HomeMy WebLinkAbout83-06 RESOLUTIONRESOLUTION NO. 83-06 A RESOLUTION APPROVING TASK ORDER NO. 14 WITH McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $1059450.00 FOR DESIGN OF TWO (2) CORPORATE HANGARS, TO PROVIDE BIDDING SERVICES AND PROJECT OVERSIGHT AT THE FAYETTEVILLE MUNICIPAL AIRPORT; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF $1059450.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF.,. FAYETTEVILLE, ARKANSAS: ` Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 14 with McClelland Consulting Engineers in the amount of $105,450.00 for design of two (2) corporate hangars, to provide bidding services and project oversight at the Fayetteville Municipal Airport. A copy of Task Order No. 14, marked Exhibit "A" is attached hereto and made a part hereof. Section 2. That the City Council of the City of Fayetteville, Arkansas approves a Budget Adjustment in the amount of $105,450.00. APPI BY: PASSED and APPROVED this 2nd day of May, 2006. Dan Coody, Mayor hereby ,w It o•�GV ° • . ° SG, GST Y O,c •. � FAYETTEVILLE; ATTEST: A_ ` •�' By: " Sondra Smith, City Clerk TASK ORDER NO, 14 COMMERCIAL HANGAR BUILDINGS FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on April 301 2003, as amended. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville and McClelland Consulting Engineers (MCE) sets forth the project description, project schedule, and engineering fees related to Commercial Hangar Improvements at the Fayetteville Municipal Airport, Drake Field. SECTION I - PROJECT DESCRIPTION The project is to consist of: assistance in applying for state funding for the project; the preliminary and final engineering design for two (approximately 120' by 80') Corporate Aircraft Hangar Buildings to be located on the West Side GA Apron; preliminary and final cost estimates; meetings with the City's Airport Department and their Tenants to review various aspects of the project; and engineering services associated with detailed design, bidding, and construction administration/inspection. (:\DRAKE FIELD\CONTRACTS\2003-2006\Task Order 14.doc -1- SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), MCE will endeavor to execute the project as expeditiously as possible to enable the City of Fayetteville to solicit competitive bids for construction as soon as possible (approximately 3 months). SECTION III - SCOPE OF SERVICES MCE shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, this project is likely to include: A. Assisting the City of Fayetteville in making application for a grant from the Arkansas Department of Aeronautics. B. Topographic Surveying. C. Performing preliminary engineering including Geotechnical Report. D. Formulating preliminary and final construction cost estimates and preparation of Large Scale Development Plan. E. Meeting with the City of Fayetteville and their Tenant to discuss design criteria, desired features, and schedule. F. Performing the detailed design of the construction project as determined by the City of Fayetteville and their Tenant. G. Advertising for competitive bids and recommending the award of a construction contract. H. Construction administration and inspection. I. Construction staking for a baseline and benchmark. J. Construction materials testing. 