HomeMy WebLinkAbout78-04 RESOLUTION• RESOLUTION NO. 78-04 A RESOLUTION TO AWARD A CONSTRUCTION CONTRACT TO FORSGREN, INC. IN THE AMOUNT OF $652,762.00, PLUS A CONTINGENCY OF $97,000.00 FOR CONSTRUCTION OF DRAINAGE IMPROVEMENTS FOR THE HOLLYNISTA AND CLEVELAND/SANG AREAS, AND TO APPROVE A BUDGET ADJUSTMENT OF $414,541.00 FOR THIS PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and awards a construction contract to Forsgren, Inc. in the amount of $652,762.00, plus a contingency of $97,000.00 for construction of drainage improvements for the Holly/Vista and Cleveland/Sang areas, and to approve a budget adjustment in the amount of $414,541.00 for this project. PASSED and APPROVED this the 18th day of May, 2004. ATTEST: By: SONDRA SMITH, City Clerk By: APPROVED: D COODY, Mayor • • AGREEMENT THIS AGREEMENT is dated as of the is day of in the year 2004 by and between the City of Fayetteville (hereinafter called CITY) and Forsgren, Incorporated (hereinafter called FORSGREN) CITY and FORSGREN, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1 WORK FORSGREN shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Approximately 3000 Linear Feet of RCP Storm Sewer Pipe, a 6' X 4' RCP Box Culvert, a 4' X 4' RCP Box Culvert, and approximately 500 Linear Feet of swales constructed, 21 Junction or Inlet Boxes, other miscellaneous items of work, and all necessary measures for erosion control and related miscellaneous items of work necessary for a complete installation as set out in the Bid, these Plans and Specifications No. 030923, dated April 2004, for the unit and lump sum prices bid in the Bid. Article ENGINEER The Project has been designed by USI -Arkansas, Inc., Consulting Engineers, who is hereinafter called Engineer and who is to act as the CITY S representative, assume all duties and responsibilities and have the rights and authority assigned to Engineer in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article CONTRACT TIMFS 3.1 The Work will be substantially completed within seventy five (75) days after the date when the Contract Times commence to run as provided in paragraph 2 3 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within ninety (90) days after the date when the Contract Times commence to run. These Contract Times include delays for normal (average) weather-related events, such as rain snow, and freezing temperatures which may affect the progress of the construction in the following amounts on a per -month basis as hereinafter set out. Only weather- related delays in excess of these amounts will be considered for time extensions, if requested by the Forsgren. 6-1 • • Days Included in Contract Times for Normal Weather -Related Events (On A Monthly Basis) January 11 February 9 March 8 April 8 May 8 June 8 July 7 August 7 September 7 October 7 November 7 December 8 FORSGREN shall include within the Contract Times the respective number of days (as shown above for each month dunng the Contract) for normal weather-related events, which may cause delays in the progress of the Work, and place a sufficient work force on the project to ensure completion of the Work within the Contract Times. 3.2 Liquidated Damages. CITY and FORSGREN recognize that time is of the essence of this Agreement and that CITY will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by the CITY if the Work is not completed on time. Accordingly, instead of requiring any such proof, the CITY and FORSGREN agree that as liquidated damages for delay (but not as a penalty) FORSGREN shall pay the CITY five hundred dollars ($500.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if FORSGREN shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by the CITY, FORSGREN shall pay the CITY five hundred dollars ($500.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4 CONTRACT PRICF The CITY shall pay FORSGREN for completion of the Work in accordance with the Contract Documents an amount in current funds for the performance of the Contract in accordance with the accepted Bid therefor, subject to additions and deductions, as provided in the Specifications, for unit and lump sum pnces in the Bid, the total sum being Six Hundred Fifty -Two Thousand Seven Hundred Sixty -Two dollars ( $652 762 00 ) Dollar Amount Written in Words Total in Figures 6-2 • • As provided in paragraph 11.9 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classification are to be made by Engineer as provided in paragraph 9.10 of the General Conditions. Unit prices have been computed as provided in paragraph 11.9.2 of the General Conditions. Article 5 PAYMENT PROCEDURES FORSGREN shall submit Applications for Payment in accordance with Article 14 of the General Conditions Engineer will process applications for Payment as provided in the General Conditions. 5.1 Progress Payments; Retainage. The CITY shall make progress payments on account of the Contract Price on the basis of FORSGREN'S Applications for Payment as recommended by Engineer, on or about the 15th day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be measured by the schedule of values established in paragraph 2.9 of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as Engineer shall determine, or the CITY may withhold, in accordance with paragraph 14.7 of the General Conditions: 90% of Work completed (with the balance being retainage). If Work has been 50% completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to the CITY and Engineer, the CITY, on recommendation of Engineer, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 95% of the Work completed. • 100% of matenals and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to the CITY as provided in paragraph 14.2 of the General Conditions). 5.1.2 Upon Substantial Completion, in an amount sufficient to increase total payments to FORSGREN to 95% of the Contract Price (with the balance being retainage), less such amounts as Engineer shall determine, or the CITY may withhold, in accordance with paragraph 14.7 of the General Conditions. 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, the CITY shall pay the remainder of the Contract Price as recommended by Engineer as provided in said paragraph 14.13. 6-3 • • Article 6 FORSGRFN'S REPRESENTATIONS In order to induce the CITY to enter into this Agreement, FORSGREN makes the following representations: 6.1 FORSGREN has examined and carefully studied the Contract Documents (including the Addenda listed in paragraph 7) and the other related data identified in the Bidding Documents including "technical data." 6.2 FORSGREN has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 6.3 FORSGREN is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. 