HomeMy WebLinkAbout79-04 RESOLUTIONRESOLUTION NO. 7 9_ 04 A RESOLUTION TO APPROVE A CONSTRUCTION CONTRACT WITH MOBLEY CONTRACTORS, INC. IN THE AMOUNT OF $753,553.04 WITH A PROJECT CONTINGENCY OF $133,032.96 FOR A TOTAL OF $886,586.00 FOR THE RECONSTRUCTION OF OLD MISSOURI ROAD FROM JOYCE BOULEVARD TO THE MUD CREEK BRIDGE AND FROM ROLLING HILLS TO OLD WIRE ROAD WHEREAS, the City Council Street Committee has approved the conceptual design for the improvement of Old Missouri Road to connect the recently improved section to Joyce Boulevard and to Old Wire Road; and WHEREAS, Mobley Construction, Inc. was the low bidder for these construction projects. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the contract attached as Exhibit A which authorizes $753,553.04, plus a contingency of $133,032.96 for a total of $886,586.00 to Construction, Inc. for the reconstruction and improvement of Old Missouri Road from Joyce Boulevard to the Mud Creek Bridge and from Rolling Hills Drive to Old Wire Road. PASSED and APPROVED this the 18th day of May, 2004. ATTEST: By: SONDRA SMITH, City Clerk By: APPROVED: D COODY, Mayor • NAME OF FILE: CROSS REFERENCE: Resolution No. 79-04 wlagreement Document •--•• •• --- 1 04/23/04 City Council Agenda memo 2 draft resolution 3 copy of bid tabulation 4 draft agreement 5 copy of check request 6 copy of addendum 7 05/03/04 Staff Review Form 8 05/21/04 email to Paul Libertini 9 email to Paul Libertini 10 06/02/04 email to Paul Libertini 11 06/11/04 memo to Paul libertini NOTES: • • City Council Meeting of May 18, 2004 CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Hugh Earnest, Chief Administrative Officer From. Tim Conklin, Community Planning and Engineering Services Director Date: April 23, 2004 Subject: 1. Approval of a resolution awarding the construction contract in the amount of $753,553.04 with Mobley Contractors, Inc. for the construction of Old Missouri Road, North & South Sections 2. Approval of a project contingency in the amount of $133,032.96 which includes $113,032.96 (15%) for unforseen project expenditures and variations in final quantities; and $20,000 for materials testing, in-house management & inspection. RECOMMENDATION Staff recommends approval of the resolution awarding the contract to Mobley Contractors, Inc. in the amount of $753,553.04 and establishing a project contingency of $133,032.96. BACKGROUND This road improvement project is the combination of two separate 2003 CIP projects: Old Missouri Road from Joyce Boulevard to Mud Creek Bridge, and Old Missouri Road from Rolling Hills to Old Wire Road. Conceptual design plans were presented to the Street Committee on October 28, 2003. Four options were shown for the North Section (Joyce Blvd to Mud Creek Bridge). The Street Committee chose Option #1 for the North Section, and also accepted the proposed conceptual plan for the South Section. The first section of Old Missouri Road from Stubblefield Road to Rolling Hills has been under construction and was recently opened to traffic on Friday, April 16, 2004. Mobley Contractors, Inc. was also awarded that construction contract. 1 • DISCUSSION • City Council Meeting of May 18, 2004 The contract bids were opened on April 21, 2004. The project engineer has reviewed the bids and recommends awarding the contract to the low bidder, Mobley Contractors, Inc , in the amount of $753,553.04 (see the attached bid tabulation sheet). The estimated total project costs including the project contingency for unforeseen project expenditures are as follows: Contractor Bid Amount $ 753,553.04 Materials Testing $ 5,000.00 In-house Management & Inspection $ 15,000.00 15% Contingency $ 113,032.96 TOTAL $ 886,586.00 BUDGET IMPACT Funds of $1,330,000 are available as this project was budgeted as part of the 2003 Capital Improvement Program. It should be noted that approximately $50,000 of this budget will be used by the Transportation Division to purchase new traffic signal equipment to upgrade the existing signalization at the intersection of Old Missouri Road and Joyce Boulevard. 2 • RESOLUTION NO. • A RESOLUTION TO APPROVE A CONSTRUCTION CONTRACT WITH MOBLEY CONTRACTORS, INC. IN THE AMOUNT OF $753,553.04 WITH A PROJECT CONTINGENCY OF $133,032.96 FOR A TOTAL OF $886,586.00 FOR THE RECONSTRUCTION OF OLD MISSOURI ROAD FROM JOYCE BOULEVARD TO THE MUD CREEK BRIDGE AND FROM ROLLING HILLS TO OLD WIRE ROAD WHEREAS, the City Council Street Committee has approved the conceptual design for the improvement of Old Missouri Road to connect the recently improved section to Joyce Boulevard and to Old Wire Road; and WHEREAS, Mobley Construction, Inc. was the low bidder for these construction projects. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the contract attached as Exhibit A which authorizes $753,553.04, plus a contingency of $133,032.96 for a total of $886,586.00 to Construction, Inc. for the reconstruction and improvement of Old Missouri Road from Joyce Boulevard to the Mud Creek Bridge and from Rolling Hills Drive to Old Wire Road. PASSED and APPROVED this the 18th day of May, 2004. ATTEST: By: SONDRA SMITH, City Clerk APPROVED: By: DAN COODY, Mayor 6 a a 0 0 N • • 2O -- 4 f OI y 0 to Q o Vl o C A �a a y o a N tud00:Z @ b00Z '12 lludy'Bu/ued0 pig Z 0 Z m w J Z P w N Z O u W u 14- u Z 0 4 `O Z W I N27 Z P N u Z Y N w N N- z Z 0 Z O Z m Z J Z 0 Z to Z ➢ Z W Z to Z - Z O Z O Z J P N N4 w ZN 1 Z - Z 0 3 North Section - Construction Cost: CA Standard Signs Thermoplastic Pavement Marking (Arrows) Thermoplastic Pavement Marking White (24") _ 'Thermoplastic Pavement Marking White (18") (Thermoplastic Pavement Marking Yellow (12" Diagonal) I Thermoplastic Pavement Marking White or Yellow (6") I [Drop Inlet Silt Fence (E-6) I n O. m Baled Straw Filter Barrer (E-2) 1 Baled Straw Ditch Check (E-1) - z vo o Solid Sodding Seeding and Mulching Detectable Waning Surfaces [Concrete Access Ramp (4") w/ Agg. Base (4") 1 [Concrete Driveway (6") w/ Agg. Base (6") (Concrete Trail (4") w/ Agg. Base (4") Junction Box (4'x4') Drop Inlet Extension (8') Drop Inlet Extension (4') Drop Inlet (Type .c. 4'x4' or 'MO' 4' Dia.) 24 -inch Reinforced Concrete Pipe (RCP) 1 8 -inch Reinforced Concrete Pipe (RCP) 2" ACHM Surface Course (Type 2) ACHM Binder Course (Type 2) Concrete Curb and Gutter 16" Aggregate Base Course (Class 7) [undercut and Backfill CO 0 2 T Compacted Subgrade-Select Hillside Material (Borrow) c _ a6 m g Cold Milling Asphalt & Concrete Pavement Clearing and Grubbing Excavation Safety Tree Protection Fencing 3 = n °, 1Construction Staking 3 o ri- tic o Description < m a 1 LF 1 1 LF r= m CY AC I <<< aa EA EA g C z z q 1 TN AD AD <<<cnaaa<r n LF LS 3,000.00 P w - - OO 1 760 I O>- 4 O�OOp O O - OSI O - 4 0I I 650 I O O Oo0 O I 3,000 1 500 200 N o0 W o0 0.35 1 400 - Estimated Quantity O O se o _ o O O u 44 W N M J W J W NfnO00O J tic' p u O b W- a w .7:41-• A b PPOOwOJ a m %A N M H M 0m 0 H P N m_- u in P M 0' M O M M W m u 0 0 0 0 64En IUnit Price Mobley Contractors, Inc. EA a GO 44 A N a A .2- a 0 c o a~ 0 b w 0 o _ 0 o 56,688.001 0 o O 0 bo -- c N w W bo w L, 0 � to m bo 5770.001 w t 0 0 00000- a b P 0 a 0 0 N 64 H if. ia 1 $6,335.921 m bine. W - wwn O. J 0 Z. 0 o 0 t - a 0 o P 0 0 e w 0 0 N 0 o b co c 0 N N o 0 t' O c 0 co La 0 N o 0 N to o 0 N 0 w P 14 1 $7,426.56 64 in .- Extended Price to [ 532.701 0"8 to P to 0 !:128:`,..8.88238888 n'a"'=mwN to J O to 'n in o tn I 532.60 in o 0 o o 44C - 0 O 61 w O I 579.80 o - 8O bwV'N- I 58.35 O w O w O - O O w tn 64 oww o o O 61 oo o H O o H 0N O 40 = n nm Forsgren, Inc. 81'LS 1'8ZS$ ta w O 401 P w 61 0 0 1 51,635.001 56.650.001 -m N O 41 N o N- H 0 O o 1 52.385.001 P o L 0 0 N O o N J o' o P b 0 W u 0 J W> o 0 0 P 0' 0 N--- P O O la%N o O O O b O O 0 O O O 0 o o N tO O o 548,880.001 U b O O b O o 0- 20 o 0 O ti- oa o P o N O - c o o 0 - no o o O o O o o. 9 n to m bi O in O in N to m in W in N -4W it 00 b d o O- 4 61 io Y a00 V 44 tik o O ton n b O- P 0 41 03 P O w» 0 P P 64 in 0➢N w 0 00 m G Ob u P- V W Vi a W N 41 u - FIN W N in N N v P n4 0-- tn 4b 0 m wIQ j P 0 C 90 n'u g it ea A Ea 0 n N to N uu OoOo 0 W 43 - o N 0' b at 51.972.501 to to OWtoOOOOOto N wco0' N N o N i N to in OW P t,4 O 4,.* en w ~ Ob P b C uo J Jw ' 0 62 to w- Oa P P 0 - P N _J co 0o ti) qw 0 J0 u o w b J O t." la N O 540,625.001 J - ou ,..2 a O008 N 0u 64 0 0 N w N itl 0 0' wj 00AwN o P o m W - JmtoO JP O - tit O 0 E. 0 m 03 P Extended Price 44 La 0 a to 0 0 0 16:- 0 m 0 co - o 0 = 00 y- 0 0 ton 0 •-- 0 0 0 0 [ 525.001 0 0 1 54,000.001 in 00000 0 0 41 0 a 0 0 0 0 0 $600.00 0 0 888888 44 0 61 0 14 P 0 o a 00.ots 00'52$_ 0 0'' 0-- 0 P 00 0 N 00 0 f9 0 f; ei« _ 0 0 0 W 0 oo u o 0 o C a' 3' n City of Fayetteville N Le A • 0 O 'o 0 0 C o N 0 C O a-P IJ 0 O O u 60 0 o C 0 o 53,000.001 PPw 8888Z.;!8888 00610000o° - O 4* o co oi -4 NAa in -- o b o b P b C 5600.001 JP in O O aN0 -O O O 53,000.001 w b o 0 it O O 530.000.001 $39,000.00 64 0 b o o w W b o O 560.000.001 w P o O 00 526,000.001 N N in O 06 0 A C o 0 546,000.001 w CO to O b co. 44 c o o o N - 0 o N ' 0 O O N b 0 o ww o o o w o O o O ON 'OO O o O m 5 a 1 n 2O -- 4 f OI y 0 to Q o Vl o C A �a a y o a N tud00:Z @ b00Z '12 lludy'Bu/ued0 pig co a 0 6.1 0 • • O Z. CI Ai O N ao 0 O .• Zl ? O d CO a COf 0. N O C a iD Bid Opening, April 21, 2004 @ 2:OOpm N N O N e y W V J N P w N N a w W V N- V N O N e N O N J 0 P rd. P.t N N u N N- N V O N 0 N 00 N J N 0 N o N a N u 40 to- N N O N V, P N>VvNO^> . -, g vruau. 4 naaaqunafruurvn a,war North Section +South Section` South Section - Construction Cost: Meter Loop/Pedestrian Sign Relocation 4" Schedule 40 PVC Conduit Thermoplastic Pavement Marking (Arrows) Themmplastic Pavement Marking White (24") Tliemroplastic Pavement Marking Yellow (12" Diagonal) Thenuoplastic Pavement Marking White or Yellow (6") Erosion Control Mat (Miramar TM8 or equal) Drop Inlet Silt Fence (E-6) — -n 'Baled Straw Ditch Check (E -I ) Imported Top Soil Solid Sodding _ Seeding and Mulching Concrete Driveway (6") w/ Agg. Base (6") _ Detectable Warning Surfaces Concrete Access Ramp (4") w/ Agg. Base (4") Concrete Sidewalk (4") w/ Agg. Base (4") Modular Block Retaining Wall (3 B. max. height) Relocate Water Meter Adjust Water Valve to Finished Grade Concrete Swale w/ 3' Flat Bottom, 2:1 side slopes, 1' deep Drop Inlet Extension (8') Drop Inlet (Type '0 4'x4' or 'MO' 4' Dia.) 24 -inch Flared End Section (FES) (RCP) w/ Curtain Wall 18 -inch Flared End Section (FES) (RCP) w/ Curtain Wall 24 -inch Reinforced Concrete Pipe (RCP) 18 -inch Reinforced Concrete Pipe (RCP) �ACHM Surface Course (Type 2) ACHM Binder Course (Type 