RESOLUTION NO. 204-06
•
A RESOLUTION APPROVING AMENDMENT NO. 14
TO THE CONTRACT WITH , OPERATIONS
MANAGEMENT INTERNATIONAL (OMI) IN THE
AMOUNT OF $6,104,447.88 FOR THE OPERATION
AND MANAGEMENT OF FAYETTEVILLE
WASTEWATER TREATMENT FACILITIES FOR 200V,
AND AN INCREASE OF $153,000.00 FOR THE COST OF
SERVICES IN 2006; AND APPROVING A BUDGET
ADJUSTMENT IN THE AMOUNT OF $153,000.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Amendment No. 14 to the contract with Operations
Management International (OMI) in the amount of $6,104,447.88 for the
operation and management of Fayetteville Wastewater Treatment facilities for
2007, and an increase of $153,000.00 for the cost of services in 2006. A copy of
Amendment No. 14, marked Exhibit "A" is attached hereto, and made a part
hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby authorizes the Mayor to sign Amendment No. 14 to the contract with
OMI, contingent upon final approval of the FY2007 Budget.
Section 3. That the City Council of the City of Fayetteville, Arkansas
hereby approves a Budget Adjustment in the amount of $153,000.00.
PASSED and APPROVED this 5th day of December, 2006.
APPROVED. ATTEST.
By: .• l� By: antic
DA COODY, Mayor
SONDRA SMgirly€itg,Clerk
Fa... • II Op.0.133
GV; ••35
c
FAYETTEVILLE
°SS%
eLP••KAN10c .14•0
1''nON6TN C'v``
'i'aewofl'"
AMENDMENT NO. 14
TO
AGREEMENT FOR OPERATIONS, MAINTENANCE AND MANAGEMENT SERVICES
FOR THE CITY OF FAYETTEVILLE, ARKANSAS WASTEWATER TREATMENT PLANT
THIS AMENDMENT NO. 14 to the Agreement for Operations, Maintenance and Management Services
for the City of Fayetteville, Arkansas Wastewater Treatment Plant dated September 1, 1994 (the
"Agreement"), made effective on the 1st day of January, 2007, by and between the City of Fayetteville,
Arkansas, whose address for any formal notice is 113 W. Mountain St, Fayetteville, Arkansas 72701
(hereinafter the "City") and Operations Management International, Inc., with offices at 9193 S. Jamaica
Street, Suite 400, Englewood, Colorado 80112 (hereinafter "OMI") is made and entered into for purposes
of amending certain provisions of the Agreement, to prevent the facilities covered by the Agreement from
being deemed to be used in the trade or business of OMI pursuant to Section 141 (b) of the Internal
Revenue Code of 1986, as amended.
NOW THEREFORE, the City and OMI agree to amend the Agreement as follows:
1. Article 4.1 is hereby deleted in its entirety and replaced with the following Article 4.1:
4.1 For services rendered during calendar year 2007 the City of Fayetteville shall pay to OMI
the actual cost of services performed plus an annualized management fee of One Hundred
Thousand Five Hundred Ten Dollars and Eighty Five Cents ($105,510.85). Said fee and
estimated cost (base fee) shall be paid in twelve (12) equal monthly installments. The
management fee for subsequent years will be determined proportional to the increase in
estimated cost.
Article 4.3 is hereby deleted in its entirety and replaced with the following Article 4.3:
4.3 OMI estimates the cost for services for calendar year 2007 shall be Six Million One
Hundred Four Thousand Four Hundred Forty Seven Dollars and Eighty Eight Cents
($6,104,447.88). Details of said cost are shown in Appendix J. The base -fee shall be
negotiated each year in September for the upcoming calendar year. Should the City and
OMI fail to agree, the base fee will be determined by the application of the base fee
adjustment formula shown in Appendix F. Upon each contract year renegotiation, OMI
shall continue to invoice City of Fayetteville at the previous amount until the new contract
year price is agreed upon. Upon written notice agreement between the parties as to the
new contract year base fee, OMI shall issue an invoice retroactively adjusting the previous
base fee amount. Should the actual expenditures exceed estimated expenditures by more
than Twenty Thousand Dollars ($20,000), in any year of this Agreement, specific approval
will be obtained from the City prior to OMI incurring additional costs.
Article 4.4 is hereby deleted in its entirety and replaced with the following Article 4.4:
4.4 An administrative fee of fifteen percent (15 %) is added to personnel services and ten
percent (10%) to all other costs for administration, support, management and overhead,
with the exception of electricity and lift station odor control direct expenses.
4. Article 4.8 is hereby deleted in its entirety and replaced with the following Article 4.8:
4.8 OMI agrees to incur up to One Hundred Fifty Three Thousand Nine Hundred Seventy
Page 1 of 9
Eight Dollars and Three Cents ($153,978.03) per year in lift station odor control direct
expenses, including costs for necessary chemicals, pumps, tanks, related equipment and
such outside services as needed. These expenses will not include labor and benefits for
OMI personnel. OMI will rebate to the City of Fayetteville the entire amount that actual
lift station odor control expenses are less than One Hundred Fifty Three Thousand Nine
Hundred Seventy Eight Dollars and Three Cents ($153,978.03) in any year of this
Agreement.
Appendices B, E, and J are hereby deleted in their entirety and replaced with the attached
Appendices B, E, and J.
Appendix K is hereby added to the Agreement.
This Amendment No. 14 together with the Agreement,constitutes the entire agreement between the Parties
and supersedes all prior oral and written understandings with respect to the subject matter set forth herein:
Unless specifically stated all other terms and conditions of the Agreement shall remain in full force and
effect. Neither this Amendment nor the Agreement may be modified except in writing signed by an
authorized representative of the Parties.
The Parties, intending to be legally bound, indicate their approval of the Amendment by their signatures
below.
OPERATIONS MANAGEMENT
INTERNATIONAL, INC.
Roger B. QiMyle
Senior Vice President , /2-00 G
Date: ((
CITY OF FAYETTEVILLE
Dan oody
Mayor
Date:
APPROVED AS TO FORM:
t Williams
City Attomey
Date: /2-1/3 /06
Page 2 of 9
..``ERK/Tying,
R e"'t
G ,
SA.' 'G\TY�o,e..
