Loading...
HomeMy WebLinkAbout03-07 RESOLUTIONRESOLUTION NO. 03-07 A RESOLUTION AWARDING A CONTRACT TO BELL-CORLEY CONSTRUCTION, LLC IN THE AMOUNT OF $1,270,000.00 FOR THE CONSTRUCTION OF TWO (2) CORPORATE HANGARS AT THE FAYETTEVILLE MUNICIPAL AIRPORT; APPROVING A PROJECT CONTINGENCY IN THE AMOUNT OF $63,500.00; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF $33,500.00 FOR SAME BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby awards a contract to Bell -Corley Construction, LLC in the amount of $1,270,000.00 for the construction of two (2) corporate hangars at the Fayetteville Municipal Airport. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves a project contingency in the amount of $63,500.00. Section 3. That the City Council of the City of Fayetteville, Arkansas, hereby approves a Budget Adjustment in the amount of $33,500.00 for same. PASSED and APPROVED this 2nd day of January, 2007. APPROVED: By: DAN COODY, Ma ATTEST: CC e9e. SG. � Um •?ptt :FAYETTEVILLE: is :9d , •9RKANSQ° J ';4;1,GTON Y C By:CAA-4 SONDRA SMITH, City Clerk/Treasurer riz DOCUMENT 00500 CONTRACT THIS AGREEMENT, made and entered into on the a r1G day of January 2007, by and between Bell -Corley Construction, LLC. herein called the Contractor and the City of Fayetteville, Arkansas. WITNESSETH: That. Bell -Corley Cons truchon, LLC for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville, Arkansas as follows: 1. That Bell -Corley Construction, LLC. shall famish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Corporate Hangars for Fayetteville Municipal Airport, dated December, 2006. Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond Payment Bond General Conditions Supplementary Conditions Specifications 21 Drawings (Bound Separately) 2. That the City of Fayetteville, Arkansas hereby agrees to pay to Bell -Corley Construction, LLC. for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States, the amount of One Million, Two hundred Seventy Thousand Dollars ($ 1,270,000.00 The Work will be substantially completed within 160 days after the date when the Contract Time commences to run as provided in the Notice to Proceed. 3. Liquidated Damages: The City of Fayetteville, Arkansas and Bell -Corley Construction, LLC. recognize that time is of the essence of this Agreement and the City of Fayetteville, Arkansas will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville, Arkansas if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville, Arkansas and Bell -Corley Construction, LLC. agree that as liquidated damages for delay (but not as a penalty) Bell -Corley Construction, LLC. shall pay the City of Fayetteville, Arkansas Four Hundred Forty Dollars (5440.00) for each day that expires after the time specified in Paragraph 3 for Substantial Completion. FY062158 Corporate Hangars 00500 - 1 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville, Arkansas shall make partial payments to Bell -Corley Construction, LLC. on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by Bell -Corley Construction, LLC., LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville, Arkansas until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville, Arkansas. 6. That upon submission by Bell -Corley Construction, LLC. of evidence satisfactory to the City of Fayetteville, Arkansas that all payrolls, material bills, and other costs incurred by Bell -Corley Construction, LLC. in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by Bell - Corley Construction, LLC. of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville, Arkansas. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville, Arkansas shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, Bell - Corley Construction, LLC. shall, at its expense, within 5 days after the receipt of notice from the City of Fayetteville, Arkansas, famish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville, Arkansas. In such event, no further payment to Bell -Corley Construction, LLC. shall be deemed to be due under this Agreement until such new or additional secunty for the faithful performance of the work shall be furnished in manner and form satisfactory to the City of Fayetteville, Arkansas. 8. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior Srmal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 9. This Contract shall be govemed by the law of the State of Arkansas. 10. Freedom of Information Act. The City of Fayetteville, Arkansas contracts and documents prepared while performing City of Fayetteville, Arkansas contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, Arkansas, Bell -Corley Construction, LLC. will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.C.$25-19-101 et. Seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. FY062158 Corporate Hangars 00500 - 2 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL. WITNESSES: INthev OroA/)c)-- -U• • 13a ;FAYETTEVILLE: tic:;KANSP k Approved to form: atea,aa FY062158 Corporatc Hangars Bell -Corley Construction, LLC C/jTRAC ►` By Title Director of Operations / Partner Shaun Tyler Bell -Corley Construction 100 Gamble Road Little Rods, AR 72211 CITY OF F :YETTEVILLE, ARKANSAS By Mayor Attt1&ney for Owner. 00500 - 3 City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 2006 Department: General Government Division: Aviation & Economic Development Program: Airport Capital Expenditures Date Requested 1/2/2007 Adjustment Number Project or Item Added/Increased: $33,500 in the Building Costs account Project or Item Deleted/Reduced: Reduce Project # 05022 Fire Sprinkler System = Air Museum $548 • Increase Use of Fund Balance $32,952. Justification of this Increase: Will provide for construction of two 124' X 80' corporate hangars on the South Corporate Apron Justification of this Decrease: Increase Expense Budget (Decrease Revenue Budget) Account Name - Account Number Amount Project Number Building costs Account Name 5550 3960 5804 00 33,500 06023 1 Decrease Expense Budget (Increase Revenue Budget) Account Number Amount Building & grounds maint Use of fund balance Project Number 5550 3960 5400 00. 548 05022 1- 5550 0955 4999 99 32,952 • Approval Signatures Requested By Budget Manager Date ate Department Director Date Finance & Internal Services, Director Date Date Mayor Budget Office Use Only Type: A B C Posted to General Ledger Posted to Project Accounting Entered in Category Log Initial Date Initial Date Initial Date • Ray M. Boudreaux Submitted By City of Fayetteville Staff Review Form City Council Agenda Items Contracts 2 -Jan City Council Meeting Date efdS z1O7 U3-07 trY10(ltd1P1 al - Aviation & Economic Development General Government Division Action Required: Department Action Required: Approve a Contract with Bell -Corley Construction, LLC; Contact: Jeffery Hibbard; 100 Gamble Rd, Little Rock, AR, 72211; Phone: 501-280-3433; email. jhibbard@bell-corley.com; in the amount of $1,270,000 to construct two corportate hangars; Approve a 5% project contingency in the amount of $63,500; Approve a Budget Adjustment. $1,333,500.00 Cost of this request 5550.3960.5804.00 Account Number 06023 1 Project Number Budgeted Item 1,405, 500.00 Category/Project Budget 105,450.00 Funds Used to Date $ .. 1,300,050.00 Remaining Balance Budget Adjustment Attached West GA Hangars Program Category / Project Name Airport Capital Program / Project Category Name Airport 4 Fund Name Department Director date 444Y Finance and Internal Service Director Date City Attorney I2• t8 -o. Mayor Comments: 4 IZ Date Previous Ordinance or Resolution # 83-06, 109-06 Original Contract Date: Original Contract Number: Received in Mayor's Office City Council Meeting of: Jan 2, 2007 Agenda Item Number: CITY COUNCIL AGENDA MEMO/STAFF CONTRACT REVIEW MEMO TO: Mayor and Members of the City Co THRU: Staff/Contract Review Committee FROM: Ray M. Boudreaux, Director, Aviation and Econ... 'c Development DATE: December 15, 2006 SUBJECT: Approval to award contract for construction of two corporate hangars on the executive apron with Bell -Corley Construction, LLC. of Rogers, Arkansas. Signature of the Mayor. RECOMMENDATION: Approval of Construction Contract with Bell -Corley Construction, LLC of Rogers, Arkansas for the construction of two corporate hangars on the executive apron at Fayetteville Municipal Airport, Drake Field. Signature of the Mayor. BACKGROUND* The City Council awarded Task Order #14 to McClelland Consulting Engineering for the design and oversight for the construction of two corporate hangars on the Executive Apron adjacent to the U of A hangar. Staff leased the hangars to Million Air Fayetteville and SkyVenture Aviation Inc. With signed leases, staff petitioned City Council for financing of the buildings in order to apply for grant support from the Arkansas Department of Aeronautics (ADOA). Two grants were received for a total of $600,000.00 from the ADOA. The City Council approved up to $700,000.00. DISCUSSION: Fayetteville Municipal Airport continues to develop as a first class general aviation airport and the air portal to Fayetteville and all of Northwest Arkansas. These two buildings will be the fourth and fifth hangars constructed on the airport to support the new and expanded mission of the airport as the preferred business option for NWA. Million Air, the fuel, line and customer service fixed base operator must turn down requests for space as there is none available. They are working with several business and corporate aircraft owners wishing to move to Fayetteville Drake Field. BUDGET IMPACT: Loan from the general fund of $700,000.00 to be repaid from lease proceeds. Two Grants from the Arkansas Department of Aeronautics for $600,000 00 Task Order #14 with McClelland Consulting Engineers for design and engineering and construction management from the airport fund $105,450.00. Attachments: Staff Review Form Construction Contract with Bell -Corley Construction LLC Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field• 4500 South School Avenue, Suite F • Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director RESOLUTION NO. A RESOLUTION AWARDING A CONTRACT TO BELL-CORLEY CONSTRUCTION, LLC IN THE AMOUNT OF $1,270,000.00 FOR THE CONSTRUCTION OF TWO (2) CORPORATE HANGARS AT THE FAYETTEVILLE MUNICIPAL AIRPORT; APPROVING A PROJECT CONTINGENCY IN THE AMOUNT OF $63,500.00; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF $33,500.00 FOR SAME BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: . Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby awards a contract to Bell -Corley Construction, LLC in the amount of $1,270,000.00 for the construction of two (2) corporate hangars at the Fayetteville Municipal Airport. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves a project contingency in the amount of $63,500.00. Section 3. That the City Council of the City of Fayetteville,Arkan hereby approves a Budget Adjustment in the amount of $33,500.00 PASSED and APPROVED this 2nd day of January, 2001 APPROVED: By: IbAN CO'ODY, Mayor Ray Boudreaux - Contract.pdf .A .._ 1 DOCUMENT 00500 CONTRACT THIS AGREEMENT, made and entered into on the day of January 2007, by and between $ell -Corley Construction, LLC. herein called the Contractor and the City of Fayetteville, Arkansas. WITNESSETH: That. Bell -Corley Cons truction,LLC forthe considerationhercinafterfully set out, herebyagrees with the City of Fayctteville,Arkansas as follows: That$ell-CorleyC onstruction.LLC . shall fimtish all the materials, aid perform all ofthe work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents,which are attachedhereto andmade a partheroof,as if fully containedherein and are entitledarn orate Hangars for Fayetteville Municipal Airport dated December, 2006. Advertisement for Bids Payment Bond Insiructionsto Bidders General Conditions Bid and acceptance thereof SupplementaryConditions PerformanceBond Specifications 21 Drawings (BoundSeparately) That the City of Fayetteville,A rkansas hereby agt ma to pay to Bell -Corley C on stru etion. LLC. forthe faithfulperformanceofthisAgreement,subjectto add Monsen ddeductionsas providedin the Specificationsor Bid, in lawful money oftheUnited States, the amount of One Million. Two hundred Seventy Thousand Doilers ($ 1.270.000.00 The Work will be substantialbcompletedwithin 160 days after the date when the ContractTime commences to run as provided in theNotice to Proceed. 3. Liquidated Damages: The City of Fayetteville,Arkansasand Bell -Corley C on struction .LLC. recognize that time is of the essenceof thisAgt cement and theCity of Fayetteville,Arkansaswill suffer financial loss if the Work is not completed within the times specified in above,plus any extensionsthereofallowed in accordancewith the General Conditions. They alsorecognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville,Arkansasif the Work is notcompletedon time. A ccording lyjns teed ofrequiringany such proof,the City of Fayetteville,Arkansas andBell-C orlev C on stru ction, LLC. agreethat as liquidated damagesfor delay (butnot as a penalty)Bell-C orlev C on stru ction. LLC. shall pay the City of Fayetteville,ArkansasFour Hund red FortyD ollars ($440.00) foreach day that expires after the time specified in Paragraph3 for SubstantialCompletion. FY062158 Corporate Hangars 00500- 1 Ray Boudreaux - Contract.pdf That within 30 daysof receiptof anapprovedpaymentrequest,thc City of Fayetteville,Arkansas shall make partial paymentsto Bell -Corley C on stru ction, LLC. on the basis of a duly certified •and approved estimate of work performed during the precedingcalendarmonth by Bell -Corley Construction, LLC. LESS the retainage provided in the General Conditions,which is to be withheld by the City of Fayetteville, Arkansas unti all work within a particular part has been performedstrictlyin accordancewith this A greementand until such work has been accepted by the City of Fayetteville,Arkansas. • That upon submissiorby Bell-Corlev Const ruction. LLC . of evidencesatisfactfy to theCity of Fayetteville, Arkansas that all payrolls,material bills, and other costs incurred by Bell C orlev C on stru coon, LLC. in connection with the constructionof the work have been paid in full, final paymenton accountof this A greement shall be made within 60 daysafter the completion byBell - Corlev Construction. LLC. of all work covered by thisAgreement and the acceptance of such work by the City of Fayetteville, A rkansas. It is furthermutually agreed between the parties hereto that if, at anytime afterthe executionof this Agreement and the Surety Bond hereto attached for its faithfulperformanceand payment, the City of Fayetteville,Arkansasshall deem the Surety or Sureties upon suchbond to be unsatisfactor or if, for any reason such bond ceases to be adequate to cover the performance of the work Bell- Corlev C onstruction. LLC shall, at itsexpense,within 5 daysafterthe receipt of noticefrom the City of Fayetteville,Arkansas,fumishan additional bond or bonds in suchform and amount and with such Surety or Suretiesas shallbe satisfactoryto the City of Fayetteville, A rkansas. In such event, no furtherpaymentto Bell-Corlev Con stru ction. LLC. shall be deemed to be due under thisAgreementuntilsuch new oradditionalseaaay for the faithful polar manceoftheworkshallbe fumishedin mannerand formsatisfactoryto the City of Fayetteville,Arkansas. 8. Changes,modifications,or amendmentsin scope,price orfeesto this contractshall not be allowed without a prior Srmal contract amendment approved by the Mayor and the City Council it advance of the change in scope, cost or fees. This Contract shallbe govemedby the law of theState of Arkansas. 10. Freedom of Information Act. The City of Fayetteville, Arkansas contracts and documents prepared while performing City of Fayetteville, Arkansas contractual work are subject to the Arkansas Freedom oflnformationAct. If a Freedom of InformationAct requestis presentedto the City of Fayetteville,Arkansas Bell -Corley Construction, LLC. will do everythingpossibleto providethe documents in a promptand timely manner as prescribedin the ArkansasFreedom of Information Act (A.C.C.$25-19-101 et. Seq) Only legally authorized photocopying costs pursuantto the FOIA may be assessedfor this compliance. FY062158Corporate Hangars 00500- 2 Ray Boudreaux - Contract.pdf IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three(3) counterparts,each of which shall, without proof or accounting for the other counterpartbe deemed an originalContract SEAL: BeII-CorlevConstruction. LLC CONTRACTOR WITNESSES: By Tide ATTEST: CITY OF FAYETTEVILLE, ARKANSAS By Clerk Mayor A pproved as to form: Attorney for Owner. FY062158 Corporat e Hangars 00500- 3 �CMcCLELLAND CONSULT/NG ENGINEERS, INC. l DESIGNED TO SERVE P.O. Box 1229 Fayetteville, Arkansas 72 702-122 9 479-443-2377 FAX 479-443-9241 December 14, 2006 Mr. Ray Boudreaux Airport Department City of Fayetteville 4500 S. School Ave., Suite F Fayetteville, AR 72701 Re: Corporate Hangars - Fayetteville.Municipal Airport, Drake Field Dear Mr. Boudreaux: Bids were received on the above referenced project on Thursday, December 14, 2006, with nine Contractors submitting a bid for this project. The low bidder is Bell -Corley Construction, LLC., of Rogers, Arkansas, in