HomeMy WebLinkAbout212-06 RESOLUTIONa
RESOLUTION NO. 212-06
A RESOLUTION APPROVING CHANGE ORDER NO. 2 TO THE
CONSTRUCTION CONTRACT WITH T -G EXCAVATING, INC. IN THE
AMOUNT OF $247,686.30 FOR SANITARY SEWER MAIN REPLACEMENT
AND REHABILITATION IN THE VICINITY OF NORTH COLLEGE
AVENUE AND DAVIDSON STREET.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves
Change Order No. 2 to the contract with T -G Excavating, Inc. in the amount of $247,686.30 for
sanitary sewer main replacement and rehabilitation in the vicinity of North College Avenue and
Davidson Street. A copy of Change Order No. 2, marked Exhibit "A" is attached hereto, and
made a part hereof.
PASSED and APPROVED this 19th day of December, 2006.
APPROVED:
By
•~A` •(n ire
ro
:FAYETTEVILLE 3
• a3
ATTEST: .4-." R SPc,: 2 =
id7*- . KAN • aJ••�
By: ,CYflzt.,a> 1�-1�►yutisi:EHTZ %%%%%%%
SO DRA SMITH, City lerk/Treasurer
Change Order No. 2 Page 1 of 3
CONTRACT. CHANGE O'
DER
Contract Schedule
Section Date 11/21/2006
ANRC Project No.: XP -976902-01 Owner ProjectNo.: 02017-0401
Project Name: Sewer Rehab,
Illinois and White River Basins Location: Fayetteville,
Arkansas
Owner: City of Fayetteville ‘ Contractor: T -G Excavating, Inc.
Address: 113 West Mountain Address: 26016 Admiral PI.
Fayetteville,
AR 72701 Catoosa, OK 74015
THE FOLLOWING CHANGES ARE HEREBY AMENDED INTO THE CONTRACT PLANS AND SPECIFICATIONS:
ITEM #
DESCRIPTION
DECREASE
INCREASE
1
2
Change
advantage
Order to add additional
of favorable unit
Add Additional time
prices
to complete
rehabilitation
the
work
additional
to take
-
work
$247,686.10
TOTAL DECREASE AMOUNT
TOTAL INCREASE AMOUNT
NET CHANGE ORDER
$0.00
$247,686.10
$247,686.10
CHANGE TO CONTRACT AMOUNT:
TOTAL AMOUNT
ENGINEERS FINAL
ELIGIBLE AMOUNT
Original Contract Amount
$2,223,022.00
$2,223.022.00
Total Previous Change Order(s)
$43.584.00
$43 584.00
Net Amount This Change Order
$247 686.10
$247,686.10
TOTAL CONTRACT AMOUNT TO DATE
$2.514,292.10
$2 514 292 10
CHANGE TO CONTRACT COMPLETION DATE:
Original Completion Date Feb. 27, 2007
Previous Adjusted Completion Date n/a
(Increase)(Decrease) This Change Order - 30 days Calendar Days
NEW CONTRACT COMPLETION DATE: Mar. 29, 2007
RECOMMENDED- AIN GROUP
Engineer
p /
BY: p f� /�A.� _ V Via. 1 ngatIL( ///:9 e i
"""��p
- o Signature Title Date
ACCEPTED- T -G EXCAVATING, INC.
BY:
C�ty(ktor
JVs
/ lel. its•o6
APPROVED: g
Signage
Y OF Fy
Title Date
ETTEVILLE
B�
inBY:
0 eri
!_/r.