1:\DRAKE FIELD\CONTRACTS\2003-2006\Task Order 14.doc -2- I 1- K. Providing a set of "Record Drawings" at the completion of construction based upon the Contractor's mark-ups. SECTION IV - FEES AND PAYMENTS The following fees are to be paid to MCE as compensation for his services: A. Application to State: B. Topographic Survey Update: C. Geotechnical Investigation: D. Preliminary Engineering & LSD: E. Detailed Design: F. Bidding Service: a lump sum of $650. a lump sum of $950. a lump sum of $3,500. a lump sum of $32,800. a lump sum of $283800. a lump sum of $1,300. G. Construction Administration & Inspection: hourly rates, estimated to be $28,000. H.. Baseline & Benchmark Staking: a lump sum of $950. I. Construction materials testing: hourly rates & unit prices, estimated to be $8,500. Appendices A, B, C, & D present hourly rates for personnel anticipated to be assigned to this project and the unit prices as well as the basis of payments to be made to the MCE. SECTON V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. JADRAKE FIELD\CONrRACTS\2003-2006\Twk Order 14.dm -3- IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE: By: WE Date: FOR McCLELLAND CONSULTING ENGINEERS, INC.: By: ]:\DRAKE FIELD\CONTRACTS\2003-2006\Task Order 14.doe -4- r m o n m a z m O O m o V O N a M 0 Z 0 Z O m Z O O T AA T - Z N O O O O O O O O O O y 3- Z C O O O O O O O O O O O O T N T O y A 9 Z N N O O N Z m m 2 v m m m m m m m m m m D N T a C m m m m m m m m T T m A O r y O G O y y wzzy Z N➢«DxTyyyy 3333355 mx0-INNNNNNNNNNNm03 m 9m O A A CNNA O C NmrOODD DDDDDDDD m my0>1- O O( D y O C C Ol -i y' Oly- O� OCry?PFPi-r-e-PFO yZCy2 000000000-�Z �2 D 2 y y y -IpAD O_ O y OyZ30m000000000009 N- OLImOT««<GG Nm mmmmmmmmTmm- <<<20M Z MO O D y D 3_ �1 Z N N ➢ T T m m m T T T T m r y N m m m m m m m m m m m D 3 ( O 9 Z r O O 2 map_ m y A y N N N N N N N N N N D D O O w L :. :. :. :. :.pmz r x p y m z Z �y3? p m N<Zpm m p.. .. .. .. DT2C000N .. _.. .. ..z r 9 TMyOMMmrD a mrrrrr:. �D-I SC000ry O D z O 3 y OTZD O -Z OOVZy NTr�prDyAA TZ O pp AO mmTpmrD-p m2 O ],p1pp y -_N Z z N N y N A r D Oym m0r03� yCy N N ZrDDD r�T-D9yNN000 Gw-TN N ZrDD ( Z< m C D z m N lC 2-yO N 0 2 D N AyNO00yzb A- m A D( �_ Z !L = D 'A m A D Z O OI C T N p m O m y m Z 0 y 2 D Z m'Rx y N y T O OOmDOT O T p 9 LZi _ O 3 m p O A O T A y 4Dj Z G1 'i A H T T N A N p C _IN 9 00 D O T T zANyOTOOTD 00 �9v0 D ( p A ~ O z0 OOZDZ%,A A NNyC(Dj02Dz r9 5A O '� 9 0 C OzmO m T 9 O O r r m 41 p p N N m Z S N y y 4a Z D T 9 m T y D y? Z y➢ Z Z 0 m Z Z A TVOywOZ O iZxN9ppr y- Z x w,w W 3 >Mszc� n m D oosnZyam mm zrmD yD -mi� m DZv00 ms N .. DyZmS�N-Oz D_pp MID C C m N p �Z <Z H N(/1TD rn 0 fiR DN Gzi N Z N y N Om ,m 0 0 o N a oy`m 0o yn y p+9 Dp O p w + N+ N N N N N N+ d A N N N N N + N O AZO w m 0mo o?y m Z py U O O U w y a N a d a w w a N N A N A a a a N N O Z m 'mom O y p Z; 02 O O O O wU y N d N O x ZO m V n A g2� 00 CI O o O oNmA N�w OI N d A O p p $' O N on 'm c "pp m m aaor'o �' o m am mm m Dow0 N C O O O O 0 N<m N` y oOm pO iOC O AA O m O O OFm O ( A o O Am O m pyx OZ N V O O O 0 m oy O� OA 3 0 0 0 oN 40 w00 0 0 oD aO om N C N N N m m Q $ mz 0 0 0 oS $ $ $ 8$ $$ xo .d Nw Nw w a im wN N m� 00 0o e$ 0 00 $$$ o$ 00 0$ $ Nv MM NSNS wU wwN wJONtOp wNO NlOJ NSO � N N epNrNNwNNm m x y Om �N JN ON VNi� J J�p1 p UO 00O YN uO +O �U UO paOd 8"0 N � n e D O On 00 m OS $ SOSO$$eSO $ O 0S 4.9989006SS$$OO O O O 8 S S O O '-4 APPENDIX B TASK ORDER NO. 14 Hourly Rates for Personnel Fayetteville Municipal Airport CATEGORY BILLABLE HOURLY RATE RANGE Project Director $135 to $150 Project Manager $110 to $130 Engineer III $90 to $110 Engineer II $70 to $90 Engineer I $50 to $70 Registered Surveyor $60 to $85 Computer Technician $50 to $70 Senior Engineering Technician $65 to $75 Engineering Technician $45 to $65 Survey Crew (2 man) $120 to $130 Clerical Support $35 to $45 CADD Technician III $55 to $65 CADD Technician II $45 to $55 CADD Technician I $35 to $45 Soils Lab Supervisor $45 to $55 Soils Technician II $35 to $45 