HomeMy WebLinkAbout97-05 RESOLUTION•
RESOLUTION NO. 97-05
A RESOLUTION TO APPROVE A HIGHWAY —
UTILITY AGREEMENT FOR PRELIMINARY
ENGINEERING SERVICES WITH THE ARKANSAS
STATE HIGHWAY COMMISSION RELATED TO THE
HIGHWAY 16 WEST (WEDINGTON ROAD)
WIDENING PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby
approves the Highway — Utility Agreement for preliminary engineering services with the
Arkansas State Highway Commission related to the Highway 16 West (Wedington Road)
widening project.
PASSED and APPROVED this 17th day of May, 2005.
ATTEST:
G: • S Y OF ..............
G,pc
'c U;FAYETIEVILLE A
.,7d:I 'KANSPyJ=s�
11111......... CFP0‘‘
iiiiiiii,ii
By:04-)
SONDRA
SONDRA SMITH, City Clerk
APPROVED:
By:
DAN COODY, Mayor
• •
Rev. 07-02-01
LS ❑
AC
ARKANSAS STATE HIGHWAY COMMISSION
HIGHWAY - UTILITY AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES
Job No. 040423 (Utilities) FAP No. STP -9142 (15)
Job Location
Hwy. 16 Widening (Fayetteville) (S) Utility Owner Fayetteville Water & Sewer
Route 16
County Washington
Section 2 Consultant McClelland Engineers
THIS AGREEMENT, made and entered into this _Eta day of /tI1QV , 20615' , by
and between the Arkansas State Highway Commission, acting by and through the duly authorized representatives of
the Arkansas State Highway and Transportation Department, with headquarters at Little Rock, Arkansas, hereinafter
referred to as the "Department" and the Fayetteville Water & Sewer acting by and through its duly authorized
representatives, herein afer referred to as the "Owner" WITNESSETH:
(1). The "Department" proposes to make highway improvements and the "Owner" is required to adjust or
relocate its facilities, as necessary, to clear highway construction.
(2). The "Owner" is not adequately staffed to cavy out the necessary preliminary engineering and has
requested the services of the licensed engineering company of McClelland Engineers to perform the following
services.
(a) Make all necessary field surveys and investigation and subsequently prepare
complete plans, estimate of costs, and construction specifications.
(b) Furnish four (4) copies of plans, specifications, etc. for "Department" review and
approval.
(c) If construction work is to be performed by other than "Owners" forces, prepare
all necessary documents to secure bids and let a contract for the proposed work.
(d) Conduct bid opening and complete contract documents.
(3). The "Owner" has entered into a contract with the consultant, subject to the "Department's" approval,
and has furnished a copy which is attached and made part of this agreement. The estimated costs are $54,000.00*.
(4a) The cost of preliminary engineering services shall be eligible for reimbursement from the
"Department" at the same ratio as the adjustment of "Owners" facilities are eligible.
(4b) "Owner" agrees to retain cost records and accounts for inspection and audit for a period of three (3)
years from the date of final payment.
(5) The consultant shall begin work 5 days after receiving written authorization from "Owner" and
complete 30 days thereafter.
*Not to exceed $54,000
(6) The "Department" may suspend or cancel the work under this contract at any time. Reimbursement
will be made, in a proportionate amount, for any services performed by the consultant prior to the receipt, by the
"Owner," of written notice of cancellation.
• •
(7) "Owner" shall be responsible for any and all hazards to persons, property, and traffic. With respect to
traffic control, owner shall adhere to the requirements of the "Manual of Uniform Traffic Control Devices", as
amended and supplemented..
(8). This agreement is govemed by all applicable State and Federal laws, rules, and regulations including
the Arkansas State Highway Commission Utility Accommodation Policy adopted by Commission Minute Order 96-
167 as amended and supplemented, the Federal Aid Program Guide on Utility Adjustments and Accommodation on
Federal Aid Highway Projects as amended and supplemented, and the provisions of 23 CFR § 645 as amended and
supplemented.
(9) Subject to the terms and conditions herein, neither the "Owner" nor the "Department" by execution of
this agreement waives or relinquishes any rights which either may legally have within the limits of the law or
constitution either State or Federal.
