HomeMy WebLinkAbout176-05 RESOLUTION•
RESOLUTION NO. 17 6-0 5
A RESOLUTION APPROVING AMENDMENT #1 TO THE
CONTRACT WITH McCLELLAND CONSULTING
ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED
5145,793.00 FOR FINAL DESIGN, BIDDING, CONSTRUCTION
ADMINISTRATION, AND RESIDENT SERVICES DURING
CONSTRUCTION FOR WATER AND SEWER RELOCATION
FOR HIGHWAY IMPROVEMENTS TO WEDINGTON DRIVE.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CI'T'Y OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby
approves Amendment #1 to the contract with McClelland Consulting Engineers, Inc. in
an amount not to exceed 5145,793.00 for final design, bidding, construction
administration, and resident services during construction for water and sewer relocation
for highway improvements to Wedington Drive. A copy of Amendment #1, marked
Exhibit "A" is attached hereto, and made a part hereof.
PASSED and APPROVED this 6`h day of September, 2005.
ATTEST:
By
��•c Ott's.P
z. •
;FAYETT EVILLE•
gs.9RKANSPc' •:41
S
1St A
DRA SMITH, Ct
APPROVED:
By
AN COODY, Mayor
• •
AMENDMENT NO. 1
TO
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
FAYETTEVILLE HIGHWAY 16 WATER AND SEWER MAIN RELOCATION
RELOCATION OF WATER AND SEWER MAINS ALONG WEDINGTON DRIVE
FINAL DESIGN, BIDDING, AND CONSTRUCTION PHASE SERVICES
The Agreement for Professional Engineering Services executed on January 18,
2005 for Relocation of Water and Sewer Mains along Wedington Drive in Fayetteville,
Arkansas is hereby amended. This Amendment entered into and executed on the date
indicated beneath the signature blocks, by and between the City of Fayetteville
(hereinafter "City of Fayetteville") and McClelland Consulting Engineers, Inc.
(hereinafter "McClelland") changes the authorized Scope of the Project, and the Fees and
Payments, due to the requested increase in scope of services on the Wedington Drive
water and sewer main project.
The Agreement lists the Scope of Services for:
1. Preliminary Design Phase Services
2. Final Design Phase Services
3. Bidding Phase Services
4. Construction Phase Services
5. Post -Construction Phase Services
6. Resident Services During Construction
However, only the Preliminary Design Phase Services were authorized for
completion in the basic Agreement and were covered in Section 6, Payments to
McClelland.
The purpose of this Amendment No. 1 is to authorize McClelland to complete
Final Design, Bidding, Construction, Post -Construction and Resident Services During
Construction as defined in the Agreement and hereinafter, and to establish compensation
for these services.
FY042165 Amendment No. 1 1
SECTION 2 — BASIC SERVICES OF MCCLELLAND
McClelland is hereby authorized to complete Final Design Phase Services as
defined under Section 2.3 of the Agreement, to include preparation of property mapping
and detailed easement documents as defined under Subsection 2.3.6. McClelland is
hereby authorized to complete Bidding Phase Services as defined under Section 2.4 of the
Agreement.
McClelland is hereby authorized to complete Construction Phase Services to
include:
1. Review of submittals.
2. Processing monthly pay requests.
3. Scheduling and attending progress meetings, as needed.
4. Coordination of Construction activities between the Contractor and City of
Fayetteville.
McClelland is hereby authorized to complete Post — Construction Phase Services
to include:
1. Securing and processing of final documents (Bonds, affidavits, etc.).
2. Preparation and submission of Record Drawings.
3. Coordination of post —construction/clean up activities required of the
Contractor.
McClelland is hereby authorized to provide Resident Services During
Construction to include:
1. Providing a resident construction observer to be at the project during
construction activities related to the water and sewer main installation.
Resident services shall be full time during pipe laying periods and part
time during site preparation and site clean up periods.
2. The resident construction observer shall maintain daily logs of site
conditions, work completed, activities relating to property owners, and
information/directives received from the City of Fayetteville.
FY042165 Amendment No. 1 2
• •
3. The resident construction observer shall not provide superintendence over
the Contractor's personnel or over the Contractor's work and safety
procedures.