the amount of $1,270,000.00 for the Total Lump Sum Base Bid amount. There were eleven General Contractors who had plans and were considering bidding on this project and who were asking questions. A copy of the certified Bid Tabulation is enclosed. The Engineer's estimate of the Construction Cost was in the amount of $1,300,000.00. The Total Lump Sum Base Bid amount is - below our estimate and within the current funding available for this project including the City funds and the Grants from the State Aeronautics Department. If necessary an additional grant can be requested from the State Aeronautics Department for the site work including the road, parking and water line relocation. We have worked with Bell -Corley Construction, LLC, on several commercial projects in northwest Arkansas and have had very excellent results. We recommend the City accept the low bid submitted by Bell -Corley Construction, LLC, Inc. for the Total Lump Sum Base Bid in the amount of $1,270,000.00. If there are any questions regarding the bids or this recommendation, please contact us - Sincerely, MAND CO LTING�ENGINEERS, INC. a W-yne JI 1 Vice Presint Enclosure: Bid Tabulation J:12006\062158 Corp HangarslCarrespondencelbourdreaux-1214.wpd:wj gee SSI Incorporated of Northwest Arkansas Southern Building Services, Inc. Midland Construction, Inc. LJB Construction, Inc. Don Peters Construction, Inc. C. R. Crawford Construction, LLC Bossier Contracting, Inc. Benchmark Construction of NWA, Inc. Bell -Corley Construction, LLC CONTRACTOR $ 1,316,000.00 $ 1,328,300.00 $ 1,413,000.00 $ 1,486,000.00 —1 Co W O O O O O $ 1,455,000.00 W a O O O O O N - O O O O O O Total Lump Sum Base Bid 69419EA N CO O O O O O $ 198,000.00 $ 65,000.00 $ 220,000.00 1 $ 350,000.00 $ 139,000.00 $ 82,500.00 $ 92,972.70 00'000'0L $ $ 162,562.00 Site Work EA N O O O O O $ 500.00 $ 100.00 00'000'6 $ 23,774.00 $ 1,000.00 Trench and Excavation Safety System, Required by Act 291 of 1993 kn N in O O O O ,to cn O O O EA O O O O O 1 $ 22.00 per CY $ 16.50 per CY $ 19.50 per CY $ 20.00 per CY $ 20.00 per CY $ 16.95 per CY $ 18.24 per CY $ 14.75 per CY fA _N N cn ID CD 0 UNIT COST for Undercut/Backfill • • Ray Boudreaux - Corporate Hangars From: To: Date: Subject: CC: Wayne Jones <wjones@mcclelland-engrs.com> Jeffery Hibbard <jhibbard@bell-coiley.com> 12/14/2006 6:52 PM Corporate Hangars Ray Boudreaux<rboudreaux@ci.fayetteville.ar.us> Page 1 of 1 Jeffery, I have attached a pdf copy of the Construction contract for this project. Please print 4 copies and have them signed and return the signed copies to Mr Ray Boudreaux at his office at the Airport. These contracts are needed for the packet being presented to the City Council for Approval. We are forwarding our letter of recommendation to the City recommending awarding the contract to your company. If you have any question please contact me. R. Wayne Jones, P E McClelland Consulting Engrs., Inc. P.O. Box 1229 Fayetteville, AR 72702 (479) 443-2377, ext 20 (Office) (479) 443-9241 (Fax) (479) 409-7061 (Mobile) wjones@mcclelland-engrs.com (02'6/ / file://C:\Documents and Settings\rboudreaux.000\Local Settings\Temp\XPGrpWise\4581... 12/15/2006 (1.8.07) Clarice Pearman - Res. 03-07 From: To: Date: Subject: Attachments: Clarice Pearman Boudreaux, Ray 1.8.07 3:46 PM Res 03-07 03-07 Bell -Corley Construction LLC.pdf CC: Audit Ray: Attached is a copy of the above resolution passed by the City Council, January 2, 2007. This will confirm that you picked up three of four original agreements this morning. I will forward the blue budget adjustment to Budget & Research for processing. If anything else is needed please let me know. Thanks. Clarice Clarice Buffalohead-Pearman, CMC City Clerk/Treasurer Division 113 West Mountain Fayetteville, AR 72701 479-575-8309 cpearman@ci.fayetteville.ar.us Page 1 • 1 • • • (SEs d • PROJECT MANUAL • CORPORATE HANGARS • FOR. FAYETTEVILLE MUNICIPAL AIRPORT FAYETTEVILLE, ARKANSAS ' • • • • NOVEMBER 2006 . MCE PROJECT NO. FY062158 Prepared By: McClelland, Consulting Engineers, Inc 1810. North College .: ._.P 0.136x 1229 { Fayetteville, Arkansas 72703 (479).443-2377 • • • • • • • f McCLELLAND CONSULTING ENGINEERS, INC. 1810 N College Ave. P.O. Box 1229 FAYETTEVIf1E. AR 72702-1229 479/443-2277 479/443-9241 FAX TRANSMITTAL McCLELLAND CONSULTING 1 DESIGNED 