rn ,
—V • •t -
5 FAYETTEVILLE:
y .AN
Appendix B
LOCATION OF PROJECT
B.I OMI agrees to provide the services necessary for the management, operation and maintenance of
the following:
a) All equipment, vehicles, grounds and facilities now existing within the present property
boundaries of or being used to operate the City of'Fayetteville's Wastewater Treatment
Plant located at:
1400 North Fox Hunter Road
Fayetteville, Arkansas
b) All equipment, grounds, and facilities now existing within the present property boundaries
of pump stations described as follows:
WW1 978 E. Zion Rd
WW2 4938 Mission Blvd. (Timbercrest)
W W 3 Salem Rd — Off Mount Comfort Rd (Crystal Springs)
WW4 691 W. Poplar
WW5 3896 N. Gregg Ave
WW6 3021 N. Old Wire Rd
WW7 2034 N. County Road 877
WW8 729 W. North St
WW9 1336 N. Porter
WW10 716FutrallDr
WWII 4412 W. 6th St
W W 12 398 N. Double Springs Rd
W W 13 878 S. Stonebridge Rd
W W 14 1820 S. Armstrong
W W l5 203 E. 29th Circle (Country Club)
W W 16 3917 S. McCollum Rd
W W 18 202 N. Sandy (Greenland)
W W 19 988 S Mallywagnon Rd
WW 20 3212 N. Highway 112
WW21 1687 S. Happy Hollow Rd
WW22 630 N. Double Springs Rd
WW23 440 E. Fairway Ln (Masters Addition - Country Club 2)
WW24 4071 South McCollum (Airport East)
WW25 551 W. Aster Ave (Willow West - Farmington)
WW26 74 S. Kestrel (Sequoyah Preserve)
WW27 1031 River Meadows Dr (Stonebridge Meadow)
WW28 1603 Plantation Avenue (Heritage Village)
WW29 390 N. Cato Springs (Bohannon - Greenland)
WW30 2324 Rupple Rd (Holt Middle School)
WW31 2130 W. Moore Ln (Research Park)
WW32 478 N. Durango Place (Silverthome)
WW33 4644 N. Crossover Rd (Stonewood - Copper Creek)
WW34 4572 S. School (Airport South)
WW35 3083 W. 6th Street (Lowe's)
WW36 1642 N. Willowbrook Dr (Skyler Place)
W W 37 3848 W. Edgewater Dr (Clabber Creek)
Page 3 of 9
WW38 3710 E. Zion Rd (Copper Creek II)
WW39 2392 N. Kenswick Avenue (Crofton Manner)
WW40 1811 S. Cherry Hills Dr (Stone Bridge Meadow II)
WW41 1608 S. Springlake Dr (Crescent Lake)
WW42 2588 N. Firefly Catch Dr (Clabber Creek III)
WW43 308 S. Ray Ave (Timber Trails)
W W 44 (Legacy Pointe Phase 5)
All equipment, grounds, and facilities now existing within the present property boundaries
of or being used to operate the City of Fayetteville's Sludge Management Site located east
of the wastewater treatment facility across the White River:
The potable water SCADA system at the following locations:
W1 215 W. 241h Street
W2 844 N. Crossover Road
W4 1016 E Ash Street
W5 707 E. Rogers Drive
W6 456 E. Baxter Lane
W7 707 E. Rogers Drive
W8 113 N. Sang
W9 1170 E. South Skyline
W10 1044 E. Township Road
W11 Mt. Kessler
W12 Highway 45 Valve Station
W13 . Fire Tower Avenue (Goshen)
W14 Fire Tower Avenue (Goshen)
W15 Co. Road # 55 (Round Mountain)
W16 Co. Road # 4343 (Benson Mountain)
W17 Gulley Road Tank
W18 Gulley Road Station
W19 1490 Sunrise Mountain Rd
W20 Monitor Rd
W21 2210 N. Old Wire Rd
W22 2880 N. Old Missouri Rd
W23 3385 N. Par Ct
W24 3023 E. Joyce Blvd
W25 Ozarks Regional Transit (Hwy 12)
2435 S. Industrial Dr.
12141 Ed Edwards Road
Page 4 of 9
Pump Station
Pump Station
Pump Station
Pump Station
Ground Storage Tank
Ground Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Pressure -reducing Valve
Ground Storage Tank
Pump Station
Ground Storage Tank
Ground Storage Tank
Elevated Storage Tank
Pump Station
Pump Station
Surge Tank
Valve
Valve
Valve
Valve
Valve
Water & Sewer Ops Center
Mt. Robinson Tower Site
Appendix E
VEHICLE AND MOBILE EQUIPMENT DESCRIPTION
Unit
Unit Description
Year
82
Sykes 6" Pump/Trailer
1995
266
GMC V -Jimmy
1990
320
Ford F-350SD 4X4 Utility, Crew Cab w/crane
1999
324
Ford F-350 SD 4X4 Utility, Reg. cab w/crane
1999
325
Ford F-350 4 X 4, Reg. cab
2000
339
Ford F-350 4 X 4, Flatbed
2002
539
Ford CM -224 Mower
1994
551
Ford 3930 Gen Purpose Tractor, 2X4
1995
556
Ford/New Holland 8160 Tractor w/Loader
1997
562
Ford/New Holland 8160 Tractor
1999
563
Ford/New Holland 8160 Tractor
1999
564
Ford/New Holland 8160 Tractor w/Loader
1999
566
Ford/New Holland LS55 Lawn Tractor
1999
570
New Holland 8670 Tractor, 145 hp, 4X4
2000
581
Ford/New Holland TS100A Tractor w/NH 52# Frontend
Loader
2004
582
New Holland 1412 Discbine Mower Conditioner
2004
583
New Holland 740 Round Baler
2004
588
New Holland B940A Large Square Baler
2005
589
New Holland 1412 Discbine Mower Conditioner
2005
644
New Holland 575E Backhoe/Loader
2000
706
IHC S-1900 T/A Dump
1985
712
Ford F800 (Gooseneck) Tractor
1983
734
Freight Liner 112 Cony Tractor
1987
806
Case 1150G Bulldozer, 119 hp
1995
900
Generator
1987
910
Trailer, 16 Ft. N/C
1987
927
Parker, 24' Gooseneck Trailer
1991
959
Bush Hog 2620 Rot. Cutter
1995
966
P.J. Trailer, 18 Ft.
1996
969
LO -Boy, 25T-36FT Trailer
1996
988
Hesston 3982 Wheel Rake
1998
989
M & W DF -12 Wheel Rake
1998
992
Polaris 500 4 X 4
1998
Page 5 of 9
Appendix E
VEHICLE AND MOBILE EQUIPMENT DESCRIPTION (CONTINUED)
1092
Ford Explorer
2002
2004
Ford Ranger, 4X4
1997
2007
Ford Ranger, 4X4
1997
2089
Chevy Silverado, 4X4, Reg. Cab
2006
2090
Chevy Silverado; 4X4, Reg. Cab
2006
2103
Ford 150, 1/2 Ton, 4WD, Ext. Cab
2006
9004
John Deere 348-C Small Square Baler
1999
9017
New Holland 1411 Mower Cond.