6.4 FORSGREN has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in paragraph 4 2 1 of the General Conditions. FORSGREN accepts the determination set forth in paragraph 4.2.1 of the General Conditions of the extent of the "technical data" contained in such reports and drawings upon which FORSGREN is entitled to rely as provided in paragraph 4.2 of the General Conditions. FORSGREN acknowledges that such reports and drawings are not Contract Documents and may not be complete for FORSGREN'S purposes. FORSGREN acknowledges that the CITY and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. FORSGREN has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by FORSGREN and safety precautions and programs incident thereto. FORSGREN does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and fumishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents. 6.5 FORSGREN is aware of the general nature of Work to be performed by the CITY and others at the site that relates to the Work as indicated in the Contract Documents. 6.6 FORSGREN has correlated the information known to FORSGREN, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. 6-4 • • 6.7 FORSGREN has given Engineer written notice of all conflicts, errors, ambiguities or discrepancies that FORSGREN has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to FORSGREN, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 7 CONTRACT DOC( IMFNTS The Contract Documents which comprise the entire agreement between CITY and FORSGREN conceming the Work consist of the following: 7.1 This Agreement. 7.2 Exhibits to this Agreement. 7.3 Performance, Payment and other Bonds. 7.4 Notice to Proceed. 7.5 General Conditions. 7.6 Specifications consisting of divisions and sections as listed in the Table of Contents. 7.7 Drawings consisting of 18 sheets. 7.8 Addenda numbers 1 to 1, inclusive. 7.9 FORSGREN's bid. 7.10 Documentation submitted by FORSGREN prior to Notice of Award. 7.11 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Wntten Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in this Article. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. Article a MISCELLANFOUS 8.1 Terms used in this Agreement, which are defined in Article 1 of the General Conditions, will have the meanings indicated in the General Conditions. 6-5 • • • 8.2 FORSGREN and all Subcontractors shall pay not less than the minimum prevailing hourly wage rates as found by the Arkansas Department of Labor or as determined by the Court on Appeal to all workmen performing work under the Contract. 8.3 No assignment by a party hereto of any nghts under or interests in the Contract Documents will be binding on another party hereto without the wntten consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restnction may be limited by law), and unless specifically stated to the contrary in any wntten consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.4 The CITY and FORSGREN each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8.5 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon the CITY and FORSGREN, who agree that the Contract Documents shall be reformed to replace such stncken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 6-6 • • IN WITNESS WHEREOF, the CITY and FORSGREN have signed this Agreement. One counterpart each has been delivered to the CITY, FORSGREN and Engineer. All portions of the Contract Documents have been signed, initialed or identified by CITY and FORSGREN or identified by Engineer on their behalf. MALI / $ , 200g (which is This Agreement will be effective on the Effective Date of the Agreement). OWNER. CONTRACTOR: City of Fayetteville Forsgren Inc Dan Coody, May SER ....e9s' ••C\SY 6F'•G�i _. cos.As E ;FAYETTEVILLE• [Corporate Seal] 9s•9RKAN5?•J4 [Corporate Seal] "''y;;�croA G°`'` Attest ^^�c�l. , Attest Sondra Smith, City Clerk • By 0$L ///G s rnG✓T itle Address for Giving Notices Address for Giving Notices 113 W Mountain St Po Box 368 Fayetteville AR 72701 Fort Smith AR 72902 6-7 • City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 2004 Department: Division: Program: Community Planning/Engineering Engineering Operations & Administration Date Requested 4/30/2004 Adjustment Number Project or Item Requested: $414,541 is requested in the Drainage Improvements for the HollyNista and Cleveland/Sang Areas. Project or Item Deleted: Funding from the Other Drainage Improvements capital fund and from Drainage Study/Phase II Stormwater Management that has remaining funds. Justification of this Increase: The funding is needed to cover the construction cost, right-of-way acquisition and contingency of the project. Justification of this Decrease: There are no anticipated cost shares or other drainage projects at this time, there are sufficient funds in 02097 to accomplish 2004 objectives. Account Name Bridge & drainage improve Account Name Bridge & drainage improve Bridge & drainage improve Increase Budget (Decrease Revenue) Account Number Amount Project Number 4470 9470 5817 00 Decrease Budget (Increase Revenue) Account Number 414,541 02023 1 Amount Project Number 4470 9470 5817 00 231,062 02108 4470 9470 5817 00 183,479 02097 1 1 Approval Signatures • Requested By Its udget ravager A/14•4/2 ector Date 57-6. 2f. Date 1%1 -0-v Date S -7-c finance & Internal rvices Director n Date Mayor Date Budget Office Use Only Type: A B Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log E Initial Date Initial Date Initial Date Initial Date NAME OF FILE: CROSS REFERENCE: Item # Date Resolution No. 78-04 w/agreement & budget adjustment Document • 1 05/11/04 Staff Review Form 2 05/04/04 draft resolution 3 copy of bid tabulation 4 04/30/04 City Council agenda memo 5 draft resolution 6 draft resolution 7 04/30/04 letter to Gary Coover 8 04/30/04 Bid 04-35 attendance list 9 copy of bid tabulation 10 05/04/04 Staff Review Form 11 05/11/04 Staff Review Form 12 05/24/04 memo to Gary Coover NOTES: x x AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW • STAFF REVIEW FORM - FINANCIAL OBLIGATION 7."(/ �'67rS /ar 5com Tit/Q./cfra, J /iy • For the Fayetteville City Council Meeting of: May18,2004 FROM: Gary Coover Name Engineering Community Planning & Engineering Division Department ACTION REQUIRED: Award a construction contract to Forsgren, Inc., in the amount of $652,762.00 and approve $97,000 for project contingency for Bid No. 04-35, Construction of Drainage Improvements for the HollyNista .and Cleveland/Sang Areas. Also to approve the attached budget adjustment in the amount of $414,541.00 which will also cover the project contingency and right-of-way acquisition costs. COST TO CITY: $824,762.00 $ 486,077.00 Holly & Vista Dr. Drainage Impr. Cost of this request Category/Project Budget Program Category / Project Name 4470-9470-5817.00 $ 75,855.80 Bridge/Drainage Account Number Funds Used to Date Program / Project Category Name 02023 $ Project Number 410,221.20 Sales Tax Remaining Balance Fund Name BUDGET REVIEW: Budget Manager Budgeted Item Budget Adjustment Attached Date CONTRACT/GRANT/LEASE REVIEW: Accounting Manager Date S-(roy torney Date Internal Auditor Purchasing Manager Date Date STAF'i RECOMMENDT ON: �.. l 4' sion Head Department Director Finance & Internal Services Dir. Date //—o47/ Date b -//-co, Date Chie _ inistrat ve 0 Received in Mayor's Office Date Cross Reference: Previous Ord/Res#: Orig. Contract Date: Orig. Contract Number: New Item: Yes No RESOLUTION NO. • A RESOLUTION TO AWARD A CONSTRUCTION CONTRACT TO FORSGREN, INC. IN THE AMOUNT OF $652,762.00, PLUS A CONTINGENCY OF $97,000.00 FOR CONSTRUCTION OF DRAINAGE IMPROVEMENTS FOR THE HOLLYNISTA AND CLEVELAND/SANG AREAS, AND TO APPROVE A BUDGET ADJUSTMENT OF $414,541.00 FOR THIS PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS• Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and awards a construction contract to Forsgren, Inc in the amount of $652,762.00, plus a contingency of $97,000.00 for construction of drainage improvements for the HollyNista and Cleveland/Sang areas, and to approve a budget adjustment in the amount of $414,541.00 for this project. PASSED and APPROVED this the 18'h day of May, 2004. ATTEST: By: SONDRA SMITH, City Clerk APPROVED: dic #� By: DAN COODY, Mayor Pal P!8 peyiya0 EZ60E0 r �+ _ + 0 0 a 41 N+ O m 0 V 0 y 91:I"9 N+ 0- CO• V 0 0 a W N+ 00 C 3 Company: - -. Arkansas License No.: " Address. City, State: 0 0 N N t01 N 0 V 0 W 6.1 0 O 0 N 0+ 0 + N N + + 0++ N++ 0+ O W 0 0+ a+ 0 c M1 _ = 'Z rc c r c 3 3 3 3 3 0 0 o v a co r -1-I m N rr mn m m m m g c c m c c r- in r r rm rc V= j g( T T J g g 0 a = 3 3 g 3 3 V g V V 71 T 8- T 3 Unit 0DD-I-It SNSO > > > > = AA C CO lO CO d C- a C V m V a V m V-^ V m 0^ 0 N a.912, m 0, o.° m a m m � m m m � m •aW m m g w a u" ao c n I 0 x 0 x 0 x 0 x 009 x 3 xo m m m 0 Oi N N 0. tT -� J '- A -� O� 0- 0+ 0- m m m o 0 0 0 o N 5 m .-C13-„0....h.-•-.1-`>c '- ti X X 9 y 0 0'-c o n n n m•<m y :-.co 3= p m a2 w y m m -1 309 m 2 m 3 c la P. at w=m?g?- 3?ig8 0-Z rg�30 a y m r 8 v m v_ m v m v n v n 3P3 m mm m ; 5 3. 3 8 0 0 0 0 o u D o ? 5.d gmm m' (Y o iY OO -8 73 83pO",m-8NmmOVvvvv o m 3 g o _0 0 8 u 8= 8 8= 8= o R r 0 m m=m 3 303a303 0o n5 8-m a m a in gmoo groom n 88"a 8 s m m m m m m m O T y o O R R J 0 5 0> a> 0> 0 0 O CAi m R 8 a m a m a maga e m 0 o a RRm2R3Rm -•gx a o m 80 5 r8 m.2 m 2 2 m8a m C. c c m 3 mc t < < = a ' -1 2 = R o o CD=m g 0 0 0 m .522 K It R O 0 oa M i 0 o 0 m g to t_ 9 c 0 oR. m z W O o x n P. -3 a m 1 8= -3 QmQ m a m = m 3' 2m,n g? < y8 i 0 - at m -'c3 W W a aura W W X X 0 0 0 0 M 0 m W n 0 - a A CD ID at A A A A ,v X X v m A A 5' m 5' 3' S' 3' a m m o 5 5 O o 0 0 o O b r A o o R a a a () $ 5 m Q n n a n n v o D 0 0 0 0 0 0 0 a g 8 • r 0 ^ n n 4 R R n 3 r x x 55 m m m 0 9 0v r n n co m co co co 0.8 o 4.01-< yfa-3 f/! a a. m m `rd m a -1 a8 C_�'Iii(lo!laDm D 9 a 0 m w w 01 w -1”,2> S . n m .. n m can N j� ,..or � 9,= 8°8888 'a.,m ma ga a a a= m-o�0 R m .0 m mm 80 ^ m mm ma�c _>>>>g 9 V 0 o v v 8a d aY 8 RRRR=- v mm m R m 0 0 3 R a co 8 0 0 v O M M M M M 61 a H W a N W CO a en H ON I/1 O N 0 N N V CO 0 co O m 0 O 19 0 0 O O 0 0 0 0 0 0 0 o o 0 0 0 b o 0 0 0 0 0 0 0 0 0 0 0 61 61 + W CO W 0 0 W 61 EA 01 + CO 44 0 0 W W a O O O O 0 O O a 01 N N 0 0 0 0 0 0 0 0 0 0 0 0 00009000 0 0 0 0 b 0 0 0 0 0 0 0 0 0 b0 H W W O O O 0 0 o O 0 0 69 0 0 0 b O 0 0 0 0 0 0 0+ H N Ca N W O H W b O o O O d1 0 a a O O 0 0 0 O 0 CO 0 N o o o 0 0 0 0 0 0 0 0 0 0000000000.0 H M W 41 W M 01 W O+ N+ O N+ J ..0 O O O O 0 0 W a 0 0 0 0 0 0 0 0 N co N CO 0 0 C)100004:300000 0 0 0 0 0 0 0 0 0 0 W N N W 0 0 O O 0 0 0 'O'o M M N CO W 0 V O o N O 0 0 0 Unit Total Price Amount Forsgren, Inc. 0036900404 PO Box 368 Fort Smith, AR 72902 H N M 0 q H H N b M + 0 H V + N W W W W W W J 0 W 0 O 0.4 a a N fy N M M N N M H+ W 0 A N W th -an++ 0 0 0 N O 0 N W -co-4 Ca N N N CO W N CO J CO (y 0) a p� W V a CO 0 W 0 CO U N a 0 N N 0 O 0 a 0 O N a 0 + b N 0+ 0 a V J O 0 W 0 0 10 0 W+ 0 0 01 0 0 0+ 0 W 0 0 0 O+ N N CO a 0 0 0 00 0 CO 0 0 a N 0 CO W a W H V. u+ 4/9 M M+ N N 44 b1 H N 0+ N N H -. W H 4:9 69 0+ o N 6)4 0 J a+ -O NaW W V 0 W W 0 V00 .N 0 y10000N0N N 0+ W+> W 0 0 N W 0 0+ 0 V 0 0 0 O 0 N 0 0 a 0 N N CO CO W 0 J J W (� W a CO CO 0 N N J N N 0 0+ O J CO W W V CO V O 0 a a N N 0 0 O 0 a V N W W W o O 0 0 N 0 W V 0 O O W N 0 N N W+ 'O 0 0 0 N a+ W W 0 0 0 O 0 N 0+ 0 CO 0 0 0 0 0 10 0 0 0 0 0 0 0 0 W 0 W O= 0 Cr. D 3 H O e 0� C m Mobley Contractors; Inc. 0003660904 PO Box 160 Morrllton, AR 72110 a w a u a 64 w m m 69 fa o ff"if « u u N N a 0 of M M 0 0 0 b O O 0 O O a 0 M N+ U+ O N O 0 O 0 N aro O O O O co O O O O O W 0 003093000 01 0 0 0 0 0 0 0 0 0 O O O O O O 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O o O O O b O O O o O O O o O O O O O o 00000000 0 o O o 0 ciao 000.00000000 . . M 0 N 0 M M W 0) (M M i 01 61 W N (0 0 N+ 0 M f«.1 b1 a N W CO O 0 CO a W 0 J a W V CO 0 V O 0 b++ W CO 0 0 0 O O N O O O 0 0 0 0 0 N O O O O o V in 4U1 m CO0 0 0 0 0 0 0 N 0 0 0 O 0 0 0 0 0 0 O O fn O O a 00000 0 0 0 0 0 0 0 0 O 0 O O 0 0 0 0 00000000000 O O O O O O O O O OO C O 000 66666066'066 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V !Si = 0: D 3 m1 0 O c g In z 2 m m N m y 3 H m - I 1 DO 0 r C n < 5 • 4 • 1 ai y 00 O 0 p z = -n D tic a Dzo .9m ro oma B n_rn o.a m3p w z <73 0M -um < 0 0 0 m m O m m z < a W 0 •T 0 0 z D IQ Z 0 A 2 N 0 F Sb 030923 Certified Bid Tab 0 0 0 IIP51AL SCHEDULE B N N O 0 W V W U A W N+ O 0 W J W W + ITOTAL SCHEDULE A W W W N N N N+ O 0 W J = n PN+ 3 Company: Arkansas License No.: Address: City, State: _ O+ O N W O D U W N W W N O A N+ .O 0 0 A ++ O O N W W++ 0 O U+ + W N A W+ N CO W 0 O A O+ N U O N++ N W 0 m 0 C �` r T m r T -I -I m g r n m g r r n T C c r a s 0 W r r D m m m m r -1-10T 3 3 T T N '01 g J J T>> '0l 3 y 3 (yt 9 r T r a W r r r r y T T' T 3 I- cr c 0 a r r N N D m T• T• 3 3 0 B. 0 �_ DEDUCTIVE ALTERNATE NO. 1 24" Reinforced Concrete Pipe (Class 3) complete in place 18" Reinforced Concrete Pipe (Class 3) complete in place 4' Type C Inlet Box (or equivalent Type MO), Pre -Cast or Cast -In -Place Curb Inlet Extensions, complete in place Curb Inlet Neenah Type L Grate #R3578 (or equivalent) for Combination Inlet Asphalt Street Repair, complete in place Aggregate Base Course (Class 7), complete in place Curb and Gutter, complete in place Relocate Existing 6" Water Line (only if directed by Engineer) Remove and Reconstruct Sidewalk, complete in place SCHEDULE B • CLEVELAND -SANG AREA Site Preparation complete in place 36" Reinforced Concrete Pipe (Class 3) complete in place 24" Reinforced Concrete Pipe (Class 3) complete in place 18" Reinforced Concrete Pipe (Class 3) complete in place Ditch 1 Sod Swale with 2' Bottom (Sta. 0+00 to Sta. 8+30), complete in place 4' Type C Inlet Box (or equivalent Type MO), Pre -Cast or Cast -In -Place complete in place Cum Inlet Extensions, complete in place Curb Inlet Neenah Type L Grate #R3578 (or equivalent) for Combination Inlet complete in place 4' Type E Junction Box (or equivalent Type MO), Pre -Cast or Cast -In -Place complete in place 36" Reinforced Concrete Pipe Flared End Section Asphalt Street Repair, complete in place Aggregate Base Course (Class 7), complete in place Curb and Gutter, complete in place Relocate Existing 6" Water Line (only if directed by Engineer) Relocate Existing B" Water Line (only if directed by Engineer) Reinstate Individual 4" Sanitary Sewer Service, complete in place Reinstate Individual Water 1" Service, complete in place Seeding, complete in place Reconstruct Sidewalk, complete in place Reconstruct Existing Fence, complete in place Maintenance of Traffic, complete in place Trench or Excavation Safety System, complete in place Reinstate Individual 4" Sanitary Sewer Service, complete in place Seeding, complete In place Maintenance of Traffic, complete in place Trench or Excavation Safety System, complete in place Root Pruning of Existing Trees, complete In place Remove and Reconstruct Existing Fence, complete in place !Description $48.00 320,352.00 $70.00 32,101.00 32,200.00 36,600.00 385.00 31,020.00 $3,500.00 $10,500.00 348.00 31,880.00 $14.00 38,750.00 310.00 $5,000.00 $4,500.00 $4,500.00 345.00 3450.00 H A + H H UW N H+ N O H H+ CO CO O O H H H N 0 H O+ U 0 V N O O+ U 0 O -10434,30000000000 O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 H H H H H H H H H H A V H H CO U A N N o+ 01 N J U 0 0 0 L fT N 0 H co U N N 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 000000 p A O 0 0 O 0 H N O 0 0 O H N + 0 N 0 00 O o 00 H H W CO O 0 00 00 0 0 H H W H H H+ O + CO U 0 0 V O N U O O O O O O 0 0 0 0 0 H H H H H N U O 0 N V U V 0 0 V O O A U o 00000 0 0 0 0 0 00'09Z'£3 00£14 00'0Z0'LS 00'2£1$ 00'14 00'14 00000'££$ 00'000'££S 00'0Z£'LS 00'00(' LS 00'099'1$ o0•025s 0 a 0 w D 3 ..'I 0 Mo - Forsgren,Inw• ' 0036900404. PO Box 369 Fort Smlth, AR 72902 H 14 + 0) ND'0000000000000 o $441,573.001 $43.11 $18,278.64 $32.28 $988.40 32,537.57 $7,612.71 3114.60 $1,375.20 $955.01 32,665.03 325.00 $875.00 $19.61 312,256.25 313.75 $6,875.00 34,970.85 34,970.65 $55.39 3553.90 69 H - a A " M a N H_ 0- N 0 H U A N 0 H H H 0 A N 0. H U O A CO A V N W d O U f0 U o CO W A O W 0 U' W a O W 0 W 0 0 0+ 0 V W 0 W 0 O W 0 0 0 0 CO CO. U U+ O+ O H (q H H H H (p H H+ H H A U H H rh W U A CO J a H Al N W N U W m J ta b W W+ co A N co N U 0 Y CO A V V A N CO A O D U W o o CO A o U CO U CO o W O Co o W N W o o o W W O CO 0 0 0 J V CO U 0 0 0+ 0 H 0 0 U o + H N W W U b W N-N + W W A V 0 U O J H H+ N U J'N U N 0 U A A O N N H H H H N W A W CO N N W W O V N+ V O O W+ U O H N _N CD -1H H O 0 V H U A O CO 0I J O O O O 00000�n U N O co O V p H 0 H H A 0s N N W U N A -c•+ -to co W U A W L N+ O O o N U m O W o o O> O W O+ 0 = V 0Q MM Mobley Contractors, Inc. - 0003660904. PO Box 150 Morrilton, AR 72110 H A V O V CO N 0 CA H H+ Cia H co W W W Al O U N 94 N O U J CO a 0 W N 0 O 0 W O O O P O O H CO W f0 0 V f0 V 345.00 319,080.00 $30.00 3900.00 32,500.00 37,500.00 320.00 3240.00 31,500.00 $4,500.00 $9D.00 33,150.00 316.00 $11,250.00 $15.00 37,500.00 33,000.00 $3,000.00 330.00 3300.00 H H H H H H H 0 0 H H H A W N N a 0 O H U U U O 0 H H H U U 0 00-w00000--000 co O O O O o O o O O U 0 O O O o O O O o o O O O 0 O O o o O b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 H H H H H H H H -- 0 H H H .cal U U H H A W V W A N N A O o 0 CO a U U 0 O 0 N 0 U U U 00000 00000014000 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 H _ 0 H 100 O 0 o O 00 H /a t0 A O 00 op bo 00 H + o H H H H o W A 0 O U O U 0 0 o o O o O 00000 00'009'2S 00'0 LS 00'OZg4 0o'OLS 00'000'S$ 00'000'3$ 00'000'0(4 00'000'01$ 00'009$ 11'1134 00'009'14 00.0095 ca 0 0 0 D 3 y 0 0 i - ENGINEER'S ESTIMATE '" • H 0) A 0) o 0 0 y H H H A H 0 W 0 P O A W O O O 410000 00000 0 0 0 0 0 00000 00'OVL'£04s N A n C 0 co 0 6 D a co c 00) ( g o A CO n a a to 0 'o N 'Amount corrected by Engineer to Coco TOTAL BID ACCEPTING DEDUCTIVE ALTERNATE NOS. 2 AND 3 (Deductive Alternate No. 3 - Line 2 Station 0+00 to Station 2+07 and Line 1 Station 12+98 to Station 19+97 OTAL BID ACCEPTING DEDUCTIVE ALTERNATE NO. 2 eductive Alternate No. 2 - Schedule B In Its entirety (TOTAL BID ACCEPTING DEDUCTIVE ALTERNATE NO. 1 Deductive Alternate No. 1 - Line 5 Station 0+00 to 4+64 TOTAL BID, SCHEDULES A AND B Total Deductive Alternate No. 1 Z m 3 Company: - - _ . r Arkansas License No.: Address: City, State: ..a 0 —& — M 1 W N b V 0 O 0 r s 0 W b -. M a m 0 N 0 a I qb O W 0 A qN O J N N N J 01 N 0 m S m r n S T N mm m r S S .n Lump Sum Lump Sum Lump Sum Unit DEDUCTIVE ALTERNATE NO. 3 ITEMS 30" Reinforced Concrete Pipe (Class 3), complete in place 30" Reinforced Concrete Pipe Flared End Section, complete in place Junction Box, 4' Type E, Reinforced Concrete (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place Seeding, complete in place 36" Reinforced Concrete Pipe (Class 3), complete in place 7' X 4' Type E Inlet (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 4' X 4' Type E Inlet (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 4' X 4' Type E Junction Box (or equivalent Type MO), Pre -Cast or Cast -In -Place complete in place Trash Grate, complete in place Swale Construction Site Preparation (partial), complete in •lace Site Preparation (partial), complete in place Maintenance of Traffic (partial), complete in place Trench or Excavation Safety System (partial), complete in place 44 O oO O 0 L EA 0 W N O 0 A O 1P O O O 0 o O O O O O qO 0 0 0 AA a A N !J N V 0 A 0 0 0 0 0 0 0 0 O O O O 0 0 0 0 69 N A 0 O O 0 09Wil N A 0 O o 0 f«p69 0 0 O O 0 ( 0) 0 0 b 0 H N 69 CO A 0 0, O 0 O O O O O 0 0 0 0 0 0 0 In A A 0 V 0 CO 0 0 O O O 0 0 0 4 0 M N N O W O O O 0 VI 0 O 0 O N 0 0 0 O O 0 0 M 0 0 0 W 0 in 0 69 in G) A N O 0 0 0 0 O O 0 0 4 W A in 0 0 0 0 0 O O 0 0 Unit Total Price Amount Forsgren?Ino. ' ' 0036900404 PO Boz 368 Fort Smith, AR 72902 401 0 A W N yl 0 W W 0 N rQ co A O W � Np 0 0 A 0 O 0 0 OO 0 N O A W 0 W W N W+ W 0 0 b- O W A 0 ba W 0 O 0 0 0 A W 0 100 A 0 CO W W Y P W W A O A COW 0 OA — + W T w 0 O V V 09 61 W W W W W• 0 0 0 0 0 0 N 0-6 N 0 W 0 0 0 N (0D a 0 0 CO > O 0 10 0—& W A V V CO 0 $617,959.84 $2,280.00 $2,280.00 $4,895.63 $4,895.63 51,220.00 $1220.00 0 M 0 a 10 W CO CO N 0 0 001 0 cs N 0 a • EA J « W 0 W 0 O 0 0 0 0 0 0 0 0 O O O O O O O O 0 N _+ O O W O 0 0 0 0 0 0 0 0 0 O o 0 o 0 0 461 4 0 O O O O W O O O 0 0 a 0 O O O O A O O o 0 0 0 W 0 W _ 0 0 0 0 O O O O O O O O O W 0 An ((0 A N 0 0 0 0 0 0 0 0 0 0 0 0 W+ 0 0 O 0 O O O O 0 O $5,000.00 $5,000.00 $2,500.00 $2,500.00 $2,500.00 $2,500.00 (=f m O ^ — H O a — ENGINEER'S ESTIMATE, •' CO44 0 co 0 00 0 « W+ 0 O O 0 0 0 0 0 0 V pI. N o 0 0 0 0 01 b W 0 0 o $403,740.00 0 a W 0 b 0 0 o 0 0 b V A 0 0 0 0 0 0 0 Total Deductive Alternate No. 3 411, Total Deductive Alternate No. 1 Z m 3 Company: - - _ . r Arkansas