70 SERV f I ENGINEERS, INC To: City Clerk City of Fayetteville F 113 West Mountain St. Fayetteville, AR 72701 DATE: January 24, 2007 PROJECT NUMBER FY062158 ATTENTION: Ms Sondra Smith RE: West Side Corporate Hangars Fayetteville. Municipal Airport WE ARE SENDING YOU: ❑ SHOP DRAWINGS ❑ COPY OF LETTER O SPECIFICATIONS ❑ PLANS ❑ PRINTS ❑ SAMPLES 0 FLOPPY DISK 0 CHANGE ORDER ❑ FACSIMILE ® ATTACHED ❑ UNDER SEPARATE COVER VIA: COPIES DATE NO. DESCRIPTION 1 1 24-07 Complete set of Contract Documents . PLEASE CHECK AND ADVISE IF ENCLOSURES ARE NOT AS LISTED. THESE ARE TRANSMITTED (AS CHECKED BELOW) O FOR APPROVAL 0 AS REQUESTED N FOR YOUR USE O FOR YOUR INFORMATION ❑ FOR DISTRIBUTION REMARKS: COPY TO: File ❑ REVIEWED FOR GENERAL COMPLIANCE 0 RESUBMIT_ COPIES FOR APPROVAL ❑ FOR REVIEW AND COMMENT ❑ REVIEWED FOR NOTED COMMENTS 0 SUBMIT _COPIES FOR DISTRIBUTION O RETURNED FOR CORRECTIONS ❑ RETURN CORRECTED PRINTS BY: McCAND CONSULTING NEERS, INC. Wayne Jovfks Vice President J:\2006\062158 Corp Hangars\Correspondence\City-Transmittal-0124.doc PROJECT MANUAL CORPORATE HANGARS FOR FAYETTEVILLE MUNICIPAL AIRPORT FAYETTEVILLE, ARKANSAS NOVEMBER 2006 MCE PROJECT NO. FY062158 Prepared By: McClelland Consulting Engineers, Inc 1810 North College P O. Box 1229 Fayetteville, Arkansas 72703 (479) 443-2377 ADDENDUM NO. 1 CORPORATE HANGARS FAYETTEVILLE MUNICIPAL AIRPORT Fayetteville Arkansas Project No. FY062158 December 12, 2006 The Project Manual and the Drawings dates November 2006 for the project are amended as noted this Addendum. Receipt of this Addendum shall be acknowledged on the Bid Form. This Addendum consists of 6 pages. The Project Manual is amended as follows: Item No. 1 Item No. 2 Item No. 3 Item No. 4 Item No. 5 The General Contractors are reminded that the Water Line Relocation is required to be performed by a licensed Water and Sewer Subcontractor. Delete the complete Paragraph 2.10 B of Section 03300. Revise Paragraph 2.1.0 of Section 08520 to read `...Type: Fixed." Revise Paragraph 3.10.6 on page 6 of Section 09900 to read "...cold metal primer at 2.0 mills and touch up metal primer". Delete the Painting Schedule following page 9 of Section 09900 and the Painting Schedule at the end of the Section. Replace the Painting Schedule with the new Painting Schedule included with this Addendum. Item No. 6. Revise Paragraph 1.5.B of Section 13121 to read "...In conformance with the 2000 International Building Code, Basic Wind Speed 90 Mph (3 second gust). (Exposure C)." Item No 7. Item No. 8 Item No. 9 The Project Item No. 1 Item No. 2. Item No. 3 Revise all references to the Standard Building Code to the International Building Code within Section 13121 Delete the last sentence of Paragraph 1.5.B.1 on page 4 of Section 13121. Delete Paragraph 1.2.B of Section 13130. Drawings are amended as follows: The Grading Plan on Sheet 4 is hereby modified by the two attached drawings (XC -3 and XC -4). The Detail 1 of Sheet 13 is hereby modified by the attached drawing X -C1. The Detail 6 of Sheet 13 is hereby modified by the attached drawing X -C2. J:\2006\062158 CORP HANGARSISPECS1ADDENDUM NO-1.DOC Addendum No. 1 1 AREA NUMBER AND COLOR MANUFACTURER NO. OF COATS Interior Walls: Gypsum Board Walls Primer Manufacturer's Recommendation Sherwin Williams 1 Coat Top Coat Promar 200 - Latex Sherwin Williams 2 Coats Semi -Gloss Wood Trim Primer Manufacturer's Recommendation Sherwin Williams 1 Coat Top Coat Promar 200 - Latex Sherwin Williams 2 Coats Semi -Gloss Hollow Metal Doors and Frames, Rolling Service Door: Primer Top Coat Shop Primed with non -corrosive rust inhibitors SuperPaint - Satin Finish Sherwin Williams Shipyard Gray No. SW2139 1 Coat 2 Coats Interior side of Hollow Metal Doors SuperPaint - Satin Finish Sherwin Williams 2 Coats Frames Coco No. SW1048 Metal Building Wall Panels Supplied by Metal Building Manufacturer Primer Finish coat(s) Manufacturer's Recommendation Kynar-500 System (color —Selected by Owner) Metal Building Steel Structure Primary and Secondary Members Primer Manufacturer's Recommendation touch up as required. Hangar Floor Primer (First & Second Coats) Tnemec Series 205 Terra -Tread FC @ 4 to 6 DFT Finish coat Tnemec Series 291 Terra -Tread FC @ 2 to 3 DFT Color 33GR Gray -Ansi No. 61 FY062158 Corporate Hangars Addendum No. 1 09900 - 10