Loading...
HomeMy WebLinkAbout170-05 RESOLUTION• RESOLUTION NO. 170-05 A RESOLUTION APPROVING TASK ORDER NO. 11 WITH McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $31,150.00 FOR DETAILED ARCHITECTURAL AND ENGINEERING DESIGN FOR THE PI-IASE 1 RENOVATION OF THE TERMINAL BUILDING AT THE FAYETTEVILLE MUNICIPAL AIRPORT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 11 with McClelland Consulting Engineers in the amount of 531,150.00 for detailed architectural and engineering design for the Phase 1 Renovation of the Terminal Building at the Fayetteville Municipal Airport. PASSED and APPROVED this 6th day of September, 2005. ATTEST• SONDRA SMITH, City Clerk APPROVED: By DAN COODY, Mayo tes o -cis • • TASK ORDER NO. 11 PHASE 1 TERMINAL\FBO RENOVATIONS FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on May 6, 2003, as amended. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville and McClelland Consulting Engineers sets forth the project description, project schedule, and engineering and architectural fees related to the preparation of Construction Documents for the Phase 1 of the Terminal/FBO Building Renovation at Fayetteville Municipal Airport, Drake Field. Our Architectural Consultant Wittenberg-Delony Davidson, Inc. from their Fayetteville office will perform this task. SECTION I - PROJECT DESCRIPTION The project is to consist of: assistance in applying for state funding for the project; Detailed Architectural and Engineering Design for the Phase 1 Renovation of the Terminal\FBO Building; final cost estimates; meetings with the Airport Management and Airport Advisory Board to review the desired renovations; and Architectural Services associated with the Construction Administration for this project. J:IDRAKE FIELD\CONTRACTS\2003-2006\Task Order 11.doc • • SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), McClelland Consulting Engineers through its Consultant will endeavor to execute the project construction documents within a four (4) week time period, as expeditiously as possible, to enable the City of Fayetteville to solicit competitive bids for construction as soon as possible. SECTION III - SCOPE OF SERVICES MCE through its Consultant shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, this project is likely to include: A. Assisting the City of Fayetteville in making application for a grant from the Arkansas Department of Aeronautics. B. Development of Final Construction Documents and Cost Estimates for the following areas. FBO New Carpet and Flooring Entry Desk and Display Wall Millwork Flight Line Desk Weather Info Area New Room Finishes for: Media Room,. 2 Offices, & Reading Room Misc. Wall Finishes Toilets (South) Counter Tops Showers Restaurant New Wall at Kitchen Windows & Doors at Patio Selective Demolition J:\DRAKE FIELD\CONTRACTS\2003-2006\Task Order 11 doc 2 • • C. Meeting with the Airport Management and their Tenants to discuss design criteria, desired features, and schedule. D. Construction Administration and Periodic Inspections of the work. E Providing a set of Record Drawings" at the completion of construction based upon the Contractor's mark-ups. F. Reproduction Cost for drawing sets. SECTION IV - FEES AND PAYMENTS The following fees are to be paid to MCE as compensation for his services: A. Project Coordination: Lump Sum $ 850. B. Construction Documents, Bidding, & Const. Admin: Lump Sum $ 26,750. C. Preparation of Record Drawings": hourly rates estimated to be $ 550. D. Reproduction Costs: Actual Cost Not to Exceed $ 3000. Appendix "A" presents hourly rates for personnel anticipated to be assigned to this project as well as the basis of payments to be made to MCE. J\DRAKE FIELD\CONTRACTS\2003-2006\Task Order 11.doc 3 • • SECTION V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE: Date: 9/6/(J.f FOR McCLELLAND CONSULTING ENCiJNEERS, INC.: By: /(c F-y€G5- 11f&t414't.9 ent Attest: J:\DRAKE FIELD \CONTRACTS\2003-2006\Task Order 11.doc 4 • • APPENDIX A TASK ORDER NO. 11 Hourly Rates for Personnel Fayetteville Municipal Airport CATEGORY Project Director Project Manager Project Engineer Design Engineer II Principal Architect Project Architect Associate Architect Architect Intern Architect Construction Coordinator Computer Technician Clerical Support CADD Technician III CADD Technician II CADD Technician I J:\DRAKE FIE LD\CONTRAGTS\2003-2006\APPENDIX A TO 11.DOC BILLABLE HOURLY RATE RANGE $125 to $150 $90 to $120 $75 to $90 $65 to $75 $130 to $165 $100 to $125 $90 to $110 $80 to $95 $60 to $75 $75 to $95 $45 to $60 $45 to $65 $55 to $65 $45 to $55 $35 to $45 • • TASK ORDER NO. 11 PHASE 1 TERMINAL\FBO RENOVATIONS FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on May 6, 2003, as amended. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the date Indicated below the signature block, by and between the City of Fayetteville and McClelland Consulting Engineers sets forth the project description, project schedule, and engineering and architectural fees related to the preparation of Construction Documents for the Phase 1 of the Terminal/FBO Building Renovation at Fayetteville Municipal Airport, Drake Field. Our Architectural Consultant Wittenberg-Delony Davidson, Inc. from their Fayetteville office will perform this task. SECTION I - PROJECT DESCRIPTION The project is to consist of: assistance in applying for state funding for the project; Detailed Architectural and Engineering Design for the Phase 1 Renovation of the Terminal\FBO Building; final cost estimates; meetings with the Airport Management and Airport Advisory Board to review the desired renovations; and Architectural Services associated with the Construction Administration for this project. J:\DRAKE FIELD \CONTRACTS 12003-2006\Task Order 11.doc • • SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), McClelland Consulting Engineers through its Consultant will endeavor to execute the project construction documents within a four (4) week time period, as expeditiously as possible, to enable the City of Fayetteville to solicit competitive bids for construction as soon as possible. SECTION III - SCOPE OF SERVICES MCE through its Consultant shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, this project is likely to include: A. Assisting the City of Fayetteville in making application for a grant from the Arkansas Department of Aeronautics. B. Development of Final Construction Documents and Cost Estimates for the following areas: FBO New Carpet and Flooring Entry Desk and Display Wall Millwork Flight Line Desk Weather Info Area New Room Finishes for: Media Room,. 2 Offices, & Reading Room Misc. Wall Finishes Toilets (South) Counter Tops Showers Restaurant New Wall at Kitchen Windows & Doors at Patio Selective Demolition J:\DRAKE FIELD \CONTRACTS\2003-2006\Task Order 11.doc 2 • • C. Meeting with the Airport Management and their Tenants to discuss design criteria, desired features, and schedule. D. Construction Administration and Periodic Inspections of the work. E. Providing a set of Record Drawings" at the completion of construction based upon the Contractor's mark-ups. F. Reproduction Cost for drawing sets. SECTION IV - FEES AND PAYMENTS The following fees are to be paid to MCE as compensation for his services: A. Project Coordination: Lump Sum $ 850. B. Construction Documents, Bidding, & Const. Admin: Lump Sum $ 26,750. C. Preparation of Record Drawings": hourly rates estimated to be $ 550. D. Reproduction Costs: Actual Cost Not to Exceed $ 3000. Appendix "A" presents hourly rates for personnel anticipated to be assigned to this project as well as the basis of payments to be made to MCE J:\DRAKE FIELD\CONTRACTS\2003-2006\Task Order 11.doc 3 • • SECTION V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE: By: Cm 40 Attest: Date: ai Mayor 41/44 SSP ft rn &r 6 °-cos S A..'cViY p CG'' �'• 9? • - U . • • c • riot JItVILLE. 9d'•ZRKANstc. FOR McCLELLAND CONSULTING ENGINEERS, INC.: By: Attest: ent CIMM) N/ J:\DRAKE FIELD\CONTRACTS\2003-2006\Task Order 11.doc 4 • • APPENDIX A TASK ORDER NO. 11 Hourly Rates for Personnel Fayetteville Municipal Airport CATEGORY Project Director Project Manager Project Engineer Design Engineer II Principal Architect Project Architect Associate Architect Architect Intern Architect Construction Coordinator Computer Technician Clerical Support CADD Technician III CADD Technician II CADD Technician I J:\DRAKE FIELD\CONTRACTS\2003-2006\APPENDIX ATO 11.DOC BILLABLE HOURLY RATE RANGE $125 to $150 $90 to $120 $75 to $90 $65 to $75 $130 to $165 $100 to $125 $90 to $110 $80 to $95 $60 to $75 $75 to $95 $45 to $60 $45 to $65 $55 to $65 $45 to $55 $35 to $45 • CITY COUNCIL AGENDA MEMO TO: Mayor and City Council THRU: Stati/Contract Review Co Airport Board FROM: DATE: SUBJECT: City Council Meek of: Agenda Item Number: September 6, 2005 Ray M. Boudreaux, Director, Aviation and E onymic Development August 11, 2005 94705 / 7o C/a. t� litse OtJ r // Approve Task Order No. 11 with McClelland Consulting Engineers for detailed Architectural and Engineering design for the phase 1 renovation of the Fayetteville Municipal Airport, Drake Field Terminal Building in the amount of $31,150.00. RECOMMENDATION: Approve Task Order No. 11 to contract #917 with McClelland Consulting Engineers in the amount of $31,150.00 for Architectural and Engineering services related to phase I of the Terminal Building remodeling project.. The Airport Board approved this project at their August 11, 2005 meeting. BACKGROUND: Task Order No. 11 employs McClelland Consulting Engineers and Richard Alderman of Whittenberg-Delony Davidson, Inc. architects to engineer and design a project to remodel the lobby and FBO space of the Airport Terminal Building. The Airport Board included this project in the capital program to remodel the area to look more like an executive airport service center or hotel Lobby rather than a commercial airport lobby. With Million Air accepting a contract to operate the FBO line and fuel services, it makes the project even more appropriate. Million Air of Fayetteville will participate in the project in accordance with their lease agreement. DISCUSSION: This project will remodel the lobby of the airport into an executive style airport service area and will result in the lobby looking more like a hotel lobby. Since the airlines moved to XNA, the number of people in the building reduced with the number of aircraft remaining relatively the same. The difference is the number of passengers per aircraft. General aviation airports that serve the business passenger are designed to look more like a living room where passengers and crews can wait in comfort. This project will bring the Fayetteville Drake terminal up to the standard and style of the terminals at Springdale, Rogers, and the Regional Airport to attract the business traveler. BUDGET IMPACT: The project is budgeted in the 2005 capital improvement budget. Funds are available. Attachments: Staff Review Form Aviation and Economic Development Department Fayetteville Municipal Airport. Drake Field 4500 South School Avenue, Suite F Fayetteville. Arkansas 72701 Ray M. Boudreaux. Director • • RESOLUTION NO. A RESOLUTION APPROVING TASK ORDER NO. 11 WITH McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $31,150.00 FOR DETAILED ARCHITECTURAL AND ENGINEERING DESIGN FOR THE PHASE 1 RENOVATION OF THE TERMINAL BUILDING AT THE FAYETTEVILLE MUNICIPAL AIRPORT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 11 with McClelland Consulting Engineer in the amount of 531,150.00 for detailed architectural and engineering dJgifor tyke Phase 1 Renovation of the Terminal Building at the Faye. v e Municipal Airport. !r'l • A B PASSED and APPROVED this 6m day of Septembb r, 20e5. APPROVEIr t ,. 1 N GOODY, Mayor A SMITH, City Clerk 1 I 1 1 1 J 1 J 1 J J McClelland Consulting Engineers. Inc. CAPABILITY GENERAL QUALIFICATIONS THE TEAM McClelland Consulting Engineers, Inc. (MCE) will serve as the lead consultant for the "team". We have assembled a group of professionals that brings specialized ex- perience relative to your potential projects. • Kimley-Horn and Associates, Inc. is a national engineering firm with extensive airport facilities design experience. They provide a wealth of experience that will supplement McClelland's "local knowledge" of Drake Field. • Barnard Dunkelberg & Company is a nationally recognized airport planning firm that can provide all services required for the development of an airport planning prog ram. • Aviation Alliance; Inc. will provide engineering services for all runway and/or taxiway lighting assignments. • Wittenberg Delony & Davidson, Inc. is an architectural firm that has served with MCE on many team projects in the past. • Green Anderson Engineers, Inc. Is a mechanical and electrical consulting engi- neering firm with a wide range of commercial, industrial and institutional expen- ence McClelland has worked with each of these team members on past projects that were successfully implemented. McCLELLAND CONSULTING ENGINEERS, INC. McClelland Consulting Engineers (MCE) is a mul- tidiscipline engineering firm specializing in civil and environmental engineering, geotechnical en- gineering, structural engineering, environmental laboratory analysis, construction management and surveying. Established in Fayetteville, Arkan- sas, in 1963, McClelland Consulting Engineers, Inc. (MCE) has grown to become one of the larg- est engineenng consulting firms in Arkansas. MCE specializes in planning, design, and con- struction management of airport facilities. MCE employs approximately 80 skilled persons who work out of offices in Little Rock and Fayetteville. Both offices are similar in size, and both offices have similar experi- ence. In its second generation, the company maintains a strong financial position, has increased its staff by 70% in the past 24 years, and Is one of the largest engineering firms In Arkansas. The average term of employment for MCE's three Fayetteville of- fice Partners is 25 years, which means that the company expenence claimed remains with us rather than with those who have moved on. FAYETTEVILLE, ARKANSAS Designed To Serve Ray M. Boudreaux Submitted By • City of Fayetteville • Staff Review Form City Council Agenda Items Contracts 6 -Sep City Council Meeting Date Aviation & Economic Development General Government Division Action Required: Department Approve Task Order #11 to Contract #917 McClelland Consulting Engineers, Inc., PO Box 1229, Fayetteville, AR, 72702-1229, Wayne Jones P.E., Vice President, 479-443-2377 office, 479-443-9241 fax, wjones@mcclelland- engrs.com, in the amount of $31,150.00. $31,150.00 Cost of this request 5550.3960.5314.00 Account Number 05021.1 Project Number Budgeted Item X 300,000.00 Category/Project Budget 8,200.00 Funds Used to Date 291,800.00 Remaining Balance Budget Adjustment Attached Departmen Director City Attom y ., r• de Firlanc4 and Internal Service Director Date Mayor Date Terminal Building Rehabilitation Program Category / Project Name Airport Capital Improvements Program / Project Category Name General Fund / Airport Fund Name Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: 4/30/2003 # 917 Received in City Clerk's Office Comments: Clarice Pearman - Res 170-05 From: Clarice Pearman To: Boudreaux, Ray Subject: Res. 170-05 Ray, Attached is a copy of the resolution passed by City Council September 6, 2005 regarding McClelland's Task Order 11. I will return to you two of three originals via interoffice mail. Thanks. Clarice CC: Deaton, Vicki Page 1