2000
9021
Volvo Penta 400 KW - Trailer Mounted Diesel Generator @
LS#8
2001
9024
Hesston GEHL WR -522 Wheel Rake
2001
9025
Volvo Penta 400 KW - Trailer Mounted Diesel Generator @
LS#9
2001
9031
E -Z -GO ST -350 Utility Vehicle
2001
9034
Yale 5000# Fork Lift, Solid Tires
2002
9037
E -Z -GO ST -480 Workhorse Utility Vehicle
2002
9083
28 yd, 38' End Dump Trailer, Tandem Axle
Portable Generator for LS
2005
•
Page 6of9
Appendix J
COST DETAIL
The annualized estimated costs for calendar year 2007 are as follows:
The following are some of the major reasons for cost circumstances:
OMI has significantly reduced the mark up on labor from thirty percent (30%) to fifteen percent
Page 7 of 9
Current 2006
Proposed 2007
Direct Labor & Benefits
$ 1,714,624.83
$ 2,180,396.37
Labor Markup @ 30% for 2006 & 15% for 2007
$ 514,387.45
$ 327,059.46
Electricity
$ 576,000.00
$ 696,999.87
Electricity Markup
Other Direct Costs
$ 1,434,090.16
$ 1,927,477.81
Other Direct Costs Markup @ 10%
$ 143,409.02
$ 192,747.78
Subtotal
$ 4,382,511.46
$ 5,324,681.29
Fixed Fee
$ 86,841.35
$ 105,510.85
Lift Station Odor Control
$ 104,855.00
$ 153,978.03
Capital Item Amortization
$ 100,621.85
$ 119,712.00
Total Estimated O&M Budget
$ 4,674,829.66
$ 5,703,882.17
Odor Control System Rehabilitation
$ 118,741.88
Bar Screen Relocation
$ 39,422.22
Aerator Rehabilitation
$ 183,085.47
HMI Integration for Westside WWTP
$ 59,316.15
Total Estimated Annualized Budget
$ 4,674,829.66
$ 6,104,447.88
Net Annualized Difference
$ 1,429,618.23
The following are some of the major reasons for cost circumstances:
OMI has significantly reduced the mark up on labor from thirty percent (30%) to fifteen percent
Page 7 of 9
(15%) in recognition of the outstanding long term relationship that has existed between OMI and
the City of Fayetteville and in the interest of helping the City to contain operational costs in light
of recent cost issues related to the overall wastewater systerii within the City. The cost reduction is
made possible by heavily leveraging OMI's experience and expertise in the wastewater treatment
industry and through significant job sharing within the OMI network.
Addition of 2 5 full time positions to cover additional sludge handling & disposal, O&M of the
odor scrubbers for the sludge tank, headworks area, and the solids building, and 2007 cost of
living adjustments.
3. Electrical budget has been increased by twenty one percent (21%) to reflect the actual electrical
cost in 2006. Electrical cost has been significantly impacted by the fuel cost adjustment, which
ranged from twenty three percent (23%) to forty three percent (43%) of the total electrical cost in
2006.
Additional costs in chemicals to operate odor scrubbers at the Noland facility and increased alum
usage to meet summer phosphorus limits in Beaver Water District agreement.
5. Additional costs for sludge disposal which include vehicle expenses, tipping fees, polymer costs,
and contract hauling.
6. Additional odor control efforts in the collection system including significantly greater efforts at the
Hamestring lift station which feeds the Porter Road lift station.
7. Ever increasing cost to maintain community -expected high level of performance with many pieces
of equipment nearing, the end of their life cycle and destined to be replaced or upgraded as part of
the ongoing Wastewater Improvement Project.
8. Additional costs for maintenance of forty two plus (42+) sewage lift stations during the next year.
Addition of the one-time Odor Control System Rehabilitation Project to rebuild the existing odor
scrubber for odor control at the sludge holding tank. This project is not covered under the plant
upgrade and should save the City about Thirty Five Thousand Dollars ($35,000) by performing the
work in house.
10. Addition of the Bar Screen Relocation Project to relocate one of the existing bar screens at the
Noland plant to the new headworks building. This project is not covered under the plant upgrade
and allows delaying the purchase of about Four Hundred Fifty Thousand Dollars ($450,000) in
additional capital items for the present time. This item will likely be duplicated in 2008 to relocate
one of the existing bar screens to the Westside WWTP as well.
11. Addition of the one-time Aerator Rehabilitation Project to rebuild at least two of the twenty (20)
year old aerators to keep up with the additional organic loadings. This represents about a thirty
percent (30%) savings over the purchase of new units and should have similar life expectancy.
12. Addition of the one-time HMI Integration for the Westside WWTP Project to allow a Seventy Five
Thousand Dollar ($75,000) deduction from the cost of the West Side WWTP construction. Much
of this cost would have been expended by plant personnel anyway in becoming familiar with the
new SCADA system. This project will also allow more complete integration of the new Westside
WWTP with the existing SCADA system for the Noland plant and the collection system.
Page 8 of 9
Appendix K
2006 BUDGET ADJUSTMENT DETAIL
In accordance with Article 4.3 of the "Agreement for Operations, Maintenance and Management Services for the
City of Fayetteville's Wastewater Treatment Plant" dated September I, 1994, Operations Management International
respectfully requests approval of a budget adjustment to the 2006 O&M budget in the amount of One Hundred Fifty
Three Thousand Dollars ($153,000.00).
The estimated increase is extrapolated using the average actual O&M costs from January to September 2006
based on the major contributing factors listed below:
1. The monthly costs for electrical power are influenced by several factors. One of those factors which we
have no control over relates to the cost of fuel used to generate the electricity. The normal rate structure
has an estimated `normal' cost for fuel built in, but if the actual fuel costs are higher than the budgeted
amount, the cooperative charges the customer for that difference via a separate line item called "Fuel
Cost Adjustment". Recognizing that these costs were also higher in 2005 than we had originally
anticipated, the 2006 budget included what we felt was a reasonable amount to cover the anticipated fuel -
related costs as projected by the cooperative. However, the monthly charges for fuel cost adjustments
have been significantly higher than even that increased amount and have greatly impacted the total
electrical costs in 2006. The average fuel cost adjustment in 2006 has been 30.1% of the total monthly
electrical cost compared to 18.7% for 2005 and 0% in most previous years. These high fuel cost
adjustments have caused an average $4,530 cost overrun in the monthly electrical budget, or an estimated
$54,360 for the year.
2. Treatment of domestic wastewater in Fayetteville produces very clean effluent but also leaves a residual
product known as sludge or biosolids, which is made up largely of excess bacteria that have been
removed from the treatment process. Several factors affect sludge disposal costs including: sludge
hauling, landfill tipping fee, and polymer usage. The combination of higher sludge hauling costs (largely
impacted by higher than anticipated costs for diesel fuel) and tipping fee (charges from the landfill which
have also risen during the budget year), have caused expenses to be an average of $5,720 more per
month than budgeted. In addition to the sludge hauling and disposal costs, the average polymer use was
much higher in the first 6 months of 2006 due to both increased loadings and process complications
caused by the ongoing construction project. Adaptation to the new sludge holding tank and alterations to
the sludge processing schedule due to temporary or interim sludge pumping issues and such have
required more polymer than we had planned to use. The estimated costs for polymer use are $2,500 a
month more than the budgeted amount. The overall costs for sludge disposal, therefore, are estimatedto
be $8,220 per month or $98,640 more than budget for the year.
As always, OMI strives to provide the best value service that is possible to deliver. This is the first time in nearly
twenty years of contract operations that OMI has had to ask for a budget adjustment due to situations beyond OMI's
control. Even though this amount is already more than $100,000 less than projected in mid -summer of this year,
OMI will obviously continue every effort to maintain expenses at the lowest level possible.
Page 9 of 9
City of Fayetteville, Arkansas
Budget Adjustment Form
Budget Year
2006
Department: Operations
Division: Wastewater Treatment
Program: Wastewater Treatment Plant
Date Requested
12/5/2006
Adjustment Number
Project or Item Added/Increased:
$153,000 is being requested in the PCP Operation
Contract account.
Project or Item Deleted/Reduced:
$153,000 is being requested from Sewer Sales on
Computer revenue account.
Justification of this Increase:
For the approval of amendment 14 with Operations
Management International (OMI).
