HomeMy WebLinkAbout19-07 RESOLUTIONRESOLUTION NO. 19-07 A RESOLUTION AWARDING BID # 07-02 AND APPROVING A CONTRACT WITH WACHTER ELECTRIC IN THE AMOUNT OF $52,568.00 FOR THE INSTALLATION OF LIGHTING AT THE WALKER PARK BASKETBALL AND TENNIS COURTS; APPROVING A 15% PROJECT CONTINGENCY IN THE AMOUNT OF $7,885.00; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF $10,900.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #07-02 and approves a contract with Wachter Electric in the amount of $52,568.00 for the installation of fighting at the Walker Park Basketball and Tennis Courts Section 2. hereby approves Section 3. hereby approves That the City Council of the City of Fayetteville, Arkansas a 15% project contingency in the amount of $7,885.00. That the City Council of the City of Fayetteville, Arkansas a Budget Adjustment in the amount of $10,900.00. PASSED and APPROVED this 6th day of February, 2007. APPROVED: By: ATTEST: By: JatilA-e.- SONDRA SMITH, City Clerk/Treasurer CONTRACT a inarl THIS AGREEMENT, made and entered into on the ) day of datuary_ 2007, by and between _Wachter Electric_, herein called the Contractor, and the City of Fayetteville, Arkansas: WITNESSETH: That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville as follows: 1. That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Specifications and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Walker Park Tennis and Basketball Court Lighting, dated December 2006. Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond Payment Bond General Conditions Supplemental Conditions Specifications Drawings (See Sheet Index below) Sheet No. Description 1 Cover and Sheet Index 2 Site Plan and Details 3 Electrical Site Plan and Details That the City of Fayetteville hereby agrees to pay to the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid in lawful money of the United States, the amount of: $52,568.00_ 3. The Work will be completed and ready for final payment in accordance with the General Conditions within 60 days after the date when the Contract Time commences to run, as provided in the Notice to Proceed. 4. Liquidated Damages: The City of Fayetteville and Contractor recognize that time is of the essence of this Agreement and the City of Fayetteville will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay the City of Fayetteville Two Hundred FY062195 Walker Park Tennis and Basketball Court Lighting Section 00500 - 1 Dollars ($200.00) for each day that expires after the time specified in Paragraph 3 for completion and readiness for final payment. 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville. 6. That upon submission by the Contractor of evidence satisfactory to the City of Fayetteville that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the Contractor of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the City of Fayetteville, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement. until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the City of Fayetteville. 8. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 9. This contract will be interpreted and enforced according to the laws of the State of Arkansas.. 10. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the Contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. FY062195 Walker Park Tennis and Basketball Court Lighting Section 00500 - 2 • IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. � 1 f �+Pr..1/ �/ Jnr E. i.,J 1 1. ... CONTRACTOR I SEAL. WITNESSES: ATTEST: �,.`"RK%TRI."''�., City Clerk GE . eq zo. 'A: : FAYETTEVILLE • 5. 1#14/1,VTOA C;O.•. By J ii I P` j..3- t'\rkr .r Ar'KantKsA em..