HomeMy WebLinkAbout53-04 RESOLUTION• RESOLUTION NO. 53-04 A RESOLUTION TO APPROVE A CONTRACT WITH THE LOW BIDDER, LILLICH BOSSLER, INC. TO PROVIDE AND INSTALL NEW BALL FIELD LIGHTING AT THE WHITE RIVER BASEBALL COMPLEX FOR THE AMOUNT OF $250,000.00 PLUS A CONTINGENCY OF $25,000.00 AND TO APPROVE A BUDGET ADJUSTMENT OF $67,955.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with the low bidder, Lillich Bossier, Inc to provide and install new ball field lighting at the White River Baseball Complex for the amount of $250,000.00 plus a contingency of $25,000.00 and approves a budget adjustment of $67,955.00. PASSED and APPROVED this the 6th day of April, 2004. By: s _ OPt-e4 1A -J CightdAL) SONDRA SMITH, City Clerk By APPROVED: 4 / / A i., DAN COODY, Mayof • Section 00500 AGREEMENT • BETWEEN CITY OF FAYETTEVILLE AND CONTRACTOR THIS AGREEMENT is dated as of the day of 14pr 1 in the year 2004 by and between the City of Fayetteville, Arkansas and L i 111 ch&Bo ss le r(hereinafter called CONTRACTOR). The City of Fayetteville and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of removal of existing light structures and providing and installing a new sports lighting system for White River Baseball Complex Lighting Project and all items indicated in the Drawings and Specifications for the project. Article 2. ENGINEER. The Project has been designed by Green Anderson Engineers, Inc. 2233 N. Green Acres Rd. Fayetteville, AR 72703 who is hereinafter called ENGINEER and who is to act as the City of Fayetteville's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. Article 3. CONTRACT TIME. 3.1. The Work shall be substantially completed within 40 working days after the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.B & C of the General Conditions within 50 working days after the date when the Contract Time commences to run. City of Fayetteville 10/02/02 Agreement Page -1 3.2. Liquidated Damages. The City of Fayetteville and CON CRACTOR recognize that time is of the essence of the Agreement and that the City of Fayetteville will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay the City of Fayetteville Two hundred dollars ($200.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by the City of Fayetteville, CONTRACTOR shall pay the City of Fayetteville Two hundred dollars ($200.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. The City of Fayetteville shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the Bid Form pursuant to paragraphs 4.1 and 4.2 below: 4.1. for all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. for all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2. As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER as provided in paragraph 9 08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.B of the General Conditions. Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. Progress Payments. The City of Fayetteville shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by ENGINEER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14 02 All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the City of Fayetteville 10/02/02 Agreement Page -2 • • number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or the City of Fayetteville may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the ENGINEER, and if the character and progress of the Work have been satisfactory to the City of Fayetteville and ENGINEER, the City of Fayetteville, on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to the City of Fayetteville as provided in paragraphs 14.02.B.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), less such amounts as ENGINEER shall determine, or the City of Fayetteville may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. 