2) Concrete Curb and Gutter 6" Aggregate Base Course (Class 7) Undercut and Backfill Borrow (Unclassified Fill) Compacted Subgrade-Select Hillside Material (Borrow) Unclassified Excavation Cold Milling Asphalt & Concrete Pavement Clearing and Grabbing Excavation Safety O 3 om 'Maintenance of Traffic. Construction Staking 'Mobilization Description ri+ rii D r+i r n Nn D '° EA 1 CY K AC K r<< SF SA D D T D> EA EA 1 r LF TN TN r TN I AD AD 1 < CY 1 K LS i -i, n c ? __ OC- S OOO 460 OO_ a O OO _ _ O 5 1 to tt to 380 to _u8 O 8 O uPJ_ O to _ _ _- C q = g. 4 ..:el . U_ O, eel be 0 O 10 N— o 0 6"N Lt. o 0 P P 0 O in N V- 00 en J V b CO Jrbtr u N $25.301 O N No o 0 N in O 1 558.30 J N o a in 0 N 5270.29 00 p o - in f N «N u N- P p b N N b a Na •u a N It: b m N O P N w N a N a N u 0 N P 00 N_ 00 V to 00 - O O O P w P N to — O. O 0 O w N A 0 N 0 La u C 9 ,R' 0 1 Mobley Contractors, Inc. J N • ai - 0=0000000v, V O O V o P V O 0 _ u O 0 - N 0 - O u _ in P 00 O m 1 5923.801 _ - --I O W 0 O _ 0 O 00 O 0 0 g 0 w 0 - O Y O N O PO O N- N to 0 O in S to N- N O-0 O A b 0 A -0 O O N- W J an to N - N 0-0 J g in N CO O en O 0 O O en N A J O en -- m O en - O O N N S P p P S LA O- V N O bl u 0 O ' – 53,776.901 J 0 O P O. tNn 60 O O. O O 59,028.521 J A P ce e 0' u Extended Price 00 Ot a :. ' OO 61 Da O V — 0 N_ p.- a 0 0 O b 0 P N N O N V N ' 5229.001 P N N 0 O. 0 N C O V N 65 to O 0 0000000000000000 N b J in inN~ �- N P O w m b N O IA N O 00 N N U N 0 N a -- N 1 540.60 61 N 0 1 522.80 N V 0 N_ 0 N_ 0 V ;a N N 0in 0 O 0 N 0 O 0 1 $36,000.00 N 0 S O 000'tl N b O -- N 0 1 Unit Price ra0) N OOSOOOOOOOSOOOOOO b*NM P O u o oOO0AObO P -u a V Pb V NVO_A O i+ OaOu . 44 1 1 1 54,680.001 1 5236.00' _ - O 1 56,846.001 — N OOO _ O O O 5432.001 O . co J PoOOooOO_O O u A_ 10 O 1 $17,952.501 O0 OaO coO P O _ P - N ONb atiQm ONOO N _ N O O u S' Extended Price reA ta a. et61 0OO to O tOaOPOoeNO 0 P en O ten 00 N-4 N in o J P V N O O $43.741 64 v.OP 69 —- 61 VS tun Ln iv P LnN14j in O Ln 0 [ 5966.511 O u O N- O P b J J 4a a u N A V N J N__ M P t'D V b N S0 S t u en ill u to _ P P O _ S JQn C t g O i ~ 0'�.- ta Ote • b O- :'1' N V o P ao 1.1 J 0 A 0 P 0 on in) 0 u 0 61 w 0 W 00 b 0 N 0 — — 52,403.001 a o 4.9 0 N P 00 V J 0 J a.‚00000 e V O V O N ow - 1 5679.88] N N b IA e N 0iNJ 61 to u 0 tel COw H to l000r5'S1$ 0 fn. 0 fa ..-.1a..00001- 0 N. a 0 oo N 0 61 . A 0 0 V 0 w N P N P N Co SI7,398.87 Extended Price q = ig GO Lra Oti..G Ul .r O ,. '0... 0-' - N o- 00000011.10000 0 0__ 0 N N 41 o o U 00 0 o 55.001 0 P 0 O 0 0 o 0 O 0 o O 0 0 o 0 V 0 0 6' 0 b 0 ' 5400.001 0 o 00 N o O 1 53,000.00 N 0 0000000000000 N o 0 0 0 0 o - 0 0 __ 0 0 1 54,000.00 - 0 b 0 N 0 0 o 0 0 0 0 0 CO0 0 b 0 N o 0 0 0 C n a City of Fayetteville y5 V_ O 0 o A't 0 o — 0 o o N A 0 o O 1 52,200.001 b O 00 64 o 0 1 5500.001 - In O C O b' P O o O P U S o O 10 N L. O O O N- C O o O Do o O t0 O S _ o O 0D O O 0 N P O O N- O O S - l 6 o O 55,600.001 p O O O t0 OO o 0 O - 0 0 V O o 0 5240.001 J O 0 0 J S 0 0 W O 0 0 40 lb O 0" 0 0 0 O 0 J In O 0 0 o o 0 u- O O 0 W8; O 0 Pi O 0 54,000.001 - u O O P O 0 O O N O 0 b 0 W O 0 o 0 O 0 O Extended Price o U1 Ot • 0 O O Z. CI Ai O N ao 0 O .• Zl ? O d CO a COf 0. N O C a iD Bid Opening, April 21, 2004 @ 2:OOpm • i Section 00500 AGREEMENT BETWEEN CITY OF FAYETTEVILLE AND CONTRACTOR THIS AGREEMENT is dated as of the day of in the year 2004 by and between the City of Fayetteville, Arkansas and Mobley Contractors, Inc. (hereinafter called MOBLEY). CITY OF FAYETTEVILLE and MOBLEY, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. MOBLEY shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of the construction of approximately 2,800 L.F. of 37' and 28' wide street with curb & gutter. The construction work will involve aggregate base, asphalt binder, and asphalt surfacing with associated earthwork, storm sewer, drainage structures, sidewalks, pavement markings, and all items indicated in the Drawings and Specifications. Article 2. ENGINEER. The Project has been designed by City of Fayetteville Engineering Dept. 113 W. Mountain Fayetteville, Arkansas 72701 who is hereinafter called ENGINEER and who is to act as CITY OF FAYETTEVILLE's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. Article 3. CONTRACT TIME. 3.1. The Work shall be substantially completed within 180 consecutive calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs I4.07.B & C of the General Conditions within 210 consecutive calendar days after the date when the Contract Time commences to run. 3.2. Liquidated Damages. CITY OF FAYETTEVILLE and MOBLEY recognize that time is of the essence of the Agreement and that CITY OF FAYETTEVILLE will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by CITY OF FAYETTEVILLE if the Work is not completed on time. Accordingly, instead of requiring any such proof, CITY Of FAYETTEVILLE and MOBLEY agree that as liquidated damages for delay (but not as a penalty) MOBLEY shall pay CITY OF FAYETTEVILLE One thousand dollars ($1,000.