SECTION 6 — PAYMENTS TO MCCLELLAND
Compensation for Final Design, Bidding, Construction, Post -Construction and
Resident Services During Construction shall be based upon cost reimbursement, plus
profit, as established under Subsection 6.1.1 for Preliminary Design Phase Services. This
payment procedure is to be acceptable to the Arkansas Highway and Transportation
Department for reimbursement purposes. Attachments B 1 through B 4 list estimated
manhours and labor rates as applicable for these phases of the project. Thesc cost factors
are summarized as follows:
Final Design and Easement Preparation: $53,068
Bidding Phase: $ 3,167
Construction and Post — Construction Services: $15,284
Resident Services During Construction: $74,274
Total $145,793
It is estimated that $14,000 of the $54,000 previously authorized for the
Preliminary Design Phase Services can be transferred to Final Design and Bidding Phase
Services, so that an Agreement Amendment Total Contract Amount for Preliminary
Design, Final Design, Bidding, Construction, Post — Construction and Resident Services
is one hundred eighty five thousand seven hundred ninety three dollars ($185,793).
Consequently, this Amendment No. 1 authorizes an additional one hundred thirty one
thousand seven hundred ninety three dollars ($131,793) to the originally approved fifty
four thousand dollars ($54,000). This Contract Amount ($185,793) shall not be exceeded
without specific written authorization from the City of Fayetteville.
All other provisions and conditions of the original Agreement remain in full force
and effect. Final Dcsign and Bidding Services shall be completed to conform to the
requirements of the Arkansas Highway and Transportation Department's project
FY042165 Amendment No. 1 3
• •
schedule. Subsequent phases shall conform to the City of Fayetteville's schedule with
the construction contractor.
IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly
executed as of the date and year first herein written.
FOR: THEITY OF FAYETTEVILLE:
By:
Date: 4 l ' x r
FOR:
Attest:
McCLELLAND CONSULTING ENGINEERS, INC.:
Date:
_roe.
c : FAYETTEVILLE;
:t. •
6;1•1'QkANgPy �,
J
.."CP
'..j .ON ....``
r
V Attest: 1
FY042165 Amendment No. 1 4
City of Fayetteville, Arkansas
Budget Adjustment Form
Budget Year
2005
Department: Water & Wastewater
Division: Water & Sewer Maintenance
Program: Sewer Mains Construction
Date Requested
August 2,2005
Adjustment Number
Project or Item Added/Increased:
Wedington (Highway 16 West) Water and Sewer
Relocation
Project or Item Deleted/Reduced:
None. AHDT Cost Reimbursement and use of reserves
are proposed for this project.
Justification of this Increase:
AHTD is preparing to bid this highway widening project
Justification of this Decrease:
Sufficient cash and investments exist to fund this project
Increase Expense Budget (Decrease Revenue Budget)
Account Name Account Number Amount Project Number
Water line improvements
Sewer improvements
5400 5600 5808 00 1,411,126 05015
5400 5700 5815 00 268,168 05015
Decrease Expense Budget (Increase Revenue Budget)
Account Name Account Number Amount Project Number
St Hwy -utility relocation 5400 0940 4303 00 1,233,500 05015 I
Use of fund balance 5400 0940 4999 99 445,794 -95015.•
Approval Signatures Budget Office Use Only
Tvoe: A B C .D
Requested By Date
Budget Manager Date
Dep
ent Dir tor
Finan
Inte
crvices Director
• 1
Date
•
Date of Approval
Posted to General Ledger
Posted to Project Accounting
Entered in Category Log
Initial Date
Initial Date
Initial Date
Mayor Date Initial Datc
ayettv?e
•
City of Fayetteville �
Engineering Division /7
I I,�
I
Fayetteville. West Mountain
AR 72701 MLei r
ph: 479-575-8206
79-57-820
fax: 479-575-8202 kyintirrittatts
9/S
Date: August 18, 2005
To: Fayetteville City Council
Thru: Dan Coody, Mayor
Gary Dumas, Director of Operations
David Jurgens, Interim Water & Wastewater Director
From: Ron Petrie, City Engineer
Subject: Wedington Drive Water & Sewer Relocations Project
Amendment #t to Engineering Contract
RECOMMENDATION:
The Staff recommends Council approval of Amendment #1 to the contract with
McClelland Consulting Engineers, Inc. in an amount not to exceed $145,793 for final
design, bidding, construction administration, and resident services during construction for
water & sewer relocations for the Hwy. 16 (Wedington Drive) Widening Project from
Rupple Road to Double Springs Road.
