HomeMy WebLinkAbout178-06 RESOLUTIONRESOLUTION NO. 178-06 A RESOLUTION APPROVING A CONTRACT WITH GN CONTRACTORS, LLC IN THE AMOUNT OF $275,571.00 FOR CONSTRUCTION OF IMPROVEMENTS TO KINGS DRIVE; AND APPROVING A PROJECT CONTINGENCY IN THE AMOUNT OF $55,114.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with GN Contractors, LLC in the amount of $275,571.00 for construction of improvements to Kings Drive. A copy of the Contract, marked Exhibit "A" is attached hereto, and made a part hereof. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a project contingency in the amount of $55,114.00. PASSED and APPROVED this 7th day of November, 2006. APPROVED: By DAN COODY, Mayor ATTEST. By: SONDRA SMITH, City Clerk DOCUMENT 00500 CONTRACT'' rr THIS AGREEMENT, made and entered into on the 1441 day of November, by and between GN Contractors, LLC herein called the Contractor, and the City of Fayetteville, Arkansas, Owner: WITNESSETH: That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville as follows: . That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Kings Drive Reconstruction, dated August, 2006. Advertisement for Bids Maintenance Bond Instructions to Bidders General Conditions Bid and acceptance thereof Supplemental Conditions Performance Bond Specifications Payment Bond Drawings (13 Sheets) 2. That the City of Fayetteville hereby agrees to pay to the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States, the amount of: Two Hundred Seventy Five Thousand Five hundred Seventy One Dollars ( $ 275 571.00 ). 3. The Work will be completed and ready for final payment in accordance with the General Conditions within 180 calendar days after the date when the Contract Time commences to run, as provided in the Notice to Proceed. Liquidated Damages: The City of Fayetteville and Contractor recognize that time is of the essence of this Agreement and the City of Fayetteville will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay the City of Fayetteville Five Hundred Dollars ($500.00) for each day that expires after the time specified in Paragraph 3 for completion and readiness for final payment. FY062125 Kings Drive Reconstruction Section 00500 - 1 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville. 6. That upon submission by the Contractor of evidence satisfactory to the City of Fayetteville that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work' have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the Contractor of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the City of Fayetteville, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful .performance of the work shall be furnished in manner and form satisfactory to the City of Fayetteville. No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the City of Fayetteville in writing. 9. Freedom of Information Act. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Arkansas Freedom of Information Act request is presented to the City of Fayetteville, (Contractor) will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. Seq.). Only legally authorized photocopying cost pursuant to the FOIA may be assessed for this compliance. FY062125 Kings Drive Reconstruction Section 00500 - 2 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. o^'- FWITNESSES: t'te•yf • r ATTEST: Det-a%�•a-' City Clerk �r� „ann,rr. `.G..