1Z/71
,/,/
. _ _ Sip ature _ - (
Title
Date
Cost Breakdown for Change Order
Quantities
Adjusted
Contract
Amount
Item
Description
Unit
Unit Cost
Original
Adjusted
Adjust
+/-
Construction
1
48" STANDARD MANHOLE, 0'-6' DEEP
EA
51,900.00
59.00
70.00
11.00
520,900.00
2
48" STANDARD MANHOLE, EXTRA DEPTH
VF
$150.00
66.00
65.00
-1,00
-5150.00
3
48" DROP MANHOLE, 0'-6' DEEP
EA
$2,500.00
11.00
8.00
-3.00
47,500.00
4
48" DROP MANHOLE, EXTRA DEPTH
VF
$200.00
31.00
19.00
-12.00
-52,400.00
5
48" SHALLOW MANHOLE
EA
$2,000.00
4.00
4.00
0.00
$0.00
6
ABANDON EXISTING MANHOLE
EA
$1,000.00
4.00
7.00
3.00
53,000.00
7 .
REMOVE EXISTING MANHOLE
EA
5100.00
42.00
49.00
7.00
5700.00
8
18" SEWER PIPE BY OPEN CUT AND EMBEDMENT
LF
5150.00
588.00
593.00
5.00
5750.00
9
10" SEWER PIPE BY OPEN CUT AND EMBEDMENT
LF
$150.00
25.00
906.00
881.00
5132,150.00
10
8" SEWER PIPE BY OPEN CUT AND EMBEDMENT
LF
5100.00
5300.00
3733.00
-1567.00
-$156,700.00
11
TRENCH EXCAVATION AND BACKFILL (0-6 FEET)
LF
50.10
3616.00
3086.40
-529.60
-552.96
12
LF
50.20
2229.00
4115.00
1886.00
5377.20
TRENCH EXCAVATION AND BACKFILL (6-10 FEET)
13
LF
$1.00
5845.00
6807.00
962.00
5962.00
TRENCH SAFETY
14
8" SEWER PIPE BY TRENCHLESS PIPE ENLARGEMENT, ALL DEPTHS ,
8" RESTRAINED JOINT PVC SEWER PIPE BY
LE
590.00
3554.00
5722.00
2168.00
5195,120.00
15
TRENCHLESS PIPE ENLARGEMENT, ALL DEPTHS
LF
5110.00
170.00
0.00
-170.00
-$18,700.00
16
8" SANITARY SEWER BY BORE (NO CASING)
LF
5100.00
120.00
101.00
-19.00
-$1,900.00
17
8" SANITARY SEWER BY DIRECTIONAL DRILLING
LF
5180.00
215.00
0.00
-215.00
438,700.00
18
16" SEWER PIPE BY PIPE REAMING, ALL DEPTHS
LF
$200.00
2262.00
2162.00
0.00
$0.00
19
4" SERVICE LATERAL FOR LINE OPEN CUT
EA
$800.00
50.00
65.00
15.00
512,000.00
20
4" SERVICE LATERAL FOR LINE TRENCHLESS PIPE REHABILITATION
EA
$800.00
51.00
43.00
-8.00
-$6,400.00
21
SERVICE LATERAL EXTENSION (> 4 FEET IN LENGTH)
LF
$90.00
242.00
775.00
533.00
$47,970.00
22
4" SERVICE LATERAL CLEANOUT
EA
$200.00
101.00
86.00
-15.00
-53,000.00
23
CUT AND PLUG EXISTING SEWER
EA
$500.00
6.00
6.00
0.00
$0.00
24
18" TO 12" REDUCER
EA
5800.00
1.00
1.00
0.00
50.00
25
CREEK CROSSING (LR216) - INCL. CONCRETE ENCASEMENT,
STEEL ENCASEMENT, PIERS & ANCHORING
LS
$25,000.00
1.00
1.00
0.00
50.00
26
REMOVE EXISTING CONCRETE PIERS
EA
5300.00
4.00
4.00
0.00
50.00
27
CLAY DAM
EA
$200.00
32.00
30.00
-2.00
-$400.00
28
CONCRETE DRIVEWAY REMOVAL AND REPLACEMENT
SY
$50.00
153.00
95.00
-58.00
-52,900.00
29
CONCRETE CURB & GUTTER REMOVAL AND REPLACEMENT
LF
$25.00
420.00
184.00
-236.00
-55,900.00
30
ASPHALT PAVEMENT.REMOVAL/REPLACEMENT
SY
$120.00
1319.00
1993.00
674.00
580,880.00
31
ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT
SY
$50.00
25.00
' 52.00
27.00
$1,350.00
32
CONCRETE PAVEMENT REMOVALJREPLACEMENT
SY
$90.00
10.00
90.45
80.45
$7,240.50
33
CONCRETE SIDEWALK REMOVAL AND REPLACEMENT
SF
$10.00
636.00
284.00
-352.00
-53,520.00
34
REMOVE AND REPLACE WOOD.FOOTBRIDGE
EA
53,000.00
1.00
1.00
0.00
50.00
35
ROCK RIP RAP (INCLUDING GROUT)
CY
5100.00
142.00
208.40
66.40
56,640.00
36
16" DIRECT BURY STEEL CASING
LF
5110.00
20.00
40.00
20.00
52,200.00
37
6" CONCRETE ENCASEMENT
CY
$150.00
5.00
3.33
-1.67
-5250.50
38
REMOVE AND REPLACE 2"-4" DOGWOOD TREES
EA
$400.00
6.00
4.00
-2.00
-5800.00
39
UTILITY ADJUSTMENTS
EA
5600.00
7.00
3.00
-4.00
-52,400.00
40
REPAIR BOX CULVERT
EA
$1,000.00
2.00
2.00
0.00
50.00
41 -
REMOVE AND REPLACE EXISTING RCP,
EA
$2,000.00
4.00
0.00
-4,00
-$8,000.00
42
REMOVE AND REPLACE EXISTING CMP
EA
$1,500.00
2.00
- 1.00
-1.00
-$1,500.00
43
ECCENTRIC REDUCER
EA
$1,500.00
1.00
0.00
-1.00
-$1,500.00
44
POINT REPAIR REMOVAL OF OBSTRUCTIONS OR SAGS
LF
5100.00
100.00
0.00
-100.00
-510,000.00
45
SURFACE VIDEO DOCUMENTATION
LS
52,000.00
1.00
1.00
0.00
50.00
46
EROSION CONTROL
LS
$3,000.00
1.00
1,00
0.00
50.00
47
TRAFFIC CONTROL
LS
55,849.60
1.00
1.34
0.34
$1,988.86
48
TREE PROTECTION AND PRUNING
LS
$3,000.00
1.00
1.00
0.00
50.00
49
SAG REMOVAL
LF
5100.00
100.00
40.00
-60.00
-56,000.00
50
EXPLORATORY EXCAVATION -
EA
$1,000.00
5.00
4.00
-1.00
-51,000.00
51
ROCK EXCAVATION
CY
$200.00
100.00
500.40
400.40
580,080.00
Cost Breakdown for Change Order
Quantities
Adjusted
Item
Description-
Unit
Unit Cost
Original
Adjusted
Adjust
+/-
Contract
Amount
52
ROOT CUTTING
LF
$3.00
1000.00
95.00
-905.00
-$2,715.00
53
OBSTRUCTION REMOVAL
EA
$500.00.
10.00
5.00
-5.00
-$2,500.00
Alternate Bid Items (Construction)
Al
8" HDPE DR -17 SEWER PIPE BY DIRECTIONAL DRILLING,
ALL DEPTHS (LR122)
LF
$170.00
232.00
0.00
-232.00
-$39,440.00
Point Repairs
PRO1
6" AC PIPE 0-6' DEEP 10 FEET LONG
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR02, 02A
6" VCP 0-6' DEEP REPLACE SERVICE LINE TO PROPERTY LINE
LS
$2,000.00
2.00
2.00
0.00
$0.00
PRO4
6" VCP 0-6' DEEP 10 FEET LONG
LS
$2,000.00
1.00
1.00
0.00
$0.00
PRO6
10" VCP 6-10' DEEP 36 FEET LONG -
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR07
8" PVC 6-10' DEEP 10 FEET LONG
LS
$3,000.00
1.00
-1.00
43,000.00
PRO9
16" VCP 6-10' DEEP 10 FEET LONG
LS
$3,000.00
1.00
1.00
0.00
$0.00
PRIO
8" PLASTIC TRUSS PIPE 0-6' DEEP 10 FEET LONG
LS
$2,000.00
1.00
1.00
0.00
50.00
PRI 1
15" VCP 6-10' DEEP 15 FEET LONG
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR17
6" VCP 0-6' DEEP 10 FEET LONG _
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR21
6' VCP 0.6' DEEP REPLACE SERVICE LINE TO PROPERTY LINE .