‘ Title By CITY OF FAYETTEVILLE, ARKANSAS OWNE Mayor Coody .FY062195 Walker Park Tennis and Basketball Court Lighting Section 00500 - 3 City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 2007 Department: Operations Division: Parks & Recreation Program: Parks Development Capital Date Requested 1/8/2007 Adjustment Number Project or Item Added/Increased: $10,900 is requested in the Park Improvements account in the Neighborhood Park Development project. t`/ Project or Item Deleted/Reduced: None. This adjustment is to recognize $10,900 in the Greenspace Fees SE revenue account. Justification of this Increase: Funding will be used for Walker Park Basketball and Tennis Court Lighting. Justification of this Decrease: The Parks & Recreation Advisory Board on January 8, 2007 approved $10,900 of greenspace fees to assist with this project. Increase Expense Budget (Decrease Revenue Budget) Account Name Account Number Amount Project Number Park improvements Account Name 2250 9255 5806 00 10,900 02013 6 Decrease Expense Budget (Increase Revenue Budget) Account Number Amount Greenspace Fees SE Project Number 2250 0925 4419 03 10,900 02013 6 Approval Signatures fequested By G/l Budget Manager f eta )/ Date A50 Date Department Director Date Finance & Interpa1 Services Director Date Mayor ate Budget Office Use Only Type: A B C E Posted to General Ledger Posted to Project Accounting Entered in Category Log Initial Date Initial Date Initial Date Connie Edmonston/David Wrigh Submitted By TL City of Fayetteville Staff Review Form City Council Agenda Items or Contracts 2/6/2007 City Council Meeting Date Parks & Recreation Division Action Required: Res /6 cialdkv Operations Department A resolution awarding Bid #07-02 to Wachter Electric, in the amount of $52,568 with a 15% project contingency of $7,885 for a total of $60,453; and approving a project budget adjustment in the amount of $10,900 recognizing greenspace revenue fees. 60,453.00 Cost of this request 2250.9255.5806.00 Account Number 02013.6 Project Number Budgeted Item 65,900.00 Walker Basketball/Tennis Lights Category / Project Budget Program Category / Project Name 3,595.00 Neighborhood Park Development Funds Used to Date Program / Project Category Name $ 62,305.00 Parks Development Capital Remaining Balance Fund Name Budget Adjustment Attached • reAte Departmenttor Date City Attorney Date d7 Finance and Internal Service Director Mayor -23-07 Date Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in Ci ClerkOffice Received in Mayor's Office Comments: City Council Meeting of February 6 CITY COUNCIL AGENDA MEMO To: Mayor Dan Coody and City Council Throe Gary Dumas, Operations Director y Connie Edmonston, Parks and Recreation DirectorC : From: David Wright, Recreation Superintendent Date: January 18, 2007 Subject: Walker Park Tennis / Basketball Court Lighting RECOMMENDATION Parks and Recreation Staff recommends that City Council approve a resolution awarding Bid 07-02 and approving contract with Wachter Electric in the amount of $52,568 with a 15% project contingency of $7,885 for a total project cost of $60,453 for the installation of lights at Walker Park Tennis and Basketball Courts. Also approve a budget adjustment in the amount of $10,900 recognizing Park Land Dedication Ordinance revenue fees. BACKGROUND Walker Park, a 64 acre park located at 10 W. 15th Street, has witnessed many improvements in the last several years. These improvements include a new mural, entry sign, walking trail and renovated tennis and basketball courts. The renovation of the basketball and tennis, along with other improvements, have increased the use of this park by Fayetteville residents. This increase in use, along with requests from citizens, caused the need for Parks and Recreation to install lighting at the basketball and tennis courts. DISCUSSION One of the recent improvements at Walker Park includes the renovation of the tennis and basketball courts. This renovation included resurfacing and stripling the courts; new • tennis fencing and nets; and new basketball goals and nets. Since the renovation, the use of this facility has increased. These recreation elements are used daily until dark. In 2005, the community requested lights be installed at this facility for evening play. Parks and Recreation -immediately responding by placing the project in the Capital Improvement Budget approved by Parks and Recreation Advisory Board and City Council in December 2005. Four bids were received. Parks and Recreation Staff recommends giving the bid to the lowest bidder, Wachter Electric. The lights that Wachter Electric will install include a horizontal lens with spill/glare optics and visor, meeting all the requirements of the Fayetteville Lighting Ordinance. The fixture's bulb has an internal and external visor directing light onto the court(s) and away from neighboring properties. The lights will feature a timer, much like the tennis lights at Wilson Park, where they will not have the ability to be on past the time the park closes at 11:OOpm. The difference in this timer and the ones at Wilson Park is a device that people can tum on the lights for use. This means that when nobody is using the courts, the lights will not turn on. City Council Meeting of February 6 This project was first bid in July 2006. However the lowest bid submitted was $74,858. Parks and Recreation Staff worked with Purchasing to complete this project within its respective budget. After looking at many options; McClelland Engineers was hired to re- write the specifications. . BUDGET .IMPACT The original contract for this project is $52,568, with a 15% project contingency of $7,885 for a total cost of $60,453. This money is being funded through the Park Development Fund and the Park Land Dedication Ordinance Fund. Attachments: Contract with Wachter Electric Budget Adjustment Bid Tabulation RESOLUTION NO. A RESOLUTION AWARDING BID #07-02 AND APPROVING A CONTRACT WITH WACHTER ELECTRIC IN THE AMOUNT OF $52,568.00 FOR THE INSTALLATION OF LIGHTING AT THE WALKER PARK BASKETBALL AND TENNIS COURTS; APPROVING A 15% PROJECT CONTINGENCY IN THE AMOUNT OF $7,885.00; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF $10,900.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #07-02 and approves a contract with Wachter Electr,� tic,� the amount of $52,568 00 for the installation of lighting at the Walken Pa BAasketball and Tennis Courts. Section 2. That the City Council of the i 7 .f Fayetteville] \rkansas hereby approves a 15% project contingency in the amount of/ 7,885.00 Section 3. That the City Cou cJI hereby approves a u get^Adjustment n t of Fa>ettevilleArkansas $10,900.00 PASSED andAPPROVED this;6t1 da By 0 ATTEST: ary, 2007. By: SONDRA SMITH, City Clerk/Treasurer (2.8.07 Clarice Pearman - Wachter Electric Page ) From: Clarice Pearman To: Edmonston, Connie' Wright, David Date: 2.8.07 11:37 AM Subject: Wachter Electric David/Connie: The City Council passed a resolution approving a contract with Wachter Electric. In preparing the resolution for signature I noticed that your budget adjustment does not have complete signatures before I can get the mayor's signature. The Department Head and Finance Director signature are needed before I get the mayor to sign the resolution and budget adjustment. Please come by and obtain these signature so that we can continue processing the resolution. Have a good day. Thanks. Clarice Clarice Buffalohead-Pearman, CMC City Clerk/Treasurer Division 113 West Mountain Fayetteville, AR 72701 479-575-8309 cpearman@ci.fayetteville.ar.us • 2 0 P.1 m n a 0 Q m C O co 6 O 3 m m t m 3 5 3 N R n 0 O 0 O w 1 0 0 0 3 'G Multi-Craft Contractors, Inc. Finance & Internal Services Director: Budget Manager: IT Manager: Dispatch Manager: Utilities Manager: Other: „7m7 'O 0 CO -4 Cl N a W N Requester: David Wright _. Address: $ City Of Fayetteville (Not a Purchase Order) i 1i !A co N 2.R PI 7 m a. CD Installation of Lights at Walker Park 1 Description c 0) q IVendor Name " '� �' ,: _.. •eWedhter.Electric. -.. i .. ,;�,: 5 ea Unit of Issue cnET m 52,568.00 Unit Cost a co N N m m O O Extended Cost 2250.9255.5806.00 Account Numbers Requester's Employee #: 707 Zip Code: Ship to code: 75 Fob Point: Subtotal: $52,568.00 Tax: $4,862.54 Total: $57,430.54 tO ProjecUSubproject # Requisition No.: Date: 411212006 N.0 Number: Expected Delivery Uate: Mail 'Yes:_ No:_x_ Taxable Quotes Attached Yes: No: Yes: No: Divis// 0cMo Head Approval: (.22/(%[ Qi 4 r Exte ion: 481 'Inventory # (Fixed Asset # (2.14.07) Clarice Pearman - Res. 19-07 From: To: Date: Subject: Attachments: CC: Connie/David: Attached is a copy of the above resolution passed by City Council, February 6, 2007 regarding Wachter Electric. I will forward to you via interoffice mail two of three original agreements. Also, your original budget adjustment will be forward to Budget & Research and the purchase requisition will be forwarded to Purchasing Division. Have a good day. Thanks. Clarice • Clarice Pearman Edmonston, Connie; Wright, David 