HomeMy WebLinkAbout158-07 RESOLUTION ARCHIVED
RESOLUTION NO. 158-07
A RESOLUTION APPROVING A CONSTRUCTION CONTRACT
WITH GARNEY COMPANIES, INC. IN THE AMOUNT OF
$1,393,880.00 FOR THE REPLACEMENT OF THE 2.6 mgd MALLY
WAGNON LIFT STATION AND 16-INCH FORCE MAIN, WSIP
SUBPROJECT EL-1; AND APPROVING A 8% CONTINGENCY IN
THE AMOUNT OF $110,000.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves a Construction Contract with Garney Companies, Inc. in the
amount of $1,393,880.00 for the replacement of the 2.6 mgd Mally Wagnon Lift
Station and 16-inch force main, WSIP Subproject EL-1. A copy of the contract, `"
marked Exhibit"A," is attached hereto and made a part hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby approves a 8% contingency in the amount of$110,000.00. `���,,,�RWTR ��o,
a.
PASSED and APPROVED this 4w day of September, 2007. 1%-s,‘
•• �VSY OF SGp '
=U• •13;
APPROVED •
ATTEST: 'c ;5 „.•FAYETTEVILLE'
By: a—
„K. .,
--,-57,,,„Ams,...,-/, -.,„/„,.••••.,,0 „,
By: G/1 �iGT.0 ''''
''''
DAN COODY, Mayor , SONDRA E. SMITH,City Clerk/Treasurer
esse
sea
DIVISION 1
. GENERAL REQUIREMENTS
• v
SECTION 01785—WARRANTIES (continued)
PART 3 - EXECUTION
NOT USED •
END OF SECTION 01785
•
•
01785-Warranties.doc _01785-3 Garver Project No.0605-1300(1)
•
DIVISION 2
SITE CONSTRUCTION
DIVISION 3
CONCRETE
DIVISION 5
METALS
DIVISION 9
FINISHES
DIVISION 11
EQUIPMENT
DIVISION 16
ELECTRICAL
(.s is-8-07-
ARCHIVED
s8-o }ARCHIVED
sl. . . City of Fayetteville, Arkansas
1: E { Water and Wastewater Department
, •
. . . : „...„ . .. : . . ...„ ... .. .
h'.
David Jurgens,Director
. . . . . . . . y' A;RKA:NSAS .:
PROJECT MANUAL
FOR
a
CONSTRUCTION CONTRACT NUMBERS EL-1 & EL-2
FAYETTEVILLE WASTEWATER SYSTEM
IMPROVEMENT PROJECT
June 2007
ENGINEER OWNER
City of Fayetteville
Garver Engineers LLC Water and Wastewater
1088 East Millsap Road Department
Fayetteville, AR 72703 113 West Mountain Street
Fayetteville, Arkansas 72701
•
CONSOLIDATED FINANCIAL STATEMENTS
._I
_1
--)
.,
1
SUPPLEMENTAL INFORMATION
J
-J
DIVISION 1
GENERAL REQUIREMENTS
SECTION 01785—WARRANTIES (continued)
PART 3 - EXECUTION
NOT USED
END OF SECTION 01785
01785-Warranties.doc 01785—3 Garver Project No.0605-1300(1)
DIVISION 2
SITE. CONSTRUCTION
DIVISION 3
CONCRETE
DIVISION 5
METALS
- I
DIVISION 9
FINISHES
SECTION 09961 —EXTERIOR COATINGS (continued)
1.5 OUALITY ASSURANCE
A. Manufacturer's Qualifications:
1. Specialize in manufacture of coatings with a minimum of 10 years successful
experience.
2. Able to demonstrate successful performance on comparable projects.
B. Applicator's Qualifications:
1. Experienced in application of specified coatings for a minimum of 5 years on
projects of similar size and complexity to this Work.
C. Pre-Installation Conference: Prior to beginning exterior coating operations, a meeting
will be held with Contractor,coating sub-contractor,Engineer,Owner's
representative, and coating manufacturer's representative to verify and review the
following:
1. Project requirements for coating as set out in Contract Documents.
2. Manufacturer's product data including application instructions.
3. Substrate conditions and procedures for substrate preparation and coating
installation.Applicator shall be familiar with the overall condition of
structures to be coated prior to the conference.