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR22
8" VCP 0-6' DEEP 18 FEET LONG (TREE PROTECTION REQD)
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR24
8" VCP 0-6' DEEP 10 FEET LONG _
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR25
8" VCP 0-6' DEEP 10 FEET LONG .
LS
$2,000.00
- 1.00
1.00
0.00
$0.00
PR27
8" PVC 0-6' DEEP REPLACE SERVICE LINE TO PROPERTY LINE
LS
$3,000.00
1.00
1.00
0.00
$0.00
6" VCP 0-6' DEEP 19 FEET LONG WITH
PR28
10' LONG CONCRETE PATCH REPLACEMENT -
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR30 -
8" PVC 0-6' DEEP REPLACE SERVICE LINE TO PROPERTY LINE
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR31
6" VCP 0-6" DEEP 10 FEET LONG
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR33
8" VCP 0-6' DEEP REPLACE SERVICE LINE TO PROPERTY LINE
LS
$3,000.00
- 1.00
-1.00
-$3,000.00
PR37
6" VCP 0-6' DEEP 10 FEET LONG .
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR38
8" VCP 0-6' DEEP 10 FEET LONG WITH POSSIBLE GAS MAIN CROSSING
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR39 .
8" VCP 0-6' DEEP 10 FEET LONG
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR40
8" VCP 6-10' DEEP 15 FEET LONG
LS
53,000.00
1.00
1.00
0.00
$0.00
PR40A
8" VCP 6-10' DEEP 10 FEET LONG
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR41
6" VCP 0-6' DEEP 10 FEET LONG (10' DRIVEWAY REPAIR)
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR4IA
6" VCP 0-6' DEEP REPLACE SERVICE LINE TO PROPERTY LINE
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR42
8" PVC 6-10' DEEP 10 FEET LONG (CONCRETE ENCASEMENT IN A CREEK)
LS
$3,000.00
1.00
1.00
0.00
$0.00
PR43
8" PVC 0-6' DEEP 10 FEET LONG
LS
$2,000.00
1.00
1.00
0.00
$0.00
PR45
8" VCP 6-10' DEEP 14 FEET LONG WITH MANHOLE REPLACEMENT
LS
2000.00
1.00
-1.00
-$2,000.00
PR45A .
8" VCP 6-10' DEEP 30 FEET LONG a.
LS
3000.00
1.00
-1.00
-$3,000.00
PR45B
8" VCP 0-6' DEEP 10 FEET LONG
LS
2000.00
1.00
1.00
0.00
50.00
Alternate Bid Items (Point Repairs)
Al
ADDITIONAL PIPE FOR POINT REPAIRS (AS DIRECTED BY ENGINEER)
LF
300.00
20.00
10.30
-9.70
-$2,910.00
A2
CLAY DAM
EA
200.00
31.00
31.00
0.00
$0.00
Chl
24 bore - Dirt
LE
270.00
80.00
Ch2
24" bore Rock
LF
380.00
80,00
$30,400.00
Ch3
Mob/Demob Hoe Ram
Ea
1.00
-
$3,500.00
Ch4
Gravel Surface Repair
LF
10.00
130.00
$1,300.00
Total Contract Change
$291,270.10
Less Change Order 1
$43,584.00
Amount This Change Order
$247,686.10
Shannon Jones
Submitted By
City of Fayetteville
Staff Review Form
City Council Agenda Items
or
Contracts
19 -Dec -06
City Council Meeting Date
Engineering
Division
Action Required:
265
izpika
EGo
. d
Water/Wastewater
Department
Approval of Change Order Number 2 to the construction contract with T -G Excavating, Inc., in the amount of
$247,686.30, for sanitary sewer main replacement and rehabilitation in the vicinity of North College Avenue and
Davidson Street, and maintain a contingency of $15,000. Funds are available: $67,603 remain within the previously
approved contingency; the balance of $195,083 is available within the project budget.
