HomeMy WebLinkAbout100-06 RESOLUTION•
•
RESOLUTION NO. 100-06
A RESOLUTION APPROVING CONTRACT AMENDMENT #2
TO THE JUNE 15, 2004 AGREEMENT FOR PROFESSIONAL
ENGINEERING SERVICES WITH RJN GROUP, INC. IN THE
AMOUNT OF $124,105.00 TO PROVIDE ENGINEERING DESIGN
AND CONSTRUCTION PHASED SERVICES INCLUDING
INSPECTION FOR SANITARY SEWER REHABILITATION IN
THE FARMINGTON SEWER BASIN; AND APPROVING A FIVE
PERCENT (5%) CONTINGENCY IN THE AMOUNT OF $6,200 00.
BE IT RESOLVED BY THE. CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Contract Amendment #2 to the June 15, 2004 Agreement for
Professional Engineering Services with RJN Group, Inc. in the amount of
$124,105.00 to provide engineering design and construction phased services
including inspection for sanitary sewer rehabilitation in the Farmington Sewer
Basin. A copy of Amendment #2, marked Exhibit "A," is attached hereto and
made a part hereof.
Section 2. That the City Council of the City of Fayetteville, Arkansas
hereby approves a five percent (5%) contingency in the amount of $6,200.00.
PASSED and APPROVED this 6th day of June, 2006.
APPROVED:
By
ATTEST:
By:
t
.c.� :qS''.
.^G\SY Oc•.C�
tV° • (rk:
6. -At:
;FAYETTEVILLE•
's9»l• 4—ANSP�J1'.'
��''�;;;,GTON CP,`
ONDRA SMITH, City Clerk
AMENDMENT NO: 2
TO
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
AND
RJN GROUP, INC., DALLAS, TEXAS
WHEREAS, On June 15, 2004 the City of Fayetteville, Arkansas (CITY OF
FAYETTEVILLE) and RJN Group, Inc., of Dallas, Texas (RJN GROUP, INC.)
entered into an agreement for engineering services in connection with the
planning, design, permitting, construction, operation, maintenance, management
and financing of the Fayetteville Wastewater System Improvement Project, and
in particular the Collection System Improvements related to the Unites States
Environmental Protection Agency (USEPA) State and Tribal Assistance Grant
Program (PROJECT), and
WHEREAS, RJN GROUP, INC. has proceeded with these services in
accordance with the scope set forth in the agreement, and
WHEREAS, CITY OF FAYETTEVILLE requests that the scope of RJN GROUP,
INC.'s services be amended and increased to include additional design and
construction resident engineering services for the Farmington Sewer
Rehabilitation Project (FARMINGTON PROJECT), the basic nature, extent and
schedule for the services being detailed in Attachment Number 1, which forms a
part of this amendment; and
WHEREAS, RJN GROUP, INC. agrees to provide the amended scope of
services for the FARMINGTON PROJECT on a cost plus fixed fee basis with an
upper limit of costs of one hundred twenty-four thousand, one hundred five
dollars ($124,105.00);
NOW THEREFORE, in consideration of the mutual covenants and agreements
herein contained, CITY OF FAYETTEVILLE and RJN GROUP, INC., the parties
hereto, stipulate and agree that the Agreement for Engineering Services dated
June 15, 2004, is hereby amended in the following particulars:
SECTION 6 -PAYMENTS TO ENGINEER is amended to read as follows:
For the scope of services set forth in the original PROJECT agreement for
$226,978.00, plus the services set forth for the FARMINGTON PROJECT in
Amendment No. 1 for $175,000.00, and additional services contained in this
Amendment No. 2 for $124,105.00, CITY OF FAYETTEVILLE shall authorize
RJN GROUP, INC. to provide the stipulated scope of services for a
•
not -to -exceed maximum fee of FIVE HUNDRED TWENTY-SIX THOUSAND,
EIGHTY-THREE UNITED STATES DOLLARS (US $526,083.00)
For purposes of progress payments and accounting, RJN GROUP, INC. shall
maintain separate accounting and billing for the original services of the
PROJECT and for the amended scope of services for the FARMINGTON
PROJECT.
