HomeMy WebLinkAbout57-04 RESOLUTION•
RESOLUTION NO. 57-04
A RESOLUTION APPROVING CHANGE ORDER 1114 TO THE
CONTRACT WITH CROSSLAND CONSTRUCTION COMPANY,
INC. IN THE AMOUNT OF SEVENTY-EIGHT THOUSAND FOUR
HUNDRED FIFTY-FOUR DOLLARS ($78,454.00) TO INSTALL
LANDSCAPE IRRIGATION, ENGINEERED SOIL AND MULCH,
AND LOW VOLTAGE CONDUIT AT THE NEW FAYETTEVILLE
PUBLIC LIBRARY
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby
approves Change Order #14 to the contract with Crossland Construction Company, Inc.
in the amount of Seventy -Eight Thousand Four Hundred Fifty -Four Dollars ($78,454.00)
to install landscape irrigation, engineered soil and mulch, and low voltage conduit at the
new Fayetteville Public Library. A copy of Change Order 4114, marked Exhibit "A" is
attached hereto and made a part hereof.
PASSED and isrPagyED this 20th day of April 2004.
"t9 (/?
S C.% • • .... • Sift,
Y °P.6:421% APPROVE
e_,--••cr1/4..r.
•,3%
E :FAvETTEvILLE:
Itt :A.47 By.
tl'N Sted
.... **** •‘
. STONo ....
ATTEST:
By:
$(-Attit74161e7
SONDRA SMIT , City Clerk
DAN COODY, Ma
•
Change Order
(Instructions on reverse side)
PROJECT:
(Name and address)
•
FAYETTEVILLE PUBLIC LIBRARY
401 WEST MOUNTAIN STREET
FAYETTEVILLE ARKANSAS 72701
TO CONTRACTOR:
(Name and address)
CROSSLAND CONSTRUCTION COMPANY INC
ATTENTION: JOHN PRIEST— PROJECT MANAGER
2510 WEST HUDSON ROAD
ROGERS ARKANSAS 72756
2 000•ITION
AIA DOCUMENT
CHANGE ORDER NUMBER:
DATE:
ARCHITECT'S PROJECT NUMBER
CONTRACT DATE:
CONTRACT FOR:
THE CONTRACT IS CHANGED AS FOLLOWS:
(It/elude, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.)
14
24 March, 2004
2000073-00
21 MAY 2002
GENERAL CONSTRUCIION
G701-2000
OWNER CI
ARCHITECT fl
CONTRACTOR fl
FIELD D
OTHER 0
Provide for changes to the Contract Documents as listed on "Attachment to Fayetteville Public Library Change
Order #14"
The original (Contract Sum) (rdentrettteed-Mettieveteett-ileiee.) was $ 17,633,931.00
The net change by previously authorized Change Orders $ 1,347,907.70
The (Contract Sum)-(feeepeeseeeettl-Meatieeee+Reakee). prior to this Change Order was $ 18,981,838.70
The (Contract Sum) (Gua1ailt..._.1 MaJn,m. l'IkL) will be (increased)
-(u44rehotegeti.) by this Change Order in the amount of 78,454.00
The new (Contract Sum) trzna..a..t..ed Magi a... Ric .3 including this Change Order will be 19,060,292.70
The Contract Time will be el) (elseri.as J) (unchanged) by
( 0 ) days.
The date of Substantial Completion as of the date of this Change Order therefore is 31 JULY 2004
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph
7.3.8 of AIA Document A201.
Not valid until signed by the Architect, Contractor and Owner.
AFHJ ARCHITECTS
PO BOX 790
FAYETTEVILLE, AR 72702
ARCIIIT(CT Typed name)
As ociat ct
CROSSLAND CONST. CO. INC.
PO SOX 907
ROGERS, AR 72796
CONTRACTOR (Typed name)
mfrsgoti-
DATE
BY
5/,f4g
DATE
CITY OF FAYETTEVILLE
113 WEST MOUNTAIN ST
FAYETT LLE, AR 72701
(Signature)
MAYOR DAN COODY
:11410
02000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its
provisions without written permission of the AIA violates the copyright laws of the united States and will subject
the violator to legal prosecution.
WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution.
1
02000 AIA®
AIA DOCUMENT G701-2000
CHANGE ORDER
The American Institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
C2000 AIA®
AIA DOCUMENT G701-2000
INSTRUCTIONS
The American institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
Instructions
GENERAL INFORMATION
t
• ••
PURPOSE. This document is intended for use in implementing changes in the Work agreed to by the
Ownef,tontractor and Architect. Execution of a completed Gzoi form indicatelslagreement upon all the
• terms of the change, including any changes in the Contract Sum (or Guaranteed Muirnum Price) and
- ; ContracttTime.
•
RELATED DOCUMENTS. This document was prepared for use under the terms of AIA general conditions,
i,
including AIA Document A201, General Conditions. of the Contract for Construction, and the.general
. , .
conditions contained in AIA Document Aioz, Abbreviated. Owner -Contractor Agreement Form for
Construction Projects of Limited Scope—Stipulated Sum.-. • ;.•-• \
• -
USE OF CURRENT DOCUMENTS. Prior to using any AIA document, the user should consult the AIA, an
AIA component chapter or a current AIA Documents l'rice List to determine the current edition of each
document.
REPRODUCTIONS. AIA Document G7o1 is a copyrighted work and may not be reproduced or excerpted
from in substantial part without the express written permission of the AIA. The G7o1 document is intend-
ed to be used as a consumable—that is, the original document purchased by the user is intended to be con-
sumed in the course of being used. There is no implied permission to reproduce this document, nor does
membership in The American Institute of Architects confer any further rights to reproduce G701 in whole
or in part.
A limited license is hereby granted to retail purchasers to reproduce a maximum of TEN copies of a com-
pleted or executed Gzoi, but only for use in connection with a particular project.
COMPLETING THE G701 FORM
DESCRIPTION OF CHANGE IN THE CONTRACT
Insert a detailed description of•thichange.or reference specific exhibits describing in detail the change to
, be made in the Contract by this Change Order, including any Drawings, Specifications, documents or
other supporting data to clarify the scope of the change.
DETERMINATION OF COSTS
Insert the -following information in the blanks provided, and strike out the terms in parentheses that do
not apply:
• the original Contract Sum or Guaranteed Maximum Price;
• the net change by previously authorized Change Orders (note that this does not include changes
authorized by Construction Change Directive unless such a change was subsequently agreed to by the
Contractor and recorded as a Change Order);
• the Contract Sum or Guaranteed Maximum Price prior to this Change Order;
• ]theamount Of increase or liecreise, if anyin the Contract Sum or Guaranteed Maximum Price;',
and „1-
1.14 -rt: tnhe new Contract Sum or Guaranteed...Max' imum Price al adjusted by th.g.dnange Order.
,
CHANGE IN CONTRACT TIME
Insert the following information in the blanks provided, and strike out the terms in parentheses that do
not apply:
• the amount in days of the increase or decrease, if any, in the Contract Time; and
• the date Of Substantial Completion, including any adjugtment effected by this Change Ofder. -
EXECUTION OF THIS DOCUMENT
When the Owner and Contractor, in concurrence with the Architect, have reached agreement on the
change to be made in the Contract, including any adjustments in the Contract Sum (or Guaranteed
Maximum Price) and Contract Time, the Gzoi document should be executed in triplicate by the two par-
ties and the Architect, each of whom retains an original.
wAgyagaG: Unlicensed photocopying violates US. copyright laws and will subject the violator to legal prosecution.
