HomeMy WebLinkAbout31-05 RESOLUTION• RESOLUTION NO, 31- 0 5 A RESOLUTION APPROVING CHANGE ORDER #3 TO THE CONTRACT WITH SWEETSER CONSTRUCTION, INC. IN THE AMOUNT OF $59,295.43 AS FINAL RECONCILIATION OF THE WEST MUD CREEK MULTI -USE TRAILPROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order #3 to the contract with Sweetser Construction, Inc. in the amount of $59,295 43 as final reconciliation of the West Mud Creek Multi -Use Trail project. PASSED and APPROVED this 15th day of February 2005. ....RamTn. '%.APPROV �kG.'G\TYp:SGS% .Fi 56. V' FAYETTEVILLE; Xem St "PR VEQ•62 •s1,507 KA NS lin%) I'114 "V TO G%-:0% ATTEST: �''ing1iii.. By: s Cmdi.att4)M47L NDRA SMITH, City Clerk By DAN COODY, May CHANGE ORDER NO. 3 Cost Plus Pre -Agreed Unit Price X Project Name and Number: West Mud Creek Trail Construction Name of Contractor: Jerry D. Sweetser Construction, Inc Address of Contractor: 590 West Poplar, Fayetteville, AR 72703 Date of Contract: August 12, 2003 Original Amount of Contract: Total Amount of All Previous Change Orders: $426,936.03 $19,930.00 Subject and Reason For This Change Order: Final pay request reconciliation Actual quantities have been submitted for final payment. Additional Time Requested: 0 Calendar Days Total Cost of All Materials, Labor and profit $ 59,295.43 (Attach Itemization With Unit and Total Costs) Total Amount of This Change Order' Dated this _lth day of December, 2004 $ $59 295 43 ITEM DESCRIPTION 'UNI •Y,1- 'VI= Adual Estima - Y14i'I'$ 0a OS oa os Estimate Actual 5 TREE PROTECTION FENCING (18) LF 0.00 500.00 5.00 2,500.00 0.00 10 UNDERCUT AND BACKFILL(10) C.Y. 1115.00 500.0 16.00 8,000.00 17,840.00 11 TEMPORARY BALE BARRIERS (10) L.F. 75.99 200.0 5.00 1,000.00 379.95 12 TEMPORARY SILT FENCE L.F. 5725.00 4935.0 4.00 19,740.00 22,900.00 14 IMPORTED TOP SOIL (10) CY 0.00 200.00 24.00 4,800.00 0.00 15 GRASSED SWALE LS 0.00 1.00 1500.00 2,500.00 0.00 16 CONCRETE SWALE (10' WIDE, 2' DEEP) LF 0.00 20.00 75.00 1,500.00 0.00 17 AGGREGATE BASE (CLASS7) C.Y. 2248.14 1485.0 28.00 41,580.00 62,947.92 19 CONCRETE TRAIL SY 110133 1133.3 32.00 36,265.60 35,242.56 20 ASPHALT CONCRETE TYPE "3"(14) TON 741.60 593.8 42.00 24,939.60 31,147.20 22 14" x 23" ELLIPTICAL CONCRETE PIPE (17) LF 84.00 54.0 66.00 3,564.00 5,544.00 23 29"x45" ELLIPTICAL CONCRETE PIPE (17) LF 56.00 60.0 148.75 8,925.00 8,330.00 24 18" Reinforced Cone ete Pipe (17) LF 160.00 140.0 40.00 5,600.00 6,400.00 25 24" Corrugated Meta Pipe (17) LF 185.00 182.0 41.50 7,553.00 7,677.50 26 24" Reinforced Concrete Pipe (17) LF 328.00 254.0 59.50 15,113.00 19,516.00 29 48" Reinforced Concrete Pipe LF 32.00 30.0 225.00 6,750.00 7,200.00 30 18 - inch Concrete Flared End Section EA 3.00 - 2.0 1,000.00 2,000.00 3,000.00 31 14 -inch x23- inch Concrete Flared End Section EA 4.00 3.0 1,050.00 3,150.00 4,200.00 32 24 inch Concrete Flared End Section EA 15.00 16.0 1,150.00 18,400.00 17,250.00 34 48 - inch Concrete Flared End Section EA 1.00 2.0 2,950.00 5,900.00 2,950.00 37 12'X3' BOX CULVERT W/WINGWALLS 8 CONC. APRONS LF 36.50 36.0 850.00 30,600.00 31,025.00 38 4 Ft. x4 Ft. Junction Box EA 1.00 1.0 1,800.00 1,800.00 1,800.00 39 4 Ft. x 4 Ft Boxw/Area Inlet (12 - inch x4 Ft) EA 1.00 1.0 2,500.00 2,500.00 2,500.00 40 4 Ft. x6 Ft. Boxw/Area Inlet (6 - inch x6 Ft) EA 1.00 1.0 2,100.00 2,100.00 2,100.00 41 12 Ft. x 5 Ft. Box w/Area Inlet (9 -inch x 10 Ft) EA 1.00 1.0 7,000.00 7,000.00 7,000.00 42 GEOCOIR/DeKOWE 700 EROSION CONTROL FABRIC SY 0.00 430.0 2.50 1,075.00 0.00 43 MIRAMAT TM8 EROSION CONTROL FABRIC SY 370.61 350.0 5.00 1,750.00 1353.05 44 RIP -RAP (MAXIMUM 18") TON 343.19 200.0 55.00 11,000.00 18,875.45 45 FENCE STYLE CLF (4' HIGH NOBAR) (8) L.F. 550.00 591.0 12.00 7,092.00 6,600.00 46 AHTD TYPE (0) FENCE (10) L.F. 0.00 85.0 10.00 850.00 0.00 48 CEDAR SIGN POST INSTALLED (13) L.F. 330.00 260.0 12.60 3,276.00 4,158.00 51 SHEET ALUMINUM SIGNS (16) S.F. 139.00 146.8 18.50 2,715.80 1571.50 52 2 1/2" SQUARE TUBE POSTS (13) L.F. 84.00 158.0 13.65 2,156.70 1,146.60 53 TRAFFIC STRIPE (PAINT) (4" WIDE) (7) L.F. 2187.33 5500.0 0.30 1,650.00 656.20 54 Compacted Embankment -Select Hillside Material (Borrow)) h -Place CY 2783.02 600.0 10.00 6,000.00 27,830.20 55 UNDERCUT 594.66 0.0 6.00 0.00 3,567.96 56 B Stone 847.94 0.0 18.00 0.00 15,262.92 (4) Denotes constnulion notes on sheet 4 SUB -TOTAL 301,345.70 360341.13 TOTAL Change Order# 3 $59,295.43 CITY OF FAYETTEVILLE Parks & Recreation Division By: Parks Landscape !chitect • CHANGE ORDER NO. 3 CITY OF FA EVILLE By: ATTE Je D. Sweetse Contractor By: Title: ATTEST: • ion Inc FAYETFEVILLE PARKS B RECREATION MEMORANDUM • Re5 „Al X5/4 3/-a5 5,iltuictr andruel toVedisfilial Date: To: Thru 1/31/05 Mayor