License No.: Address: City, State: ..a 0 —& — — m ? + + 0 0 -a — 0 -. —& — 0 ca r 3 0 r m 3 S J m S m r n S T N mm m r S S .n Lump Sum Lump Sum Lump Sum Unit DEDUCTIVE ALTERNATE NO. 3 ITEMS 30" Reinforced Concrete Pipe (Class 3), complete in place 30" Reinforced Concrete Pipe Flared End Section, complete in place Junction Box, 4' Type E, Reinforced Concrete (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place Seeding, complete in place 36" Reinforced Concrete Pipe (Class 3), complete in place 7' X 4' Type E Inlet (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 4' X 4' Type E Inlet (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 4' X 4' Type E Junction Box (or equivalent Type MO), Pre -Cast or Cast -In -Place complete in place Trash Grate, complete in place Swale Construction Site Preparation (partial), complete in •lace Site Preparation (partial), complete in place Maintenance of Traffic (partial), complete in place Trench or Excavation Safety System (partial), complete in place 44 O oO O 0 L EA 0 W N O 0 A O 1P O O O 0 o O O O O O qO 0 0 0 AA a A N !J N V 0 A 0 0 0 0 0 0 0 0 O O O O 0 0 0 0 69 N A 0 O O 0 09Wil N A 0 O o 0 f«p69 0 0 O O 0 ( 0) 0 0 b 0 H N 69 CO A 0 0, O 0 O O O O O 0 0 0 0 0 0 0 In A A 0 V 0 CO 0 0 O O O 0 0 0 4 0 M N N O W O O O 0 VI 0 O 0 O N 0 0 0 O O 0 0 M 0 0 0 W 0 in 0 69 in G) A N O 0 0 0 0 O O 0 0 4 W A in 0 0 0 0 0 O O 0 0 Unit Total Price Amount Forsgren?Ino. ' ' 0036900404 PO Boz 368 Fort Smith, AR 72902 401 0 A W N yl 0 W W 0 N rQ co A O W � Np 0 0 A 0 O 0 0 OO 0 N O A W 0 W W N W+ W 0 0 b- O W A 0 ba W 0 O 0 0 0 A W W Y P W W A O A u r0 0 J 0 W W 0l 0 V 0 09 61 W W W W W• 0 0 0 0 0 0 N 0-6 N 0 W 0 0 0 N (0D a 0 0 CO > O 0 10 0—& W W 0 Cr O 0 (J 0 P W W 50 0 to N O 0 a 0 W 01 0 $2,280.00 $2,280.00 $4,895.63 $4,895.63 51,220.00 $1220.00 Unit Total Price Amount Mobley Contractors, Inc. 0003660904 PO Box 150 Morrilton, AR 72110 (WD y0 W b, • 001 0 cs N 0 a EA J « W 0 W 0 O 0 0 0 0 0 0 0 0 O O O O O O O O 0 N _+ O O W O 0 0 0 0 0 0 0 0 0 O o 0 o 0 0 461 4 0 O O O O W O O O 0 0 a 0 O O O O A O O o 0 0 0 W 0 W _ 0 0 0 0 O O O O O O O O O W 0 An ((0 A N 0 0 0 0 0 0 0 0 0 0 0 0 W+ 0 0 O 0 O O O O 0 O $5,000.00 $5,000.00 $2,500.00 $2,500.00 $2,500.00 $2,500.00 (=f m O ^ — H O a — ENGINEER'S ESTIMATE, •' CO44 0 co 0 00 0 « W+ 0 O O 0 0 0 0 0 0 V pI. N o 0 0 • City Council teeting of May 18, 2004 CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Hugh Earnest, Chief Administrative Officer From: Tim Conklin, Community Planning and Engineering Services Director Date: April 30, 2004 Subject: Approval of a resolution awading a construction contract to Forsgren, Inc. in the of $652,762.00 for construction of drainage improvements in the vicinity of Holly, Vista, Sang, Cleveland and Berry Streets, a budget adjustment increasing the project budget, authorizing a project contingency of $97,000 and establishing a right-of-way acquisition budget of $75,000. RECOMMENDATION Staff recommends approval of the construction contract with Forsgren, Inc., establishment of the project contingency, establishment of a right-of-way budget and approval of a budget adjustment. BACKGROUND This construction project is in the approved Five Year Capital Improvements Program 2002-2006 with a projected cost of $600,000. On July 2, 2002, the City entered into a consulting services agreement with US Infrastructure to perform engineering studies and develop recommendations for the Upper Hamestring Creek basin. Based on recommendations from these studies, on June 17, 2003, the City hired US Infrastructure to provide preliminary and final engineering designs for drainage improvements along Holly Street from Sang Avenue to Lewis Avenue and Wedington Road, and along Cleveland Street and Sang Avenue just south of Wedington Road. The value of the contract approved in 2003 was $180, 208 which left approximately $420,000 to perform construction services associated with the drainage improvements. DISCUSSION Numerous meetings with the neighborhood and city staff have been conducted to insure that the proposed improvements would address the drainage issues along Holly Street from Sang Avenue to Lewis Avenue and Wedington Road, and along Cleveland Street and Sang Avenue just south of Wedington Road. The final construction bid documents were developed and the project was advertised. 1 • City Council N3eeting of May 18, 2004 Bids were opened on Monday, April 26, 2004, at 11:OOam from two contractors. Forsgren, Inc., was the low bidder at $652,762.00. The bid certification letter from US Infrastructure and bid tabulation sheet are attached to this memo. Right-of-way acquisition costs for this project are estimated to be: $75,000. The bid documents listed three deductive alternates to assist the Ctiy in keeping the project within the remaining budget. These deductive alternates were included, in part, because the level of effort required to alleviate the drainage issues was more extensive than originally expected. The first alternate deducted the proposed storm sewer line along Cleveland Street east of Sang Avenue. The second alternate deducted the entire Cleveland/Sang/Berry drainage design. The third alternate deducted the entire Cleveland/Sang/Berry drainage design and also certain portions of storm sewer pipe in the upper reaches of the Holly Street design. Staff does not recommend acceptance of any of the deductive alternates. A summary of the bid prices is as follows: Entire Project as Designed $652,762.00 Deductive Alternate #1 (Cleveland storm sewer) $584,309.50 Deductive Alternate #2 (Cleveland storm sewer and ditch) $441,573.00 Deductive Alternate #3 (Cleveland/Sang/Berry, Holly storm pipe) $371,562.00 BUDGET IMPACT As previously stated above, the original budget for this project was $600,000. After deducting for the engineering contract and other project related expenses approximately $410,000 remains. To fully fund the construction project, establish a project contingency and establish a right-of-way budget additional funding of $414,541.00 is needed. The funding for this adjustment is proposed to come from Project #02108 Other Drainage Improvements, and Project #02097 Drainage Study/Phase II Stormwater Management. The funding identified from these other two projects is not needed for this year and can be used for this project. # # # 2 • • RESOLUTION NO. A RESOLUTION TO AWARD A CONSTRUCTION CONTRACT TO FORSGREN, INC. IN THE AMOUNT OF $652,762.00, PLUS A CONTINGENCY OF $97,000.00 FOR CONSTRUCTION OF DRAINAGE IMPROVEMENTS FOR THE HOLLYNISTA AND CLEVELAND/SANG AREAS, AND TO APPROVE A BUDGET ADJUSTMENT OF $414,541.00 FOR THIS PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS - Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and awards a construction contract to Forsgren, Inc. in the amount of $652,762.00, plus a