drainage system, and construction of 6 foot sidewalks on both sides of the roadway, as approved by the City Council and Street Committee. Relocation of utility lines, to include gas, telephone, cable, and electric lines, will also be required as part of this project. DISCUSSION: Arkansas Western Gas has presented a proposed agreement for relocation of their facilities on Zion Road, from College Avenue to Vantage Drive. This relocation is to allow the construction of widening and improvements to Zion Road that will be completed as part of the Transportation Bond Program. Under the proposed agreement, the City will reimburse Arkansas Westem Gas for 48.5% of the actual cost of their relocations on the project. This percentage was determined based on the date of installation of the gas lines: any lines that were installed prior to annexation of Zion Road into the City are considered reimbursable by Arkansas Westem Gas. The estimated cost to the City for this work is $47,500. 1 City Council Meeting of November 20, 2007 BUDGET IMPACT: The cost of the gas line relocation will be funded with a portion of the 2006 Transportation Bond Issue proceeds. $2,540,000 has been budgeted for the Zion Road Improvements Project. 2 RESOLUTION NO. A RESOLUTION APPROVING AN AGREEMENT WITH ARKANSAS WESTERN GAS COMPANY FOR RELOCATION OF GAS UTILITY FACILITIES ON ZION ROAD. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves an agreement with Arkansas Western Gas Company for relocation of gas utility facilities on Zion Road, a copy of which, marked Exhibit "A," is attached hereto and made a part hereof. PASSED and APPROVED this 20th day of November, 2007. APPROVED: ATTEST: By: By: DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer R11.21.07) Clarice Pearman - Arkansas Western Gas sy _Page 1 From: Clarice Pearman To: Petrie, Ron Date: 11.21.07 4:25 PM Subject: Arkansas Westem Gas Ron: The Gty Council passed a resolution regarding an agreement for relocation of utility facilities with Arkansas Westem Gas. However I do not have a signed agreement from AWG. Please let me know when I might expect to receive a signed agreement. Have a good day. Thanks. Clarice 1(11.26.07) Clarice Pearman - RE: Fwd: Arkansas Westem Gas Pa e 11 From: Clarice Pearman To: Smith, Sondra Date: 11.26.07 1:50 PM Subject: RE: Fwd• Arkansas Westem Gas Sondra: I sent Ron Petrie an email regarding signed agreements from AWG. Please see the email regarding signatures for the Arkansas Westem Gas Item. Please let me know how you want to deal with this item. Have a good day. Thanks. Clarice »> "James F. Koch" <james KochaSWN.COM> 11.26.07 1:08 PM »> Ron, Thanks! We cannot sign the agreement until we have the two agreements signed by the Mayor. Once we have these documents executed by the City, our Senior Vice President will sign and we'll return an original for the City's records. Just let me know how I can help! J. Koch (479) 530-7372 -----Original Message ----- From: Ron Petrie Jmailto:Roetrie@c!.favetteville.ar,usl Sent: Monday, November 26, 2007 11:47 AM Central Standard Time To: James F. Koch Subject: Fwd: Arkansas Western Gas James, Please see attached e-mail from the City Clerk. The City Council approved the Zion Road agreement last week. Notice: This e-mail may contain privileged and/or confidential information and is intended only for the addressee. If you are not the addressee or the person responsible for delivering It to the addressee, you may not copy or distribute this communication to anyone else. If you received this communication in error, please notify us immediately by telephone or retum e-mail and promptly delete the original message from your system. (11.26.07) Clarice Pearman - RE: Fwd Arkansas Western Gas From: To: Date: Subject: Attachments: Sondra Smith Pearman, Clarice 11.26.07 3:11 PM RE: Fwd: Arkansas Western Gas Sondra Smith.vcf Give them the original signed agreements but keep a copy for our file. Also please make sure we get the original signed agreements back from AWG. Sondra E. Smith, CAMC CMC City Clerk/Treasurer City of Fayetteville 113 West Mountain Fayetteville, AR 72701 (479) 575-8323 ssmith@ci.fayetteville.ar.us »> Clarice Pearman 11/26/2007 1:50 PM »> Sondra: I sent Ron Petrie an email regarding signed agreements from AWG. Please see the email regarding signatures for the Arkansas Western Gas item. Please let me know how you want to deal with this item. Have a good day. Thanks. Clarice »> "James F. Koch" <James Koch@SWN.COM> 11.26.07 1:08 PM »> Ron, Thanks! We cannot sign the agreement until we have the two agreements