Soils Technician I $30 to $35 J:\DRAKE FIELD\CONTRACTS\2003-2006\Appendix B TO14.doc APPENDIX "FC" TASK ORDER NO. 14 CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE GENERAL Laboratory Field Technician * $ 35.00 per hour AHTD-Qualified Technician* 40.00 per hour Engineering Technician * 45.00 per hour Senior Engineering Technician 75.00 per hour Lab Supervisor 55.00 per hour Consultation: Lab Supervisor 55.00 per hour Field Engineer 75.00 per hour Project Engineer 85.00 per hour Project Manager 110.00 per hour Principal Engineer 130.00 per hour Lab Report Preparation 35.00 per hour SOILS AHTD-Qualified Field Technician 40.00 per hour Soils Field Technician (1 -hour minimum) 35.00 per hour In -Place Compaction Test -Nuclear Gauge ASTM D 2922 Sample Pickup Nuclear Density Gauge Fee (per project, per day) 15.00 each Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318 48.00 each Sieve Analysis -Washed No. 200 (Wet) ASTM 0 1140 35.00 per sieve Sieve Analysis -Dry ASTM D 422 8.00 per sieve Hydrometer Analysis ASTM D 422 90.00 each Specific Gravity ASTM D 854 50.00 each Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145 110.00 each Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99 120.00 each Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180 135.00 each Potential Volume Change -Swell Pressure 100.00 each California Bearing Ratio-CBR ASTM D 1883 (3 point) (Proctor curve additional) 150.00 each Shrinkage ASTM D 427 50.00 each Soil Bearing Capacity (Engineering Tech., 2 -hour minimum) 45.00 per hour Non-ASTM Procedures Available On Request CONCRETE: Concrete Mix Design Price on Request Review Concrete Mix Design (Lab Supervisor) 55.00 per hour Confirm Concrete Mix Design Price on Request Concrete Field Technician * (1 -hour minimum): [For any of the following 6 items:] 35.00 per hour • Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 • Concrete Cylinder or Beam Molding ASTM C 31 • Concrete Cylinder or Beam Pickup • Concrete Slump Test ASTM C 143 • Concrete Air Content Test ASTM C 231 or C 173 • Cement Mortar or Group Sampling AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items:] 40.00 per hour Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap) 10.00 each Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped) 15.00 each Spare Cylinders Specimens Processed but not Tested 10.00 each Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum) 45.00 per hour ACI Grade I Concrete Field Testing Technician J NRM@ FIEIDGOMRACTSQOO .2OD'APPENOIX C TOIL WC jm Page 1 of 2 •r Y APPENDIX "C" TASK ORDER NO. 14 CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE CONCRETE (Continued): Flexural Strength of Concrete Beams ASTM C 78 or C 293 25.00 each Spare Beam Specimens Processed but not Tested 20.00 each Compressive Strength of Grout Cubes 20.00 each Compressive Strength of Cement Mortar Cubes 15.00 each Concrete Coring (3" or 4"): Core Machine & Lab Technician 65.00 per hour Additional Lab Technician, as required 35.00 per hour Compressive Strength of Concrete Cores (3" or 4") 30.00 each Other Core Sizes Price on Request Aggregate Sieve Analysis: Dry Sieve ASTM C 136 8.00 each Wet Sieve ASTM C 117 35.00 each Fineness Modules 25.00 each Decantation 30.00 each Deleterious Materials 60.00 each Specific Gravity and Absorption of Aggregate ASTM C 127 & C 128 85.00 each Dry Rodded Unit Weight of Aggregate ASTM C 29 50.00 each Sodium or Magnesium Sulfate Soundness (5 cycles) ASTM C 88 250.00 each Additional Cycles 50.00 each ASPHALT: Asphalt Mix Design Price on Request Review Asphalt Mix Design (Lab Supervisor) 55.00 per hour Asphalt Field Technician