�,RK/TR�SG. a ; 'G\S Y pF 'a _U • � (ck ;FAYETTEVILLE: %et>gRKAN4= Jam` GN CONTRACTORS, LLC CnTOR By: C� Title CITY OF FAYETTEVILLE, ARKANSAS OWNER By Mayor FY062125 Kings Drive Reconstruction Section 00500 - 3 Ron Petrie Submitted By City of Fayetteville Staff Review Form City Council Agenda Items or Contracts November 7, 2006 City Council Meeting Date Engineering 1. Division Action Required: -Ke5 /7? (�v d%T/7GlG0�i ZLe- Operations Department A resolution to award a contract to GN Contractors, LLC in the amount of $275,571.00 for construction of improvements to Kings Drive and approve a project contingency of $55,114. 330,685.00 Cost of this request 4470.9470.5809.00 Account Number 05030 Project Number Budgeted Item X 534,999.86 Category / Project Budget 95, 767.56 Funds Used to Date 439,232.30 Remaining Balance Budget Adjustment Attached Kings Drive -Lakeside to Columbus Program Category / Project Name Street Improvements Program / Project Category Name Sales Tax -Capital Improvements Fund Name Department Director City Attorney Finance and Internal Service Director Mayor to17o' C6 Previous Ordinance or Resolution # Date Original Contract Date: /d/too( Date t0-23 -OA Date 0Z3/0A Date Original Contract Number: Received in Ci Received in Mayor's Office Comments: • Itv?1e..; City of Fayetteville Engineering Division 113 West Mountain Fayetteville, AR 72701 ph: 479-575-8206 fax: 479-575-8202 Date: October 17, 2006 To: Fayetteville City Council Thru• Dan Coody, Mayor Gary Dumas, Director of Operations From: Ron Petrie, City Engineer Y" Subject: A resolution to award a contract to GN Contractors, LLC in the amount of $275,571.00 for construction of improvements to Kings Drive and approve a project contingency of $55,114. RECOMMENDATION: Staff recommends approval of a construction Contract with GN Contractors, LLC in the amount of $275,571.00 for construction of improvements to Kings Drive, and approval of a project contingency of $55,114. BACKGROUND: • In 2001, the City contracted with Grubbs, Hoskyn, Barton, and Wyatt to perform a geotechnical investigation of the Kings Drive area and provide recommendations. The study recommended a complex set of concrete piers and a hybrid retaining wall/pinning system. At the time, the preliminary cost of these improvements was estimated to be in it% excess of $1,000,000, and the project was determined to be unfeasible. In May, 2004, the City approved a contract with the geotechnical firm of Terracon, Inc. to study flood damages caused by April rainfall events. A portion of that contract was to again study Kings Drive that was damaged during the April flooding. The study prepared by Terracon recommended installing a drilled pier retaining wall system on the downhill side of the road. The cost for these recommended improvements was estimated to be $325,000 plus the cost to rebuild the street. In March, 2005, the City approved a contract with McClelland Consulting Engineers for additional study of the Kings Drive area and to provide recommendations and cost estimates for alternative solutions for the street. The study has been completed and was presented to the Street Committee on February 13th of this year. The Committee accepted the recommendations, and voted to proceed with final design and construction of the • • recommended improvements. In March of 2006, a contract amendment with McClelland was approved for final design and preparation of contract documents needed in order to solicit bids for construction of improvements to Kings Drive. The plans were completed according to the initial contract schedule, and bids were subsequently received on October 12t. • DISCUSSION: Five bids were received on the project, however, one bid was determined to be non- responsive and was rejected due to lack of an adequate bid bond. The four responsive bids received are as follows: GN Contractors, LLC Tomlinson Asphalt Co., Inc Mobley Contractors, Inc. Keith Austin Construction $275,571.00 $371,087.90 $503,062.25 $527,160.00 Detailed bid tabulations, along with a recommendation letter from Wayne Jones with McClelland Consulting Engineers, are attached. BUDGET IMPACT: $429,232.30 is the available balance remaining in budget for Kings Drive Improvements. This contract will be paid from those funds. • • RESOLUTION NO. A RESOLUTION APPROVING A CONTRACT WITH GN CONTRACTORS, LLC IN THE AMOUNT OF $275,571.00 FOR CONSTRUCTION OF IMPROVEMENTS TO KINGS DRIVE; AND APPROVING A PROJECT CONTINGENCY IN THE AMOUNT OF $55,114.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with GN Contractors, LLC in the amount of $275,571 00 for construction of improvements to Kings Drive. A copy of the Contract, marked Exhibit "A" is attached hereto, and made a part hereof. Section 2. That the City Council of the City of Fayetteville approves a Project Contingency in the amount of $55,114.00. PASSED and APPROVED this 7th day of Novemb By: j= '- ;SOATDRA SMITH, City Clerk iI-COODY, Mayor DOCUMENT 00500 CONTRACT THIS AGREEMENT, made and entered into on the day of ,by and between herein called the Contractor, and the City of Fayetteville, Arkansas, Owner: WITNESS ETH: That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville as follows: That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Kings Drive Reconstruction, dated August, 2006. Advertisement for Bids Maintenance Bond Instructions to Bidders General Conditions Bid and acceptance thereof Supplemental Conditions Performance Bond Specifications Payment Bond Drawings (13 Sheets) • • 2. That the City of Fayetteville hereby agrees to pay to the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States, the amount of: Dollars ( ). 3. The Work will be completed and ready for fmal payment in accordance with the General Conditions within 180 calendar days after the date when the Contract Time commences to run, as provided in the Notice to Proceed. 4. Liquidated Damages: The City of Fayetteville and Contractor recognize that time is of the essence of this Agreement and the City of Fayetteville will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay the City of Fayetteville Five Hundred Dollars ($500.00) for each day that expires after the time specified in Paragraph 3 for completion and readiness for final payment. FY062125 Kings Drive Reconstruction Section 00500 - 1 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville. 6. That upon submission by the Contractor of evidence satisfactory to the City of Fayetteville that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the Contractor of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the City of Fayetteville, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be famished in manner and form satisfactory to the City of Fayetteville 8. No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the City of Fayetteville in writing. • 9. Freedom of Information Act. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Arkansas Freedom of Information Act request is presented to the City of Fayetteville, (Contractor) will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. Seq.). Only legally authorized photocopying cost pursuant to the FOIA may be assessed for this compliance. FY062125 Kings Drive Reconstruction Section 00500 - 2 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL: CONTRACTOR WITNESSES: By: Title Secretary 4 • CITY OF FAYE 1 I'EVILLE, ARKANSAS ATTEST: OWNER By City Clerk Mayor • • FY062125 Kings Drive Reconstruction Section 00500 - 3 Document 00600-1 Construction Performance Bond Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY (Name and Principal Place of Business): OWNER (Name and Address): City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701 'CONSTRUCTION CONTRACT Date: • Amount: Description (Name and Location): BOND Kings Drive Reconstruction Date (Not earlier than Construction Contract Date): Amount: Modifications to this Bond Form: CONTRACTOR AS PRINCIPAL SURETY Company (Corp. Seal) Company (Corp Seal) Signature: Signature: Name and Title: Owner Name and Title: CONTRACTOR AS PRINCIPAL SURETY Company (Corp. Seal) Company (Corp Seal) Signature: Signature: Name and Title: Name and Title: . EJCDC No. 1910-28A (1984 Edition) Prepared through the joint efforts of the Surety Association of America, Engineers' Joint Contract Documents Committee, The Associated General Contractors of America, American Institute of Architects, American Subcontractors Association, and the Associated Specialty Contractors FY062125 Kings Drive Reconstruction Section 00600-1-1 Document 00600-2 Construction Payment Bond . Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY (Name and Principal Place of Business): OWNER (Name and Address): City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701 CONSTRUCTION CONTRACT Date: Amount: Description (Name and Location): BOND Kings Drive Reconstruction Date (Not earlier than Construction Contract Date): Amount: Modifications to this Bond Form: CONTRACTOR AS PRINCIPAL SURETY Company (Corp. Seal) Company (Corp Seal) Signature: Signature: Name and Title: Owner Name and Title: CONTRACTOR AS PRINCIPAL SURETY Company (Corp. Seal) Company (Corp Seal) Signature: Signature: Name and Title: Name and Title: EJCDC No. 1910-28B (1984 Edition) Prepared through the joint efforts of the Surety Association of America, Engineers' Joint Contract Documents Committee, The Associated General Contractors of America, American Institute of Architects, American Subcontractors Association, and the Associated Specialty Contractors FY062125 Kings Drive Reconstruction Section 00600-2-1 CEMcCLELLAND CONSULTING ENGINEERS, INC. I DESIGNED TO SERVE I P.O. Box 1229 Fayetteville, Arkansas 72702-1229 479-443-2377 FAX 479-443-9241 • October 17; 2006 Mr. Chris Brown Staff Engineer City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 Re: Kings Drive Reconstruction Dear Mr. Brown: Bids were received on the above referenced project on Thursday, October 12, 2006, with five Contractors submitting a bid for this project. The apparent low bidder submitted/a Cashier's Check as the Bid Bond which was less than the five (5) percent required and this bid was rejected. GN Constructors. LLC of Springdale submitted the lowest acceptable bid, in the amount of $ 275,571.00 for the Total Bid amount. A copy of the certified Bid Tabulation is enclosed. The Engineer's estimate of the Construction Cost is also attached and was in the amount of $ 408,540.00. We have worked with GN Constructors, LLC, on several protects in Springdale and Lowell and have had very good results. We recommend the City accept the low bid submitted by GN Constructors. LLC of Springdale for the Total Base Bid in the amount of $ 275,571.00. If there are any questions regarding the bids or this recommendation, please contact us Sincerely, Mclelland Cons 1g+ ng Engineers, Inc. ay e J�'es, P E Vice P esi -nt/Project Manager Enclosure: Bid Tabulation Cost Estimate J:\2006'062125 -Kings Drive\Correspondence\Brown 1017.wpd RECEIVED OCT 17 2006 ENGINEERING DIV. ID 0 0Wulps3 sAauleu3 2 A N a A 0 W 0 II 38 W J W 0) W N W A W W N W + W 0 N 0 CO J N 0) N 01 N a N W N N+ N N 0 0 0 16 17 15 14 13 Al N+ 10 CO CO 7 m 5 4 3 N+ r. 0 3 TOTAL Adjust Water VaNe to Grade Reconnection to Existing Meter W Service Line 1- Service Line Class 7 Water Line Trench Backfill Ductile Iron Fittings - - - - 8' Gate Valve V' a r o 1 CI @ 0 N 3 c Z 0 o. b a V 0 8 -inch C-900 PVC Water Pipe Remove Existing 8 -inch Water Line Install 2 W Gate VaNe and 2 W Cap !Install 8 -inch Cul -Inn Valves and 8 -Inch caps Street Construction Control [Sodding b co 0. m 'Slope Stabilization Material Topsoil Replacement (Plan Quantity) - [ IPetrotac Joint Reinforcement I Concrete Joint Repair 'Concrete Pavement Repair I Concrete Joint Cleaning and Sealing Hay Bales Silt Fence 'Adjust Sewer Manhole to Grade 'Concrete Curb and Gutter 12 -inch Asphalt Overlay • 13 -inch ACHM Surface Course 8 -inch Crashed Stone base (Class 7) Undercut and Backfill (Field Measured) Embankment Backfill Behind Curb and Gutter (Plan Quantity) 18 -inch Select Embankment (Plan Quantity) Street Subgrade Excavation (Plan Quantity) Shear Key Stone Backfill wbh Drainage Fabric Class 57 Drainage Median 6 -inch Preforated or Solid Drainage Pipe 'Shear Key Trench Excavation o 0 c q: m ro m 0 3 0 e m 5' Maintenance of Traffic • Removal of Existing Asphalt and Concrete Pavement and Curb and Gutter 1 1/2 -inch Cold Milling Clearing and Grabbing Description Act 291, 1993 Trench and Excavation Safety System 36 N O O W N O 1200 N+ N N++ 0 2 _ + 480 0.4 W N• O W+ O O 1 + W W O J 0 N + O 0 N O 0 N N 0 0 J 0 1 200 250 0+ N 0 0 x 0 0 0 0 0 0 OI 0 A b++ W 1040 J+ 0 + 0 �T 'C �n EA LF r a -1��nn Z LBS y ��nn y LF LS D D LS C AC < C T T C a D T D T TN z TN AD <<<<< T T a JLS C C or w o A O O o 1 51,500.00 I N N CO O O F N 0 O o N 0 O 0 N CO O N a J O O O N A N O O O 0 en co CO O 0 N J+ O 0 O O 0 F O 0 O O 0 a CO A 0 O O 0 a N O 0 O O 0 N A O 0 N N b 0 O O 0 N A 0 0000000000000000000000 F W W O N N O N 0 O N N CO O a W O F O O N A O 41N a O O O O N N O a 010 A O N A O N CO 0 N N O a A O N 01 N b a 0 0 N A O N A O F 0+ O N O N N O O O 1 51,0o0.00 0 o 0 44 A 0 N a W W 0 o 0 o N J V1 0 O 0 O 1 Unit Price 1 GN Contractors, LLC $275,571.00 $1,200.00 $1,500.00 O 0 01 0 O N N IV 0 0 O O N N In 0 O O o N 0 o1 0 p C 0 N W A 0 o O 0 N A 0 0 O O 0 + 0 J 0 o o 0 a J 0 0 o 0 0 N a 0 0 O 0 0 N CO 0 0 O 0 0 N 0a O 0 o o 0 51,920.00 0 0 0 O 0 55,850.00 N J 0 o 0 0 F N 0 O O 0 N 01 o o 0 N 0 -0 0o 0 0 0 N A --. 0 0 0 yl 0 0 0 N N -40 A 0 O 0 N N O 0 O 0 $12,240.00 + 0 0) 0 0 0 0 N 0 0I 0 0 C 0 +44 0 O CO 1 0 0 a A A 0 0 0 0 N W 0 0 0 0 0 I- 510,625.00 511,025.00 N 0 0 0 b 0 1 51,920.00 510,560.00 a 1 A N 0 O 0 N N N 0 0 O 0 O 0 0 O 0 a 0 N a 0 O 0 N J 0 0 01 O 0 N W 43 0 O o 0 N J 0 0 0 O 0 1 Extended 0 O 0 a a 0 o O 0 In O O 0 N 0 O 0 N N O 0 N 0 O 0 O 0 0 O 0 54,000.00 0 N O 0 a a 0 0 O 0 51.000.00 N 0 O 00 O 0 N W 0 O O 0 N 41043.0030/401.40a O 0 F W 0 o 0 N W 0 44 A b 0 a O 0 N W 14 CO O 0 M N 0 N b 0 a O 0 N A 0 O+ O 0 N O 0 N CO 0 O 0 N CO co 0 0 a 14 0 J 0 N W N O 0 a N+ A O+ 0 F co 0 $12.40 574.00 NFF> 411-14000 043000 O+ 0 0 O 0 mwNmN O 0 AN O 0 A O 0 0100 41.00 W 0 O 0 0 O0 0 0 CN 9 1 0 0 Tomlinson Asphalt Co., Inc. N W 616 O V m o N N 0 0 N 0 0 0 N 0 0 0 51,600.00 [ N J O 0 0 N J O 0 0 F N N 0 0 y1 A O 0 0 N J p 14 0 0 N A 0 0 0 0 51.000.00 N W 0 0 0 N CO 0 O 0 0 F + 0 N 0 0 a 43 0 0 0 ' 55.590.00 a 0 0 O O 0 N N J 0 0 0 N N O J 00 N 0 W A 0 0 F A J 0 N0 0 a 0 O 0 F N 0 A 0 00 N+ 0 O 0 00 01 N N O 0 a+ CO 0 O O 0 ++ CO 0 W N 0 43 0 0 0 00 N 0 A 0 O 0 N 0 o 0 o 0 1 515.427.50 513,020.00 00'009'99S N 14 0 0 010000 0 F 0 0 43 0 64 0> 0 0 0 0 0 43 A 0 0 - + A 0 0 0 0 V 0) 0 0 0 N 0 0 0 0 0 0 0 0 0 0 1 Extended 0 0 0 W 0 N 0 J A 1O 0 01 A J '0 0 F in N 44 0 A J F 0 J O N W 1a b (0n1 A N A 0 0 0 'O O N 14 J 01 A N 0 CO N a N O+ 0 0 N N in 0 a 0 0 44 1 a 0 + 1 F W 0 J 0 O O 520.10 N N 0 J 0 Na R+ F 0 1 598.78 N L+ N N 0 J 52.58 1 5555.36 00.tts 1 N 43 0 N 0 N CO J 41 0 N W 0 o N 0 N IV W N 0 A W W + N N CO 0 A F 0 N 0 0 0+ CO A F N W J J 0 0 CO N 0 (r CO 0 O+ O N 0 0.1 a CO a 01 J CO a 0 N 0 F 0 N N 14 0.c Unit Price 55,033.81 0+ 0 Q 0 O 0 7 0 15M a [1 N O 4 m+ Na0 N+ (11 0 +00 J 0 J A CO 43 N J A $1,904.00[ 0 0 A o 0 a 0 m A O 0 M 0 0 W b CO F A 0 0 0 O. 64 N A J N O 043 0 F 0 0 J W 0 52,066.72 N 0 N A CO 000op N 0 W A N 01 A J N 000001 0 F W+ 0 O 0 01 0 W b 0 M 0 N H O N N 0 0 O a 0 0 0 43 O N O W v 00+0 O 0. J 0 0 0 O 0 A 0 O 41 -co 43+ O -- O N a N O 0000000 O a 0 'a J O O N a 'a J O N 0+ O W O F p A 0 O N 43 la W 0 O M N CO --. N O 1 520,517.00 J14 0 O O00O0+' O N 43 O J O N • Co A a O N J A 0 W N W 0 N 0 0 O H CO 0, A J+ CO M 0 d O CO 10 J 0 000 O+ 64 0 0 0 O W W 1 Extended a+ 0 410141014018.1009 O 0 0 b0 0 0 N b0 0 0 a 0 0 0 F 0 0 J 0 0 a+ O 0 0 (4 A O 0 0 0 0 0 N+ +� O 0 0 51,000.00 51,500.00 N O 0 0 O 0 0 O 69 + O 0 0 O 44 0 O O 0 p 0 0 O $100.00 O 0 O O 0 O $30.00 J 0 0000000000000 N O 0 4.4.4.4.4.p N 0 a O 0 N O 0 N 0 1111 0 co0 0 0 m 0 N 0 O 0 O 0 00'095 ' 1 V 0 b 0 0 N 0 0 O 0 O a+ O 0 00000 O 0 W 0 0 O 0 N 0 0 3 0 0 O 0 0 Keith Austin Construction Co. 5527 160.00 44 N NO 1 0 0 61 O 0 0 44 N 0 0 F N bJAO0 0 0 0 N J 0 0 0 N CO 0 0 0 N W 0 p 0 0 N A 0 0 0 $18,200.00' N + O00000'm 0 0 000000000000000000000000000000 a 0 0 s W 0 0 F O O N A 0 O a A 0 O N 0 0 O N CO 00 0 O F 0+ 0 O 64 ONJ 0 O p 0 0 O 44 W 0 O 0WoNoIJ 0 O N 0 N 0 N 0 O N N A O F N N O O F N A 0 O'o F N W A 0 F J 000 O 0 N A 1 N a 1 F 0 0th N 1 N A 0 0 0 F N A-00lO0 0 0 N CO 0 0 N A 1 0 N 1 J 0 0 N 01 0 O 0 N O O 0 b J ObO 000 000 0 F W 0 0 a N 0 0 Extended 2 CONSTRUCTION COST ESTIMATE KINGS DRIVE RECONSTRUCITON CITY OF FAYETTEVILLE MCE Project FY062125 September 21, 2006 Item # Schedule Description I Qty. Unit Unit Price Extended 1 Act 291, 1993 Trench and Excavation Safety System 1 LS 54,500.00 51,500.00 2 Clearing and Grubbing 1 LS 58,500.00 $8,500.00 3 1 1/2 -inch Cold Milling 1700 SY $20.00. 334,000.00 4 Removal of Existing Asphalt and Concrete Pavement and Curb and Gutter 1040 SY $9.50 $9,880.00 5 Maintenance of Traffic 1 LS $5,000.00 $5,000.00 6 Mobilization and Demobilization 1 LS $10,000.00 $10,000.00 7 Shear Key Trench Excavation 493 LF 520.00 59,860.00 8 8 -inch Preforated & Solid Drainage Pipe 660 LF 34.50 52,970.00 9 Class 57 Drainage Median 80 CY 565.00 $5,200.00 10 Shear Key Stone Backfill with Drainage Fabric 900 CY 535.00 531,500.00 11 Street Subgrade Excavation (Plan Quantity) 1050 CY $19.00 519,950.00 12 18 -inch Select Embankment (Plan Quantity) 850 CY 520.00 517,000.00 13 Embankment Backfill Behind Curb and Gutter (Plan Quantity) 250 CY 517.00 - $4,250.00 14 Undercut and Backfill (Field Measured) 200 CY 518.00 $3,600.00 15 B -inch Crushed Stone base (Class 7) 670 TN 322.00 514,740.00' 16 3 -inch ACHM Surface Course 220 TN 585.00 518,700.00 17 2 -inch Asphalt Overlay 200 TN 585.00 $17,000.00 18 Concrete Curb and Gutter 1020 LF 510.00 $10,200.00 19 Adjust Sewer Manhole to Grade 2 EA $850.00 $1,700.00 20 Sift Fence 710 LF $5.25 $3,727.50 21 Hay Bales 30 EA $3.50 . 5105.00 22 Concrete Joint Cleaning and Sealing 1370 LF - $25.00 534250.00 23 Concrete Pavement Repair 105 SY 552.00 $5,460.00 24 Concrete Joint Repair 110 LF $50.00 $5,500.00 25 Petrotac Joint Reinforcement • 1380 LF 55.50 37,590.00 26 Topsoil Replacement (Plan Quantity) 220 CY $16.00 $3,520.00 27 Slope Stabilization Material 1300 SY 510.00 $13,000.00 28 Seeding 0.4 AC 53,850.00 51,540.00 29 Sodding 480 SY 510.00 • 54,800.00 30 Street Conshuction Control 1 LS $6,500.00 56,500.00 31 Install 8 -inch Cut -In Valves and 8 -inch caps 2 EA $1,800.00 53,600.00 32 Install 2 W Gale Valve and 2 W Cap 1 EA 51,700.00 51,700.00 33 Remove Existing 8 -inch Water Line 1 LS 55,000.00 $5,000.00 34 8 -inch C-900 PVC Water Pipe 520 LF 535.00 518,200.00 35 5.1/4" Fire Hydrant Assembly and 6" pipe 1 EA $3,000.00 $3,000.00 36 8' Gate Valve 2 EA $800.00 $1,600.00 37 Ductile Iron Fittings 1200 LBS $7.00 _ $8,400.00 38 Class 7 Water Line Trench Backfill 350 TN 525.00 58,750.00 39 1' Service Line 200 LF 518.00 53,600.00 40 "A' Service Line 36 LF 528.00 51,008.00 41 Reconnection to Existing Meter 1 EA $500.00 5500.00 42 Adjust Water Valve to Grade 3 EA 5500.00 • 51,500.00 SUBTOTAL $371,400.50 Contingency 10 % 537,140.05 TOTAL ESTIMATED CONSTRUCTION COST $408,$40.55 (11.8.06) Clarice Pearman - GN Contractors Page 1 From: Clarice Pearman To: Petrie, Ron Date: 11.8.06 1:28 PM Subject: GN Contractors • Ron, The City Council passed your agenda item for above company, . However I will need the signed agreement to continue processing of this item. Please let me know when I expect the signed agreements. Have a good day. Thanks. Clarice • 1(11.27.06) Clarice Pearman - Res. 178-06 From: To: Date: Subject: Attachments: Clarice Pearman Petrie, Ron 11.27.06 3:15 PM Res. 178-06 178-06 GN Contractors.pdf • CC: Audit Ron: Attached is a copy of the above resolution regarding GN Contractors. I am returning to you three of four originals via interoffice mail. If anything else is needed please let me know. Thanks. Clarice • Sid Norbash 2,1 Submitted By City of Fayetteville Staff Review Form City Council Agenda Items or Contracts N/A - Mayor s Approval Only City Council Meeting Date Engineering Division Action Required: 4 02467 CA-ra :ta s, LLL �1 Operations/Water & Wastewater Department Approval of Change Order #1 to the construction contract with GN Contractors, LLC for Kings Dr. Reconstruction Project in the amount of $52,644.50. $52,644.50 Cost of this request 4470-9470-5809-00 Account Number 05030-20 Project Number Budgeted Item $55,114.00 Category / Project Budget $0.00 Funds Used to Date $55,114.00 Remaining Balance Budget Adjustment Attached Kings Dr Reconstruction Program Category / Project Name Street Impovements Program / Project Category Name Sales Tax - Capital Improvements Fund Name c Department D ector >7� City Attorn4y Q1J Date elhon Finance and Internal Service Director Mayor Date 6-i(-67 Date Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: 178-06 11-7-2006 1057 Received in Mayor's Office ''ENTERED Comments: Item Requiring Mayor's Approval To: Mayor Dan Coody Thru: Gary Dumas, Director of Operations Ron Petrie, City Engineer4 , From: Sid Norbash, Staff Engineer At./ Date: June 6, 2006 Subject: Kings Dr. Reconstruction — Change Order #1 RECOMMENDATION Approval of Change Order #1 to the construction contract with GN Contractors, LLC in the amount of $52,644.50. BACKGROUND Construction of this project was approved by the City Council on 11-7-2006. At the present time this project is under construction, and approximately 75% complete. DISCUSSION Several field conditions necessitated some changes in the bid items, also requiring items that were not anticipated on the original bid documents. These changes were negotiated with the contractor, and resulted in the attached change order. The justifications for these changes are noted on the attached change order form. BUDGET IMPACT SN/sn Attachment: Project Contingency approved by City Council $55,114.00 Used to date $-0- Balance Available $55,114.00 Proposed Change Order #1 $52,644.50 Balance after Change Order #1 $ 2,469.50