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if MOBLEY shall neglect, refuse or fail to complete the remaining Work within the time Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 26, 2004 Page 00500-1 specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by CITY OF FAYETTEVILLE, MOBLEY shall pay CITY OF FAYETTEVILLE One thousand dollars (51,000.002 for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. CITY OF FAYETTEVILLE shall pay MOBLEY for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the following Schedule of Values pursuant to paragraphs 4.1 and 4.2 below: 4.1. for all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. for all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2. Old Missouri Road Improvements North & South Sections PAY ITEMS North Section of Old Missouri Road Item No. Description Unit Estimated Quantity Unit Price Extended Price NI Mobilization LS 1 $32,153.51 $32,153.51 N2 Construction Staking LS 1 57,426.56 57,426.56 N3 Maintenance of Traffic LS 1 517,716.02 517,716.02 N4 Tree Protection Fencing LF 400 $3.03 $1,212.00 N5 Excavation Safety LS 1 5525.00 5525.00 N6 Clearing and Grubbing AC 0.35 $8,946.43 $3,131.25 N7 Cold Milling Asphalt & Concrete Pavement SY 2,400 $3.58 $8,592.00 N8 Unclassified Excavation CY 3,266 516.45 553,725.70 N9 Compacted Subgrade-Select Hillside Material (Borrow) CY 2,300 $16.30 537,490.00 NI0 Borrow (Unclassified Fill) CY 200 $13.66 $2,732.00 NII Undercut and Backfill CY 500 $19.16 $9,580.00 NI2 6" Aggregate Base Course (Class 7) TN 1,300 $18.62 $24,206.00 N13 Concrete Curb and Gutter LF 3,000 59.76 529,280.00 N14 ACHM Binder Course (Type 2) TN 1,000 540.65 540,650.00 N15 2" ACHM Surface Course (Type 2) TN 800 $43.98 $35,184.00 N16 18 -inch Reinforced Concrete Pipe (RCP) LF 200 $70.95 $14,190.00 N17 24 -inch Reinforced Concrete Pipe (RCP) LF 650 546.35 $30,127.50 N18 Drop Inlet (Type 'C' 4'x4' or 'MO' 4' Dia.) EA 10 $3,236.15 532,361.50 N19 Drop Inlet Extension (4') EA 4 5726.51 52,906.04 N20 Drop Inlet Extension (8') EA 8 $791.99 $6,335.92 N21 Junction Box (45(4') EA 1 $3,746.31 $3,746.31 Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 26, 2004 Page 00500-2 • • N22 Concrete Trail (4") w/ Agg. Base (4") SY 1,150 530.77 535,385.50 N23 Concrete Driveway (6") w/ Agg. Base (6") SY 150 $19,697.73 $48.81 S2 $7,321.50 N24 Concrete Access Ramp (4") w/ Agg. Base (4") SY 10 S3 599.08 $990.80 N25 Detectable Warning Surfaces SF 120 558.30 $6,996.00 N26 Seeding and Mulching AC 1.00 53,300.00 53,300.00 N27 Solid Sodding SY 200 53.85 56 $770.00 N28 Imported Top Soil CY 300 $27.47 $8,241.00 N29 Baled Straw Ditch Check (E -l) EA 25 531.07 5776.75 N30 Baled Straw Filter Barrier (E-2) EA 50 531.07 $1,553.50 N31 Silt Fence (E-3) LF 400 $3.42 51,368.00 N32 Drop Inlet Silt Fence (E-6) EA 11 $141.95 $1,561.45 N33 Thermoplastic Pavement Marking White or Yellow (6") LF 6,400 $0.55 53,520.00 N34 Thermoplastic Pavement Marking Yellow (12" Diagonal) LF 300 56.60 $1,980.00 N35 Thermoplastic Pavement Marking White (18") LF 760 58.80 56,688.00 N36 Thermoplastic Pavement Marking White (24") LF 150 $40.65 511.00 S15 51,650.00 TN N37 Thermoplastic Pavement Marking (Arrows) EA 14 $165.00 $2,310.00 N38 Standard Signs SF 6.25 538.50 5240.63 N39 Slurry Seal SY 3,000 51.50 $4,500.00 North Section - Construction Cost:. ` +,. 5482,424.44 5656.91 51,313.82 S19 South Section of Old Missouri Road Item No. Description Unit Estimated Quantity Unit Price Extended Price SI Mobilization LS 1 $19,697.73 519,697.73 S2 Construction Staking LS 1 $7,426.56 57,426.56 S3 Maintenance of Traffic LS 1 $9,028.52 59,028.52 S4 Demolition LS 1 518,610.70 518,610.70 S5 Excavation Safety LS 1 $606.25 5606.25 56 Clearing and Grubbing LS 1 57,100.00 $7,100.00 S7 Cold Milling Asphalt & Concrete Pavement SY 1,055 53.58 53,776.90 S8 Unclassified Excavation CY 790 $14.18 511,202.20 S9 Compacted Subgrade-Select Hillside Material (Borrow) CY 650 516.88 510,972.00 SI0 Borrow (Unclassified Fill) CY 500 $13.89 56,945.00 Sll Undercut and Backfill CY 300 $18.54 S5,562.00 512 6" Aggregate Base Course (Class 7) TN 500 522.24 511,120.00 513 Concrete Curb and Gutter LF 2,150 $8.92 519,178.00 S14 ACHM Binder Course (Type 2) TN 380 $40.65 515,447.00 S15 2" ACHM Surface Course (Type 2) TN 455 $43.98 520,010.90 S16 18 -inch Reinforced Concrete Pipe (RCP) LF 295 $43.34 512,785.30 517 24 -inch Reinforced Concrete Pipe (RCP) LF 4 $231.94 5927.76 SI8 18 -inch Flared End Section (FES) (RCP) w/ Curtain Wall EA 2 5656.91 51,313.82 S19 24 -inch Flared End Section (FES) (RCP) w/ Curtain Wall EA 1 51,333.15 51,333.15 Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 26, 2004 Page 00500-3 • • S20 Drop Inlet (Type 'C' 4'x4' or 'MO' 4' Dia.) EA 5 $3,514.75 $17,573.75 S21 Drop Inlet Extension (8) EA 4 $1,145.01 $4,580.04 S22 Concrete Swale w/ 3' Flat Bottom, 2:1 side slopes, 1' deep LF 140 $32.28 $4,519.20 S23 Adjust Water Valve to Finished Grade EA 3 5270.29 $810.87 S24 Relocate Water Meter EA 1 $1,578.52 $1,578.52 S25 Modular Block Retaining Wall (3 ft. max. height) SF SA 150 $37.50 $5,625.00 S26 Concrete Sidewalk (4") w/ Agg. Base (4") SY 470 $32.04 $15,058.80 S27 Concrete Access Ramp (4") w/ Agg. Base (4") SY 20 $94.72 $1,894.40 S28 Detectable Warning Surfaces SF 48 $58.30 $2 798 40 529 Concrete Driveway (6") w/ Agg. Base (6') SY 176 $34.58 $6;086.08 S30 Seeding and Mulching AC 0.40 $9,625.00 $3,850.00 S31 Solid Sodding SY 460 $3.85 $1,771.00 S32 Imported Top Soil CY 260 $25.30 $6,578.00 S33 Baled Straw Ditch Check (E-1) EA 40 $29.32 $1,172.80 S34 Silt Fence (E-3) LF 310 $2.98 $923.80 S35 Drop Inlet Silt Fence (E-6) EA 5 $162.17 $810.85 S36 Erosion Control Mat (Miramat TM8 or equal) SF 200 $7.98 $1,596.00 S37 Thermoplastic Pavement Marking White or Yellow (6") LF 3,910 $0.55 $2,150.50 S38 Thermoplastic Pavement Marking Yellow (12" Diagonal) LF 220 $6.60 $1,452.00 S39 Thermoplastic Pavement Marking White (24") LF 120 $11.00 $1,320.00 S40 Thermoplastic Pavement Marking (Arrows) EA 6 $165.00 $990.00 S41 4" Schedule 40 PVC Conduit LF 140 57.82 $1,094.80 S42 Meter Loop/Pedestrian Sign Relocation LS 1 $3,850.00 $3,850.00 South SectionConstruction Cost: "$271,128.60 Grand Total Construction Cost. North Section + South Section =. $753,553.04 As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.B of the General Conditions. Article 5. PAYMENT PROCEDURES MOBLEY shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. Progress Payments. CITY OF FAYETTEVILLE shall make progress payments on account of the Contract Price on the basis of MOBLEY's Applications for Payment as recommended by ENGINEER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02. All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 26, 2004 Page 00500-4 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the ENGINEER, and if the character and progress of the Work have been satisfactory to CITY .OF FAYETTEVILLE and ENGINEER, CITY OF FAYETTEVILLE, on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to CITY OF FAYETTEVILLE as provided in paragraphs 14.02.B.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to MOBLEY to 98 percent of the Contract Price (with the balance of 2 percent being retainage), less such amounts as ENGINEER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs I4.07.B & C of the General Conditions, CITY OF FAYETTEVILLE shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraphs 14.07.B & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce CITY OF FAYETTEVILLE to enter into this Agreement MOBLEY makes the following representations: 6.1. MOBLEY has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data." 6.2. MOBLEY has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, or furnishing of the Work. 6.3. MOBLEY is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. MOBLEY has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of the General Conditions. MOBLEY accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which MOBLEY is entitled to rely as provided in paragraph 4.02 of the General Conditions. Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 26, 2004 Page 00500-5 • • MOBLEY acknowledges that such reports and drawings are not Contract Documents and may not be complete for MOBLEY's purposes. MOBLEY acknowledges that CITY OF FAYETTEVILLE and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. MOBLEY has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to the employed by MOBLEY and safety precautions and programs incident thereto. MOBLEY does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. MOBLEY is aware of the general nature of work to be performed by CITY OF FAYETTEVILLE and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. MOBLEY has correlated the information known to MOBLEY, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. MOBLEY has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that MOBLEY has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to MOBLEY and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and fumishing of the Work. Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between CITY OF FAYETTEVILLE and MOBLEY conceming the Work consist of the following: 7.1. This Agreement (pages 1 to 8, inclusive). 7.2. Performance and Payment Bonds (Exhibits A and B respectively). 7.3. Certificates of Insurance (Exhibit C). 7.4. Documentation submitted by MOBLEY prior to Notice of Selection (Exhibit D). 7.5. General Conditions (pages 1 to 42, inclusive). 7.6. Supplementary Conditions (pages 1 to 12 inclusive). 7.9. Specifications consisting of Divisions 1 through 16 as listed in table of contents thereof. 7.10. Addenda number 1. 7.11. One set of drawings (not attached hereto) consisting of a cover sheet and additional sheets numbered 1 through 43 with each sheet bearing the following general title: Old Missouri Road Improvements, North & South Sections Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 26, 2004 Page 00500-6 • • 7.12. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.12.1. Notice to Proceed 7.12.2. All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. Article 8. MISCELLANEOUS. 8.1. Terms used in the Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction maybe limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3. CITY OF FAYETTEVILLE and MOBLEY each binds itself, it partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8.4. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intention of the stricken provision. 8.5. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 8.6. Freedom of Information Act. CITY OF FAYETTEVILLE contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the CITY OF FAYETTEVILLE, MOBLEY will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 8.7. This contract must be interpreted under Arkansas Law. Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 26, 2004 Page 00500-7 APR -28-2004 WED 03:28 PM MO0EY CONTRACTORS 64/28/2084 16:03 479-5, -9252 FAX NO. 4772 2285 P. 01 ENGINEERING C.O.F. PAGE 11 IN Wr NE; S WHEREOF, CITY OF FAVETTEVILLE and MOBLEY have signed this Agreement in quad up!ica:a. Cate counterpart each Inas been delivered to CITY OF FAYETTEVILLE and ENGINEER, and two counterparts hav- been delivered tc.MOBLEY. Alt portions oftheContract Documentshave been signed, initialed, or ident:fted by CITY OF FAYETTEVILLE and MOBLEY or identified by ENGINEER on their behalf. This Agreement will be effective on • , 2004 (which is the Effective Date of the Agreement). OWNER Citv of Fayetteville _ CONTRACTOR: Mobley contractors, Inc. By B Mayor Dan Coody Vice Pr -3r en Title [CORPORATE SEAL] [CORPORATE SEAL] Attest ' Attest ' If a Corporation, attest by the Secretary. Address for giving notices Address for giving notices (If OWNER is apublic body, attach evidence of authority to Sign and resolution or other documents authorizing execution ofAgreenient.) License No. Agent for service of process: (Tf CONTRACTOR is a corporation, attach evidence of authority to sign) -..e.,.a,,W-1•2=3:••=1:4•... Old Mirsomi Road Improvements, North Sr South Sections City of vayencville Engineering Division [o�t���i2SVL� n a'i I ) APR 2 8 2004 April 26, 2004 Page 00500.8 • • IN WITNESS WHEREOF, CITY OF FAYETTEVILLE and MOBLEY have signed this Agreement in quadruplicate. One counterpart each has been delivered to CITY OF FAYETTEVILLE and ENGINEER, and two counterparts have been delivered to MOBLEY. All portions of the Contract Documents have been signed, initialed, or identified by CITY OF FAYETTEVILLE and MOBLEY or identified by ENGINEER on their behalf. This Agreement will be effective on 2004 (which is the Effective Date of the Agreement). OWNER: City of Fayetteville CONTRACTOR: Mobley Contractors, Inc. By: By: Mayor Dan Coody Ron F. Mobley, Jr. Vice President Title [CORPORATE SEAL] [CORPORATE SEAL] Attest * Attest * If a Corporation, attest by the Secretary. Address for giving notices Address for giving notices (If OWNER is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of Agreement.) License No. Agent for service of process: (If CONTRACTOR is a corporation, attach evidence of authority to sign) Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 26, 2004 Page 00500-8 Mayor: Department Director: Purchasing Manager: Finance & Internal Services Director: Budget Manager: IT Manager: Dispatch Manager: Utilities Manager: Other: . 0 CO J 0) 0 A tJ We ... N 3 Requester: Paul Libertint City: Springdale Address: 705 Hatcher Road Vendor #: 2570 City Of Fayetteville (Not a Purchase Order) Special Instructions: Return PO to Engineering___ Shipping/Handling Construction Contract for Old Missouri Road Improvements, North & South Sections, Bid #04-30 0 m N 0 t. 9 0 Quantity Vendor Name: Mobley Contractors, Inc. Lot Unit of Issue State: AR Unit Cost 00'04 M O O M O O M O O M O O M O 0 M O O Si O O 404 O O 30.00 M J N w (J O A Extended Cost 4470.9470.5809.00 Account Numbers Requester's Employee #: 1516 Zip Code: 72764-8464 Fob Point: Ship to code: 90 Subtotal: $753,553.04 Tax: $0.00 Total: $753,553.04 03007.20 Project/Subproject # Extension: 419 Divison Head Approval: { y CO O1 N X I C 0 z O Ix Mail Yes: No: X P.O Number: Requisition No.: [Inventory # Quotes Attached Yes: No: rxpected Delivery Date: Date: 4/26/2004 T X CD 0. D co N N it • • • CITY OF FAYETTEVILLE OLD MISSOURI ROAD IMPROVEMENTS NORTH & SOUTH SECTIONS BID # 04-30 ADDENDUM #1 This Addendum #1 makes changes to the Bidding Requirements and Specifications. This Addendum #1 consists of Pages AD1-1 thru AD1-2. Should there be any conflicts between the previous Plans and/or Specifications and this addendum, this addendum supersedes those documents. CHANGES TO THE BIDDING REQUIREMENTS: Section 00300 — BID FORM Page 00300-6, Insert Additional Bid Item N39, as follows, and include the cost in the subtotal for the "NORTH SECTION" BASE BID: N39 3,000 Sq Yd Slurry Seal dollars ($ )/SY $ amount written in words in figures in figures CHANGES TO THE SPECIFICATIONS: Section 01025 - MEASUREMENT AND PAYMENT Page 01025-15, Add the following paragraph: 00. Slurry Seal (Pay Item N39) .1. Description - Furnish and install slurry seal over the existing pavement of Old Missouri Road which is currently outside the project limits. It is intended to seal the remaining existing asphalt surface on Old Missouri Road which is not scheduled for any improvements. Slurry seal shall comply with AHTD Standard Specifications for Highway Construction, Section 418, Slurry Seal (2003 Edition). 2. Incidental Items - Mineral aggregate, mineral filler, asphalt emulsion, tack coat (if used), field control additives; designing the mixture (including trial mixtures required); performing quality control and acceptance sampling & testing; preparation of the surface; heating, mixing, hauling, placing, and finishing; and for all labor, equipment, tools, materials, and incidentals necessary to complete the work. 3. Related Items - None. 4. Units and Measurement - Payment shall be at the unit price per square yard of slurry seal famished, installed, and accepted by the Engineer. 