In -Place Compaction Test -Nuclear Gauge (Lab Technician) 35.00 per hour Sample Pickup 35.00 per hour Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids, Percent Voids in Mineral Aggregate (3 specimens per test) 225.00 each Extraction including percent Bitumen and Aggregate Gradation 170.00 each Laboratory Density of Cored Plugs including Depth Measurement 25.00 each Asphalt Coring (3" or 4"): Core Machine & Lab Technician 65.00 per hour Additional Lab Technician, if required 35.00 per hour Sample Pickup 35.00 per hour FIREPROOFING: Unit Weight, Bonding Strength, Thickness and Sampling (actual time required for Lab Technicians) 35.00 per hour/Tech. Report Preparation (Lab Supervisor) 45,00 per hour STRUCTURAL STEEL: Bolt Torque Testing: Lab Technician(s) 35.00 per hour Field Engineer 85.00 per hour Pneumatic Torque Wrench Calibration (twice per day) 50.00 each Visual Weld Inspection Field Engineer 75.00 per hour Services not Listed are Available on Request JD PJE FIEW CNTRACTSR00Y2W0YPPENDI%C TO14 DOC Im Page 2 oft APPENDIX "D" TASK ORDER NO. 14 GEOTECHNICAL INVESTIGATION TWO 80' BY 120' CORPORATE HANGARS DRAKE FIELD, FAYETTEVILLE MUNICIPAL AIRPORT April 25, 2003 I Item No. Item Descri tion / ASTM Designation I Quantity Units Unit Price I Extended 1 Equipment Mobilization and Demobilization ($2.10/mi each way: 2 Boring Layout Boring Setup Charges 3 Soil Drilling and Sampling, ASTM D-1586 & ASTM D-1587 Soil Drilling in Apron Area ( 6 Borings - 15 feet max. ) 4 Soil and F ASTM ASTM ASTM ASTM ASTM lock Laboratory Testing D-2216, Moisture Content Determination D-4318, Liquid and Plastic Limit of Soils D-422, Gradation Analysis of Soils (6 Sieves) D-2166, Dry Unit Weight of Soil Specimens D-2166, Unconfined Compressive Strength of Soils 5 Geotechnical Engineering Report and Recommendations Engineering Supervision (Project Manager) Engineering Analysis & Recommendations (Project Engr.) Boring Plot Log Preparation (Senior Draftsman) Boring Plot Plan Preparation (Draftsman) Report Preparation (Clerical) ESTIMATED GEOTECHNICAL INVESTIGATION J:\DRAKE FIELD\CONTRACTS\2003-2006\fee sheets\Appendix DTO14.wb3:wj 1 LS $75.00 $75.00 Subtotal $75.00 1 HR $60.00 $60.00 6 EA $35.00 $210.00 Subtotal $270.00 150 LF 32 EA 6 EA 6 EA 6 EA 4 EA 2 HR 4 HR 2 HR 1 HR 1 HR $8.50 Subtotal $10.00 $55.00 $50.00 $10.00 $40.00 Subtotal $105.00 $75.00 $60.00 $45.00 $35.00 Subtotal $1,275.00 $1,275.00 $320.00 $330.00 $300.00 $60.00 $160.00 $1,170.00 $210.00 $300.00 $120.00 $45.00 $35.00 $710.00 $3,500.00 E /us. 83 -di City of Fayetteville, Arkansas Budget Adjustment Form Budget Year Department: General Government Date Requested Adjustment Number 2006 Division: Aviation & Economic Development 5/9/2006 Program: Airport Capital Expenditures Project or Item Added/Increased: Project or Item Deleted/Reduced: $105,500 in the Professional Services account. None: Increase Use of Fund Balance account $500,000 Justification of this Increase: Will provide for Design and Engineering for two 80x100 hangars. Justification of this Decrease: Approved by City Council 5/2/06 Increase Expense Budget (Decrease Revenue Budget) Account Name Account Number Amount Project Number Professional services 5550 3960 5314 00 105,500 o t�023 ' Decrease Expense Budget (Increase Revenue Budget) Account Name Account Number Amount Use of fund balance 5550 0955 4999 99 105,500 /Dat V Date ate /� Datt Project Number Budget Office Use Only \\ Type: A B C U E Posted to General Ledger Initial Date Posted to Project Accounting I Entered in Category Log Initial Date Initial Date Ray M. Boudreaux Submitted By 1. City of Fayetteville Staff