Justification of this Decrease:
Currently $181,859 has been collected over the original
2006 budgeted amount for the Sewer Sales on Computer
revenue account. This additional revenue is being
recognized for the OMI contract.
Account Name
Increase Expense Budget (Decrease Revenue Budget)
Account Number
PCP operation contract
Account Name
5400 5100
Amount Project Number
5328 00 153,000
Decrease Expense Budget (Increase Revenue Budget)
Account Number Amount
Sewer sales on computer
5400 0940
4432 01 153,000
Project Number
Approval Signatures
RequestedBy
1
i) Alf A
nager
ar
nt Di
ector
Finance & Inte Services Director
Eta) AL
Mayor
C
Date
Date
I N0J 06
Date
11-17-o[
Date
2-
Date
Budget Office Use Only
Type: A B
Posted to General Ledger
Posted to Project Accounting
Entered in Category Log
E
Initial Date
Initial Date
Initial Date
David Jurgens
Submitted By
City of Fayetteville
Staff Review Form
City Council Agenda Items
or
Contracts
5 -Dec -06
City Council Meeting Date
Water/Wastewater
Division
Action Required:
/a/5/06
D/1 /, •,-i.eynat!
Water/Wastewater
Department
Resolution approving Amendment No. 14 to the Agreement between the City and Operations Management, International, Inc. (OMI), for
Operations, Maintenance, and Management Services for the City of Fayetteville, Arkansas Wastewater treatment Plant and approval of a
budget adjustment. This contract amendment provides for $6,104,447.88 for services for 2007, and an increase of $153,000.00 for the cost of
services in 2006. The 2007 cost is included in the proposed Fiscal Year 2007 Budget. A budget adjustment is attached for 2006.
$6,257,447.88
Cost of this request
5400.5100.5328.00
Account Number
Project Number
Budgeted Item
XX
6,104,447.88
Category/Project Budget
Funds Used to Date
6,104,447.88
Remaining Balance
Budget Adjustment Attached
XX
Water/Wastewater
Program Category / Project Name
Wastewater Treatment
Program / Project Category Name
Water and Sewer
Fund Name
Department Dir for
I�
City Attorney
Finance and Internal Service Director
Mayor
7
!' had Olo
Date
11-17-41‘
Date
Date
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number
94-94
August, 1994
412
Received in C'fy ClerkOffice
N1ERED
'Received in Mayor's Office
ENTERED
1149/
'Comments:
ela
t'aye evi le
CITY COUNCIL AGENDA MEMO
City Council Meeting of December 5, 2006
To: Mayor and City Council
From: David Jurgens, Water/Wastewater Director
Date: November 14, 2006
Subject:
ion
Resolution approving Amendment Number 14 wIIh Operations Management International,
Inc. for operation, maintenance and management of wastewater treatment facilities for 2007
and for reconciliation of costs for 2006
RECOMMENDATION
Fayetteville City Administration recommends approval of Amendment No. 14 to the Agreement between the City
and Operations Management, International, Inc. (OMI), for Operations, Maintenance, and Management Services
for the City of Fayetteville, Arkansas Wastewater Treatment Plant and approval of a budget adjustment. This
contract amendment provides for $6,104,447.88 for services for 2007, and an increase of $153,000.00 for the cost
of services in 2006. The 2007 cost is included in the proposed Fiscal Year 2007 Budget. A budget adjustment is
attached for 2006.
BACKGROUND
The City of Fayetteville's first private operating contract commenced in 1987 with this year marking 20 years of
privatized services from Operations Management International, Inc. (OMI). In May of 2003, Fayetteville City
Council approved Amendment No. 9 extending this agreement through December 31, 2008.
The scope of services provided by OMI to the City of Fayetteville include: (1) operate and maintain the Noland
Wastewater Treatment Plant; (2) operate and maintain 43 wastewater pumping stations; (3) administer the City's
NPDES discharge permit; (4) manage the City's sludge disposal program; (5) implement the City's industrial
pretreatment program; (6) support the SCADA (supervisory control and data acquisition system) network that
monitors water/wastewater facilities; (7) pursue operation economies, efficiencies, and permit compliance; (8)
actively participate in the design and construction of the Wastewater System Improvement Project (WSIP)
providing technical, operational, and maintenance input; and (8) perform several one-time, out of scope tasks,
identified in the contract, related to and saving costs from the WSIP.
To encourage operational economy and innovation, an incentive provision is incorporated within the contract
whereby budget underruns are distributed 87.5% to the City and 12.5% to OMI.
DISCUSSION
The operating expenses for fiscal year 2007 contain an increase from 2006 due to significantly higher fuel and
chemical costs, a 2.6% labor increase, a 3% customer base increase, a 21% electrical cost increase, addition of four
sewer lift stations, and a 12% increase in organic loadings and the resultant increase of sludge to be processed and
hauled in the year. Additionally, this contract amendment includes $400,566 in costs directly related to the WSIP.
The contract increase for operations (excluding one-time costs) is 21.5%; the overall contract increase is 22%.
To validate the costs of the contract, staff compared operational costs between the Rogers and Fayetteville plants on
a unit -cost comparison basis. Costs are broken down on a per -thousand gallons treated or a per -pound of material
removed. Although Fayetteville's permit is much more stringent, the costs are very close. Rogers is higher on
some specific costs; Fayetteville is higher in others. In all cases, the costs are so close that staff is confident both
cities are receiving excellent value for their WWTP operation. Details are in the attached memo.
BUDGET IMPACT
The 2007 cost of $6 104,447.88 is included in the proposed 2006 Budget; authorization of Amendment No. 14 will
be contingent upon the budget approval. A budget adjustment is attached for the $153,000.00 for the cost of
services in 2006 is attached. Funds are coming from additional (higher than budgeted) sewer revenues received in
2006.
RESOLUTION NO.
A RESOLUTION APPROVING AMENDMENT NO. 14
TO THE CONTRACT WITH OPERATIONS
MANAGEMENT INTERNATIONAL (OMI) IN THE
AMOUNT OF $6,104,447.88 FOR THE OPERATION
AND MANAGEMENT OF FAYETTEVILLE
WASTEWATER TREATMENT FACILITIES FOR 2006,
AND AN INCREASE OF $153,000.00 FOR THE COST OF
SERVICES IN 2006; AND APPROVING A BUDGET
ADJUSTMENT IN THE AMOUNT OF $153,000.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Amendment No. 14 to the contract with Operations
Management International (OMI) in the amount of $6,104,447.88 for the
operation and management of Fayetteville Wastewater Treatment facilities for
2007, and an increase of $153,000.00 for the cost of services in 2006. A copy of
Amendment No. 14, marked Exhibit "A" is attached hereto, and made a part
hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby authorizes the Mayor to sign Amendment No. 14 to the contract with
OMI, contingent upon final approval of the FY2007 Budget.
Section 3. That the City Council of the City of F jayettlelle, • 'kansas
hereby approves a Budget Adjustment in the amount of$1.53;00�0.0O.
PASSED and APPROVED this 5th da of December, 2006.
Al
By
SMITH, City Clerk
AN COODY, Mayor
AMENDMENT NO. 14
TO
. AGREEMENT FOR OPERATIONS, MAINTENANCE AND MANAGEMENT SERVICES
FOR THE CITY OF FAYETTEVILLE, ARKANSAS WASTEWATER TREATMENT PLANT
THIS AMENDMENT NO. 14 to the Agreement for Operations, Maintenance and Management Services
for the City of Fayetteville, Arkansas Wastewater Treatment Plant dated September 1, 1994 (the
"Agreement"), made effective on the 151 day of January, 2007, by and between the City of Fayetteville,
Arkansas, whose address for any formal notice is 113 W. Mountain St, Fayetteville, Arkansas 72701
(hereinafter the "City') and Operations Management International, Inc., with offices at 9193 S. Jamaica
Street, Suite 400, Englewood, Colorado 80112 (hereinafter "OMP') is made and entered into for purposes
of amending certain provisions of the Agreement, to prevent the facilities covered by the Agreement from
being deemed to be used in the trade or business of OMI pursuant to Section 141 (b) of the Internal
Revenue Code of 1986, as amended.
NOW THEREFORE, the City and OMI agree to amend the Agreement as follows:
1. Article 4.1 is hereby deleted in its entirety and replaced with the following Article 4.1:
4.1 For services rendered during calendar year 2007 the City of Fayetteville shall pay to OMI
the actual cost of services performed plus an annualized management fee of One Hundred
Thousand Five Hundred Ten Dollars and Eighty Five Cents ($105,510.85). Said fee and
estimated cost (base fee) shall be paid in twelve (12) equal monthly installments. The
management fee for subsequent years will be determined proportional to the increase in
estimated cost.
2. Article 43 is hereby deleted in its entirety and replaced with the following Article 4.3:
4.3 OMI estimates the cost for services for calendar year 2007 shall be Six Million One
Hundred Four Thousand Four Hundred Forty Seven Dollars and Eighty Eight Cents
($6;104,447.88). Details of said cost are shown in Appendix J. The base fee shall be
negotiated each year in September for the upcoming calendar year. Should the City and
OMI fail to agree, the base 'fee will be determined by the application of the base fee
adjustment formula shown in Appendix F. Upon each contract year renegotiation, OMI
shall continue to invoice City of Fayetteville at the previous amount until the new contract
year price is agreed upon. Upon written notice agreement between the parties as to the
new contract year base fee, OMI shall issue an invoice retroactively adjusting the previous
base fee amount. Should the actual expenditures exceed estimated expenditures by more
than Twenty Thousand Dollars ($20,000), in any year of this Agreement, specific approval
will be obtained from the City prior to OMI incurring additional costs.
3. Article 4.4 is hereby deleted in its entirety and replaced with the following Article 4.4:
4.4 An administrative fee of fifteen percent (15 %) is added to personnel services and ten
percent (10%) to all other costs for administration, support, management and overhead,
with the exception of electricity and lift station odor control direct expenses.
4. Article 4.8 is hereby deleted in its entirety and replaced with the following Article 4.8:
4.8 OM agrees to incur up to One Hundred Fifty Three Thousand Nine Hundred Seventy
,Page 1 df 9
•
•
Eight Dollars and Three Cents ($153,978.03) per year in lift station odor control direct
expenses, including costs for necessary chemicals, pumps, tanks, related equipment and
such outside services as needed. These expenses will not include labor and benefits for
OMI personnel. OMI will rebate to the City of Fayetteville the entire, amount that actual
lift station odor control expenses are less than One Hundred Fifty Three Thousand Nine
Hundred Seventy Eight Dollars and Three Cents ($153,978.03)• in any year of this
Agreement.
5.' Appendices B, E, and J. are hereby deleted in their entirety and replaced.. with the attached
Appendices B, E, and J.
6. Appendix K is hereby added to the Agreement.
This Amendment No. 14 together with the Agreement, constitutes the entire agreement between the Parties
and supersedes all prior oral and written understandings with respect to the subject matter set forth herein.
Unless specifically stated all other terms and conditions of the Agreement shall remain in full force and
effect. Neither this Amendment nor the Agreement may be modified except in writing signed byan
authorized representative of the Parties.
The Parties, intending to be legally bound, indicate their approval of the Amendment by their signatures
below. '
OPERATIONS MANAGEMENT CITY OF FAYETTEVILLE
INTERNATIONAL, INC.
Roger B. Quayle Dan Coody
Senior Vice President Mayor
Date: Date:
APPROVED AS TO FORM:
Kit Williams
City Attorney
Date:
Page 2 of 9
Appendix B
LOCATION OF PROJECT
•
B.1 OMI agrees to provide the services necessary for the management, operation and maintenance of
the following:
a) All equipment, vehicles, grounds and facilities now existing within the present property
boundaries of or being used to operate the City of Fayetteville's Wastewater Treatment
Plant located at:
1400 North Fox Hunter Road
Fayetteville, Arkansas .
b) All equipment, grounds, and facilities now existing within the present property boundaries
of pump stations described as follows:
•
WW1 978 E. Zion Rd
WW2 4938 Mission Blvd. (Timbercrest)
WW3 Salem Rd — Off Mount Comfort Rd (Crystal Springs)
WW4 691 W. Poplar
WW5 3896 N. Gregg Ave
WW6 3021 N. Old Wire Rd •
W W7 2034 N. County Road 877
WW8 729 W. North St
WW9 1336 N. Porter
W W I O 716 Futrall Dr •
W W 11 4412 W. 6th St
WWI2 398 N. Double Springs Rd
WW13 878 S. Stonebridge Rd
W W 14" 1820 S. Armstrong
WW15 203 E. 291h Circle (Country Club)
WWY6 3917 S. McCollum Rd
W W 18 202 N. Sandy (Greenland)
WW19 988 S. Mallywagnon Rd
WW 20 3212 N. Highway 112 '
W W21 1687 S. Happy Hollow Rd
WW22 630 N. Double Springs Rd
WW23 440 E. Fairway Ln (Masters Addition - Country Club 2)
WW24 4071 South McCollum (Airport East)
WW25 551 W. Aster Ave (Willow West - Farmington)
WW26 74 S. Kestrel (Sequoyah Preserve) '
WW27 1031 River Meadows Dr (Stonebridge Meadow)
WW28 • 1603 Plantation Avenue (Heritage Village)
WW29 390 N: Cato Springs (Bohannan - Greenland)
WW30 2324 Rupple Rd (Holt Middle School)
WW31 2130 W. Moore Ln (Research Park)
WW32 478 N. Durango Place (Silverthome)
WW33 4644N. Crossover Rd (Stonewood - Copper Creek)
WW34 4572.S. School (Airport South) •
WW35 3083 W. 6'h Street (Lowe's)
WW36 1642 N. Willowbrook Di (Skyler Place)
WW37 3848 W. Edgewater Dr (Clabber Creek)
Page 3, of 9
WW38 3710 E. Zion Rd (Copper Creek II)
WW39 2392 N. Kenswick Avenue (Crofton Manner)
W W40 1811 S. Chevy Hills Dr (Stone Bridge Meadow II)
WW4I 1608 S. Springlake Dr (Crescent Lake)
WW42 2588 N. Firefly Catch Dr (Clabber Creek III)
WW43 308 S. Ray Ave (Timber Trails)
WW44 (Legacy Pointe Phase 5) ,
MI equipment, grounds, and facilities now existing within the present property boundaries
of or being used to operate the City of Fayetteville's Sludge Management Site located east
of the wastewater treatment facility across the White River:
The potable water SCADA system at the following locations:
WI 215 W. 241h Street
W2 844 N. Crossover Road
W4 1016 E. Ash Street
W5 707 E. Rogers Drive.