2.14.07 1:31 PM Res. 19-07 19-07 Wachter Electric.pdf Audit; Fell, Barbara; Vice, Peggy Clarice Buffalohead-Pearman, CMC City Clerk/Treasurer Division 113 West Mountain Fayetteville, AR 72701 479-575-8309 cpearman@ci.fayetteville.ar.us Connie Edmonston Submitted By City of Fayetteville Staff Review Form City Council Agenda Items Contracts n/a City Council Meeting Date Parks and Recreation Division Action Required: Operations Department Approving Change Order #1 - for Walker Park Tennis / Basketball Court Lighting Project, in the amount of $2,300 allowing for the installation of Musco's Green Structure Lights. $2,300.00 Cost of this request 2250.9255.5806.00 Account Number 02013.6 Project Number Budgeted Item 65,900.00 Category/Project Budget 4,227.00 Funds Used to Date 61,673.00 Remaining Balance Budget Adjustment Attached Walker Basketball/Tennis Lights Program Category / Project Name Neighborhood Park Development Program / Project Category Name Parks Development Capital Fund Name • Department a 'rector s4. City Attorne 2.20' O7 Date 74 2-21—°-7 Finance and Internal Service Director 4 Mayor Comments: Date 2-4.5767 Date Previous Ordinance or Resolution # Original Contract Date. Original Contract Number: Received in City `ao e 19 Received in Mayor's Office tia-}nWiea. PARKS & RECREATION 1455 S. Happy Hollow Road Fayetteville, AR 72701 To: Mayor Dan Coody and City Council Thru: Gary Dumas, Operations Director Connie Edmonston, Parks and Recreation Director From: 't David Wright, Recreation Superintendent Date: February 12, 2007 Subject: Walker Park Tennis / Basketball Court Lighting — Change Order 1 RECOMMENDATION Parks and Recreation Staff recommends approving Change Order #1 for Walker Park Tennis / Basketball Court Lighting Project, in the amount of $2,300, allowing for the installation of Musco's Green Structure Lights. BACKGROUND Walker Park, a 64 acre park located at 10 W 15th Street, has witnessed many improvements in the last several years. These improvements include a new mural, entry sign, walking trail and renovated tennis and basketball courts. The renovation of the basketball and tennis, along with other improvements, have increased the use of this park by Fayetteville residents. This increase in use, along with requests from citizens, caused the need for Parks and Recreation to install lighting at the basketball and tennis courts. When this project first bid in Summer 2006, the specifications indicated Musco Green Structure Lights to be installed. This particular structure provides more than 50% of energy savings over standard lighting structures and has 50% less spill and glare. However, when bids were submitted the cost of the project was more than $25,000 over the project budget. After meeting with several different contractors and discussing different options, Parks and Recreation decided re -write the specifications allowing bidders to submit lights from other manufacturers. Wachter Electric was the low bidder at $52,568. After the bid was awarded, Wachter Electric brought to Parks and Recreation Staff the option of upgrading the submitted Hubbel Lights to the Musco Green Structure Lights. The additional cost is only $2,300 more than the original contract price and will provide the City an upgrade in lighting features as well as a more energy efficient light. DISCUSSION The Musco Green Strucutre Lights are generally known as one of the best products in sports lighting. As stated before, the Tight reduces spill and glare by as much as 50%, meaning the neighbors of the park should not notice any difference with the new lighting around the courts. Most importantly, these lights provide more than 50% energy savings when compared to other sport lighting fixtures. Estimates say the City of Fayetteville should save more than $2,500 on an annual basis in utility costs In addition, the Musco light provide a 10 year warraranty, compared to a 7 year warranty with the Hubbell lighting fixtures. BUDGET IMPACT The onginal contract for this project is $52,568, with a 15% project contingency of $7,885 for a total cost of $60,453. This was the amount approved in Resolution 19-07. The $2,300 increase in this cost is within the project contingency. Attachments: Change Order Form Contract with Wachter Electric Musco Bill of Material Resolution 19-07 01/18/2007 12:28 4053212423 MUSCO SOUTH REGION 0000 m Musco Lighting Oklahoma 201 Ridge Lake Blvd Norman, Oklahoma 73071 Facsimile Transmittal To: David Johnson Wachter Electric From; Mike Cook PAGE 01 Local : 405-321-2886 Toll Free: 1-888-966-8726 Fax 405-321-2423 Phone; 479-751-3600 PaRasp including cover :me 479-927-4843 Date: January 18, 2007 Re: Walker Park TE & 8K ec David, I have attached a copy of the quote that we talked about Delivery to the Job Site; 4 Weeks or less from the release of the order I have put a packet of information together and will be mailing it out today. Hopefully, you should receive it on Friday. If you have any questions or need any additional information, please call. ank you for considering Musco for your sports -lighting needs. ike 1 • 01/18/2007 12:28 4053212423 Existing SNI Condaions prestressed Concrete Base MUSCO SOUTH REGION DlamelmH Hofer PAGE 02 Welker Park Tennt&Basketball Repreeentative: Mike Cook pretied #: 110041 If (Drawing tint to state) NOTE: Foundation design based on assumed soil conditions of Class 5 Material per IBC 2000/2003 Edition, Chapter 18, Section 1804 S 1806, Table 1804.2. Concrete backfill must have a minimum compressive strength of 3000 psi alter 28 days. •Weight of steel polo and fixtures. COPVRklin (C) MUSCOt1GHTUla, INF IPA 11el WSW repmd ueed M wild, or part MtlpJtMlpen anent at Mime Light*. be Pole Locative 11 Fixtures per Polo Base Weight Hole Dlamoter Book rill Quantity Burial. Depth Dressed Pole Weight* Bl, Tl -T4 2 1030 30" 1.3yds 8' t393Ibs •Weight of steel polo and fixtures. COPVRklin (C) MUSCOt1GHTUla, INF IPA 11el WSW repmd ueed M wild, or part MtlpJtMlpen anent at Mime Light*. be 81/18/2007 12:28 4653212423 MUSCO SOUTH REGION PAGE 03 Walker Park TE/BK Courts Fayetteville, AR Date: Jan 18, 2007 To: David Johnson Equipment Description Light Structure Greenm System delivered to your site in Five Easy Plecesw • 5 - Pre -cast concrete bases • 5 - 40' MH Galvanized steel poles • 5 - UL Listed remote electrical component enclosures • 5 - Pole length wire harness • 10 -1500 Watt Metal Halide Factory -aimed and assembled luminaries • Arkansas Stamped Structural Design by Licensed Structural Engineer Also Includes: • Energy savings of more than 5O% over standard lighting system • 50% less spill and glare Tight than Musco's prior industry leading technology • 10 -Year warranty including ten years parts, two years labor. Lamps are warranted for two years, with the first year Including lamps and labor, and the second year lamps only Musco Is not providing: • The Photo Electric Switch • GEC! Receptacle • Push Button SW • Any signage • Contactor Cabinet Sales tax, labor, and unloading of the equipment is not Included as part of this quote. Pricing furnished is effective for 60 days unless otherwise noted and is considered confidential. Divulging technical or prtcng information to competitive vendors will insult in removal from the bld list 1 • 01/18/2007 12:28 4053212423 Payment Terms MUSCO SOUTH REGION PAGE 04 Payment of 25% of the contract price Is required with order, The contract balance is due no later than 30 days alter invoice date. Late payment will be subject to service charges of 1 Ya% per month (18% APR). Musco will attempt to coordinate shipment so that delivery corresponds with the customer's payment schedule. It will be the responsibility of the whotesater to ensure that Musco Is aware of this delivery timeframe. We will expect payment within the terns described above unless them is a written statement from Musco's corporate headquarters stating the acceptance of different terms. Delivery to the fob Site from the lime of order, submittal approval, and confirmation of order details Including voltage and phase, pole locations is approximately 90 days. Due to the built-in custom light control per luminaire, pole locations need to be confined prior to production. Changes to pole locations atter the product Is sent to production could result in additional charges. Notes Quote is based on: • Shipment of entire project together to orte location • Field size of 181' x 114' for