contingency of $97,000.00 for construction of drainage improvements for the Holly/Vista and Cleveland/Sang areas, and to approve a budget adjustment in the amount of $414,541.00 for this project. PASSED and APPROVED this the 18th day of May, 2004. ATTEST: By: SONDRA SMITH, City Clerk APPROVED: Et #P By: DAN COODY, Mayor • • RESOLUTION NO. A RESOLUTION TO AWARD A CONSTRUCTION CONTRACT TO FORSGREN, INC. IN THE AMOUNT OF $652,762.00, PLUS A CONTINGENCY OF $97,000.00 FOR CONSTRUCTION OF DRAINAGE IMPROVEMENTS FOR THE HOLLYNISTA AND CLEVELAND/SANG AREAS, AND TO APPROVE A BUDGET ADJUSTMENT OF $374,540.80 FOR THIS PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS - Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and awards a construction contract to Forsgren, Inc. in the amount of $652,762.00, plus a contingency of $97,000.00 for construction of drainage improvements for the HollyNista and Cleveland/Sang areas, and to approve a budget adjustment in the amount of $374,540.80 for this project. PASSED and APPROVED this the 18`h day of May, 2004. ATTEST: By: SONDRA SMITH, City Clerk APPROVED: By: pR P�‘ DAN COODY, Mayor Tito 'UWP�j, �a� • • USI -ARKANSAS, INC. Mr. Gary Coover, P.E. City Engineer City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701 CONSULTING ENGINEERS April 30, 2004 RE- Fayetteville Drainage Improvements HollyNista and Cleveland/Sang Areas USI Project No. 030923 Dear Gary: oo_Ew_ D (-1 1. APR 3 0 2004 v Ceti 4 • Bids were received Monday, April 26, 2004, for construction of the above referenced drainage project. Forsgren, Incorporated, of Fort Smith, Arkansas submitted the low bid. Two bids were submitted, and the totals are shown below: Forsgren, Incorporated Mobley Contractors, Inc. Total Bid $652,762.00 $682,986.25 A copy of the certified bid tabulation is included for your reference, along with a copy of the list of persons attending the bid opening. The engineer's estimate prior to receipt of bids was $568,200. At the request of the City, deductive alternates were included with the bid, in order of prioritized areas, to keep the project within the City's available funds. Deductive alternate 1 removes a portion of the drainage improvements scheduled for the Cleveland/Sang area and if chosen, would reduce the base bid to the following totals: Forsgren,Incorporated Mobley Contractors, Inc. Total Bid Accepting Deductive Alt. 1 $584,309.50 $617,959.84 Deductive alternate 2 removes the entire drainage improvements scheduled for the Cleveland/Sang area and if chosen, would reduce the base bid to the following totals: Forsgren, Incorporated Mobley Contractors, Inc. Total Bid Accepting Deductive Alt. 2 $441,573.00 $535,907.97 Research • Planning • Engineering • Management 4710 South Thompson • Suite 102 • Springdale, Arkansas 72764 Telephone: (479) 872-7115 • Fax (479) 872-7118 E-mail: springdale@usinfrastructure.com • • Mr. Gary Coover, P.E. City Engineer City of Fayetteville 4/30/2004 Page 2 of 2 Deductive alternate 3 removes the entire drainage improvements scheduled for the Cleveland/Sang area as well as a portion of the HollyNista area and if chosen, would reduce the base bid to the following totals: Forsgren, Incorporated Mobley Contractors, Inc. • Total Bid Accepting Deductive Alt. 3 $371,562,00 $439,446.36 We have reviewed the Statement of Bidders Qualifications submitted by Forsgren, Inc., and based upon the information provided we believe themto be qualified for this project. They have been in business since 1936, and have successfully completed several street and drainage projects throughout Arkansas such as Phoenix Avenue West in Fort Smith, scheduled to be completed in Fall 2004, Kelley Highway in Fort Smith scheduled to be completed in Spring 2005, and the Rogers Municipal Airport Safety Improvements scheduled to be completed in Fall 2004. While we have no way of verifying the present financial condition of Forsgren, Inc., the contract documents require the furnishing of 100 percent performance and payment bonds prior to authorization of the notice to proceed of construction. Therefore, we recommend that the City of Fayetteville award this contract to Forsgren Incorporated in the amount bid of $652,762.00. We trust the City will concur in this recommendation. The contract requires substantial completion of the project within 75 days and full completion and ready for final payment within 90 calendar days from the date of the issuance of the notice to proceed. Assuming a notice to proceed is issued May 31, the work should be substantially complete August 24, 2004 with final completion on September 8, 2004. If you have any questions or need additional information, please do not hesitate to call. TWC:aw Enclosures Sincerely, U -Arkansas. In Carptfn Vic -Q esident LIST OF ATTENDEES BID OPENING DRAINAGE IMPROVEMENTS HOLLY -VISTA AND CLEVELAND -SANG AREAS Nae rdLlk v-01 Ant*? I )NIvr.cc for City of Fayetteville, Arkansas USI Project No. 030923 Monday, April 26, 2004 11:00 a.m. /cc(' dee.„ �1. APR 3 0 2004 caem,-(1 deft. Representing Cc . r lQC. Ls! ,��u;1F�as I, l\ mooy sc • ACt- kZa.•S4S ! at, Cn5 G, c 17 v P jam. e 1 1, 4 ist of Attendeeq Name to 4040-5 /, • Bid Opening Prnj ctP 23 Representing///�� 2 • gel Pig paygJa3 EZ60£0 co to a Z D CO 0 r C ny < v_ < 1 00 • 0 .1 xi Z O -n DDO y y -n D z T < Z D W i,? m on o n_0 to o a m"m3xi z <O<�m O n 0 o r mOm co w m z<< a� omv - v xi z D D g z 6Z7 y W DE 0 A W m No 0 A • Pre -Cast or Cast -In -Place, complete in place 13. 1 Lump Sum Relocate 8" Water Line under 6' X 4' RC Box, complete in place 14. 1 Lump Sum Relocate 17' Sanitary Sewer Line ("ForceMain'), complete in place 15. 5 Each Inlet Box, 5' Type C, Reinforced Concrete (or equivalent Type MO), Pre -cast or Cast -In -Place, complete in place 15a. 1 Each Inlet Box, 6' X 5' Type C, Reinforced Concrete (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 16. 1 Each Inlet Box, 6' X 4' Type C, Reinforced Concrete (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 17. 2 Each Inlet Box, 4' Type E, Reinforced Concrete (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 18. 2 Each Inlet Box, 7' X 4' Type E, Reinforced Concrete (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 19. 1 Each Inlet Box, 5' Type E, Reinforced Concrete (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 20. 8 L.F. Curb Inlet Extensions, complete In place 21. 451 L.F. Swale Construction, complete in place 22. 