W6 456 E. Baxter Lane
W7 707 E. Rogers Drive
W8 113 N. Sang
W9 1170 E. South Skyline
W10 1044 E. Township Road
WI1 Mt. Kessler
W12 Highway 45 Valve Station
WI3 Fire Tower Avenue (Goshen)
WI4 Fire Tower Avenue (Goshen)
W15 Co. Road # 55 (Round Mountain)
WI6 Co. Road # 4343 (Benson Mountain)
WI 7 Gulley Road Tank
W18 Gulley Road Station
WI9 1490 Sunrise Mountain Rd .
W20 Monitor Rd
W21 2210 N. Old Wire Rd
W22 2880 N. Old Missouri Rd
W23 3385 N. Par Ct
W24. 3023 E. Joyce Blvd
W25 Ozarks Regional Transit (Hwy 12)
2435 S. Industrial Dr.
12141 Ed Edwards Road
Page 4 of 9
Pump Station
Pump Station
Pump Station
Pump Station
Ground Storage Tank
Ground Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Elevated Storage Tank
Pressure -reducing Valve
Ground Storage Tank
Pump Station
Ground Storage Tank
Ground Storage Tank
Elevated Storage Tank
Pump Station
Pump Station
Surge Tank
Valve
Valve
Valve
Valve
Valve
Water & Sewer Ops Center
Mt. Robinson Tower Site
•
•
Appendix E
VEHICLE AND MOBILE EQUIPMENT DESCRIPTION
Page 5 of 9
Unit
#
Unit Description
Year
82
Sykes 6" Pump)Trailer
1995.
266
GMC V -Jimmy
1990
320
Ford F-350 SD 4X4 Utility, Crew Cab w/crane
1999
324
Ford F-350 SD 4X4 Utility, Reg. cab w/crane
1999
325
Ford F-350 4 X 4, Reg. cab
2000
339
Ford F-350 4X 4,.Flatbed
2002
539
Ford CM -224 Mower
1994
551
Ford 3930 Gen Purpose Tractor, 2X4
1995
556
Ford/New Holland 8160 Tractor w/Loader
1997
562
Ford/New Holland 8160 Tractor
1999
563
Ford/New Holland 8160 Tractor
1999
564
Ford/New Holland 8160 Tractor w/Loader
' 1999
566
Ford/New Holland LS55 Lawn Tractor
1999
570
New Holland 8670 Tractor, 145 hp, 4X4
2000
581
Ford/New Holland TS 100A Tractor w/NH 52#
Loader
Frontend
2004
582
New Holland 1412 Discbine Mower Conditioner
2004
583
New Holland 740 Round Baler
2004
588
New Holland B940A Large Square Baler
2005
589
New Holland 1412 Discbine Mower Conditioner
2005
644
New Holland 575E Backhoe/Loader
2000
706
1HC S-1900 T/A Dump
1985
712
Ford F800 (Gooseneck) Tractor
1983
734
Freight Liner 112 Cony Tractor
1987
806
Case 1150G Bulldozer, 119 hp•
1995
900
Generator
1987
910
Trailer, 16 Ft. N/C
1987
927
Parker, 24' Gooseneck Trailer
1991
959
Bush Hog 2620 Rot. Cutter
1995
966
P.J. Trailer, 18 Ft.
1996
969
LO -Boy, 25T-36FT Trailer
1996
988
Hesston 3982 Wheel Rake
1998
989
M & W DF -12 Wheel Rake
1998
992
Polaris 500 4 X 4
1998
Page 5 of 9
Appendix E
VEHICLE AND MOBILE EQUIPMENT DESCRIPTION (CONTINUED)
1092
Ford Explorer
2002
2004
Ford Ranger, 4X4
1997
2007
Ford Ranger, 4X4
1997
2089
.Chevy Silverado, 4X4, Reg. Cab
2006
2090
Chevy Silverado, 4X4, Reg. Cab
2006
2103
Ford 150, 1/2 Ton, 4WD, Ext..Cab
2006
9004
John Deere 348-C Small Square Baler
1999
9017
New Holland 1411 Mower Cond.
2000
9021
Volvo Penta 400 KW - Trailer Mounted Diesel Generator @
LS#8
2001
9024
Hesston GEHL WR -522 Wheel Rake
2001
9025.
Volvo Penta 400 KW - Trailer Mounted Diesel Generator @
LS#9
2001
9031
E -Z -GO ST -350 Utility Vehicle
2001
9034
Yale 5000# Fork Lift, Solid Tues
2002
9037
E=Z-GO ST -480 Workhorse Utility Vehicle
2002
9083
28 yd, 38' End Dump Trailer, Tandem Axle
Portable Generator for LS
2005
Page 6 of 9
Appendix J
COST DETAIL
The annualized estimated costs for calendar year 2007 are as follows:
• The following are some of the major reasons for cost circumstances:
OMI has significantly reduced the mark up on labor from thirty percent (30%) to fifteen percent
Page 7 of 9
Current 2006
Proposed 2007
Direct Labor & Benefits
$ 1,714,624.83
$ 2,180,396.37
Labor Markup @ 30% for 2006 & 15% for 2007
$ 514,387.45
$ 327,059.46
Electricity
$ 576,000.00
$ 696,999.87
Electricity Markup
Other Direct Costs
$ 1,434,090.16
$ 1,927,477.81
Other Direct Costs Markup @ 10%
$ 143,409.02
$ 192,747.78
Subtotal
$ 4,382,511.46
$ 5,324,681.29
Fixed Fee .
$ 86,841.35
$ 105,510.85
Lift Station Odor Control
$ 104,855.00
$ 153,978.03
Capital Item Amortization
$ 100,621.85
$ 119,712.00
Total Estimated O&M Budget
$ 4,674,829.66
$ 5,703,882.17
Odor Control System Rehabilitation
$ 118,741.88
Bar Screen Relocation
$ 39,422.22
Aerator Rehabilitation 1
$ 183,085:47
HMI Integration for Westside WWTP
$ 59,316.15
Total Estimated Annualized Budget
$ 4,674,829.66
$ 6,104,447.88
Net Annualized Difference
$ 1,429,618.23
• The following are some of the major reasons for cost circumstances:
OMI has significantly reduced the mark up on labor from thirty percent (30%) to fifteen percent
Page 7 of 9
(15%) in recognition of the outstanding long term relationship that has existed between OMI and
the City of Fayetteville and in the interest of helping the City to contain operational costs in light
of recent cost issues related to the overall wastewater system within the City. The cost reduction is
made possible by heavily leveraging OMI's experience and expertise in the wastewater treatment
industry and through significant job sharing within the OMI network.
2. Addition of 2 5 full time positions to cover additional sludge handling & disposal, O&M of the
odor scrubbers for the sludge 'tank, headworks area, and the solids building, and 2007 cost of
living adjustments.
Electrical budget has been increased by twenty one percent (21%) to reflect the actual electrical
cost in 2006. Electrical cost has been significantly impacted by the fuel cost adjustment, which
ranged from twenty three percent (23%) to forty three percent (43%) of the total electrical cost in
2006.