All other provisions of the original agreement remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
duly executed this (04-k day of j u r ,e 2006.
CITY OF FAYETTEVILLE ARKANSAS
By
Dan Goody
Mayor
ATTEST:
Sondra Smith
City Clerk
aU•GSTY 0
. Pcfp i
:FAYETTEVILLE:
V:64-
6 9:;KR NISP�J=:•c;
�''y.;v TON 4,4)41 ��e.10 �`
By:
RJN GROUP, INC.
HugM. Kelso
Vice President
ATTACHMENT NO. 1
EXPANDED SCOPE OF SERVICES
Amendment No. 2 to Agreement Dated June 15, 2004
AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF FAYETTEVILLE,
ARKANSAS AND RJN GROUP, INC.
SEWER SYSTEM STUDY OF THE
CITY OF FARMINGTON WASTEWATER COLLECTION SYSTEM
The City of Fayetteville and the City of Farmington have entered into an Agreement to complete
specific sanitary sewer maintenance activities in the City of Farmington. The specifics of the
activities are set forth in the approved Settlement Agreement between Farmington and
Fayetteville. The City of Fayetteville retains RJN Group to provide engineering services for the
evaluation, planning, design, bidding and construction assistance of applicable sanitary sewer
maintenance and rehabilitation activities in the Farmington sewer system, hereinafter referred to
as the Project. The extent of the Project includes the City of Farmington's System containing
approximately 121,000 linear feet of sewer and 540 manholes Improvements to the Town
Branch Interceptor Sewer will be limited in scope to plans for future upgrading/replacement. A
study of the collection system was completed in 2002 by Severn Trent and included manhole
- inspection, smoke testing, and television inspection activities. The report for the study included
recommendations for repair of various manhole and sewer line defects identified during the
investigation.
Work completed to date on the project includes the following:
• Review of Sevem Trent (ST) Report
• Review of all ST inspection forms and computer printouts.
• Review of all ST CCTV tapes
• Inspection of all manholes
• Smoke testing of selected portions of the system
• Flow monitoring
• Preparation of construction documents for Manhole Rehabilitation
• Bidding and construction assistance for Manhole Rehabilitation
• Development of rehabilitation requirements for sewer mains
• Partial preparation of plans and specifications for sewer main rehabilitation
Amendment 2 services will include completion of the plans and specifications as defined in
Amendment No. 1 Scope of Services and Resident Engineering Services as defined in the
following section.
5/17/2006
A-1
RESIDENT ENGINEERING
RJN GROUP, INC. will provide resident engineering services which will include the following:
A. Resident Engineering
5/17/2006
Provide the successful bidder(s) with three (3) sets of the contract specifications
for execution and the insertion of the required insurance certificates. Provide the
successful bidder(s) with five (5) sets of the contract documents for construction
purposes.
2. Assist the CITY in conducting a pre -construction conference with the Contractors
by notifying utilities, governmental agencies, and other interested parties, and
answer questions at the conference.
3. Review shop drawings, scheduling, test results, and other submittals which the
Contractor is required to submit.
4. Consult with CITY and act as the CITY's engineering representative in dealings
with the Contractor. Issue instructions of CITY to Contractor and issue necessary
interpretations and clarification of the contract specifications.
5. Provide engineering survey(s) for construction to establish horizontal and vertical
reference points which are necessary for the Contractor to construct the work.
Coordinate the taking of preconstruction photos and surface video taping with the
Contractor as necessary.
6. Provide resident observation for rehabilitation and sewer replacement
construction for general conformance to the contract drawings and contract
specifications. Also provide resident observation of acceptance testing and
restoration work by the Contractor.
7. Review and respond to complaints received by CITY and report any differences
of opinion between the Contractor, ENGINEER and complaining party.
8. Review applications for partial payment with the Contractor for compliance with
contract specifications and submit to the CITY a recommendation for payment.