BACKGROUND
The Arkansas State Highway Department (AHTD) has a current construction project (Job
040423) for the widening of Hwy 16 (Wedington Drive) from Rupple Rd. to Double
Springs. In order to clear the way for the widening project by A.H.T.D., the existing
water and sewer facilities serving this arca will have to be relocated to avoid construction
conflicts with the highway facilities. Also, in addition to the necessary relocations, staff
has requested some over -sizing of the water mains, and fire protection improvements for
this arca
Per City Council approval on January 18, 2005, McClelland Consulting Engineers, Inc.
was awarded a contract in the amount of 554,000 for performing the preliminary
engineering services for this project.
Afrolii?iVrt
• •
DISCUSSION
Bids were opened on August 10`h and Gilbert Central is the apparent low bidder. AHTD
typically issues a Notice To Proceed to the contractor 30 days after the bid opening. It is
imperative that McClelland Consulting Engineers, Inc. be authorized to complete the
design work immediately and then oversee this project throughout the construction phase.
BUDGET IMPACT
This project is currently funded as the City Council passed Resolution No. 158-05 at its
August 2"`i meeting which approved a budget amendment in the amount of $1,754,694.
RP/pdl
Attachments: 3 Original Contract Amendments No. I
• •
RESOLUTION NO.
A RESOLUTION APPROVING AMENDMENT #1 TO THE
CONTRACT WITH McCLELLAND CONSULTING
ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED
S145,793.00 FOR FINAL DESIGN, BIDDING, CONSTRUCTION
ADMINISTRATION, AND RESIDENT SERVICES DURING
CONSTRUCTION FOR WATER AND SEWER RELOCATION
FOR HIGHWAY IMPROVEMENTS TO WEDINGTON DRIVE.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby
approves Amendment #1 to the contract with McClelland Consulting Engineers, Inc. in
an amount not to exceed $145,793.00 for final design, bidding, construction
administration, and resident services during construction for water and sewer relocation
for highway improvements to Wedington Drive. A copy of Amendment #1, markad
Exhibit "A" is attached hereto, and made a part hereof.
PASSED and APPROVED this 6ih day of September, pae 1 r•-•
►
APPROVED:
I.
Y•
\ DAN C ODY, Mayos'
•
ATTE giS
By
Ron Petrie
Submitted By
•
City of Fayetteville
Staff Review Form
City Council Agenda Items
or
Contracts
September 6, 2005
City Council Meeting Date
Engineering
Division
Action Required:
•
Operations
Department
A resolution approving Amendment #1 to the contract with McClelland Consulting Engineers, Inc. in an amount not to
exceed $145,793 for final design, bidding, construction administration, and resident services during construction for
water & sewer relocations for the Hwy. 16 (Wedington Drive) Widening Project from Rupple Road to Double Springs
Road. 4Ppnsl'0 a. In 401-.,lb.,s}.•.4k . t iuq....t4a1.
145,793.00
Cost of this request
$
slf. 000
5400-5600-5808-00 $
Account Number
05015
Project Number
Budgeted Item
X
Category / Project Budget
54,000.00
$
Wedington Utility W/S Relocations
Program Category / Project Name
Water Line Improvements
Funds Used to Date Program / Project Category Name
—0 —
Remaining Balance
Budget Adjustment Attached
Ilc I
Water & Sewer
Fund Name
Department Director
rie/X -03-%
Date
City Attorney
Finance and Internal Service Director
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
12-05
1/18/2005
990
Received in Mayor's Office
• Clarice Pearman _ Res. 176-05_
Page 1
From: Clarice Pearman
To: Petrie, Ron
Subject: Res. 176-05
Ron,
Attached is a copy of the resolution passed by City Council September 6, 2005 approving Amendment No.
1 to the McClelland agreement. I have attached a copy of that agreement. I will return to you via
interoffice mail two of three originals of the agreement.
Also attached is a copy of the budget adjustment for this protect. I will forward to Budget & Research the
original budget adjustment.
Thanks.
Clarice
CC: Deaton, Vicki; Fell, Barbara