D. Technical Consultation: The coating manufacturer's representative shall provide
technical consultation on coating application.
1.7 DELIVERY, STORAGE AND HANDLING
A. Delivery: Deliver materials to site in manufacturer's original,unopened containers
and packaging, with labels clearly identifying:
1. Coating or material name.
2. Manufacturer.
3. Color name and number.
4. Batch or lot number.
5. Date of manufacture.
6. Mixing and thinning instructions.
B. Storage:
1. Store materials in a clean dry area away from open flame, heat, and strong
oxidants. Store materials within temperature range as recommended by
manufacturer.
• 2. Keep containers sealed until ready for use.
3. Do not use materials beyond manufacturer's shelf life limits.
C. Handling: Protect materials during handling and application to prevent damage or
contamination. Handle materials according to their material safety data sheets.
09961-Exterior Coatings 09961-2 Garver Project No.0605-1300(1)
DIVISION 15
MECHANICAL
DIVISION 16
ELECTRICAL
SECTION 16120 - WIRES AND CABLES (continued)
Q. For high-temperature fixture connections for fixtures rated 300 volts and below, provide
Type AF indoors and Type XF in any location not smaller than No. 12 AWG.
R. For Class 1 (120-volt control) remote control and signal circuits provide single or multiple
conductor cable. For single conductor cable, provide 600 volt, Type THWN/THHN
conductors. For multiple conductor cable, provide UL listed Type TC 600V 90°C cable
with ethylene propylene/chlorinated polyethylene composite insulation on the single
conductors and chlorinated polyethylene overall jacket. Furnish individual conductors not
smaller than No. 14 AWG.
S. For Class 2 (instrumentation) remote control and signal circuit provide single or multiple
conductor cable. Furnish UL listed Type TC 600V 90°C single or multiple twisted pair or
twisted triad cable with PVC insulation on the single conductors; with double faced
aluminum/synthetic polymer backed 100% coverage overlapped shield and stranded tinned
copper drain wire for each pair or triad; with overall PVC jacket. Furnish conductors not
smaller than No. 16 AWG.
2.3 CONNECTORS FOR CONDUCTOR
A. Provide UL-listed factory-fabricated, 75°C AL/CU solderless metal connectors of sizes,
ampacity ratings, materials, types and classes for applications and for services indicated.
Use connectors with temperature ratings equal to or greater than those of the wires upon
which used.
2.4 MINI POWER CENTER(TRANSFORMER/PANELBOARD COMBINATION)
A. Provide a complete transformer/panelboard combination panel. Transformer shall be
copper wound, 115°C rise, and epoxy-resin encapsulated. The panel section shall utilize
copper bus and bolt on circuit breakers. The combination panel shall be furnished with
factory installed primary and secondary main circuit breakers. Populate panelboard with
quantity of circuit breakers as required by load plus 6 additional spare circuits.
•
PART 3-EXECUTION
3.1 WIRING METHOD
A. Use the following wiring methods as indicated:
1. Wire: Install all wire in raceway.
2. For all underground or underfloor feeders: Install Service Entrance Conductor Type
"RHH/RHW/USE."
B. All conductors shall be continuous from origin to panel or equipment termination without
splices. Where splices and taps are indicated in the drawings, they shall be made in splice
boxes.
16120-Wires and Cables 16120-5 Garver Project No.0605-1300(1)
SECTION 16195 - ELECTRICAL IDENTIFICATION (continued)
with explicit description and identification of items controlled by each individual breaker.
K. Install labels at locations indicated and at locations for best convenience of viewing without
interference with operation and maintenance of equipment.
3.2 MEASUREMENT AND PAYMENT—The items of this section will not be measured for
separate payment but will be subsidiary to the lump price bid for the associated item.