Dan Coody Gary Dumas, Director of Operations Connie Edmonston, Parks and Recreation Director From: Steve Hatfield, Park Landscape Architect, Trails & Greenways Coordinator Reference: West Mud Creek Multi -use Trail Subject: Final Payment and approval of final quantity reconciliations Background: West Mud Creek Trail is a wonderful multi -use trail that follows Mud creek from Front Street to Steele Blvd. This project was originally designed by Milholland Engineering and sent out to bid in October of 2002. There were four bids with the low bid in the amount $1,153,681.00. It was determined at that time to not award the contract and redesign the project in- house. With assistance from Engineering for drainage design, we looked at all design issues and implemented many cost reducing changes as well as improvements to the trail experience. Current Status: The re -designed project bids were opened and the low bid was from Sweetser Construction in the amount of $ 426,936.03. This amount is a 63% reduction in cost from the original bid. The final quantities reconciliation is complete and the project is over in some pay items. Please see attached change order for a listing of quantities. The estimated quantities used in project were based on the Geotechnical Engineer's recommendation of building the trail in the dry part of the year. Many factors out of our control prevented this from happening, such as an extremely wet spring and summer and the publics desire to complete the trail project in a timely fashion. Recommendation: Parks and Recreation staff recommends approving Change Order #3 which includes all final quantity reconciliations. This project currently has the funds needed to cover this expenditure. cc: files Telephone: 501-718-7688 1 City of Fayetteville Parks and Recreation Division 113 W. Mountain Street, Fayetteville, Arkansas 72701 E-mail. shatfield@ci ayetteville.ar.us a FAYETTEVILLF PARKS & RECREATION • • MEMORANDUM Date: To: Thru 1/27/05 Mayor Dan Coody and City Council Members Gary Dumas, Director of Operations Connie Edmonston, Parks and Recreation Director From: Steve Hatfield, Park Landscape Architect, Trails & Greenways Coordinator Reference: West Mud Creek Multi -use Trail Subject: Final Payment and approval of additional funds Background: West Mud Creek Trail is a wonderful multi -use trail that follows Mud creek from Front Street to Steele Blvd. This project was originally designed by Milholland Engineering and sent out to bid in October of 2002. There were four bids with the low bid in the amount $1,153,681.00. It was determined at that time to not award the contract and redesign the project in- house. With assistance from Engineering for drainage design, we looked at all design issues and implemented many cost reducing changes as well as improvements to the trail experience. In 2002, the Parks and Recreation Division applied and was awarded a $200,000 dollar 80/20 matching grant from the Arkansas State Highway and Transportation Department for this project. The city also has an outstanding 80/20 matching grant from previous trail projects that can be applied to West Mud Creek Trail. Current Status: The re -designed project bids were opened and the low bid was from Sweetser Construction in the amount of $ 426,936.03. This amount is a 63% reduction in cost from the original bid. The final quantities reconciliation is complete and the project is over in some pay items. The estimated quantities used in project were based on the Geotechnical Engineer's recommendation of building the trail in the dry part of the year. Many factors out of our control prevented this from happening, such as an extremely wet spring and summer and the publics desire to complete the trail project in a timely fashion. Recommendation: Parks and Recreation staff recommends approving an additional expenditure of $14,488.38 above the current contract price including the project contingency. This project currently has the funds needed to cover this expenditure. cc: files 1 City of Fayetteville Parks and Recreation Division 113 W. Mountain Street, Fayetteville, Arkansas 72701 Telephone: 501-718-7688 E-mail: shatfeld@ci.fayetteville.ar.us • • RESOLUTION NO. A RESOLUTION APPROVING CHANGE ORDER #3 TO THE CONTRACT WITH SWEETSER CONSTRUCTION, INC. IN THE AMOUNT OF $59,295.43 AS FINAL RECONCILIATION OF THE WEST MUD CREEK MULTI -USE TRAILPROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order #3 to the contract with Sweetser Construction, Inc. in the amount of $59,295.43 as final reconciliation of the West Mud-Crk Multi -Use Trail project. PASSED and APPROVED this 15th day of Februar APPROVE ATTES B� Y ODY, Mayor