$195,083.00
Cost of this request
5400-5700-5315.00
Account Number
02017-0401
Project Number
Budgeted Item
XX
$
7,498,907.00
Category/Project Contingency
3,389,898.13
Funds Used to Date
4,109,008.87
Remaining Balance
Budget Adjustment Attached
Sanitary Sewer Rehabilitation
Program Category / Project Name
Water and Wastewater
Program / Project Category Name
Water/Sewer
Fund Name
Depa
nt D
ector
City Attorney
3bNoN)O(o
Date
`P A Q_
Finance and Internal Service Director
dxd
Mayor
Date
Previous Ordinance or Resolution # 56-06
Original Contract Date:
Original Contract Number:
Received in City Clerk's Office
21 -Mar -06
1034
Comments: •
•
City Council Meeting of December 19, 2006
CITY COUNCIL AGENDA MEMO
To: Fayetteville City Council
Thru: Mayor Dan Coody
David Jurgens, Water and Wastewater Director
Fayetteville Sewer Committee
From: Shannon Jones, Water and Wastewater Engineer
Date: 29 November, 2006
Subject: Approval of Change Order Number 2 to the construction contract with T -G Excavating, Inc.,
in the amount of $247,686.30, for sanitary sewer main replacement and rehabilitation in the vicinity of
North College Avenue and Davidson Street, and maintain a contingency of $15,000. Funds are
available: $67,603 remain within the previously approved contingency; the balance of $195,083 is
available within the project budget.
RECOMMENDATION
Staff recommends approval of Change Order Number 2 to the construction contract with T -G Excavating, Inc.,
in the amount of $247,686.10, for sanitary sewer main replacement in the vicinity of North College Avenue and
Davidson Street, and maintaining a contingency of $15,000. Funds are available: $67,603 remain within the
previously approved contingency; the balance of $195,083 is available within the project budget.
BACKGROUND
This work involves replacing and relocating the 10" sewer main over which Doc Murdoc's and University Auto
were constructed roughly 50 years ago. The sewer main was installed in 1907; the joints leak and it needs to be
replaced. Extensive searching found no easement for the line, making it difficult to force the building owners to
pay the full cost of the relocation. We are, however, negotiating the easements and are requesting the owner pay
$40,168.30 of the cost, as he has requested an alignment that increases the construction cost by this amount.
In January, 2006, T -G provided an excellent bid of $2,223,022.00, for a City-wide sanitary sewer rehabilitation
project. Their price was $764,000 below the Engineer's Estimate and $1,451,151 below the second low bidder.
The prices in this change order are the same as in the bid, so we are able to capitalize on this excellent value.
DISCUSSION
This work was originally intended to be included in the sewer rehabilitation contract from the beginning.
However, STAG grant requirements include the necessity for an environmental assessment (EA) if any work is
performed outside existing easements.. All such work, including this reroute, was thus removed from the project
saving the $20,000 estimated to develop the EA. As the STAG grant funds dedicated to this project are fully
spent, we can now execute this work using City funds without the need for the EA.
The City could not execute this change order until all STAG funds were spent. This is by far the best and most
cost effective opportunity to eliminate this long standing problem. The building is under renovation, the parking
lot where the sewer will be rerouted is in bad shape from construction, we have an excellent price, and we have
a proven sewer rehabilitation contractor. This is a win-win opportunity for the City, the owners, and the
customers of the future businesses at this location. The change order has been reviewed by RJN Group, the
Engineer, they feel this is the best price the City could receive for this work. Their letter of recommendation is
attached.