4. Additional costs in chemicals to operate odor scrubbers at the Noland facility and increased alum
usage to meet summer phosphorus limits in Beaver Water District agreement.
5. Additional costs for sludge disposal which include vehicle expenses, tipping fees, polymer costs,
and contract hauling.
6. Additional odor control efforts in the collection system including significantly greater efforts at the
Hamestring lift station which feeds the Porter Road lift station.
7. Ever increasing cost to maintain community -expected high level of performance with many pieces
of equipment nearing the end of their life cycle and destined to be replaced or upgraded as part of
the ongoing Wastewater Improvement Project.
8. Additional costs for maintenance of forty two plus (42+) sewage lift stations during the next year.
9. Addition of the one-time Odor Control System Rehabilitation Project to rebuild the existing odor
scrubber for odor control at the sludge holding tank. This project is not covered under the plant
upgrade and should save the City about Thirty Five Thousand Dollars ($35,000) by performing the
work in house.
10. Addition of the Bar Screen Relocation Project to relocate one of the existing bar screens at the
Noland plant to the new headworks building. This project is not covered under the plant upgrade
and allows delaying the purchase of about Four Hundred Fifty Thousand Dollars ($450,000) in
additional capital items for the present time. This item will likely be duplicated in 2008 to relocate
one of the existing bar screens to the Westside WWTP as well.
11. Addition of the one-time Aerator Rehabilitation Project to rebuild at least two of the twenty (20)
year old aerators to keep up with the additional organic loadings. This represents about a thirty
percent (30%) savings over the purchase of new units and should have similar life expectancy.
12. Addition of the one-time HMI integration for the Westside WWTP Project to allow a Seventy Five
Thousand Dollar ($75,000) deduction from the cost of the West Side WWTP construction. Much
of this cost would have been expended by plant personnel anyway in becoming familiar with the
new SCADA system. This project will also allow more complete integration of the new Westside
WWTP with the existing SCADA system for the Noland plant and the collection system.
Page 8 of 9
Appendix K
2006 BUDGET ADJUSTMENT DETAIL
In accordance. with Article 4.3 of the "Agreement for Operations, Maintenance and Management Services for the
City of Fayetteville's Wastewater Treatment Plant" dated September 1, 1994, Operations Management International
respectfully requests approval of a budget adjustment to the 2006 O&M budget in the amount of One Hundred Fifty
Three Thousand Dollars ($153,000.00).
The estimated increase is extrapolated using the average actual O&M costs from January to September 2006
based on the major contributing factors listed below:
1. The monthly costs for electrical power are influenced by several factors. One of those factors which we
have no control over relates to the cost of fuelused to generate the electricity. The normal rate structure
has an estimated `normal cost for fuel built in, but if the actual fuel costs are higher than the budgeted
amount, the cooperative charges the customer for that difference via a separate line item called "Fuel
Cost Adjustment". Recognizing that these costs were also higher in 2005 than we had originally
anticipated, the 2006 budget included what we felt was a reasonable amount to cover the anticipated fuel -
related costs as projected by the cooperative. However, the monthly charges for fuel cost adjustments
have been significantly higher than even that increased amount and have greatly impacted the total
electrical costs in 2006. The average fuel cost adjustment in 2006 has been 30.1% of the total monthly
electrical cost compared to 18.7% for 2005 and 0% in most previous years These high fuel cost
adjustments have caused an average $4,530 cost overrun in the monthly electrical budget, or an estimated
$54,360 for the year.
2. Treatment of domestic wastewater in Fayetteville produces very clean effluent but also leaves a residual
product known as sludge or biosolids, which is made up largely of excess bacteria that have been
removed from the treatment process. Several factors affect sludge disposal costs including: sludge
hauling, landfill tipping fee, and polymer usage. The combination of higher sludge hauling costs (largely
impacted by higher than anticipated costs for diesel fuel) and tipping fee (charges from the landfill which
have also risen during the budget year) have caused expenses to be an average of $5,720 more per
month than budgeted. In addition to the sludge hauling and disposal costs, the average polymer use was
much higher in the first 6 months of 2006 due to both increased loadings and process complications
caused by the ongoing construction project. Adaptation to the new sludge holding tank and alterations to
the sludge processing schedule due to temporary or interim sludge pumping issues and such have
required more polymer than we had planned to use. The estimated costs for polymer use are $2,500 a
month more than the budgeted amount. The overall costs for sludge disposal, therefore, are estimated to
be $8,220 per month or $98,640 more than budget for the year.
As always, OMI strives to provide the best value service that is possible to deliver. This is the first time in nearly
twenty years of contract operations that OMI has had to ask for a budget adjustment due to situations beyond OMI's
control. Even though this amount is already more than $100,000 less than projected in mid -summer of this year
OMI will obviously continue every effort to maintain expenses at the lowest level possible.
Page 9 of 9
•
•
iUevIlle
AIIKANSAS
WATERAND WASTEWATER DEPARTMENT
DEPARTMENTAL CORRESPONDENCE
To: Mayor Dan Coody
From: David Jurgens, Water and Wastewater Director j dyl l
Date: November 2, 2006 rj
Subject: Comparison of Rogers -Fayetteville Wastewater Trea{ent Plant Costs
Staff compared operational costs between the Rogers and Fayetteville wastewater treatment plants. It is
difficult to develop a valid comparison, as the size, NPDES permits, and complexities of the two operations
are much different although the treatment methods are similar.
Fayetteville - Roeers WWTP Operational Comparison
Operational
Component
Rogers Jul -
Sep 06 t
Units
Difference
Rogers
Three Month Total O&M Expense
Fayetteville
$488,950
Average Daily Flow
mgd
Three Month Total Plant Flow (gallons)
594,563,000
6.0
469,587,000
Three Month Average 0 & M Cost /1,000 gallons
12 6
NPDES Permit Limits // Agreement Limits
$0.83
$0.01
Three Month Average Total Cost /1,000 gallons
$1.24
BOD
mg/I
$0.02
10
998,226
2,029,692
5
TSS
mg/I
$0.44
10
Total Cost / lb. CBOD Removed
5
Ammonia
mg/I
1.5
1,139,933
2,169,598
2
Phosphorous
1
mg/1
None //
1.0
1
//
0.5
Rogers has no NPDES phosphorous limit; Fayetteville has a 1.0. By agreements,
Rogers has a 1.0 limit; Fayetteville has a 0.5.
On the advice of Mike Lawrence, Rogers Water Utility, I opted for a unit -cost comparison. Costs are broken
• down on a per -thousand gallons treated and a per -pound of material removed basis. The numbers are actual
costs of operation for July — September, 2006 which contained wet and dry months. Sludge disposal costs
are included.
HDR/EES consultants who are conducting rate studies for both utilities were available. Tom Gould reviewed
the analysis, and felt it was a valid comparison and that the numbers for both utilities were correct.
Fayetteville - Roaers WWTP Cost Comparison
Expense Element
Rogers Jul -
Sep 06 t
Fayetteville 2
Jul - Sep 06
Difference
Three Month Total O&M Expense
$488,950
$887,338
$398,388
Three Month Total Plant Flow (gallons)
594,563,000
1,064,150,000
469,587,000
Three Month Average 0 & M Cost /1,000 gallons
$0.82
$0.83
$0.01
Three Month Average Total Cost /1,000 gallons
$1.24
$1.26
$0.02
Three Month Total Pounds CBOD Removed
998,226
2,029,692
1,031,466
O & M Cost / lb. CBOD Removed
$0.49
$0.44
($0.05)
Total Cost / lb. CBOD Removed
$0.74
$0.66
($0.08)
Three Month Total Pounds TSS Removed
1,139,933
2,169,598
1,029,665
O & M Cost/ Ib. TSS Removed
$0.43
$0.41
($0.02)
Total Cost / Ib. TSS Removed
$0.65
S0.62
($0.03)
Rogers WWTP numbers based on input from Mike Lawrence, Rogers Water Utility, using actual costs related
to WWTP O&M, deducting capital and depreciation.
2' Fayetteville WWTP numbers using actual percentage of OMI contract related to WWTP O&M, thus deducting
capital, depreciation, lift station, and SCADA maintenance.
Fayetteville - Rogcrs WWTP Cost Comparison Oct06 vcr 2
1(12.6.06) Clarice Pearman - OMI Page 1
From: Clarice Pearman
To: Jurgens, David
Date: 12.6.06 5:44 PM
Subject: OMI
David,
The Council passed your item for OMI however I do not have a signed agreements. Please let me know when I might
expect signed agreements.
Thanks.
Clarice
•
•
•
RESOLUTION NO. 204-06
A RESOLUTION APPROVING AMENDMENT NO. 14
TO THE CONTRACT WITH OPERATIONS
MANAGEMENT INTERNATIONAL (OMI) IN THE
AMOUNT OF $6,104,447.88 FOR THE OPERATION
AND MANAGEMENT OF FAYETTEVILLE
WASTEWATER TREATMENT FACILITIES FO
AND AN INCREA OF $153,000.00 FOR THE COST OF
SERVICES IN 210. AND APPROVING A BUDGET
ADJUSTMENT IN THE AMOUNT OF $153,000.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Amendment No. 14 to the contract with Operations
Management International (OMI) in the amount of $6,104,447.88 for the
operation and management of Fayetteville Wastewater Treatment facilities for
2007, and an increase of $153,000.00 for the cost of services if' A copy of
Amendment No. 14, marked Exhibit "A" is attached hereto, and made a part
hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby authorizes the Mayor to sign Amendment No. 14 to the contract with
OMI, contingent upon final approval of the FY2007 Budget.
Section 3. That the City Council of the City of Fayetteville, Arkansas
hereby approves a Budget Adjustment in the amount of $153,000.00.
PASSED and APPROVED this 5th day of December, 2006.
APPROVED: ATTEST.
By:
DAN COODY, May
By:
SONDRA SMITH, City Clerk
•
/
RESOLUTION NO.
A RESOLUTION APPROVING AMENDMENT NO. 14
TO THE CONTRACT WITH •OPERATIONS
MANAGEMENT INTERNATIONAL (OMI) IN THE
AMOUNT OF .$6,104,447.88 FOR _THE OPERATION
AND MANAGEMENT OF FAYETTEVILLE
WASTEWATER TREATMENT FACILITIES FOR 2006,
AND AN INCREASE OF $153,000.00 FOR THE COST OF
SERVICES IN 2006; AND APPROVING A BUDGET
ADJUSTMENT IN THE AMOUNT OF $153,000.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Amendment No. 14 to the contract with Operations
Management International (OMI) in the amount of $6,104,447.88 for the
operation and management of Fayetteville Wastewater Treatment facilities for
2007, and an increase of $153,000.00 for the cost of services in 2006. A copy of
Amendment No. 14, marked Exhibit "A" is attached hereto, and made a part
hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby authorizes the Mayor to sign Amendment No. 14 to the contract with
OMI, contingent upon final approval of the FY2007 Budget.
Section 3. That the City Council of the City of Fayetteville, Arkansas
hereby approves a Budget Adjustment in the amount of $153,000.00.
PASSED and APPROVED this 5th day of December, 2006.
ATTEST:
By:
SONDRA SMITH, City Clerk
APPROVED:
By:
DAN COODY, Mayor
• CH2MHILL
loop OMI
MEMORANDUM
TO: Duyen Tran
FROM: Andrea Nicolelli
DATE: December 7, 2006
SUBJECT: Amendment No. 14
PROJECT(s): Fayetteville
Attached please find two original amendments for Fayetteville Please have the client
execute both originals, keeping one for their files and returning the other to my attention:
Andrea Nicolelli
Contract Administrator
OMI, Inc.
9193 S. Jamaica Street, Suite 400
Englewood, CO 80112
If you have any questions please feel free to contact me directly at 720/286-4306.
Respectfully,
Andrea Nicolelli
Contract Administration
[(12/12/2006) Amber Wood - Fwd: OMI Contract Agenda Item Error Page 1
From: David Jurgens
To: Wood, Amber
Date: 12/12/2006 8:13 AM
Subject: Fwd: OMI Contract Agenda Item Error
»> David Jurgens 12/11/2006 9:24:03 pm »>
Sondra,
I just discovered an error. The 5 December meeting included the following:
4, Operations Management International (0MI): A resolution approving Amendment No. 14 to the contract with
Operations Management International (OMI) in the amount of $6,104,447.88 for the operation and management of
Fayetteville Wastewater Treatment Facilities for 2006, and an increase of $153,000.00 for the cost of services in 2006; and
approving a budget adjustment in the amount of $153,000.00.
It should have read:
4. Operations Management International (OM1): A resolution approving Amendment No. 19 to the contract with Operations
Management International (OMI) in the amount of $6,109,447.198 for the operation and management of Fayetteville Wastewater
Treatment Facilities for 20071 and an increase of $153,000.00 for the cost of services in 2006; and approving a budget adjustment
in the amount of $153,000.00.
The amendment covered operations and maintenance for 2007, and the smaller change for services in 2006.
The date appears to have been correct in the text of the resolution (in the draft agenda packet) but was incorrect in the title and on
the Agenda itself.
I apologize for not seeing this earlier.
Please give guidance as to what we need to do now.
Thank you,
David
»> City Clerk 11/22/2006 1:31:09 pm »>
Attached is a copy of the Tentative Agenda for the December 5, 2006 City Council meeting. If you have any questions
please feel free to contact our office at the number listed below.
Have a great holiday!
City of Fayetteville
City Clerk's Office
113 W. Mountain
Fayetteville, AR 72701
479-575-8323
(12.15.06) Clarice Pearman - Res. 204-06
From:
To:
Date:
Subject:
Attachments:
CC:
Attention Nuyen:
Page 1
Clarice Pearman
Waste Water Treatment Plant
12.15.06 3:25 PM
Res. 204-06
204-06 OMI Amendment No. 14.pdf
Audit; Fell, Barbara
Attached is a copy of the resolution passed by City Council, December 5, 2006. I finally got everything signed and
processed. I will forward to you via interoffice mail one of two original agreements I will also forward the budget
adjustment to Budget & Research. If anything else is needed please let me know.
Thanks.
Clarice
Clarice Buffalohead-Pearman, CMC
City Clerk/Treasurer Division
113 West Mountain
Fayetteville, AR 72701
479-575-8309
cpearman@cl.fayetteville.ar.us