Review Form City Council Agenda Items Contracts 2 -May City Council Meeting Date General Government Aviation & Economic Development Division Department K order Ala. ?'t Action Required: Approve Task Order #14 to Contract #917 McClelland Consulting Engineers, Inc., PO Box 1229, Fayetteville, AR, 72702-1229, Wayne Jones P.E., Vice President, 479-443-2377 office, 479-443-9241 fax, wjones@mcclelland- enqrs.com, in the amount of $105,450. $105,450.00 Cost of this request 5550.3960.5314.00 Account Number Please Create Project # Project Number $ - Category/Project Budget $ Funds Used to Date $ Remaining Balance Corporate Hangars (2) Program category / Project Name Airport Capital Improvements Program I Project Category Name General Fund / Airport Fund Name Budgeted Item Budget Adjustment Attached X - City Attorney / Received in City Clerk's Office Finance and Internal' Service Director Date Received in Mayor's Office ' D Date City Council Meeting of: May 2, 2006 Agenda Item Number: CITY COUNCIL AGENDA MEMO/STAFF CONTRACT REVIEW MEMO TO: Mayor THRU: Staff/Contract Review FROM: Ray M. Boudreaux, Director, Aviation 'a tljconomic Development DATE: April 14, 2006 SUBJECT: Approve Task Order No. 14 with McClelland Consulting Engineers (MCE) for the design, bidding services and project management to construct two corporate hangars on the new West Side General Aviation Apron. Signature of the Mayor. RECOMMENDATION: Approve Task Order No. 14 with MCE to design two corporate hangars, to provide bidding services and to oversee the project. Signature of the Mayor. BACKGROUND: The Airport Board approved this Task Order No. 14 at their April 12, 2006 meeting. A Falcon Jet Maintenance Company, Phoenix Rising Aviation elected to move to Oklahoma to a larger hangar near their home. Spitfire Aviation had asked for the first option on any corporate hangar that might become available. When offered this building he took it. By the end of the week, we had three other offers for the property indicating, dramatically, the need for more corporate hangar buildings. In discussions with the Airport Board, the members unanimously agreed and directed staff to investigate the possibility of constructing hangars to lease to corporate and business aircraft owners and operators. The Arkansas Department of Aeronautics has a program to match hangar construction and renovation projects that "accommodate aviation business and/or industry. The match is 50/50 up to $250,000.00 per fiscal year. Once the letters of intent to lease the buildings are obtained and verified, we will apply to the State for the grants. The Arkansas Fiscal Year is July through June. We will apply for one grant in June and the second in July and build the hangars at the same time to hopefully get the very best possible price. No funds will be expended until we are able to find the match money for the State Grant program. The engineering estimate for construction of both buildings is $1,200,000.00. Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field 4500 South School Avenge, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director DISCUSSION: This Task Order No. 14 is for the design, bidding services and project management. MCE has a fee of less than 8% since we intend to use the same building design as we used for the U of A Hangar. The design will consist of very minor modifications with one building being reversed and site adaptation for both structures. BUDGET IMPACT: Total Task Order No.14 is $105,450.00 Attachments: Staff Contract Review Form Task Order No. 14 Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field 4500 South School Avenue, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director RESOLUTION NO. A RESOLUTION APPROVING TASK ORDER NO. 14 WITH McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $105,450.00 FOR DESIGN OF TWO (2) CORPORATE HANGARS, TO PROVIDE BIDDING SERVICES AND PROJECT OVERSIGHT AT THE FAYETTEVILLE MUNICIPAL AIRPORT; AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF $105,450.