5. Partial Payment Provisions - None. • Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 13, 2004 Page ADI -1 • • END OF ADDENDUM #1 The Bidder shall acknowledge receipt of the Addendum by return fax, as well as, by submitting a signed copy with his Proposal and acknowledging receipt on Page 00300-1 of the Bid Form. Acknowledged by: Notes: 1. This addendum becomes a part of the bidding documents. 2. Revised Page 00300-6 and Page 01025-15 are included for your convenience. Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 13, 2004 Page ADI -2 • Item Estimated No. Quantity N32 11 • • Unit Description of Item and Unit Price Bid Each Drop Inlet Silt Fence (E-6) dollars amount written in words N33 6,400 Lin Ft ($ )/EA in figures Total Amount Thermoplastic Pavement Marking White or Yellow (6") dollars amount written in words N34 300 Lin Ft ($ )/LF in figures in figures Thermoplastic Pavement Marking Yellow (12" Diagonal) dollars amount written in words N35 760 Lin Ft ($ )/LF in figures Thermoplastic Pavement Marking White (18") dollars amount written in words N36 150 Lin Ft ($ )/LF in figures Thermoplastic Pavement Marking White (24") dollars amount written in words N37 14 Each ($ )/LF in figures Thermoplastic Pavement Marking (Arrows) dollars amount written in words N38 6.25 Sq Ft Standard Signs dollars amount written in words N39 3,000 Sq Yd Slurry Seal . dollars amount written in words ($ )/EA in figures ($ )/SF in figures ($ )/SY in figures in figures in figures in figures in figures in figures in figures in figures "NORTH SECTION" BASE BID $ Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 13, 2004 Page 00300-6 • • NN. Meter Loop/Pedestrian Sign Relocation (Pay Item S42) 1. Description - Fumish and install all necessary equipment & materials to place existing overhead electrical service underground, relocate existing ground mounted meter loop, and relocate existing pedestrian sign & warning light, as indicated on the Drawings. 2. Incidental.ltems - Circuit breakers, electrical permits, coordination with local Utility, steel conduit, conduit fittings, wiring, ground rod, testing, removal of existing utility pole, and all equipment, materials, tools, labor, and any other item required to complete the work. 3. Related Items - PVC conduit shall be paid for under a separate pay item.. 4.Units and Measurement - Payment shall be at the unit price per each Meter Loop/Pedestrian Sign relocated, installed, tested, and accepted by the Engineer. 5. Partial Payment Provisions - None. 00. Slurry Seal (Pay Item N39) 1. Description - Furnish and install slurry seal over the existing pavement of Old Missouri Road which is currently outside the project limits. It is intended to seal the remaining existing asphalt surface on Old Missouri Road which is not scheduled for any improvements. Slurry seal shall comply with AHTD Standard Specifications for Highway Construction, Section 418, Slurry Seal (2003 Edition). 2. Incidental Items - Mineral aggregate, mineral filler, asphalt emulsion, tack coat (if used), field control additives; designing the mixture (including trial mixtures required); performing quality control and acceptance sampling & testing; preparation of the surface; heating, mixing, hauling, placing, and finishing; and for all labor, equipment, tools, materials, and incidentals necessary to complete the work. 3. Related Items - None. 4. Units and Measurement - Payment shall be at the unit price per square yard of slurry seal famished, installed, and accepted by the Engineer. 5. Partial Payment Provisions - None. PART 2 - PRODUCTS Not Used PART 3 - EXECUTION Not Used End of Section 01025 Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 13, 2004 Page 01025-15 STAREVIEW FORM - FINANCIAL OBLIGATION X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council Meeting of: May 18,2004 FROM: Paul Libertini Engineering Name Division Comm. Planning & Engineering Svcs. Department ACTION REQUIRED: 1. Approval of a resolution awarding the construction contract in the amount of $753,553.04 with Mobley Contractors, Inc. for the construction of Old Missouri Road, North & South Sections. 2. Approval of a project contingency in the amount of $133,032.96 which includes $113,032.96 (15%) for unforseen project expenditures and variations in final quantities; and $20,000 for materials testing, in-house management and inspection. COST TO CITY: $886,586.00 $ 1,330,000.00 Old Missouri Rd, N & S Sections Cost of this request 4470.9470.5809.00 Account Number Category/Project Budget Program Category / Project Name $ - Street Improvements Funds Used to Date Program / Project Category Name 03007.20 $ 1,330,000.00 Sales Tax Capital Improvements Project Number Remaining Balance Fund Name BUDGET RRjEVIEW udget Manager X Budgeted Item 9-zj 6! Date Budget Adjustment Attached CONTRJCT/GRANT/LEASE REVIEW: atn kM ag,7 X01 _42 ea Accou 1.