FAYETTEVILLE WATER & SEWER
ARKANSAS STATE HIGHWAY COMMISSION
Acting By and Through The
ARKANSAS STATE HIGHWAY AND
TRANSPORTATION DEPARTMENT
Title S Director of Highways & Transportation
Title e41 eQ&„ /a _/aAtatNeh-
FEDERAL TAXPAYER IDENTIFICATION #
2
Chief, Right of Way Division
Chief- Utilities Section
Right of Way Division
• • Res
7 7/65
f7-O5
/ciay/I/!
g5re.ern tt fAHTb
To: Fayetteville City Council
Thru: Dan Coody, Mayor
Gary Dumas, Director of Operations
Bob Davis, Water & Wastewater Director ittb
Ron Petrie, City Engineer
From: Sid Norbash, Staff Engineer �.✓
Subject: Wedington Drive Water & Sewer Relocations Project
AHTD-Utility Agreement for Preliminary Engineering Services
BACKGROUND
Wedington Drive is scheduled for improvements and widening by Arkansas Highway &
Transportation Department, from Rupple Rd. to Double Springs (please refer to the
attached vicinity map).
In order to clear the way for the widening project by A.H.T.D., the existing water and
sewer facilities serving this area will have to be relocated to avoid construction conflicts
with the highway facilities. Also, in addition to the necessary relocation, the Staff has
requested some over -sizing of the water mains, and fire protection improvements for this
area
Per City Council approval, on January 18, 2005 McClelland Consulting Engineers, Inc.
was awarded a contract in the amount of $54,000 for performing the preliminary
engineering services for this project.
DISCUSSION / STATUS
Certain portions of the water and sewer facilities are presently located outside the
highway right of way, therefore, eligible for cost reimbursement from the Highway
Department.
In order to determine the percentage of the reimbursable amounts from the Highway
Department, AHTD requires that the attached contract be executed between the City of
Fayetteville and the Highway Department.
• •
RECOMMENDATION:
The Staff recommends Council approval of the attached Utility -Agreement with AHTD
for Preliminary Engineering.
FUNDING FOR 2005:
2005 Budget $54,000
Funds used to date $54,000
Remaining Funds $ -0-
Please be advised that since this project was submitted to the City of Fayetteville, after
the 2005 budget process had been completed, no funds have been officially budgeted for
this project. After the preliminary engineering has been completed the cost of this
project will be more accurately estimated and communicated to the Council.
SN/sn
Attachments: Contract Documents
Vicinity Map
• •
RESOLUTION NO.
A RESOLUTION TO APPROVE A HIGHWAY - UTILITY
AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES
WITH THE ARKANSAS STATE HIGHWAY COMMISSION
RELATED TO THE HIGHWAY 16 WEST (WEDINGTON ROAD)
WIDENING PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby
approves the Highway — Utility Agreement for preliminary engineering services with the
Arkansas State Highway Commission related to the Highway 16 West (Wedington Road)
widening project.
PASSED and APPROVED this 17th day of May, 2005.
ATTEST.
By:
SONDRA SMITH, City Clerk
APPROVED:
"S
OODY, Mayor
rrr
/01.001tagi4-60
/
2
/
G
0
0
/
9T
§
)
;
555
S NOI.L3 S
LLNI100 NO,LONIHSVM
(S)
ON
r
-c
x
go cm-1,1/47:0:008ra°
in?- 2&
z
0
xi
`§
• City of Fayetteville
Staff Review Form
City Council Agenda Items
Contracts
May 17, 2005
City Council Meeting Date
Sid Norbash, Staff Engineer it./ Engineering
Submitted By
Division
Action Required:
•
Operations
Department
Approval of the Highway -Utility Agreement for Preliminary Engineering Services between the City of Fayetteville and
Arkansas Highway and Transportation Department for Hwy. 16 Widening (Wedington Drive), from Rupple Road to
Double Springs Road. AHTD Project # 040423.
Cost of this request
5400-5600-5808-00
Account Number
05015-1
Project Number
Budgeted Item
X
$54,000
Category/Project Budget
$54,000
Funds Used to Date
$0
Remaining Balance
Budget Adjustment Attached
Wedington Drive Water & Sewer
Relocations Project
Program Category / Project Name
Water System Improvements
Program / Project Category Name
Water & Sewer
Fund Name
1► , e -28 -es
Date
Department
'rector
City Attorney
Vim
Financ and
ernal Service Director
Mayor
Li-bets—Os
Date
Date
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
12-05
1-18-2005
900
Comments:
C
larice Pearman Res 97 05
Pa e1
From: Clarice Pearman
To: Norbash, Sid
Subject: Res. 97-05
Sid,of the
Attached is a copy of the resolution passed by City Council, May 17, 2005 along with a copy
agreement with the mayor and city clerk's signatures. Please see that I get a signed agreement after it is
signed by the state. I will return the original agreement you for signature through interoffice mail.
Thanks.
Clarice
CC: Deaton, Vicki