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Ark , s hereby approves Task Order No. 14 with McClelland Consultingy rt ers !n the amount of $105,450.00 for design of two (2) corporate tb`l rovide bidding services and project oversight at the Fayetteville iiji Air rt. A copy of Task Order No. 14, marked Exhibit "A" is a'tac ed hereto an nade a part hereof. 1flu lit I I Section 2. That the City Council d£Tthe City hereby approves a Budg6t '� j tmentanount By: By: SONDRA SMITH, City Clerk DAN COODY, Mayor McCLELLAND eo. Box 1229 MCECONSULTING Fayetteville, Arkansas 72702-1229 479-443-2377 DESIGNED TO SERVE ENGINEERS, INC. FAX 479-443-9241 April 12, 2006 Mr. Ray Boudreaux Airport Manager, Fayetteville Municipal Airport 4500-S. School Suite F Fayetteville, AR 72701 Re: Proposed Task Order No. 14 Two Corporate Hangars Fayetteville Municipal Airport Dear Mr. Boudreaux: In response to your request, please find three (3) copies of Task Order No. 14 for the two 80 ft. by 120 ft. Corporate .Hangars. Please advise if you need further information regarding this Task Order. Sincerely, - NG ENGINEERS, INC. Enclosure: Task Order No. 14 (3 copies) J:\DRAKE FIELD\CONTRACTS\200&2006\boudreaux-0412-TC-14.wpd:ch James Nicholson - Fwd: Task Order No. 14 Page 1 From: Ray Boudreaux To: Nicholson, James Date: 5/8/06 3:40PM Subject: Fwd: Task Order No. 14 Hi JAmes, Action please. Cheers, Ray Ray M. Boudreaux, Col. USAF (ret) Director, Aviation & Economic Development 4500 S. School Ave., Suite F Fayetteville, AR 72701 ph. 479.718.7642 fax. 479.718.7646 email: rboudreaux@ci.fayetteville.ar.us >>> Clarice Pearman 05/08/06 3:30 PM >>> Ray, The Council also passed a resolution for Task Order No. 14 for McClelland which does not have a blue budget adjustment attached for $105,450.00. Please see that I get a budget adjustment to continue processing this resolution as well. I did receive the budget adjustment for Task Order No. 13. Thanks. Clarice frI ii - �*�c•--..-'e+m•w„S;c�m...+a -ter,. . . Clarice Pearman - Task Order No. 14 Page 9 From: Clarice Pearman To: Boudreaux, Ray Date: 5.8.06 3:30PM Subject: Task Order No. 14 Ray, The Council also passed a resolution for Task Order No. 14 for McClelland which does not have a blue budget adjustment attached for $105,450.00. Please see that I get a budget adjustment to continue processing this resolution as well. I did receive the budget adjustment for Task Order No. 13. Thanks. Clarice From: Clarice Pearman To: Boudreaux, Ray Date: 5.12.06 12:34PM Subject: Res. 83-06 Ray, The City Council passed a resolution for McClelland Consulting Engineers Task Order #14, May 2, 2006. This item needs the blue budget adjustment to continue processing. Please let me know when I might expect to receive it. Thanks. Clarice CC: Smith, Sondra Clarice Pearman - Res. 83-06 Page 1 From: Clarice Pearman To: Boudreaux, Ray Date: 5.19.06 4:14PM Subject: Res. 83-06 Ray, Attached is a copy of the above resolution passed the City Council, May 2, 2006. Also attached is a copy of the budget adjustment and I will forward to Budget & Research the blue original. I am also forwarding to you via interoffice mail two of three original agreements. Thanks. Clarice CC: Audit; Fell, Barbara