� Date /7 /6'( Cit ttorney Date Internal Auditor l v Purchasing Manager Date 4 -a,9 -o4 Date STA COO ATION• recoreco mends approval of resolution and protect contingency. f -25-44i Received in Mayor's Office Division Head Date Department Director Finance & Internal Services Dir. Chief k6Sii'nrstra ive Officer 933-oy Date 44C1 - Date Dat Mayor Date Cross Reference: Previous Ord/Res#: Orig. Contract Date: Orig. Contract Number: New Item: Yes X Date&r No Clarice Pearman - Re: Mobley Contractor. From: Paul Libertini To: Pearman, Clarice Date: 5/21/04 8:20AM Subject: Re: Mobley Contractors Six (6) original agreements are being mailed to Mobley today for his signature and corporate seal. We are also requesting that he submit his payment bond, performance bond, and certificate of insurance. When we receive all these originals, they will be assembled in the Project Manual booklet, and then carried up to your office for the Mayor's signature. Hopefully, Mobley can get the requested docs back to us by the end of next week (Friday, May 28th). Thanks. Paul »> Clarice Pearman 05/20/04 05:40PM »> The City Council passed a resolution for this item on May 18th. It does not have a signed contract attached. Please let us know when we might expect that signed contract. This item cannot continue the resolution process until the contract is received. Thanks. Clarice CC: Conklin, Tim, Petrie, Ron Page 11 Clarice Pearman - Mobley Contractors Page 1 From: Clarice Pearman To: Libertini, Paul Subject: Mobley Contractors Just a reminder that I'm still waiting on agreements from Mobley for Res. No. 79-04. Please let me know the status. Thanks. Clarice lance Pearman - Re: Mobley Contractor Pa • e1 From: Paul Libertini To: Pearman, Clarice Date: 6/2/04 3:46PM Subject: Re: Mobley Contractors I just called Mobley today. His secretary has just returned from vacation. The documents were put in the mail today. I should receive by this Friday and then I need a day to put the books together. Thanks. »> Clarice Pearman 06/02/04 03:36PM »> Just a reminder that I'm still waiting on agreements from Mobley for Res. No. 79-04. Please let me know the status. Thanks. Clarice FAYETT&ILLE THE CITY OF FAYETTEVILLE, ARKANSAS City Clerk Division DEPARTMENTAL CORRESPONDENCE 113 West Mountain Fayetteville, AR 72701 Telephone: (479) 575-8323 To: Paul Libertini Engineering Division From: Clarice Buffalohead-Pearman 64) City Clerk Division Date: June 14, 2004 Re: Resolution 79-04 The City Council passed a resolution, May 18, 2004, approving an agreement with Mobley Contractors. This memo is to confirm that you pick up five originals of the project manual signed by the mayor and city clerk. Attached is a copy of the resolution. The resolution with attachments will be recorded in the city clerk's office and microfilmed. If anything else is needed please let the clerk's office know. /cbp attachments cc: Nancy Smith, Internal Auditor Project Manual avaitallandsk P",c\.v Firn rI f L L _ CITY OF FAYETTEVILLE ARKANSAS Old Mssouri and .improuements North. &south Sections BID # 04-30 April 2004 orenema- n - i2_ AR ANSA REGISTERED PROFESSIONAL ENGINEER INo 7 .9804 =' �'91WEL Oft 5¢ Project Manual IP'.o v r E v CITY OF FAYETTEVILLE ARKANSAS Old Missouri Road Improvements North & South Sections BID # 04-30 April 2004 Section No. 00005 00020 BIDDING REQUIREMENTS Section 00005 TABLE OF CONTENTS Old Missouri Road Improvements North & South Sections Title Pages Table of Contents 00005-1 to 00005-2 Advertisement for Bids 00020-1 00100 Instructions to Bidders 00300 Bid Form 00350 Bid Bond 00100-1 to 00100-8 00300-1 to 00300-13 00350-1 to 00350-3 CONTRACT FORMS AND CONDITIONS 00500 Agreement Form Between Owner & Contractor 00500-1 to 00500-6 Construction Performance Bond - Exhibit A 00500-7 Construction Payment Bond - Exhibit B 00500-8 Certificates of Insurance - Exhibit C 00500-9 Notice to Proceed 00500-10 00700 General Conditions 1 to 42 00800 Supplementary Conditions 00800-1 to 00800-12 SPECIFICATIONS Division 1 - General Requirements 01010 Summary of Work 01010-1 to 01010-2 01025 Measurement and Payment 01025-1 to 01025-15 01027 Applications for Payment 01027-1 to 01027-2 01035 Modification Procedure 01035-1 to 01035-3 01040 Coordination and Meetings 01040-1 to 01040-3 O 1051 Construction Surveys 01051-1 to 01051-2 O 1060 Regulatory Requirements 01060-1 to 01060-3 01090 Reference Standards and Abbreviations 01090-1 to 01090-3 01300 Submittals 01300-1 to 01300-3 O 1310 Progress Schedules 01310-1 to 01310-2 01410 Testing Laboratory Services 01410-1 to 01410-3 01500 Construction Facilities & Temporary Controls ..... 01500-1 to 01500-4 01620 Storage and Protection 01620-1 to 01620-2 01630 Product Options and Substitutions 01630-1 to 01630-2 01700 Contract Closeout 01700-1 to 01700-5 Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 2, 2004 Page 00005-1 Division 2 - Site Work 02050 Demolition 02100 Site Preparation 02161 Excavation Safety 02220 Excavation and Embankment 02230 Road Bed Preparation 02261 Site Restoration 02270 Slope Protection and Erosion Control 02500 Asphaltic Cement Paving 02581 Thermoplastic Pavement Markings 02600 Pipelaying 02605 Utility Sleeves 02666 Potable Water Services 02720 Storm Sewer System 02840 Signage 02900 Landscaping Division 3 - Concrete 02050-1 to 02050-2 02100-1 to 02100-3 02161-1 to 02161-1 02220-1 to 02220-9 02230-1 to 02230-5 02261-1 to 02261-5 02270-1 to 02270-3 02500-1 to 02500-5 02581-1 to 02581-4 02600-1 to 02600-5 02605-1 to 02605-2 02666-1 to 02666-3 02720-1 to 02720-3 02840-1 to 02840-3 02900-1 to 02900-9 03210 Reinforcing Steel 03210-1 to 03210-3 03316 Miscellaneous Concrete Work 03316-1 to 03316-10 End of Section 00005 Old Missouri Road Improvements, North & South Sections City of Fayetteville Engineering Division April 2, 2004 Page 00005-2