•
ATTACHMENT TO FAYETTEVILLE PUBLIC LIBRARY CHANGE ORDER #14
1. Provide landscape irrigation in accord with Proposal Request 29 for an
increase in Contract Sum of
2. Provide and install engineered soils and provide 49 cubic yards mulch
material delivered to roof top garden per Proposal Request 311 as revised for
an increase in Contract Sum of
3. Incorporate into the Contract Sum the value of low voltage conduit work
completed between December 17, 2003 and January 20, 2004 under
Construction Change Directive 6. Apply the balance in CCD #6 of $9,657.00
for continuing this work. CCD #6 is now void. Increase the Contract Sum
4. Under Construction Change Directive #7 incorporate into the Contract Sum
the value of low voltage conduit work completed between December 17, 2003
and March 2, 2004 beyond the maximum of CCD #6. CCD #7 with an initial
value of $25,000 shall have a balance of $111124.00 available for continuing
this work. Increase the Contract Sum •
SUMMARY OF CHANGE TO CONTRACT SUM, INCREASE
$30,417.00
$23,960.00
$9,657.00
$14,420.00
$78,494.00
•
NAME OF FILE:
CROSS REFERENCE:
Resolution No. 57-04
w/Change Order No. 14
nt
•
11=111 Tr LP Glisly
1
03/28/04
memo to mayor & city council
2
draft resolution
3
04/05/04
revised memo to mayor & city council
4
03/29/04
memo to mayor
5
04/05/04
Staff Review Form
6
04/23/04
memo to Louise Schaper
NOTES:
•
CITY COUNCIL AGENDA MEMO
,&S
• /0707-
57-0,1
eta'55Aill<
City Council Meeting of April 20, 2004
Agenda Item Number ny Oren
likapy
To: Mayor and City Council
fThru: Hugh Earnest, Chief Administrative Officer
From: Louise Schaper, Executive Director, Library
Date: March 28, 2004
Subject: Change Order /4-1-9 to contract with Crossland Construction
RECOMMENDATION
Approve a contract adjustment in the amount of $78,454.000 with Crossland Construction Company Inc.
for Change Order #14 which covers (1) landscape irrigation; (2) rooftop garden engineered soils; (3) low
voltage conduit work per Exhibit C of the original contract dated May 21,2002 with Crossland
Construction Company.
BACKGROUND
This contract adjustment is for items included in the project budget, but were deferred from the Crossland
Contract.
1. $30,417.00 to provide landscape irrigation.
2. $23,960.00 to provide and install engineered soils and provide 49 cubic yards of mulch material
delivered to roof top garden
3. $9,657.00 for low voltage conduit work.
4. $20,781 for low voltage conduit work.
DISCUSSION
This change order is for items that were deferred from the original contract and are budgeted. The low
voltage conduit work was initiated with a constructive change directive (CCD); we are asking that the
remaining $20,781 funds be added to the Crossland contract.
BUDGET IMPACT
These items are in the new main library building project budget.
RESOLUTION NO.
A RESOLUTION APPROVING CHANGE ORDER #14 TO THE
CONTRACT WITH CROSSLAND CONSTRUCTION COMPANY,
INC. IN THE AMOUNT OF SEVENTY-EIGHT THOUSAND FOUR
HUNDRED FIFTY-FOUR DOLLARS ($78,454.00) TO INSTALL
LANDSCAPE IRRIGATION, ENGINEERED SOIL AND MULCH,
AND LOW VOLTAGE CONDUIT AT THE NEW FAYETTEVILLE
PUBLIC LIBRARY.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas,
hereby approves Change Order #14 to the contract with Crossland Construction'
Company, Inc. in the amount of Seventy -Eight Thousand Four HundredriF44
Four Dollars ($78,454.00) to install landscape irrigation, enginieipetol an
mulch, and low voltage conduit at the new Fayetteville PublIyItibrakty. A nippy of
Change Order #14, marked Exhibit "A" is attachedaierSo arit made part
hereof.
PASSED and APPROVED this 20th day of April 2004.
APPROVED:
Al I Er:
By:
SOND tfi SMITH, City Clerk
By
DAN COODY, Mayor
Date: December 11, 2002, rev. 1/16/03, 1/23/03, 5/5/03, 9/29/03; 11/12/03; 3/25/04; 4/5/04
To: Fayetteville City Council Aldermen
From: Louise Schaper, Executive Director, Fayetteville Public Library
Subject: Blair Library Project Budget and Contract Approvals
This table identifies those requests related to the construction of the Blair Library that Council
has approved, as well as forthcoming requests. Our intent is to ensure that Council is aware of
all requests that are within our $23,341,655 budget for the project as approved by the FPL
Board on May 2, 2002, as well as those items that are outside of this budget. Some items will
be funded and/or procured by the FPL Foundation including most furnishings, some plant
materials, and some technology items.
Blair Library Construction, Furnishing and Equipping
Item
Within
budget?
Source(s)
Budget
Est. date
approval
Date
Approved
Amount
Notes
Crossland
contract for
construction
Yes
sales tax +
private
5/21/02
$17,633,931
Includes
off
from
site improvements
CIP
$221$95
funds
for
Contingency
Yes
sales tax +
private
$830,000
4/20/04
(remainder)
5/21/02
$700,000
$167,676 remaining of
approved contingency
Exterior
cladding: APC
replacement
Yes
sales tax +
private
$949,658
11/02
11/19/02
$402,896
APC at entrance
brick will
stairwell
to Crossland
and
clad lintels +
towers. Added
contract
Low voltage
equipment
Yes
sales tax +
private
10/21/03
$206;701
Added to Crossland
contract.
Low
conduit
voltage
Yes
sales tax +
private
4/20/04
$24,077
(pending)
Deferred from contract
Landscape
Yes
sales tax +
private
4/20/04
$54,377
(pending)
Deferred from contract
Interior
signage
Yes
sales tax +
private
4/20/04
Deferred from contract
AV Equipment
Yes
sales tax +
private
4/20/04
Deferred from contract
Meeting
enhancements
room
Yes
sales tax +
private
4/20/04
Deferred from contract
Technology
related items
Yes
sales tax +
private
$470,000
4/20/04
Fumishings
Yes
private
$980,000
3/16/04
$151,185
Shelving; remainder by
private funds
Smart
e.g. conveyor,
self -check,
RFID
library,
Yes
sales tax +
private
$659,751
5/03
5/03
$395,632
Conveyor
RF1D
Self
-check
Moving costs
Yes
sales tax +
private
$30,000
4/20/04
This page identifies those items related to off-site improvements (utility burial, drainage,
sidewalks etc.) approved in CIP ($671,995). Because additional off-site improvements have
been requested by City departments and will be funded by these departments we list them here
as well. We will, as those items come up, list any additional CIP items approved in 2003 for use
in 2004, i.e. signage and landscape.
CIP Approved Off -Site Improvements Related to Blair Library
Item
Within
budget?
Source(s)
Source(s)
Budget
Est. date
approval
Date
Approved
Amount
Notes
Off-site
improvements
(see first item
above)
Yes
Off-site
CIP
$221,995
11/18/03
5/21/02
$221,995
improvements
In
but
Includes
Crossland Contract,
funded from
project.
sidewalks
CIP site
etc.
West Avenue
underground
utilities
Yes
Off-site
CIP
$101,806
10/21/03
$101,806
West Ave
utility permanent
Vendor is
AEP/SWEPCO.
underground
power.
West Avenue
underground
utilities to
residences
Yes
Off-site
CIP
$110,117
11/18/03
$110,117
Addition to Crossland
contract for installation of
underground utilities to
seven housing structures
adjacent to Blair Library
on west side of West
Avenue.
School Street
utility burial
Yes
Off -Site
CIP
$186,395.
3/16/04
$186,395
Utility burial
AEP/SWEPCO; there is a
"rock clause" in the
contract.
Additional Improvements to Blair Library
Item
Within
budget?
Source(s)
Budget
Est. date
approval
Date
Approved
Amount
Notes
CIP Approved
Improvements
Related to
Blair •Library
Not in
library
budget. In
Water &
Sewer
Funds
Water and
Sewer
Funds
$41,342
11/18/03
11/18/03
$41,342
Improvements to water
and sewer that were
identified after the
contract was signed with
Crossland. Includes
new 6" waterlines in
Mountain; 8" waterline in
School; 8" sanitary
sewer in Rock and 12"
waterline in Rock.
These improvements are
requested to correct
leaking, deteriorated and
undersized old water
and sewer lines in the
streets adjacent to Blair
Library.
•
AmirmoezFosterHaileyJohnson
MEMORANDUM
To: Mayor Dan Coody
Copy: Bob Kohler
Sean Wagner
Bill Browner
From: Jim Fos
Architects & Planners
March 29, 2004
Reference: e Public Library, Change Order 14
This Change Order covers landscape irrigation, engineered soils and mulch for the
rooftop garden and low voltage conduit rough -in authorized under two
Construction Change Directives for a total increase in the Contract Sum of
$78,454. These are further explained in the Change Order attachment.
Please advise Bob Kohler or me if any items require information. After approval
by the City, retain the original for City record and return all copies to me for
distribution.
Post Office Box 790 • 100 West Center, Suite 302 • Fayetteville, AR 72702 • 479-442-5565 • FAX 479-442-8849
STAFF REVIEW FORM
X AGENDA REQUEST
CONTRACT REVIEW
GRANT REVIEW
For the Fayetteville City Council Meeting of: April 20, 2004
FROM:
Louise Schaper
Name
Fayetteville Public Library General Government
Division Department
ACTION REQUIRED: Approve a contract adjustment in the amount of $78,454.00 with Crossland Construction
Company Inc. for Change Order #14 including (1) landscape irrigation; (2) structural soils; and (3) low voltage
conduit work per Exhibit C of the original contract dated May 21, 2002 with Crossland Construction Company.
COST TO CITY:
78,454.00 8,950,917 New Library
Cost of this request
4150-9150-580400
Account Number
99073-1
Project Number
Category/Project Budget Program Category / Project Name
6,412,911 New Library
Funds Used to Date Program / Project Category Name
2,538,006
Remaining Balance
Library Construction Fund
Fund Name
BUDGET REVIEW:
X
Budget Manager
Budgeted Item
3it)(51
Date
Budget Adjustment Attached
CONTRACT/GRANT/LEASE REVIEW:
Acco nting Mana r
City Attorney
3/376V
—Date
91-1- /el
Date
STAFF RECOMMENDATION:
3b61014
Division Head Date
Department Director
Finance & Internal Services
Dir.
Date
44-A7:9(
Chie dministrative 0
ficer
IL( (;')INLI-13L
Internal Audi
Date
4) (lit -9
Date
Purchasing Manager
Cross Reference
New Item:
Yes No
Previous Ord/Res#:
Orig. Contract Date
Orig. Contract Number
FAYETTEVFLLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
To: Louise Schaper
Fayetteville Public Library
From: Clarice Buffalohead-Pearman
City Clerk Division
Date: April 23, 2004
Re: Resolution No. 57-04
Attached is a copy of the above resolution passed by the City Council April 20, 2004, approving
Change Order No. 14 to the agreement with Crossland Construction. Also attached is a copy of
said change order. This resolution with attachments will be recorded in the city clerk's office and
microfilmed.
If anything else is needed please let the clerk's office know.
/cbp
attachments
cc. Nancy Smith, Internal Auditor
Clarice Pearman - DLEP Grant applicatio. Erg -E.
From: Judy Cohea
To: Smith, Sondra
Date: 4/13/04 5:44PM
Subject: DLEP Grant application
Sondra, the Drug Enforcement Grant Application that is on the agenda for April 20th has to be in Little
Rock by 4:00 PM on Monday April 26th. Please try to rush this item in for Mayor Coody's signature and
call me so I can get it overnight mail by Friday, April 23, 2004. I don't understand why the grant
administrators think our Mayor can just sign this application without going to council. The application was
received in the Mayor's office on March 29th and I received it later in that week. Thanks in advance for
any help you can give me to get this to Little Rock on time. Judy
CC: Tabor, Greg
FAYETTEVFLLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
To: Rick Hoyt
Police Department
6,t)
From Clarice Buffalohead-Pearman
City Clerk Division
Date: April 23, 2004
Re: Resolution No. 56-04
Attached is a copy of the above resolution passed by the City Council April 20, 2004, to accept
the 2004/2005 grant for drug enforcement. I have attached a copy of the signed grant
acceptance. This resolution with attachments will be recorded in the city cleric's office and
microfilmed.
If anything else is needed please let the clerk's office know.
/cbp
attachments
cc: Nancy Smith, Internal Auditor