Issue field orders to Contractor after consultation with the CITY. Review any
change orders proposed by the Contractor and provide recommendations to the
CITY.
10. Conduct an on-site review to determine if the projects are substantially complete
and submit to the Contractor a list of observed items requiring completion or
correction.
A-2
5/17/2006
11. Conduct a final on-site review, in the company of the CITY and Contractor, to
verify the projects are fully complete. Submit a recommendation for final
acceptance of the projects to the CITY.
12. Provide the CITY with three (3) sets of black line prints of the record drawings.
13. RJN will not be responsible for the means or sequences of the construction work
or the implementation program for safety of the construction contractor and
subcontractors and it will be stipulated as such in the contract documents.
A-3
David Jurgens
Submitted By
City of Fayetteville
Staff Review Form
City Council Agenda Items
or
Contracts
6 -Jun -06
City Council Meeting Date
Water/Wastewater
Division
Action Required:
Rest
6/G /a6
yov
4/ Grafl
/An vhkrmf
Qi),
Water/Wastewater
Department
Approval of a contract amendment with the RJN Group, for engineering design and construction phased services
including inspection for sanitary sewer rehabilitation in the Farmington sewer basin, as required by the Farmington -
Fayetteville Arbitration Agreement dated 22 October, 2004, in the amount of $124,105.00, and approve a 5%
contingency of $6,200.00. Funds are available in Fiscal Year 2006 project budget.
$130,305.00
Cost of this request
. S4W—alk —SISI S. Ns
4480 -9480 -52•46700 -
Account Number
04042-0001
Project Number
Budgeted Item
XX
541, 831.00
Category/Project Budget
52,799.85
Funds Used to Date
489,031.15
Remaining Balance
Budget Adjustment Attached
Farmington Sewer Rehabilitation
Program Category / Project Name
Water and Wastewater
Program / Project Category Name
Water/Sewer
Fund Name
V�-+stn l
Departrr n
Dire t for
City Attorney
91-04
Previous Ordinance or Resolution # 169 04
Date Original Contract Date:
5/2 Z/24.1664
s
Finance and Internal Service Director/ ate
Mayor
> /3 /s
Date
Original Contract Number:
11/1/04
6/15/04
961
(Comments:
City Council Meeting of June 6, 2006
CITY COUNCIL AGENDA MEMO
To: Fayetteville City Council
Thru: Mayor Dan Coody
Fayetteville Sewer Committee
From: David Jurgens, Water and Wastewater Directo
Date: May 22, 2006
Subject: Approval of a contract amendment with the RJN Group, for engineering design and
construction phased services including inspection for sanitary sewer rehabilitation in the Farmington
sewer basin, as required by the Farmington - Fayetteville Arbitration Agreement dated 22 October,
2004, in the amount of $124,105.00, and approve a 5% contingency of $6,200.00. Funds are
available in Fiscal Year 2006 project budget.
RECOMMENDATION
Fayetteville City Administration recommends approval of a contract amendment with the RJN
Group, for engineering design and construction phased services including inspection for sanitary
sewer rehabilitation in the Farmington sewer basin, as required by the Farmington - Fayetteville
Arbitration Agreement dated 22 October, 2004, in the amount of $124,105.00, and approve a 5%
contingency of $6,200.00. Funds are available in Fiscal Year 2006 project budget.
BACKGROUND
The project entails design and construction inspection for an estimated 9,967' of 6" - 10" gravity
sewer main, in the Farmington sewer basin.
SUMMARY OF REPAIRS
Item No. of Segments
Estimated
Total Length Construction Cost
(1f) ($)
Point Repairs
CIPP Lining
Complete Reconstruction
Total
66
22
17
105
NA
5,548
3 719
9,267
303 500
221 92011
464,875
990,295
1/
Does no
nclude cost of service lateral re -instatement by City of Fayetteville forces.