120 S.Y. 4" Concrete Channel Lining (for erosion control), complete in place 0 3 Company: Forsgren, Inc. Arkansas License No.: 0036800404 Address: PO Box 368 City, State: Fort Smith, AR 72902 JOuantity Unit 0 m 0 n a P c 0 > H H H H H 0 N + p 0 H N 0 V CO 0 0 0 CO CO O 00000000 0 0 0 0 0 0 0 0 H 40 0 H H H H0 el So 41 m 0 41 V a O O O o 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 o m o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A N 0 O O 0 44 CO L 0 o o O NHHV 0 0 O O 0 H 0 p 0 0 O o CO N 0 O O 0 H W N 0 0 o o CO N 0 O o 0 44 GI N 0 0 0 O 0 0 O O 0 H 0 O 0 0 0 o an co O 0 Y 0 O O 0 O O O O O Obo 000 H H 0) H 0 0 CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O+ 0 0 O 00000000000 0 H N O O O 00.02e9.6.00000 0 0 461 HH N IA N H 0 O H H H ++_+CN 0 0 0 0 -1 N+ 0 0 0 O O O 0 0 0 N 0 0 O 0 0 0 0 0 0 0 0 0 0 H H H H H H Ca H p H N H 4) N H N V m N 0 CO O 0 co to a O 0 0 V O O Cl 0 0 0 N 0 0 N O 0 0 0 o b o b o 0 0 0 0 0 0 0 0 0 0 0 0 9 n J 0 CV D 3 H 0 0 » G - H H H H N H H ta N N 0 0 N 41 -1 a 0 m 0 0 0+ 0 0 0 0 0+ N N an H H a+ p1 N L 0 " 0 0 0 7-4 cn "+ O 0 J 0 0 41 Co O (ll 0 N 0 0 0 0 0 O N H 44 H+ 0 CO J 0 CO A V N+ H H 41 0 J V 0 41 �I 0+ H ca' 0 0) CO J 0 H J 0 -1 0 0 H c4 a 0 p a H 0 (u O O Co H lJ 1,2 0 O 0 H 41 + 0 O 0 H 0 -CO CO a (J 0) H co V 0) H fJ + CO 0 0 0 Of + 01 V N 0 N H H J 0 (J C$ au au a a a N N 0 O N 0 0 O H H J 0 0 N N+ io N N 0 O N H+ W H V P":' H H H H N H N V 0 610 H O -IL 10 CO 0 0 N O CO N 0 0 J Ca O 0 a 0 O N a 0 0 41 W+ W O (y 0 N 0+ 0 fu 0 0 0 0 a N CO 0 CO a 41 aH el 41 69 + H + 0 H Ica H f 0 p H 0 0 0 0 N 0 N O U O q m O V N -CO le N U 0 40i y V N 0 N W+ lJ — 0 0 0 0 N A+ 4f W 0004.000 0 0 41 0 CO Unit Total Price Amount a C 0 = 0 D 0 0 Cr Z D CO 0 r C ny < v_ < 1 00 • 0 .1 xi Z O -n DDO y y -n D z T < Z D W i,? m on o n_0 to o a m"m3xi z <O<�m O n 0 o r mOm co w m z<< a� omv - v xi z D D g z 6Z7 y W DE 0 A W m No 0 A • qel P!8 Pay!Uao E • a rTAL SCHEDULE B complete in place 7. 24 L.F. Curb Inlet Extensions, complete in place 8. 3 Each Curb Inlet Neenah Type L Grate OR3578 (or equivalent) for Combination Inlet complete In place 9. 1 Lump Sum 4' Type E Junction Box (or equivalent Type MO), Pre -Cast or Cast -In -Place complete in place 10. 1 Each 36" Reinforced Concrete Pipe Flared End Section 11. 45 Ton Asphalt Street Repair, complete in place 12. 900 Ton Aggregate Base Course (Class 7), complete in place 13. 500 L.F. Curb and Gutter, complete in place 14. 1 Each Relocate Existing 6" Water Line (only if directed by Engineer) 15. 1 Each Relocate Existing 8" Water Line (only if directed by Engineer) 16. 3 Each Reinstate Individual 4" Sanitary Sewer Service, complete in place 17. 3 Each Reinstate Individual Water 1" Service, complete in place 18. 0.2 Acre Seeding, complete in place 19. 10 L.F. Reconstruct Sidewalk, complete in place 20. 550 L.F. Reconstruct Existing Fence, complete In place ' 21. 1 Lump Sum Maintenance of Traffic, complete in place 2. 1 Lum • Sum Trench or Excavation Safe S stem, com •lets in •lace (TOTAL SCHEDULE A 4.1 N+ O m IV 10 0 N OZ g 3 Company: Forspren, Inc. Mobley Contractors, Inc. Arkansas license No.: 0036900404 0003660904 Address: PO Box 366 PO Box 160 City, State: Fort Smith, AR 72902 Morrilton, AR 72110 co O 0 N + + N W 0 e m C r Unit Each Acre Lump Sum Lump Sum L.F. DEDUCTIVE ALTERNATE N0. 1 24" Reinforced Concrete Pipe (Class 3) complete in place 18" Reinforced Concrete Pipe (Class 3) complete in place 4' Type C Inlet Box (or equivalent Type MO), Pre -Cast or Cast -In -Place Curb Inlet Extensions, complete in place Curb Inlet Neenah Type L Grate #R3578 (or equivalent) for Combination Inlet Asphalt Street Repair, complete in place Aggregate Base Course (Class 7), complete in place Curb and Gutter, complete in place Relocate Existing 6" Water Line (only If directed by Engineer) Remove and Reconstruct Sidewalk, com • lete in slate Description Reinstate Individual 4" Sanitary Sewer Service, complete In place Seeding, complete in place Maintenance of Traffic, complete in place Trench or Excavation Safety System, complete in place Root Pruning of Existing Trees, complete in place Remove and Reconstruct Existing Fence, complete In place 00'0944 00164 0011004 00'00934 00.000'94 00'OLS 00'08L'94 001714 00'099'14 001365 00'009'0 LS 00009194 00'OZO'It , 00'994 00'009'96 oo'008'84 001)0L'ZS 00'OLS 00248.024 00'964 a + M p 0 4/1 N W+ N O N H+ co W O O N 0 M N 0 a O N N 0 0 0 0 O N W 0 CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 44mL M N N H N r+ 01 H N 4 V N p • 0 W 0> N N O+ U N 0 0 0 0 A 0 N co N 0 0 N N CO 0 0 0 N 0 O 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 y L 0 0 0 44 N O 0 o o 0 M N 0 W O 0 0 H k -16N 0 CO 0 O o.O bb 0 0 r N 41 H H N O V O N 0 CO 0 0 0 0 0 H N N W 9 et + O CO N V - O J 0 0 O 0 A 0 0 0 0 0 0 0 Ctiobbet 0 0 0 0 0 Unit Total Price Amount 4520.00 11,580.00 31,100.00 $1,320.00 433,000.00 .433,000.00 41.00 41.00 5135.00 47,020.00 413.00 53,250.00 M + 0 W0000000000000 0 0 $441,573.001 543.11 418,278.64 $32.28 4968.40 42,537,57 47,812.71 5114.60 51,375.20 $955.01 52,865.03 425.00 5875.00 $19.61 $12,256.25 $13.75 56,875.00 54,970.85 54,970.65 555.39 5553.90 5147,076.281 N a VI N H N H P L a+ 0 L H N N -CO H 0 0 N+ iO H N H m N to 0 0 O pp O N CO 0 O m W A O CO 0 P 0+ O b W fJ O 0 O Co J 0 0 0 W O co O m O CO CO 0 0 0+ 0+ co «pr _Nr4r 4. -• 44 A N r r 0 CO J r N N W N 0 CO y ---1+ 0 0 0+ (O A N m N 0 O A CO A V V N CO JO 0 0 0 41 O CO 0 A O 0 0 0 CO O W O O Co NaW O O O 0 Co 063000V190301000-10 , 0 0 O r N 0 0 O CO H y4 N W a +OI Co 0 0-9 Of' N W J N O N O W A P O N p N H N M N «p N N fJ CO 0 J N+ V O 019-1410 010 j'wr 0 0, CO 0 N O 0 N V N O W J 0 O CO N O Coa O O 00 o O O 44 0 4 N N N O+ H O Co V V V o O O CO o to 0 0 0 0 O J N N O W O V 0 3 rm Nr A r N N W D N A G+ o W 3 0 0 A 0 A o 10-1000100 O 0 0 0 0 0 0^- O A 0 0 0 + M u 0 0 O • V i0 V Unit Total Price Amount O 0 MO b 'Amount corrected by Engineer .13 0 0 N TOTAL BID ACCEPTING DEDUCTIVE ALTERNATE NOS. 2 AND 3 Deductive Altemate No. 3 - Line 2 Station 0+00 to Station 2+07 and Line 1 Station 12+98 to Station 19+97 OTAL BID ACCEPTING DEDUCTIVE ALTERNATE NO. 2 etluctive Alternate No. 2 - Schedule B In its entirety TOTAL BID ACCEPTING DEDUCTIVE ALTERNATE NO. 1 Deductive Alternate No. 1 - Line 5 Station 0+00 to 4+54 TOTAL BID, SCHEDULES A AND B Company: Forsgren, Inc. Mobley Contractors, Inc. Arkansas License No.: 0036900404 0003660904 Address: PO Box 368 PO Box 160 City, State: Fort Smith, AR 72902 Monnhlton, AR 72110 Item Unit Total Unit Total Unit Total No. Quantity Unit Price Amount Price Amount Price Amount 0 — -. m O — + + N m a —& O -• $371,662.00 c 3 c r m 3."3 00'LLO'0LS I s W O w m r gg,, M tO O M mN L V al (Site Preparation (partial), complete In place Maintenance of Traffic (partial), complete in place Trench or Excavation Safety System (partial), complete in place CO CO p0 0 O p N O 0 p O H O O 0 CO 0 O 0000 O O O O p M fO 0 V -CO a O O O O 0 0 0 0 0000 8652,762.00 W a N, 0 N b a 0 0 N 0 9 0 O O 0 O O O O O O O N CO CO M N 0 N p a O O V O O 0 N O 000 0 0 a co N 0 O W bb O O 64 O N O M O in 0 �(.pW 0 O 0 0 O O 0 O O O Y a N O 0 0 O O o 0 M O 0 N yl O 0 O N V O O bb 0 0 MOM«N m p 0 N1 y 0 W 69 43 N a W b 61 O N 0+ O 0 a eo p 0 O N O 4 AO 44 N W a 4) Op Nd co O W Y N O W 0b 0 co 0 a M W a pN 4 «1 4 d 01 O a H N N W (0 _0 Co00 0 a 0 N O N 0 N 0+ 0 4) 40) i y 0 00fl CO 0 O ID 0pN -I p O N 0 N O a is is N 0 0 ( 9 N a 10 N N N N 82,280.00 $2,280.00 84,895.63 84,895.83 $1,220.00 81,220.00 CA 0 p oc. a En 8439,446.36 409 N b 0 mt 10 0 N 1535,907.97 � V V 0 m M Of V H O Co M 0 CO W 0 N k N O O 911 O 0 O O O co o OO o O O O O O 80.00 0 b O la O 0 b O Total Deductive Altemate No. 3 Total Deductive Alternate No. 1 Company: Forsgren, Inc. Mobley Contractors, Inc. Arkansas License No.: 0036900404 0003660904 Address: PO Box 368 PO Box 160 City, State: Fort Smith, AR 72902 Monnhlton, AR 72110 Item Unit Total Unit Total Unit Total No. Quantity Unit Price Amount Price Amount Price Amount 0 — -. m O — + + N m a —& O -• —' — c 3 c r m 3."3 w 4 m m r D S 9 w m r gg,, Lump Sum Lump Sum Lump Sum DEDUCTIVE ALTERNATE NO. 3 ITEMS 30" Reinforced Concrete Pipe (Class 3), complete in place 30" Reinforced Concrete Pipe Flared End Section, complete in place Junction Box, 4' Type E, Reinforced Concrete (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place Seeding, complete In place 36" Reinforced Concrete Pipe (Class 3), complete in place 7' X 4' Type,E Inlet (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 4' X 4' Type E Inlet (or equivalent Type MO), Pre -Cast or Cast -In -Place, complete in place 4' X 4' Type E Junction Box (or equivalent Type MO), Pre -Cast or Cast -In -Place 1 complete in place Trash Grate, complete In place Swale Construction Site Pres - ration • . Nal , corn . lete in • lace (Site Preparation (partial), complete In place Maintenance of Traffic (partial), complete in place Trench or Excavation Safety System (partial), complete in place p N O 0 p O H O O 0 CO 0 O 0000 O O O O p M fO 0 V -CO a O O O O 0 0 0 0 0000 N p 0 O O O N a O 0 0 W a N, 0 N b a 0 0 N 0 9 0 O O 0 O O O O O O O N CO CO M N 0 N p a O O V O O 0 N O 000 0 0 a co N 0 O W bb O O 64 O N O M O in 0 �(.pW 0 O 0 0 O O 0 O O O Y a N O 0 0 O O o 0 M O 0 N yl O 0 O N V O O bb 0 0 MOM«N m p 0 N1 y 0 W 69 43 N a W b 61 O N 0+ O 0 a eo p 0 O N O 4 AO 44 N W a 4) Op Nd co O W Y N O W 0b 0 co 0 a M W a pN 4 «1 4 d 01 O a H N N W (0 _0 Co00 0 a 0 N O N 0 N 0+ 0 4) 40) i y 0 00fl CO 0 O ID 0pN -I p O N 0 N O a is is N 0 0 ( 9 N a 82,280.00 $2,280.00 84,895.63 84,895.83 $1,220.00 81,220.00 CA 0 p oc. a En 40 0 0O N a 06 0 O 409 N b 0 mt O O 911 O 0 O STA REVIEW FORM - FINANCIAL OBLIGAN X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council Meeting of: May 18,2004 FROM: Gary Coover Name Engineering Community Planning & Engineering Division Department ACTION REQUIRED: Award a construction contract to Forsgren, Inc., in the amount of $652,762.00 and approve $97,000 for project contingency for Bid No. 04-35, Construction of Drainage Improvements for the HollyNista and Cleveland/Sang Areas. Also to approve the attached budget adjustment in the amount of $374,540.80 which will also cover the project contingency and right-of-way acquisition costs. COST TO CITY: $749,762.00 $ 486,077.00 Holly & Vista Dr. Drainage Impr. Cost of this request Category/Project Budget Program Category / Project Name 4470-9470-5817.00 $ 75,855.80 Bridge/Drainage Account Number Funds Used to Date Program / Project Category Name 02023 el $ 410,221.20 Sales Tax Project Number Remaining Balance Fund Name BUDGET REVIEW: t( Budgeted Item i` Budget Adjustment Attached BGdget Manag C/ 3J -&y Date CONTRACT/GRANT/LEASE REVIEW - ACCO City ttorney tealoq Date Internal Auditor L1/}a /by Date sion Head Department Director nanCe & Internal Services Dir Purchasing Manager !'_jr%'OY Received in Mayor's Office Date gr- Da S' -3-4C Date Mayor Date Cross Reference: Previous•Ord/Res#: Date Date Date Orig. Contract Date: Orig. Contract Number: New Item: Yes No STA7REVIEW FORM - FINANCIAL OBLIGATION X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council Meeting of: May 18,2004 FROM: Gary Coover Name Engineering Community Planning & Engineering Division Department ACTION REQUIRED: Award a construction contract to Forsgren, Inc., in the amount of $652,762.00 and approve $97,000 for project contingency for Bid No. 04 35, Construction of Drainage Improvements for the Holly/Vista .and Cleveland/Sang Areas. Also to approve the attached budget adjustment in the amount of $414,541.00 which will also cover the project contingency and right-of-way acquisition costs. COST TO CITY: $824,762.00 $ 486,077.00 Holly & Vista Dr. Drainage Impr. Cost of this request Category/Project Budget Program Category / Project Name 4470-9470-5817.00 $ 75,855.80 Bridge/Drainage Account Number Funds Used to Date Program / Project Category Name 02023 $ 410,221.20 Sales Tax Project Number Remaining Balance Fund Name BUDGET REVIEW: Budgeted Item Budget Adjustment Attached Budget Manager Date CONTRACT/GRANT/LEASE REVIEW: Accounting Manager Date Internal Auditor Date S llroq torney Date Purchasing Manager Date STAF RECOMMEND? N: sion Head Department Director Finance Internal Services Dir. 5—loy Date Received in Mayor's Office Cross Reference: Date -!/-et,0 Date Previous Ord/Res#: Orig. Contract Date: Orig. Contract Number: Date Ma -o Date New Item: Date Yes No FAYETTEtILLE THE CITY OF FAYETTEVILLE, ARKANSAS City Clerk Division DEPARTMENTAL CORRESPONDENCE 113 West Mountain Fayetteville, AR 72701 Telephone: (479) 575-8323 To: Gary Coover Engineering Division From: Clarice Buffalohead-Pearman t/ City Clerk Division Date: May 24, 2004 Re: Resolution No. 78-04 The City Council passed a resolution, May 18, 2004, awarding a construction contract to Forsgren, Inc. for drainage improvements. Attached is a copy of the resolution, contract and budget adjustment for this item. The resolution with attachments will be recorded in the city clerk's office and microfilmed. If anything else is needed please let the clerk's office know. /cbp attachments cc Nancy Smith, Internal Auditor %La/ Sid Norbash, Staff Engineer.Fev✓ Submitted By City of Fayetteville Staff Review Form City Council Agenda Items Contracts Mayor's Approval Engineering Division Action Required: editG 7/05 (l1 eMse- A.9re" AAridil Operations Department Approval of Change Order #1 & Final Reconciliation to the construction contract with Forsgren Incorporated for Holly -Vista 1 ClevetandSang Drainage Improvements Project. $30,243.28 Cost of this request 4470-9470-5809-00 Account Number 02023-20 Project Number Budgeted Item X $97,000 Project Contingency Category/Project Budget $5,850 Funds Used to Date $91,150 Remaining Balance Budget Adjustment Attached HolyNiista - Cleveland/Sang Drainage Improvements Project Program Category / Project Name Street Improvements Program / Project Category Name Sales Tax Fund Name L3o•os Date City Attomey atil3 Fin ce Intemal Service r for ‘ e 4,1 or Comments: aVerC Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: goi 5/182004