5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.B & C of the General Conditions, the City of Fayetteville shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraphs 14.07.B & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce the City of Fayetteville to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data." City of Fayetteville 10/02/02 Agreement Page -3 • • 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, or furnishing of the Work. 6.3. CONI RACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that the City of Fayetteville and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. CONTRACTOR is aware of the general nature of work to be performed by the City of Fayetteville and others at the site that relates to the Work as indicated in the Contact Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. City of Fayetteville 10/02/02 Agreement Page -4 • Article 7. CONTRACT DOCUMENTS • The Contract Documents which comprise the entire agreement between the City of Fayetteville and CONTRACTOR concerning the Work consist of the following: 7.1 Advertisement for Bids 7.2 Instructions to Bidders 7.3 Bid Form 7.4 Notice of Selection 7.5 This Agreement (pages 1 to 7 inclusive). 7.6 Performance and Payment Bonds, (Exhibits A and B respectively). 7.7 Certificates of Insurance, (Exhibit C). 7.8 Notice to Proceed (00550) 7.9 General Conditions (pages 1 to 42, inclusive). 7.10 Supplementary Conditions (pages 1 to 12 inclusive). 7.11 Specifications as listed in the table of contents. 7.12 Addenda numbers 1 to 5, inclusive. 7.13 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.14 All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. City of Fayetteville 10/02/02 Agreement Page -5 • Article 8. MISCELLANEOUS. • 8.1. Terms used in the Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3. The City of Fayetteville and CONTRACTOR each binds itself, it partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8 4 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intention of the stricken provision. City of Fayetteville 10/02/02 Agreement Page -6 • • IN WITNESS WHEREOF, the City of Fayetteville and CONTRACTOR have signed this Agreement in quadruplicate. One counterpart each has been delivered to the City of Fayetteville and ENGINEER, and two counterparts have been delivered to CONTRACTOR All portions of the Contract Documents have been signed, initialed, or identified by the City of Fayetteville and CONTRACTOR or identified by ENGINEER on their behalf. This Agreement will be effective on Ilex( 11 (0 114 , 2004 (which is the Effective Date of the Agreement). OWNER: jCity of Fayetteville CONTRACTOR: Lillich Bossier, Inc. By: E rrek 4‘ I \ 1‘. • 5 It: row .4, Attest: 011A-A-0-'frUt ORATE SEA Address for giving notices (If OWNER is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of Agreement.) City of Fayetteville By. ..Thoe President/Owner [CORPORATE SEAL] *Attest: *If a Corporation, attest by the Secretary. Address for giving notices License No. 006581040A Agent for service of process: (If CONTRACTOR is a corporation, attach evidence of authority to sign) 10/02/02 Agreement Page -7 • 00500 NOTICE TO PROCEED TO: DATE: PROJECT: White Rivers Baseball Complex Lighting Project You are hereby notified to commence WORK in accordance with the Contract dated on or before and you are to substantially complete the WORK within working days 'thereafter and have the Work complete and ready for final payment within working days thereafter The date for Substantial completion is therefore , 2004. The date for final completion is therefore 2004. CITY OF FAYETTEVILLE, ARKANSAS Owner By Owners Representative ACCEPTANCE OF NOTICE Receipt of the above NOTICE TO PROCEED is hereby acknowledged by this the day of By Title ,2004. City of Fayetteville 10/02/02 Agreement Page -II City of Fayetteville, Arkansas Budget Adjustment Form • Budget Year 2004 Department: Sales Tax Capital Improvements Division: Program: Date Requested 3/18/2003 Adjustment Number Project or Item Requested: $67,955 is requested in the White River Baseball • Complex Improvements capital project. Project or Item Deleted: To reduce the following projects: #02013 by $16,642, #02001 by $11,245, #02027 by $20,546, and #02015 by • $19,522. Justification of this Increase: These funds are necessary to complete White River Baseball Complex Improvements capital project. Justification of this Decrease: This adjustment is administrative. Funds