tennis and basketball • 240 Volt, single Phase electrical system requirement • Structural code and wind speed = 2003, IBC, 90 MPH Exposure C. • Confirmation of pole locations prior to production Thank you for considering Musco for your sports-Ilghting needs, Please contact me with any questions. ^1Obek- Mike Cook Field Sales Representative Museo Sports Lighting Phone: 1-808-966.8726 Fax: 405421-2423 Cell: 405-834-0633 E-mail: mlke.cook@musco.com Welker Park. TE & BK Page 2 o2 .41 01/18/2007 12:28 4053212423 MLISCO SOUTH REGION PAGE 05 Light•Stafiure unequaled performance .. for your budget, for the environment. New Technology • Guts operating costs in half • Reduces spill IIght by 50% • Includes system monitoring and remote on/off control services • Provides constant light levels Same 5 Easy Pieces'" • Complete system from foundation-to-poletap • Factory wired, aimed and tested • Fast, trouble-free installation • Comprehensive corrosion package Now covered by 9 To„uazs~ 25 -Year Warranty & Maintenance Program Provides 25 years of trouble-free lighting equipment operation, including parts, labor and group lamp replacement We Make It Happen. 800/825-6030 www.musco.com e-mail: lighting@musco.com lama eiNetmknaW a ana.nm pmpCpe try amprmem d the' oltimrp us Palm= u557p1:.ite3: .7a'85771 'MEM 43473C1:465171m 50755a 5154551; 5151PAZQI KM rite0115377511:$a1E:523711:612CT7eC 37;57011it $200,45:5aWI: warn Martexam; =on Oma: 2110311.:90111 m41ii237$/®R•91 EFL 4iC1.. 'vl� 1p1 M.atm pa p.6.•�01t 7A15ata:.'V58Zfiy 1. Paletop Luminaire Assembly 2. Wire Homos= 3. Galvanized Steel Pale 4. Electrical Components Enclosure 5 Precast ConereteBase All you odd Is: • Grounding rod and connection to system grounding lug • Concrete backfill • Underground wiring • Service entrance 01585, 2005 Mtmco Ugltrq • &210.1 J • 01/18/2007 12:28 4053212423 Light•Strructure resse-aekii, Ulanq hole Horizontal des Prestressed steel cables MUSCO SOUTH REGION Steel reinforce gam Condudadapler plate PAGE 06 Pre -cast Concrete Base W7reway Top tapers dawmca,d to hollow center Epogl coadng on end Tapered eppersenion for sIip•fit wflh steel pole FWdhole, above grade amend lino (grade) Access hole, below grade 6keM ;mos Name MOSgmte Frowned by aro erMelddv (dining Ue.P a115Ret:227/5®e 02017:481116t OI6a7tael7:et 11e1714 53173q 5041®: 5134557;5161010: 6 110a:=Mat SV1611; MUM; mat 612697:33at51; 37071425291aai' 5801044®t®1;66®21; 7MCC*37*1 w%5 T125038%03011%8tl�:8681046®1512a 2llyd[Issue Mint: 8611.Htlni enksa 281 1: 0477; ?WAtaN; 11474 m®u42�: 2¢0032c +.1auta Mt 211Wt/:'2201E6:256511;221$15125787Z MUIR WC PlattAC671: OWL Gmmry?Mr 695170.5.12c6M Pant 1766®;101m5.77nnatad Parc 33M153W1136.8W41bM Pkd2:1 U?.. Oft fret refit. 0a005 Mum • Stan We Make It Happen. 800/825-6030 www.rnusco.com lightlng@musco.com RESOLUTION NO. 19-07 A RESOLUTION AWARDING BID # 07-02 AND APPROVING A CONTRACT WITH WACHTER ELECTRIC IN THE AMOUNT OF $52,568.00 FOR THE INSTALLATION OF LIGHTING AT THE WALKER PARK BASKETBALL AND TENNIS COURTS; APPROVING A 15% PROJECT CONTINGENCY IN THE AMOUNT OF $7,885.00; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF $10,900.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #07-02 and approves a contract with Wachter Electric in the amount of $52,568.00 for the installation of lighting at the Walker Park Basketball and Tennis Courts. Section 2. That the City Council of the City of Fayetteville, hereby approves a 15% project contingency in the amount of $7,885.00. Section 3. That the City Council of the City of Fayetteville, hereby approves a Budget Adjustment in the amount of $10,900.00. PASSED and APPROVED this 6e day of February, 2007. APPROVED: ATTEST: By:d/. ���� �/ By AN COO Y, May, 1 Arkansas Arkansas �> e'a\TY Oc' p U• • �- : FAYETTEVILLE • :9sy9nKatJSG•`5 4 SONDRA SMITH, City Clerk/Treasurer CONTRACT THIS AGREEMENT, made and entered into on the day of � r ' 2007, by and between _Wachter Electric, herein called the Contractor, and the City of Fayetteville, Arkansas: WITNESSETH: That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville as follows: 1. That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Specifications and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Walker Park Tennis and Basketball Court Lighting, dated December 2006. Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond Payment Bond General Conditions Supplemental Conditions Specifications Drawings (See Sheet Index below) Sheet No. Description 1 Cover and Sheet Index 2 Site Plan and Details 3 Electrical Site Plan and Details 2. That the City of Fayetteville hereby agrees to pay to.the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid in lawful money of the United States, the amount of: _$52,568.00_ 3. The Work will be completed and ready for final payment in accordance with the General Conditions within 60 days after the date when the Contract Time commences to run, as provided in the Notice to Proceed. 4. Liquidated Damages: The City of Fayetteville and Contractor recognize that time is of the essence of this Agreement and the City of Fayetteville will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay the City of Fayetteville Two Hundred FY062195 Walker Park Tennis and Basketball Court Lighting Section 00500 - 1 Dollars ($200.00) for each day that expires after the time specified in Paragraph 3 for completion and readiness for final payment. i. That within 30 days of receipt of an approved payment request, the City of Fayetteville shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville. 5. That upon submission by the Contractor of evidence satisfactory to the City of Fayetteville that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the . Contractor of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the City of Fayetteville, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the City of Fayetteville. 8. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 9. This contract will be interpreted and enforced according to the • Laws of the State of Arkansas... 10. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the Contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. FY062195 Walker Park Tennis and Basketball Court Lighting Section 00500 - 2 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof' or accounting for the other counterpart be deemed an original Contract. t JC- . �I U �t n4l�T�nr �LeirI1_ � CONTRACTOR SEAL: WITNESSES: ATTEST: City Clerk • By Pra6kJ- I"\qn.1'.r /�rkcvns.a D .:5 Title CITY OF FAYEI-t'EVILLE, ARKANSAS OWNE Mayor Coody .FY. 062195 Walker Park Tennis and Basketball Court Lighting Section 00500 - 3 CHANGE ORDER Order No. Date: 1 February 8, 2007 Agreement Date: February 8, 2007 NAME OF PROJECT: WALKER PARK TENNIS & BASKETBALL COURT LIGHTING OWNER: CITY OF FAYETTEVILLE PARKS & RECREATION CONTRACTOR: WACHTER ELECTRIC COMPANY The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Install Musco Lighting System Justification: 1. At request of Owner. Add cost of $ 2,300.00 to contract. Change to CONTRACT PRICE. Original CONTRACT PRICE: $ 52,568.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDERS: $ 52,568.00 The CONTRACT PRICE due to this CHANGE ORDER will be (increased) (decreased) by: $ 2,300.00 The new CONTRACT PRICE including this CHANGE ORDER will be: $ 54,868.00 Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (decreased) by: 0 calendar days. Approvals Required: To be effective this Order must be approved by the Owner if it changes the scope or objective or the PROJECT, or as may otherwise be required by the GENERAL CONDITIONS. Requested by: acchter Electric Company Recommended by: � Mc IIffin. Approved by:��l. Dan ►.ody Mayor, of ayetteville Date 414- /07 ate C:\Documents and Settings\rmoser\Local Settings\Temporary Internet Files\OLK61\Walker Park Lighting - Change Order 1 doc Date Patti (2.27.07) Clarice Pearman - Wachter Electric From: To: Date: Subject: Attachments: Clarice Pearman Edmonston, Connie 2.27.07 12:22 PM Wachter Electric 02.23.07 Wachter Electric CO1.pdf CC: Audit Connie: Attached is a copy of Change Order No. 1 for Wachter Electric regarding the park lighting projects. I will forward to you two of three original change order via Interoffice mail. Please let me know if anything else is needed. Thanks. Clarice Clarice Buffalohead-Pearman, CMC City Clerk/Treasurer Division 113 West Mountain Fayetteville, AR 72701 479-575-8309 cpearman@ci.fayetteville.ar.us