END OF SECTION 16195 •
L
16195-Electrical Identification 16195-5 Garver Project No.0605-1300(1)
SECTION 16426 -TRANSIENT VOLTAGE SURGE SUPPRESSORS (continued)
•
2. The Contractor shall install an approved system and follow the
manufacturer's written installation instructions. The TVSS shall be installed
and connected to minimize lead lengths. The installation shall comply with
NEC Article 285 "Transient Voltage Surge Suppressors: TVSSs". Power
system TVSS shall be provided with a disconnecting means capable of
disconnecting the TVSS from the power system without interrupting the
electric service.
3. All TVSS equipment shall be UL 1449 SECOND EDITION LISTED and
tested to the industry standards, ANSI/IEEE C62.41-1991, C62.45-1992.
The TVSS system shall have a configuration similar to the following with
adequate surge suppression characteristics.
C. Medium Exposure Level Protection: Provide a TVSS on the service entrance
switchboards and main distribution panelboard as shown in the plans. Provide a
TVSS of adequate size and type for electric service entrance protection. The TVSS
shall be UL 1449 Second Edition listed, have a display counter, have pilot lights
indicating operational and trouble conditions,and have dry contacts to indicate alarm
status.The TVSS shall have the following characteristics:
Application 277/480 V rms, 3 Phase, Wye,4 Wire+Ground,
Enclosure NEMA 4X Stainless Steel Metal Enclosure or
Composite Enclosure with Integral Fused Disconnect
Wire #2 AWG Minimum
Maximum Continuous 320 V rms Line-Neutral
Operating Voltage MCOV 640 V rms Line-Line •
Input Power Frequency 60 Hz
Peak Surge Current 150,000 Amperes Per Mode, (8x20 ps Waveform,
Single Impulse)
Life Cycle Test 1,000 Hits Minimum at CAT. C3, 20kV, lokA, without
failing or degrading the UL 1449 rating more than 10%
EMI/RFI Filter Equipped,UL 1283 Listed
Protection Normal Mode(Line-Line, Line-Neutral)
Common Mode (Line-Ground, Neutral-Ground)
All Modes Protection Required, Bi-directional,
Positive&Negative Impulses
Let-Through Voltage CAT Cl-Impulse, 6,000V, 3,000A: 800 Vpk Maximum
(Line-Neutral)
CAT C3-Impulse, 20,000V, 10,000A: 950 Vpk
Maximum(Line-Neutral)
UL 1449 Suppression Voltage 800 Volts Maximum, Line-Neutral,Test Category Cl
Level
D. General: Except as otherwise indicated,provide TVSSs and ancillary components of
types, sizes, characteristics, and ratings indicated, which comply with manufacturer's
standard design, materials, components, and construction in accordance with
16426-Transient Voltage Surge Suppressors 16426-3 Garver Project No.0605-13000)
USS
City of Fayetteville /OM
Staff Review Form
City Council Agenda Items U
or /1 n ,/
Contracts (/ie „��/�q/�'G�. t!!ir��/l-t
tri
II N/A- Mayor's Approval I c�r(r
• City Council Meeting Date A R C H I V E D api
David Jurgens Wastewater System Impry Project Water/Wastewater
Submitted By Division Department
Action Required:
Approval of no cost Change Order Number 1 to the construction contract with Garney Construction for WSIP
Subproject EL-1.
$0.00 $ 110,000 Wastewater System Imp Project
Cost of this request Category/Project Budget Program Category/Project Name
4520.9520.5315.00 $ - Water and Wastewater
Account Number Funds Used to Date Program/Project Category Name
02133.0311 $ 110,000 Water/Sewer
Project Number Remaining Balance Fund Name
Bdgeted Item XX Budget Adjustment Attached
IDepa °I Ate DI T/ � "7
Previous Ordinance or Resolution# 158-07
rector Date Original Contract Date: 9/4/2007
Original Contract Number: 2007
et
ar
City Attorney Da
Received in City Clerk's Offi
4ow.A a - LSS 4-4"08 % 7 OA .lma-C' •
Finance and Internal Service Director Date
Received in Mayor's Office
ki."�
Dl'
edgh—
Mayor Date
ic.
Comments: