Loading...
HomeMy WebLinkAbout137-05 RESOLUTION• • RESOLUTION NO. 137-05 A RESOLUTION APPROVING CONTRACT AMENDMENT NO. 2 WITH McCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $56,867.00 FOR THE HIGHWAY 62-FARMINGTON WATERLINE REPLACEMENT PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves contract Amendment No. 2 with McClelland Consulting Engineers, Inc. in the amount of $56,867.00 for the Highway 62 -Farmington Waterline Replacement Project. A copy of the Amendment, marked Exhibit "A" is attached hereto, and made a part hereof. PASSED and APPROVED this 5th day of July, 2005. ATTEST ,..nnrr `:•... • \SY Oc G.p %;116;• • •ipS • FAYETTEVILLE • :>3 ,t, //'• • .. • ci° ,. �"wuuu.. By: �\ l/�i.� e�.�. �Y &kit U SONDRA SMITH, City Clerk • AMENDMENT NO. 2 • TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES FAYETTEVILLE HIGHWAY 62 WATER MAIN RELOCATION RELOCATION OF WATFR MAINS IN FARMINGTON, ARKANSAS CONSTRUCTION PHASE SERVICES The Agreement for Professional Engineering Services executed on May 18, 2004 for Relocation of Water Mains in Farmington, Arkansas is hereby amended. This Amendment entered into and executed on the date indicated beneath the signature blocks, by and between the City of Fayetteville (hereinafter "City of Fayetteville") and McClelland Consulting Engineers, Inc. (hereinafter "McClelland") changes the authorized Scope of the Project, and the Fees and Payments due to the requested increase in scope of services on the Farmington water main project. The Agreement defines the Scope of Services for: 1. Preliminary Design Phase Services 2. Final Design Phase Services 3. Bidding Phase Services 4. Construction Phase Services 5. Post -Construction Phase Services 6. Resident Services During Construction However, only the Preliminary Design Phase Services were authorized for completion in the basic Agreement and were covered in Section 6, Payments to McClelland. Amendment No. I subsequently authorized completion of Final Design and Bidding Phase Services. The purpose of this Amendment No. 2 is to authorize McClelland to complete Construction, Post -Construction and Resident Phase Services as defined in the Agreement, and to establish compensation for these services. FY042125 Amendment No. 2 1 • • SECTION 2 - BASIC SERVICES OF MCCLELLAND McClelland is hereby authorized to complete Construction Phase Services to include: I. Review of submittals. 2. Processing monthly pay requests. 3. Scheduling and attending progress meetings, as needed. 4. Coordination of Construction activities between the Contractor and City of Fayetteville. McClelland is hereby authorized to complete Post - Construction Phase Services to include: 1. Securing and processing of final documents (Bonds, affidavits, etc.). 2. Preparation and submission of Record Drawings. 3. Coordination of post - construction/clean up activities required of the Contractor McClelland is hereby authorized to provide Resident Services During Construction to include: 1. Providing a resident construction observer to be at the project during construction activities related to the water main installation. Resident services shall be full time during pipe laying periods and part time during site preparation and site clean up periods. 2. The resident construction observer shall maintain daily logs of site conditions, work completed, activities relating to property owners, and information/directives received from the City of Fayetteville. 3. The resident construction observer shall not provide superintendance over the Contractor's personnel or over the Contractor's work and safety procedures. FY042125 Amendment No. 2 2 SECTION 6 — PAYIvTENTS TO MCCLELLAND • Compensation for Construction, Post -Construction and Resident Services During Construction shall be based upon cost reimbursement, plus profit, as established under Subsection 6.1.1 for Preliminary Design Phase Services. This payment procedure is to be acceptable to the Arkansas Highway and Transportation Department for reimbursement purposes. Attachments B 1 through B 2 list estimated manhours and labor rates as applicable for these phases of the project. These cost factors are summarized as follows: Construction and Post — Construction Services: Resident Services During Construction• $15,284 $41,583 Total $56,867 The Total Contract Amount for Preliminary Design, Final Design, Bidding, Construction, Post — Construction and Resident Services is one hundred forty one thousand nine hundred sixty seven dollars ($141,967.00), which includes the previously authorized $85,100 for design and bidding services. All other provisions and conditions of the original Agreement remain in full force and effect. Completion of these construction phase services shall conform to the City of Fayetteville's schedule with the construction contractor. FY042125 Amcndmcnt No. 2 3 • • IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR: THE CITY OF FAYETTEVILLE: By: Date: Attest ""cit.. • , `rE\iY O SG. U . �'a ;FAYETTEVILLE1.• ,:929:QKANSQ::•e\t FOR: McCLELLAND CONSULTING ENGINEERS, INC.: iONiiC`O`'`; mAti B Date: cel dos Attest: FY042125 Amendment No. 2 4 • • ATTACHMENT B 1 FEE PROPOSAL CONSTRUCTION AND POST - CONSTRUCTION PHASE SERVICES IN CONJUNCTION WITH ARKANSAS HIGHWAY 62 WIDENING AHTD JOB NO. 40082 CITY OF FAYETTEVILLE WATER MAINS ALONG HIGHWAY 62 LABOR CLASSIFICATION Principal Engineer Project Manager Senior Engineering Tech Chief Draftsman Junior Draftsman Survey Supervisor Survey Crew (2 man) Computer Tech Clerical Support TIME 6 hrs 84 hrs 4 hrs 4 hrs 20 hrs 4 hrs 12 hrs 8 hrs 20 hrs Direct Labor Payroll Expenses (34.23%) Subtotal, Direct Payroll Travel 200 miles ® $0.34/mi Reproduction Materials and Supplies Subtotal, Direct Cost Indirect Costs (112.79%) Subtotal, Direct and Indirect Profit Total Construciton and Post - Construction Costs ACTUAL LABOR RATE $41.11/hr $37.50/hr $21.50/hr $17.60/hr $13.40/hr $19.00/hr $26.50/hr $18.25/hr $12.60/hr Note: Actual labor rates for billing purposes will match the rates paid to the employee performing the services and shall be subject to annual labor rate increases. FY042125 Attachment B 1 EXTENDED $246.66 $3,150.00 $86.00 $70.40 $268.00 $76.00 $318.00 $146.00 $252.0Q $4,613.06 $1,579.05 $6,192.11 $40.80 $120.00 $60.00 $6,412.91 $7,233.12 $13,646.03 $1,637.97 $15,284.00 • • ATTACHMENT B 2 FEE PROPOSAL RESIDENT SERVICES DURING CONSTRUCTION IN CONJUNCTION WITH ARKANSAS HIGHWAY 62 WIDENING AHTD JOB NO. 40082 CITY OF FAYETTEVILLE WATER MAINS ALONG HIGHWAY 62 LABOR CLASSIFICATION Project Manager Construction Observer II Construction Observer I TIME 16 hrs 100 hrs 700 hrs Direct Labor Payroll Expenses (34.23%) Subtotal, Direct Payroll Travel 850 miles @ $0.34/mi Reproduction Materials and Supplies Subtotal, Direct Cost Indirect Costs (112.79%) Subtotal, Direct and Indirect Profit Total Resident Services During Construction ACTUAL LABOR RATE $37 50/hr $26.44/hr $13 50/hr Notes: (1) This estimate for Resident Services During Construction is based on a 4 month (17 week) construction period. (2) Actual labor rates for billing purposes will match the rates paid to the employee performing the services and shall be subject to annual labor rate increases. FY042125 Attachment B 2 EXTENDED $600.00 $2,644.00 $9.450.00 S12,694.00 $4,345.16 $17,039.16 $289.00 $60.00 $60.00 $17,448.16 $19.679.78 $37,127.94 $4.455.06 $41,583.00 • • rate The City of Fayetteville, Arkansas City Council Agenda Memo /QHS 7/505 /37 (melt /444 t'y//1[l Ks/{ M�10A1an / Ao( City Council Meeting Date: July 5, 2005 To: CITY COUNCIL Thru: Mayor Dan Coody Gary Dumas, Director of Operations Ron Petrie, City Engineer pat / From: Sid Norbash, Staff Engineer , �,./ Date: June 17, 2005 Subject: Highway 62 (Farmington) - Waterline Relocations Engineering Contract Amendment #2 Recommendation: Approval of a Resolution authorizing Amendment #2 to the existing engineering contract with McClelland Consulting Engineers, Inc. in the amount of $56,867, for Highway 62 — Farmington — Waterline Relocations Project. Background: Highway 62 is scheduled for improvements and widening in Farmington from Hwy 170 intersection and proceed along Hwy 62 west for approximately one mile (please see attached map). Fayetteville owns the water distribution system in Farmington and is responsible for the relocation of water mains in conflict with the planned highway construction. In 2004 McClelland Consulting Engineers, Inc. was selected and awarded a contract to perform the engineering services for this project. The design was recently completed and the project was advertised for bid on June 2, 2005. • Discussion: • The Engineering Agreement defined the Scope of Services as following Phases: 1. Preliminary Design Phase Services 2. Final Design Phase Services 3. Bidding Phase services 4. Construction Phase Services 5. Post -Construction Phase Service The preliminary engineenng was performed under the main contract. Final design and bidding was performed under Amendment #1. The proposed Amendment #2 is for construction and post construction services, and includes Resident Services during construction. Budget Impact: 2005 Budget Obligated or expensed to date Remaining Funds Funds needed at this time Balance after the cost of this request SN/sn Attachments: Contract Amendment #2 $1,019,616 $ 321,157 $ 698,459 $ 56,867 $ 641,592 • • RESOLUTION NO. A RESOLUTION APPROVING CONTRACT AMENDMENT NO. 2 WITH McCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $56,867.00 FOR THE HIGHWAY 62-FARMINGTON WATERLINE REPLACEMENT PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves contract Amendment No. 2 with McClelland Consulting Engineers, Inc. in the amount of $56,867.00 for the Highway 62 -Farmington Waterline Replacement Project. A copy of the Amendment, marked Exhibit "1" is attached hereto, and made a part hereof. PASSED and APPROVED this 5th day of July, 200"'1 rn �APPROVBE : By: ate ODY, Mayor • City of Fayetteville • Staff Review Form City Council Agenda Items Contracts 5 -Jul -05 City Council Meeting Date Sid Norbash, Staff Engineer,QV Engineering Submitted By Division Action Required: Operations Department Approval of a Resolution authorizing amendment #2 to the existing contract with McClelland Consulting Engineers, Inc., in the amount of $56,867 for Hwy 62 -Farmington -Waterline Replacement Project. $56 867 00 Cost of this request 5400-5600-5808-00 Account Number 04034-10 Project Number Budgeted Item X $1,019,616 Category/Project Budget $321,157 Funds Used to Date $698,459 Remaining Balance Budget Adjustment Attached Hwy 62 -Farmington Waterline Replacement Project Program Category / Project Name Water System Improvements Program / Project Category Name Water & Sewer Fund Name Date City Attomeye 42- L--2✓-o5 Finance a d Internal Service Director Date Date Previous Ordinance or Resolution # 77-04 Original Contract Date: Original Contract Number: 5/18/2004 956 Received in City Clerk's Office 101 Comments: tO/L ale patinae' Mayor: Department Director Purchasing Manager: Finance & Internal Services Director: Budget Manager: IT Manager: Dispatch Manager: Ufilities Manager: Other: cn n N N 5 O n N S— (D W V OI (n a 41 — Requester: Sid Norbash City: Fayetteville Address: PO Box 1229 N 0 a a 0 City Of Fayetteville (Nd a Purchase Olden Shipping/Handling Waterline Replacement Project Hwy 62 Farmington 0 Q a g =a 0 c w c. `Vendor Name: McClelland Consulting Engineers, Inc. r 0 'Unit of Issue > 0) A 6 m C D n 0 N N O S N o b O N 0 b 0 M O O G M O O O 90.00 M O b O $0.00 44 O O $o.00 N CA a a a V O O (Extended Cost 0 O O g O o oa a a I— Account Numbers Requesters Employee A: 96 Zip Code: 72702 Fob Point: N 0 §.0 m Tax: Total: 956,867.00 yo r 0 Project/Subproject 11 re N N 0 N CD w N 075 Z m;Z co d I Z o" :iagwnN 041 re C C N 9 5 < n 0 R a rotes Attached s: No: Expected Delivery Date: C w T m n a. 0 0 0