BUDGET IMPACT
Funds are available: $67,603 remain within the approved contingency, and the balance of $195,083 is available
within the approved project budget.
STAG Rehab T -G CCMemo Chg Ord2 Oct06
RESOLUTION NO.
A RESOLUTION APPROVING CHANGE ORDER No. 2 TO THE
CONSTRUCTION CONTRACT WITH T -G EXCAVATING, INC. IN THE
AMOUNT OF $247,686.30 FOR SANITARY SEWER MAIN REPLACEMENT
AND REHABILITATION IN THE VICINITY OF NORTH COLLEGE
AVENUE AND DAVIDSON STREET.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves
Change Order No. 2 to the contract with T -G Excavating, Inc. in the amount of $$247,686.30 for
sanitary sewer main replacement and rehabilitation in the vicinity of North College Avenue and
Davidson Street. A copy of Change Order No. 2, marked Exhibit "A" is attached hereto, and
made a part hereof.
•
PASSED and APPROVED this 19`h day of December, 2006.
•
•
R
R$
2
1
OE
30�
CMG O GUTTER
rn
11-0
rri
m
p7 \
L�E ( `Ip`
LaAO¢t
0-
------------
-----
L_ctsu
\� f
r49—
ski
kit
kit
tds
\
n
-o
x
y
S
1
METAL SHED MCR MMR MEA
5W t
1
6' MOC R
SECOPI TY AP
Ac '4• CHAIN L
RODON
1
1
Ar.C_
I OCT
•
r j n group
Excellence through Ownership
November 17, 2006
Mr. David Jurgens, P.E.
Director Water and Wastewater
City of Fayetteville
113 W. Mountain St.
Fayetteville, AR 72701
Subject: Sanitary Sewer Replacement — Doc Murdoc's and University Auto
Dear' Mr. Jurgens:
•
www.rin.com
RJN was requested to secure a price from T -G Excavating to complete approximately 610 feet of 10 -inch
sanitary sewer line. The sewer line is to replace an existing 10 -inch sanitary sewer line that was installed
in 1907. Two buildings, Doc Murdoc's and University Auto, were constructed over the existing sewer
making access, and subsequent replacement not possible without causing damage to the buildings.
Apparently no easements were ever acquired for this sewer line; therefore, the City has no recourse to
require the property owners to pay for the relocation.
RJN originally included the new sewer construction in the STAG project, however, due to costly
environmental requirements of the Grant, the decision was made to remove this portion of work.
As low bidder on the STAG project, T -G Excavating's bid was 39% lower than the second low bidder.
T -G Excavating has agreed to install the 10 -inch sewer at the unit prices bid on the STAG project.
RJN recommends that the City approve a change order in the amount of $207,517.80 to T -G Excavating's
contract.
Should you have any questions, please call me.
Sincerely, _
RJN Group, Inc. "'rte
Wet
Thomas A Harris, P.E.
Senior Project Manager
Xc: file
26 East Meadow #8 • Fayetteville; AR 72701
• 479.444.6119 • fax 479.444.6119
(12.27.06) Clarice Pearman - Res. 212-06
Page 1
From:
To:
Date:
Subject:
Attachments:
Clarice Pearman
Jones, Shannon
12.27.06 4:31 PM
Res. 212-06
212-06 T -G Excavating CO2.pdf
CC: Audit
Shannon:
Attached is a copy of the above resolution passed by City Council, December 19, 2006. I will forward via interoffice mail
three of four original change orders. Please let me know if there is anything else needed. Have a good evening.
Thanks.
Clarice
Clarice Buffalohead-Pearman, CMC
City Clerk/Treasurer Division
113 West Mountain
Fayetteville, AR 72701
479-575-8309
cpearman@cilayettevillesar.us
•