taken from #02015 are needed for project contingency. Increase Budget (Decrease Revenue) Account Name Account Number Amount Project Number See Attachment Decrease Budget (Increase Revenue) Account Name Account Number Amount Project Number See Attachment Approval Signaiures Requested , Budget Manager 3 /01 -tog Date GIVRIOC-1 Date Department Director Date Finance & Intern Mayor rvices D ctor Date Date Budget Office Use Only Type: A Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log Initial Date Initial Date Initial Date Initial Date • City of Fayetteville, Arkansas Budget Adjustment Attachment • IEEE= Budget Year Department: Sales Tax Capital Improvements Date Requested Adjustment Number Division: 2004 Program: 3/18/2004 Increase Budget (Decrease Revenue) Account Name Account Number Amount Project Number Park improvements 4470 9470 5806 00 $ 45,773.00 02004 Park improvements 2250 9255 , 5806 00 $ 22,182.00 02004 $ 67,955.00 Decrease Budget (Increase Revenue) Account Name Account Number Amount Project Number Park improvements 4470 9470 5806 00 $ 16,642.00 02013 Park improvements 4470 9470 5210 00 $ 9,609.00 02027 Park improvements 2250 9255 5806 00 $ 10,937.00 02027 Park improvements 4470 9470 5806 00 $ 19,522.00 02015 Contract Services 2250 9255 5315 00 $ 111245.00 02001 67,955.00 NAME OF FILE: Resolution No. 53-04 w/agreement & budget adjustment CROSS REFERENCE: Item # Date Document 1 03/17/04 memo to mayor & city council 0,mc...,...:1. *I/LJuk iart6siic. 2 draft resolution 3 copy of proposed agreement 4 03/24/03 Staff Review Form 6 copy of purchase requisition NOTES. Iii9j04 aoLtmd 0,mc...,...:1. *I/LJuk iart6siic. • • • City Council Meeting of April 6, 2004 CITY COUNCIL AGENDA MEMO To: Mayor Coody and City Council Thru: Gary Dumas, Director of Operatio04? Connie Edmonston, Parks and Recreation Director 0 From: Date: Subject: David Wright, Recreation Superintenden March 17, 2004 Re6 116/of Agenda Item Number 50-01 • I 1141116055/ed; Approval of Bid #02-44 and contract for White River Baseball Complex Lighting RECOMMENDATION Parks and Recreation Staff recommends awarding the White River Baseball Complex Lighting Project to Lillick Bossler, Inc. in the amount of $250,000 with a 10% project contingency of $25,000 for a total cost of $275,000, and approval of a budget adjustment. BACKGROUND White River Baseball Complex is the home of baseball for children between the ages of 13 and 18. For several years, Parks and Recreation has been working to improve the quality of this facility. Fencing, a walking path and a new concession stand and restrobms have been built or replaced at this park. This lighting is an outdated system producing inadequate lighting and shadow areas. These were the original lights. For the past few years we have had a very difficult time maintaing the lights for play. On numerous occasion the lights have failed during ballgames creating considerable delays. Green Anderson was hired to evaluate the current status of the electrical wiring of the park, designing the specification and supervision of the project construction. Mr. Green reviewed and approved the bids. This project was bid on three different occassions. In the first bid, the project included lighting in the parking lot and batting cages. It also included catwalks that allow Parks and Recreation Staff to climb poles in order to change lights. However these amentities caused the price to come in at approximately $388,000. Over the course of the next two bids, Parks and Recreation Staff and Green Anderson Engineers re-evaluated and adjustments made as deemed necessary to the project. Another cost saving measure was in the specification of the type of lighting. In the first two bids, Musco Lighting or equivalent was the requirement. In the third and final round of bidding, the specifications called for Universal and/or Hubbell standards or equivilant, provided they meet the required 50 footcandles in the infield and 30 footcandles in the outfield. This change alone, saved the City of Fayetteville approximately $40,000. • • • DISCUSSION • City Council Meeting of