signed by the Mayor. Once we have these documents executed by the City, our Senior Vice President will sign and we'll return an original for the City's records. Just let me know how I can help! J. Koch (479) 530-7372 Original Message ----- From: Ron Petrie fmailto:RoetrieCalci.favetteville.ar.usl Sent: Monday, November 26, 2007 11:47 AM Central Standard Time To: James F Koch Subject: Fwd: Arkansas Western Gas James, Please see attached a -mall from the City Clerk. The City Council approved the Zion Road agreement last week. Notice: This e-mail may contain privileged and/or confidential Information and is intended only for the addressee. If you are not the addressee or the person responsible for delivering it to the addressee, you may not copy or distribute this communication to anyone else. If you received this communication in error, please notify us Immediately by telephone or retum e-mail and promptly delete the original message from your system. ,age 1 G 1(11.28.07) Clarice Pearman - Res. 193-07 Paye From: Clarice Pearman To: Petrie, Ron Date: 11.28.07 11:15 AM Subject: Res. 193-07 Ron: I have forwarded to you two originals for the Arkansas Western Gas signatures. Please see that I get an original back to finish processing the resolution. Have a good day. Thanks. Clarke • 12.14.07 Clarice Pearman - Arkansas Westem Gas Pa. a 11 From: Clarice Pearman To: Petrie, Ron Date: 12.14.07 11:35 AM Subject: Arkansas Westem Gas Ron: Please let me know the status of the agreement with Arkansas Western Gas Co. It is getting to the end of the year and I would like to finish processing Res. 193-07. Thanks for your help. Have a good day. aarice AWG #26159 ARKANSAS WESTERN GAS COMPANY UTILITY CONSTRUCTION/RELOCATION AGREEMENT Property Developer: City of Fayetteville Address: 113 West Mountain Street Fayetteville, AR 72701 Job Location: Zion Road I , 1 1_ / THIS AGREEMENT, made and entered into this 02-0+k day of 1V0OLiYlka , 2007, by and between City of Fayetteville , acting by and through its duly authorized representative, hereinafter referred to as the "Developer," and ARKANSAS WESTERN GAS COMPANY, acting by and through its duly authorized representative, hereinafter referred to as the "Owner." WITNESSETH: WHEREAS, THE "Developer" proposes to make certain improvements at the location designation as shown above; and as part of the necessary work of such improvements, `Owner" must adjust or relocate certain of its existing facilities, and in connection with such adjustment, or relocation, "Developer" shall participate in the costs of such work to the extent herein agreed upon; and WHEREAS, the proposed improvement necessitates the adjustment and/or relocation of certain facilities of "Owner" as described in the following description of work. Install pipe with all necessary appurtenances to relocate for the proposed Zion Road improvements as planned and presented in the design plans provided by the City of Fayetteville. City of Fayetteville will reimburse 48.5% of the actual cost of all materials, contract labor, company labor, equipment hours including Engineering and Inspection costs to Arkansas Western Gas Company. And, such adjustment, relocation or construction being shown in detail in "Owner's" plans, sketches, estimate of cost, and specifications (when applicable) which are attached hereto and made a part hereof; and WHEREAS, the "Developer" desires to implement the herein described utility adjustments or relocations and approve the proposed utility construction of "Owner" by entering into an agi ecment with said "Owner." NOW, THEREFORE, IT IS HEREBY AGREED: 1. Where applicable hereunder by reason of new utility occupancy or crossing of "Developer's" property, "Developer" hereby grants to "Owner" a right-of-way license and permission to install and operate utility facilities on or across "Developer's" properties as shown on the approved plans or sketch maps attached hereto and made a part hereof, and to execute such easements or right-of-way grants as may be necessary to evidence and record such right of "Owner." Page 1 of 3 2. Where applicable hereunder by reason of new construction on existing utility rights of way, "Owner" hereby grants to "Developer" the right to use for his purposes the lands within the project limits on or across which "Owner" holds a valid property interest antedating "Developer's" nghts which were subsequently acquired in the same lands, and which property rights "Owner" shall retain so long as "Owner" (or "Owner's" successors or assigns) continues such use and occupancy and does not abandon, and thereby release, such property interest to "Developer" through facility removal in making said adjustments or by subsequent facility removal for "Owner's" convenience; and the "Developer" hereby agrees that "Owner," by granting said right and by said continued joint use and occupancy, does not waive any future claim for reimbursement for adjustment cost as may be eligible for reimbursement by reason of such prior property interest, nor does "Owner" waive any other legal or property right held under the Law or Constitution of the State or the United States. 3. In the event that future construction, reconstruction, expansion, relocation, rehabilitation, betterment, maintenance, or other work on the facilities owned and operated by either the "Developer" or the "Owner" in the area jointly occupied or used under either or both the above provisions of this Agreement will disturb, detrimentally affect, interfere, or be inconvenient to the facilities or responsibilities of either party, the parties hereto shall reach agreement in writing as to locations, extent, and methods of such work before the work is undertaken. In a case of emergency, and where immediate action is necessary for the protection of the public and to minimize damage to or loss of investment in the property of the "Developer" or the "Owner" either party hereto may, at its own responsibility and risk, make any necessary emergency repairs, and shall notify the other party hereto of such action as soon as practicable. 4. "Owner" shall inform "Developer," in writing, three days or more in advance of the date work is to be started, and shall keep the "Developer " informed of progress and activity related to the work being performed, and shall furnish written notice when the work is completed. 5. "Developer" agrees that the cost of the utility adjustment and/or construction provided for hereunder shall be paid to "Owner" as follows. "Owner" agrees that "Developer" will only pay actual cost of adjustment should actual cost be less than $ 47.500.00 . If actual cost exceeds $ 47.500.00 , the "Developer" will pay the actual cost. Exhibit "A" is cost estimate as submitted to City of Fayetteville. 6. "Owner" shall accept as full payment for work hereunder the amount developed or accumulated as eligible actual and related indirect costs in accordance with "Owner's" accounting procedure, which is the Uniform System of Accounts prescribed by the Arkansas Public Service Commission. "Owner" further agrees to retain said cost records and accounts for inspection and audit for a period of not less that one (1) year from the date of final payment. 7. "Owner" shall be responsible for any and all hazards to persons, property, and traffic, and shall save the "Developer" harmless in all respects from any and all losses, damages, or injuries caused by any negligent act or omisston by "Owner's" employees or agent performing work under this Agreement or future maintenance or servicing work on facilities constructed under this Agreement; and "Owner" shall, in completing said work, perform clean up and restoration of appearances of the work area including disposal of surplus materials and debris, so as not to leave the work area in an unsafe or unsightly condition. Page 2 of 3 8. If requested by "Owner" in writing, "Developer" shall make intermediate progress payments in amounts not exceeding ninety percent (90%) of eligible billed costs, and no more often than monthly intervals, for work hereunder upon receipt of statements in two (2) copies for periodic and unpaid costs, provided the herein estimated reimbursable amount is $2,000.00 or more, and that no such intermediate payment shall be construed as final settlement for any item included in any intermediate billing. 9. "Owner" shall, within six (6) months after completion of the adjustment and acceptance thereof by the "Developer," prepare and submit to "Developer" a detailed complete (including intermediate billings, if any) and final bill in two (2) copies and covering the total cost for the adjustment of"Owner's" facilities. 10. The "Developer," upon receiving from "Owner" the final billing documents complete as listed next above, shall pay "Owner" for the eligible actual cost, less all pnor payments, if any, for making the adjustments in "Owner's" facilities as agreed herein. "Developer" shall pay "Owner" within thirty (30) days after such billing documents are received. If "Developer" fails to pay within said time, the amount due shall bear interest at the rate of 10 percent per annum until paid. "Developer" shall have the right to inspect and audit the books of account of "Owner" during normal busmess hours of "Owner" at any time within the time limit set forth in Paragraph 6 to determine the correctness of "Owner's" billing. "Owner" agrees to refund any and all amounts paid in payments found in the audit to exceed the total amount eligible for work hereunder. 11. It is mutually agreed by the parties hereto that the provisions of this Agreement pertaining to relative property rights, right-of-way occupancy permission, access for servicing when applicable and joint use of nghts of way shall continue in full force and effect from the date of execution, and shall be perpetually binding upon each party's legal representatives, successors or assigns. 114 WITNESS WHEREOF, the parties hereto have caused this instrument to be executed in duplicate by their duly authorized representatives the date first herein above written. "OWNER" "DEVELOPER" ARKANSAS WESTERN GAS COMPANY City of Its: Senior Vice -President Attest: ettevil Its: Mayor Att Its: Secretary Its: City Clerk Page 3 of 3 -ARKANSAS WESTERN GAS COMPANY OPINION OF PROBABLE COST ,AWG JOB 126159 'Zion Road 'Fayetteville, AR _ ___ Item Quantity Unit Unit Pries - Total MATERU\LS 1 TY Plastic Pipe - Proposed 2 Y x 314- Plastic Service Tee 3 ':7 Tee Plastic : 4 : 7 Cap Plastic 5 [2- 90 -degree Plastic 8 2" Transition Fitting '- 7 !7x11/4 -Plastic Reducer r 8 t7 M odeless Riser 9 Y High Volume Tee ' 10 ;3/4" Plastic Pipe 11 11114" Transition Fitting_ 12 '3/4- Anodeless Riser 13 '314" Coupling 14 3/4" Continental Service Tee 15 ;Miscellaneous Fittings -t- CONTRACT CONTRACT LABOR 18 ;Install 7 Plastic Pipe 17 Directional Drll Y Plastic Pipe L - 'COMPANY LABOR 18 'Director of Construction 19 Superintendent 20 Inspector 21 Crew Leader 22Lineman ' 23 (Serviceman 24 Mileage __ ' 1.510....'--'- L.F. ' � $0.50 --------- 1751.96-- - 8 Each 55.36 142.88 8 - Each 54.00 I 532.00 2 Each 51.62 r T 1324 10 Each 54.00 - 540.00 2 Each - 7 510.51 - 521.02 4 1 Each 57.02 128.08 - 2 Each $4720 594.40 3 Each 552.67 l 5158.01 t 500 L.F.', 50.37 ~ 1 $185.00 1 Each 18.05 58.05 12 Each - 511.11 ' $133.32 12 Each 10.70 58.40 12 I Each 116.83 : 5201.96 Sub -Total 5 ! Lot l 1 515.00 575.00 - _ 51,783.34 Stores Expenses 15.0OX _---- - 1267.50 ._ . Total Materials Cost - - 52,050.81 1,510 L.F. : - 518.00 400 ' L.F. 525.00 Sub -Total: ..._. 527,180.00 510,000.00 $77,180.00 ': 40 Hours $35.50 $1.420.00 180 - Hours 529.75 . 55,355.00 180 l Hours - rt 524.25 54,365.00 180 - - Hours 521.10 53,798.00 180 Hours 520.00 i 53600.00_: 30 Hours 520.00 $600.00 2,000 Miles 50.565 : 51,130_00____ Sub -Total _ _ 529,268.00 ^ General Overhead • Payroll Overhead:...___ 48.9% - $9,911.05 _ _.._ W To ..._, 130.179.05 • ---------- -- j •EQUIPMENT _ ; 25_ !Tractor Backhoe 80 Hours _y 517.00 26 :2 -Ton Trudc & Trailer 80 - Hours E 517.00 ' 27 1n -Ton Pidcw 180 Hours 517.00 51.360.00 51,360.00 53,060.00 Sub-Totai:.._ ........... __ ..... 552780.00 Preliminary Engineering 1__ _ _ 55,000.00 -• 552000.00 TOTAL p.van=o. Covent Labor, C,=pwr Labor. el SR,w,,we2 W00% rh.w b, r,a,abe•rbel $80,189.89 OVERHEAD CHARGE: i- 15.0% --- TOTAL ESTIMATED OPINION OF PROBABLE COST TOTAL ESTIMATED REIMBURSEMENT by CITY OF FAYETTEVILLE' 48.51% TOTAL ESTIMATED COST TO ARKANSAS WESTERN GAS - 51.49% AHTD Reimbursement Calculation = 650 .LF. x 100 1,340 LF. 512,028.48 . 592,218.38 544,732.79 ___ $47,485.58: 48.51% • ARKANSAS WESTERN GAS COMPANY REIMBURSEMENT FACTOR Zion Road Improvements Fayetteville, AR AWG JOB #26159 Zion Road Right of Way Annexed In to the City of Fayetteville in September, 1961 PRIVATE RIGHT OF WAY 1 REIMBURSEABLE SIZE - YEAR - TYPE OF PIPE SHEET # SHEET # 2" 58W r 64W r 70W 2"76P 2"79W 2"98P TOTALS TOTALS 055-057 650 0 650 055-058 0 360 60 170 0 TOTALS 650 0 0 0 0 0 I 650 CITY RIGHT OF WAY 1 NON REIMBURSEABLE SIZE - YEAR - TYPE OF PIPE SHEET # 2" 58W 2" 64W T 70W 2"76P 279W 2" 981' TOTALS 055-057 0 055-058 0 360 60 170 100 690 TOTALS 0 0 360 60 170 100 690 REIMBURSEMENT PERCENTAGE FOOTAGE RETIRED ON PRIVATE R/W FOOTAGE RETIRED ON HIGHWAY R/W TOTAL FOOTAGE RETIRED 650 LF 690 LF 1340 48.51% (12.21.07) Clarice Pearman - Res. 193-07 From: To: Date: Subject: Attachments: Clarice Pearrnan Petrie, Ron 12.21.07 2:28 PM Res. 193-07 193-07 Arkansas Western Gas Co.pdf CC: Audit Ron: Attached is a copy of the above reference resolution passed by City Coundl, November 11, 2007. I appreciate your help getting the agreement signed. Please let me know if there Is anything else needed for this item. Have a happy holiday. Thanks. Clarice Page 1