DISCUSSION
This is the contract that was identified, but for which the scope of work could not be clearly defined,
in the initial contract for Farmington rehabilitation. That contract, approved 1 November, 2004,
states 'The City of Fayetteville and RJN Group, Inc. recognize that the Scope of Services and
anticipated fee may need to be modified as the project progresses and the required work items are
more fully defined and information on the system is compiled." All field work and review of
television tapes is now complete; the full scope of work is identified. Final design may dictate some
changes to the work breakdown and methods shown above; these changes are not expected to be
major.
FarminglonRchab Engr CCM emoJun06.doc
City Council Meeting of June 6, 2006
BUDGET IMPACT
Funds are available for this Engineering contract in the Fiscal Year 2006 budget. This contract will
be funded by system revenues.
Based on the initial scope and breakout of work shown above, funding for the engineering and
construction, based on the terms of the Arbitration Agreement, is broken down as follows:
Item
COST BREAKDOWN
Fayetteville Farmington
Estimated Cost ($) Estimated Cost ($)
Total Estimated
Cost ($)
Engineering
130,305
0 130,305
Point Repairs
CIPP Lining
Complete Reconstruction
Total
303,500
100,000
0
$533,805
0
121,920
464.875
$586,795
303,500
221,920
464.875
$1,120,600
•
FanningtonRchab Engr CCMemoJun06.doc
RESOLUTION NO.
A RESOLUTION APPROVING CONTRACT AMENDMENT #2
TO THE JUNE 15, 2004 AGREEMENT FOR PROFESSIONAL
ENGINEERING SERVICES WITH RJN GROUP, INC. IN THE
AMOUNT OF $124,105.00 TO PROVIDE ENGINEERING DESIGN
AND CONSTRUCTION PHASED SERVICES INCLUDING
INSPECTION FOR SANITARY SEWER REHABILITATION IN
THE FARMINGTON SEWER BASIN; AND APPROVING A FIVE
PERCENT (5%) CONTINGENCY IN THE AMOUNT OF $6,200.00.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Contract Amendment #2 to the June 15, 2004 Agreement for
Professional Engineering Services with RJN Group, Inc. in the amount of
$124,105.00 to provide engineering design and construction phased services
including inspection for sanitary sewer rehabilitation in the Farmington Sewer
Basin. A copy of Amendment #2, marked Exhibit "A," is attached hereto -and
made a part hereof.
Section 2. That the City Council of the City ofiFayettev 11e, Aikansas
hereby approves a five percent (5%) contingency in thearuntf $6,200.00.
,�
PASSED and APPROVED this 6th flay of June, 2006
13
A SMITH, City Clerk
AN COODY, Mayor
1
rj'ngroup
'Excellence through Ownership
April 21, 2006
Mr. David Jurgens, P.E.
Water and Wastewater Director
City of Fayetteville
113 W. Mountain St.
Fayetteville, AR 72701
Subject: Farmington Sanitary Sewer Rehabilitation
Dear Mr. Jurgens:
www.rjn.com
Enclosed please find a requested amendment for the above referenced project. The amendment is
requested to provide additional design services and resident engineering services during construction. As
stated in the November 1, 2004 agreement "The City of Fayetteville and RJN Group, Inc. recognize that
the Scope of Services and anticipated fee may need to be modified as the project progresses and the
required work items are more fully defined and information on the system is compiled." All field work
and review of CCTV tapes is now completed and the full extent of rehabilitation design has been
identified.
It is estimated that the total cost to complete the design is $54,400 and the construction resident
engineering services is estimated at $70,105. Therefore, the total requested amendment amount is
$124,105.
If you should have any questions or require additional information, please call me.
RN GROUP, INC.
41 in a
Hugh M. Kelso
Vice President
HMK/kb/1959-01
26 East Meadow #8 • Fayetteville, AR472701
• 479.444.6119 • fax 479.444.6119
f
Clarice Pearman - Res. 100-06 Page 1
From: Clarice Pearman
To: Jurgens, David
Date: 6.15.06 5:53PM
Subject: Res. 100-06
David,
Attached is a copy of the above resolution regarding Amendment #2 to the RJN Group agreement for
engineering services. I forward to you two of three original amendments via interoffice mail.
Thanks.
Clarice
CC: Audit