April 6, 2004 Agenda Item Number The final process of the renovation of this facility is the sports lighting. National Safety Standards call for 50 vertical footcandles in an infield and 30 vertical footcandles in an outfield. This facility is well below both of these standards. These standards can not be met with the current electrical system in place at this facility In order for these standards to be met; a new transformer, equipment, and lights must be installed. BUDGET IMPACT Bids were opened on March 12, 2004. Two bids were received with Lillich Bossier having the low bid for the project. Their bid amount was $250,000. Parks and Recreation Staff request a project contingency of $25,000 for a total of $275,000. The project cost is over budget. The original budget for this project was $141,000. There are two factors causing this project to cost more than budgeted. First, the installation of the lights in this project is different than most sports field lighting projects. The two fields at this park are not configured where poles can be shared; meaning sixteen poles must be installed. There are trees and walking trail around the fields that required different setbacks and pole spacing. Second, special lighting requirements were specified. Both Parks Staff and Mike Green of Green Anderson Engineers felt very strongly about keeping light trespass and.spillage to a minimum. Although this park is in an industrial area, there are homes on the side of Mt. Sequoyah that face this ballpark. Staffwants to ensure residents will not be impacted from these lights. These fixtures not only reduce the amount of glare produced from the park to the neighborhoods, but by directing the lighting onto the field, will improve the quality of lighting for play. • RESOLUTION NO. • A RESOLUTION TO APPROVE A CONTRACT WITH THE LOW BIDDER, LILLICH BOSSLER, INC. TO PROVIDE AND INSTALL NEW BALL FIELD LIGHTING AT THE WHITE RIVER BASEBALL COMPLEX FOR THE AMOUNT OF $250,000.00 PLUS A CONTINGENCY OF $25,000.00 AND TO APPROVE A BUDGET ADJUSTMENT OF $67,955.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with the low bidder, Lillich Bossler, Inc. to provide and install new ball field lighting at the White River Baseball Complex for the amount of $250,000.00 plus a contingency of $25,000.00 and approves a budget adjustment of $67,955.00. PASSED and APPROVED this the 6th day of April, 2004. ATTEST: By: SONDRA SMITH, City Clerk APPROVED: pit By: DANIDODY, Mayor • AGENDA REQUEST 61Z- '11753-0/ RO,e_ °STAFF REVIEW FORm FINAIDSOAMMED Piot( e0 /ficil 60.5510,r/ bris istot CONTRACT REVIEW GRANT REVIEW X CONTRACT AMENDMENT For the Fayetteville City Council Meeting of: N/A FROM: David Wright Name Parks and Recreation Division Operations Department ACTION REQUIRED: Contra Adme ment #1 to Lillich Bossier, Inc., in the amount of $5,008.35 to raise the height of electrical panels of 6sIWsei lights to remove from danger of river waters flooding the electrical panels. Contract Admendment #2 to Lillich Bossier, Inc., in the amount of $16,275, to redrill hole base to 16 feet. This is necessary to secure the 70 foot light poles into rock in the surface. This request is covered in the project contingency of $25,000. COST TO CITY: $21,283.35 277,005.00 White River Baseball Improvments Cost of this request 4470.94/0.5806.00 2250.9255.5314.00 172,852.67 Park Improvments Category/Project Budget Program Category / Project Name Account Number Funds Used to Date Program / Project Category Name 02004.1 25,001.66 Sales Tax/Parks Development Project Number Remaining Balance Fund Name BUDGET REVIEW: Budget Manager Budgeted Item Budget Adjustment Attached Date CONTRACT/GRANT/LEASE REVIEW: Accounting mane r CierWri-O-rney Date Internal Auditor i et( Date Purchasing Manager Date Date STAFF RECOMMENDATION: To approve changes for contract. OQW)144: (62944-1fri4;66.— /0-2 7-09 Division Head Date Dep rtme t Director 4-.50 inance & Internal Services Dir. to- ze, 04\ Date /0- 2X-- eci /a Date Chief Inistr tive Officer Mayor Date Received in Mayor's Office Cross Reference: Previous Ord/Res Orig. Contract Date: Orig. Contract Number: Date New Item: Yes • . • Staff Review Form - Page 2 Vbrte arttier 3561X4(1 Lel•MT Description Comments: Budget Manager Accounting Manager City Attorney Purchasing Manager ADA Coordinator Internal Auditor Grants Coordinator Meeting Date N/A Reference Comments: FAYETTPVILLE THE CITY OF FAYETTEVILLE, ARKANSAS • To: Gary Dumas, Operations Director re, ‘ Thur: Connie Edmonston, Parks and Recreation Directofk te From: Dayld Wright, Recreation Superintendent At] Date: October 27, 2004 Re: White River Baseball Lighting Project Change Order Lillich Bossier, Inc., is currently under contract to replace the sports lighting at White River Baseball Complex for $250,000, with at $25,000 contingency. Two change orders are needed in order to complete the project. First, the height of the electrical panels needs to be raised. These ball fields are directly on the White River, which often floods. Raising the electrical panels to ten feet will reduce the chances of flood water reaching the panels and causing possibly thousands of dollars of repairs. The second change is necessary because of the condition of the soil at the facility is unsuitable to support these structures. Since the lights are so close to the river, there are several light poles requiring a special footing The majority of the light poles at the facility have the necessary rock around the concrete poles to support the structure. For proper support, these poles must be buried five feet into the shale. The closer to the river the drilling takes place, the deeper the drilling must occur to hit rock. There are four, of the sixteen, poles required be buried at sixteen feet. This extra depth and width of these holes, and the different support required is the reason for the increased price. These two change orders will cost the City of Fayetteville a total of $21,283.35. Raising the height of the electrical panels will cost $5,008.35, while the extra drilling and support will cost $16,275. With a contingency of $25,000, this will leave a remaining contingency balance of ' $3,716.65. Please find enclosed the supporting materials for this project and changes. If you have any questions concerning either of these, please call me at 481. • 10/19/2004 21:10 4795493972 • LILLICHRriceJ FR CHANGE PROPOSAL REQUEST PROJECT: White River Ballpark-13rojed 02080 OWNER: City of Fayetteingle Arkansas Attn: David Wright REASON FOR CHANG : Raise panel height per owner retmeet CR,PRS 001 DATE: 10/01/04 479-521-7714(0 PAGE 02 7456 DESCRIPTION QUANITY UNIT MATERIAL U/P MATERIAL EXTENSION CODE LABOR U/P LABOR EXTENSION CODE Subtotal Sales Tar/Payroll T & I Clean Up/Trash Removal Subtotals 9.13% 0.00 0.00 50.00 Total Materials and labor 2910% 6.O0% 0.00 0.00 0.00 80.00 $0.00 SUBCONTRACTOR CHANGE Broadway Electric w/ attachadment Total Suboontactor Charges UllIch 8 Bossier -OH 4 13 -Sub Ullich 8 Bossier -OH 8 13 Subtotal Performance Bond Cost TOTAL THIS CHANGE 5.00% 15.00% 84,704.00 $4,704.00 $235.20 50.00 54.93920 1.40% $69.15 55.008.361 Proposal by: Bossier L Bass Architect Acceptance n� Date: • • 10/19/2004 21:10 4795493972 • LILL ICHBFICCI FR • CHANGE PROPOSAL REQUEST PROJECT: White River Ballpark -Project 02060 OWNER: City of FayettewIle, Arkansas Attn: David Wright REASON FOR CHANGE: Increase foundation size due to unsuitable soil bearing. Copy of soil investigation, and pier base design attached CRIPR# 002 DATE: 10/1/04 479-521-7714 (1) PAGE 05 DESCRIPTION OUANITY UNIT MATERIAL U/P MATERIAL EXTENSION CODE LABOR U/P LABOR EXTENSION CODE Subtotal Sales Tax/Payroll T & I Olean Up/Trash Removal Subtotals 9.13% 0.00 0.00 30.00 Total Materials and Labor 29.00% 6.00% 0.00 0.00 0.00 30.00 30.00 SUBCONTRACTOR CHANGE Broadway Electric w/ attachedmeM Terracon-Soils Investigation Total Subcontactor Charges Ldlich & Bossier -ON & P -Sub LIllich & Bossier -OH & P Subtotal Performance Bond Cost TOTAL THIS CHANGE $14,000.00 31.500.00 315,500.00 5.00% 3775.00 15,00% saw $16,275.00 0.03% • 30.00 n16,275.001 Proposal by: LIN kr Robert L. ss Architect Acceptance Owner Acceptance David Wright Date: Data: