HomeMy WebLinkAbout51-04 RESOLUTION•
RESOLUTION NO. 51-04
A RESOLUTION APPROVING TASK ORDER NO. 4 WITH
McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT
OF $84,110.00 TO DESIGN AND PROVIDE ENGINEERING
SERVICES FOR THE EXTENSION OF TAXIWAY "A" TO MEET
THE EXTENSION OF TAXIWAY "E" AT THE FAYETTEVILLE
MUNICIPAL AIRPORT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Task Order No. 4 with McClelland Consulting Engineers in the
amount of $84,110.00 to design and provide engineering services for the
extension of *Taxiway "A" to meet the extension of Taxiway "E" at the
Fayetteville Municipal Airport.
PASSED and APPROVED this 6th day of April 2004.
SONDRA SMITH, City Clerk
APPROVED:
By:
DAN COODY, Mayor
TASK ORDER NO. 4
PARALLEL TAXIWAY EXTENSION
and CONNECTING TAXIWAY
FAYETTEVILLE MUNICIPAL AIRPORT
STATE OF ARKANSAS
COUNTY OF WASHINGTON
This Task Order is written pursuant to the basic agreement entitled CITY OF
FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on April
30, 2003. The referenced basic agreement pertains to proposed improvements to
Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed
4on the date indicated below the signature block, by and between the City of Fayetteville
and McClelland Consulting Engineers (ENGINEER) sets forth the project description,
project schedule, and engineering fees related to eastside parallel taxiway extension
and connecting taxiway, Fayetteville Municipal Airport, Drake Field.
SECTION I - PROJECT DESCRIPTION
The project is to consist of: detailed design and construction of the phase II of
development of the east parallel taxiway and connecting Taxiway "E" to the runway, a
distance of approximately 950 feet (with a minimum paved width of 50 feet).
JADRAKE FIELD \ CONTFtACTS \ 2003-2006 \TASK ORDER 4.DOC
SECTION II - PROJECT SCHEDULE
From the time the City of Fayetteville issues the Notice To Proceed (NTP), the
ENGINEER will endeavor to execute the project within the following time periods:
Task Completion After NTP
A. Detailed Design, Phase II 90 calendar days
B. Advertise for bids, Phase II 210 calendar days
SECTION III - SCOPE OF SERVICES
The ENGINEER shall, generally, provide those services listed in the basic agreement
which are applicable to this specific Task Order. Specifically, the project is to include:
A. Meeting with the City of Fayetteville to discuss sources of funding and an
implementation schedule for each phase of construction.
B. Performing the detailed design of the Phase II construction project as
determined by the City of Fayetteville.
C. Coordinating with the U.S. Forestry Service, Federal Aviation Administration
and the Arkansas State Department of Aeronautics to secure their review of
the proposed project.
D. Advertising for competitive bids and recommending the award of a
construction contract for Phase 11.
E Construction administration and inspection for Phase II.
F. Construction staking for a baseline for Phase II.
G. Construction materials testing for Phase II.
H. Providing a set of Record Drawings" for Phase 11 at the completion of
construction based upon the Contractor's mark-ups.
JADRAKE FIELD \ CONTRACTS \2003-2006 \TASK ORDER 4.DOC 2
SECTION IV - FEES AND PAYMENTS
The following fees are to be paid to the Engineer as compensation for his services:
A. Detailed Plans & Specs for Phase II: a lump sum of $26,000.
B. Coordination with Regulatory Agencies: hourly rates, estimated to be $ 1,250.
C. Bidding Service: a lump sum of $ 2,640.
D. Construction Administration & Inspection:
Const. Administration
Construction Observation
Record Drawings:
a lump sum of $ 2,320.
hourly rates, estimated to be $37,500.
a lump sum of $ 1,600.
E Construction Staking: a lump sum of $ 550
F. Construction materials testing: hourly rates & unit prices, estimated to be $12,250.
Appendix A presents the basis of payments to the ENGINEER.
Appendix B presents hourly rates for personnel anticipated to be assigned to this
project by the ENGINEER.
Appendix C presents the hourly rates and unit price basis of payments to the
ENGINEER for Construction Materials Testing for this project.
SECTION V - BASIC AGREEMENT IN EFFECT:
Except as amended specifically herein, the basic AGREEMENT FOR
ENGINEERING SERVICES shall remain in full force as originally approved and
executed.
JADRAKE FIELD \CONTRACTSU003-2006 \TASK ORDER 4.DOC
•
•
IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly
executed as of the date arid year first her
FOR THE CITY OF FAYETTEVILL
By:
Date:
Mayor
•-•-••••••
FOR McCLELLAND CONSULTING ENGINEERS, INC.:
Date: 3 fQ -021
JADRAKE FIELD \CONTRACTS \ 2003-2006 \TASK ORDER 4.D0C
Attest:
JADRAKE FIELD \ CONTRACTS12003-2006Vee sheets1TO 4 FEE.wb3
W
m
m
0
0
0
110
A
r
z
m
[GRAND TOTAL, ENGINEERING SERVICES
I SUBTOTAL, CONSTRUCTION PHASE
'CONSTRUCTION MLS TESTING
'CONSTRUCTION STAKING
1 RECORD DRAWINGS
1 CONSTR. INSPECTION
1 CONSTR. ADMINISTRATION
'CONSTR. ADMIN. AND INSPECTION
m
5
0
E
0
'COORDINATION WITH REGULATORY AGENCIES
SUBTOTAL, DETAILED DESIGN PHASE
REVISIONS TO CONTRACT DOCUMENTS
REVIEW MEETINGS WITH AIRPORT
IN-HOUSE QA REVIEWS
DETAILED COST ESTIMATE
FINAL QUANTITIES
SPECIFICATIONS
PREPARE CONSTR. MATERIALS TESTING PLAN
STRIPING PLAN
PAVEMENT DETAILS
PAVEMENT JOINTING PLAN
EROSION CONTROL PLAN
DRAINAGE PLAN FOR TAXIWAY
GRADING PLAN FOR TAXIWAY
SITE PLAN FOR TAXIWAY
8
m
A
'DETAILED DESIGN
TASK DESCRIPTION
n
E
io I
N
N
M
N
...
-.
_.
PROJECT
DIRECTOR
1120.00
M
C--I
-•
''.
PROJECT
MGRJENGR.
1105.00
NI
CD
-4
N
M
a00
a
N
43;
I OL I
I 141
313343”170.8133aNata3
j 12
8170.33
PROJECT
ENGINEER
$80.00
N
+
-.
0
ENGINEERING
TECHNICIAN
158.00
N
o
a
a
m
m
mm
-....4
0
-00
gm>
opO
b 0
o-•
t
-4
-4
g
R.I.
mommr.,m
y
GADD
OPER. 2
150.00
-.
0
m
12
m
2
8
m
mmomm
OL 1
w
GADD
OPER. 3
$40.00
-.
-.
0
LICENSED
SURVEYOR
170.00
a
a
a
0
00•0014
M3213
A3ANDS
a
m
m
mm
14
m
CD
1‘.)
to
1 24
CLERK
TYPIST
140.00
650
650
650
0
INSPECTOR
148.00
S
e
8
m
0
MILEAGE
10.35
e
S
.
0
«
e
6
0
m
c
co
me)
no
z
11744
««
-.
...
les
p
g
-.
_.
h
g
g
m
p
8
442'
0
ggg
m
0
w
6
o
«
"
-.4
m
g
Qt
0300
ggg
iA
.2
4*ca
"
o
6
0
DIRECT
EXPENSE
g
bMN
C
42
g
152,468.501
512.245.001
V
2
g
6,
013.4
828
ggg
m
03
m
N
t
.
0
0
m
+
`k.'
.
0
0
m
m
C
. 1
0
0
64
W
-,.,
6
0
I 1602.501
m
0,w
t..mam
6666666666660
00000001=200000
E
6461
-9.,
"-•
Olvi
to
in
O.
kl.---4,.
o
.63.
o
411
(A
SI
w
a
403
-tea
m
fa
-v.);
m
CA
EXTENDED
. TOTAL
•
APPENDIX B
•
Hourly Rates for Personnel
Drake Field, Fayetteville Municipal Airport
CATEGORY
Project Director
Project Manager
Project Engineer
Design Engineer II
Design Engineer I
Registered Surveyor
Computer Technician
Senior Engineering Technician/Observer
Engineering Technician/Observer
Junior Engineering Technician
Survey Crew (2 man)
Clerical Support
CADD Technician III
CADD Technician II
CADD Technician I
Soils Lab Supervisor
Soils Technician II
Soils Technician I
JADRAKE FIELD \CONTRACTS \2003-2006 \Appendix B T04.doc
BILLABLE HOURLY
RATE RANGE
$105 to $130
$85 to $105
$70 to $85
$50 to $75
$40 to $55
$40 to $55
$46 to $55
$55 to $70
$40 to $55
$30 to $45
$55 to $68
$22 to $38
$50 to $60
$40 to $50
$25 to $40
$35 to $45
$30 to $35
$25 to $30
•
•
APPENDIX C
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
TASK ORDER NO. 4
GENERAL:
Laboratory Field Technician
AHTD-Qualified Technician*
Engineering Technician *
Senior Engineering Technician
Lab Supervisor
Consultation:
Lab Supervisor
Field Engineer
Project Engineer
Project Manager
Principal Engineer
Lab Report Preparation
SOILS:
AHTD-Qualified Field Technician
Soils Field Technician (1 -hour minimum)
In -Place Compaction Test -Nuclear Gauge ASTM D 2922
Sample Pickup
Nuclear Density Gauge Fee (per project, per day)
Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318
Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140
Sieve Analysis -Dry ASTM D 422
Hydrometer Analysis ASTM D 422
Specific Gravity ASTM D 854
Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145
Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99
Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180
Potential Volume Change -Swell Pressure
California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional)
Shrinkage ASTM D 427
Soil Bearing Capacity (Engineering Tech., 2 -hour minimum)
Non -ASTM Procedures Available On Request
CONCRETE:
Concrete Mix Design
Review Concrete Mix Design (Lab Supervisor)
Confirm Concrete Mix Design
Concrete Field Technician * (1 -hour minimum): [For any of the following 6 items]
• Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138
• Concrete Cylinder or Beam Molding ASTM C 31
• Concrete Cylinder or Beam Pickup
• Concrete Slump Test ASTM C 143
• Concrete Air Content Test ASTM C 231 or C 173
• Cement Mortar or Group Sampling
AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items]
Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap)
Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped)
Spare Cylinders Specimens Processed but not Tested
Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum)
JAIDPAKE FIELOCONTRACTS12033-2000LAPPENDIX C /04 DOCIm
ACI Grade I Concrete Field Testing Technician
$ 35.00 per hour
40.00 per hour
48.00 per hour
62.00 per hour
45.00 per hour
45.00 per hour
75.00 per hour
85.00 per hour
105.00 per hour
120.00 per hour
35.00 per hour
40.00 per hour
35.00 per hour
20.00 each
50.00 each
35.00 per sieve
8.00 per sieve
90.00 each
50.00 each
110.00 each
120.00 each
135.00 each
100.00 each
150.00 each
50.00 each
45.00 per hour
Price on Request
45.00 per hour
Price on Request
35.00 per hour
40.00 per hour
15.00 each
20.00 each
10.00 each
45.00 per hour
Page 1 of 2
•
APPENDIX C
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
TASK ORDER NO. 4
GENERAL:
Laboratory Field Technician
AITD-Qualified Technician*
Engineering Technician *
Senior Engineering Technician
Lab Supervisor
Consultation:
Lab Supervisor
Field Engineer
Project Engineer
Project Manager
Principal Engineer
Lab Report Preparation
SOILS:
AITD-Qualified Field Technician
Soils Field Technician (1 -hour minimum)
In -Place Compaction Test -Nuclear Gauge ASTM D 2922
Sample Pickup
Nuclear Density Gauge Fee (per project, per day)
Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318
Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140
Sieve Analysis -Dry ASTM D 422
Hydrometer Analysis ASTM D 422
Specific Gravity ASTM D 854
Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145
Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99
Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180
Potential Volume Change -Swell Pressure
California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional)
Shrinkage ASTM D 427
Soil Bearing Capacity (Engineering Tech., 2 -hour minimum)
Non -ASTM Procedures Available On Request
CONCRETE:
Concrete Mix Design
Review Concrete Mix Design (Lab Supervisor)
Confirm Concrete Mix Design
Concrete Field Technician (1 -hour minimum): [For any of the follovving 6 items]
• Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138
• Concrete Cylinder or Beam Molding ASTM C 31
• Concrete Cylinder or Beam Pickup
• Concrete Slump Test ASTM C 143
• Concrete Air Content Test ASTM C 231 or C 173
• Cement Mortar or Group Sampling
AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items]
Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap)
Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped)
Spare Cylinders Specimens Processed but not Tested
Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum)
J %DRAKE FIEL TRACTSI2003.200MAPPENC4X C TO4 DOC jm
ACI Grade !Concrete Field Testing Technician
$ 35.00
40.00
48.00
6200.
45.00
45.00
75.00
85.00
105.00
120.00
35.00
per hour
per hour
per hour
per hour
per hour
per hour
per hour
per hour
per hour
per hour
per hour
40.00 per hour
35.00 per hour
20.00 each
50.00 each
35.00 per sieve
8.00 per sieve
90.00 each
50.00 each
110.00 each
120.00 each
135.00 each
100.00 each
150.00 each
50.00 each
45.00 per hour
Price on Request
45.00 per hour
Price on Request
35.00 per hour
40.00 per hour
15.00 each
2000.each
10.00 each
45.00 per hour
Page 1 of 2
•
NAME OF FILE: Resolution No. 51-04
w/Task Order No. 4
CROSS REFERENCE:
Item #
Date
Document
•
1
03/19/04
memo to mayor & city council
2
draft resolution
3
03/18/04
letter to Ray Boudreaux
4
03/24/04
Staff Review Form
memo to Ray Boudreaux
NOTES:
FAYETTEWLLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DAN COODY, MAYOR
TO:
THRU:
FROM:
DATE:
SUBJECT:
•
5 1 -401
/ne,C 61 aytei/ artekr
4. el/ nir for
MEMORANDUM
Dan Coody, Mayor
Staff Contract Review Committee
Ray M. Boudreaux, Director, Aviation and Economic evefopment
March 19, 2004
Approval of Task Order #4 with McClelland Consulting Engineers, Inc. for design
and engineering services associated with Parallel Taxiway "A" extension and
connecting Taxiway "E" construction.
Requested Action: Approve Task Order #4 with McClelland Consulting Engineers, Inc. in the
amount of $84,110.00 for the design, advertising, bid administration, construction oversight and
contract administration for Taxiway "A" extension with Taxiway "E" connection pursuant to
AIP#32 in the amount of $84,110.00.
Discussion: Task Order #4 to McClelland Consulting Engineers, Inc. is to design and provide
engineering services to the Fayetteville Municipal Airport, Drake Field for the extension of Taxiway "A" to
the South to meet the new extension of Taxiway "E" east of the runway. The FAA has agreed to award a
grant AIP #32 for this project.
Budget Considerations This contract will be paid for with the proceeds of AIP #32 covering 95%
of the project and the State of Arkansas Department grant for the remaining 5% of the project.
Attachments: Task Order #4
Staff Review Form
Aviation and Economic Development Department
Fayetteville Municipal Airport, Drake Field
4500 South School Avenue, Suite F
Fayetteville, Arkansas 72701
Ray M. Boudreaux, Director
RESOLUTION NO.
A RESOLUTION APPROVING TASK ORDER NO. 4 WITH
McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT
OF $84,110.00 TO DESIGN AND PROVIDE ENGINEERING
SERVICES FOR THE EXTENSION OF TAXIWAY "A" TO MEET
THE EXTENSION OF TAXIWAY "E" AT THE FAYETTEVILLE
MUNICIPAL AIRPORT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves Task Order No. 4 with McClelland Consulting Engineers-inifile
amount of $84,110.00 to design and provide engineering service's '67 ttie
extension of Taxiway "A" to meet the extension of 1 at the
Fayetteville Municipal Airport.
PASSED and APPROVED this 6th day of April 2004.
APPROVED:
A I liEST.
By
ONDIA SMITH, City Clerk
AIN COODY, Mayor
•
MtECONSULTING
McCLELLAND
I DESIGNED To SERVE I ENGINEERS, INC.
•
PO. Box 1229
Fayetteville, Arkansas 72702-1229
479-443-2377
FAX 479-443-9241
March 18, 2004
Mr. Ray Boudreaux
Airport Manager,
Fayetteville Municipal Airport
4500 S. School Suite F
Fayetteville, AR 72701
RECEIVED
MAR 1 6 2004
AIRPORT
Re: East Side Taxiway Extension
Fayetteville Municipal Airport
Dear Mr. Boudreaux:
In response to your request, please find three (3) copies of Task Order No. 4 for the
above referenced project.
Please advise if you need further information regarding this Task Order. Thank you for
this opportunity to extend our services.
Sincerely,
E { ANDJC�NSULTING ENGINEERS, INC.
Way nes, P E
Vice P si ent
Enclosure: Task Order No. 4 (3 copies)
J:\2004\042110\correspondence\boudreaux-0328.wpd:ch
TASK ORDER NO. 4
PARALLEL TAXIWAY EXTENSION
and CONNECTING TAXIWAY
FAYETTEVILLE MUNICIPAL AIRPORT
STATE OF ARKANSAS
COUNTY OF WASHINGTON
This Task Order is written pursuant to the basic agreement entitled CITY OF
FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on April
30, 2003. The referenced basic agreement pertains to proposed improvements to
Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed
on the date indicated below the signature block, by and between the City of Fayetteville
and McClelland Consulting Engineers (ENGINEER) sets forth the project description,
project schedule, and engineering fees related to eastside parallel taxiway extension
and connecting taxiway, Fayetteville Municipal Airport, Drake Field.
SECTION I - PROJECT DESCRIPTION
The project is to consist of: detailed design and construction of the phase II of
development of the east parallel taxiway and connecting Taxiway "E" to the runway, a
distance of approximately 950 feet (with a minimum paved width of 50 feet).
JADRAKE FIELD \ CONTRACTS \ 2003-2006 \ TASK ORDER 4.DOC
SECTION II - PROJECT SCHEDULE
From the time the City of Fayetteville issues the Notice To Proceed (NTP), the
ENGINEER will endeavor to execute the project within the following time periods:
Task Completion After NTP
A. Detailed Design, Phase II 90 calendar days
B. Advertise for bids, Phase II 210 calendar days
SECTION III - SCOPE OF SERVICES
The ENGINEER shall, generally, provide those services listed in the basic agreement
which are applicable to this specific Task Order. Specifically, the project is to include:
A. Meeting with the City of Fayetteville to discuss sources of funding and an
implementation schedule for each phase of construction.
B. Performing the detailed design of the Phase II construction project as
determined by the City of Fayetteville.
C. Coordinating with the U.S. Forestry Service, Federal Aviation Administration
and the Arkansas State Department of Aeronautics to secure their review of
the proposed project.
D. Advertising for competitive bids and recommending the award of a
construction contract for Phase II.
E Construction administration and inspection for Phase II.
F. Construction staking for a baseline for Phase II.
G. Construction materials testing for Phase II.
H. Providing a set of "Record Drawings" for Phase II at the completion of
construction based upon the Contractor's mark-ups.
JADRAKE FIELD \CONTRACTS \ 2003-2006 \TASK ORDER 4.DOC 2
SECTION IV - FEES AND PAYMENTS
The following fees are to be paid to the Engineer as compensation for his services:
A. Detailed Plans & Specs for Phase II: a lump sum of $26,000.
B. Coordination with Regulatory Agencies: hourly rates, estimated to be $ 1,250.
C. Bidding Service: a lump sum of $ 2,640.
D. Construction Administration & Inspection:
Const. Administration
Construction Observation
Record Drawings:
a lump sum of $ 2,320.
hourly rates, estimated to be $37,500.
a lump sum of $ 1,600.
E Construction Staking: a lump sum of $ 550
F. Construction materials testing: hourly rates & unit prices, estimated to be $12,250.
Appendix A presents the basis of payments to the ENGINEER.
Appendix B presents hourly rates for personnel anticipated to be assigned to this
project by the ENGINEER.
Appendix C presents the hourly rates and unit price basis of payments to the
ENGINEER for Construction Materials Testing for this project.
SECTION V - BASIC AGREEMENT IN EFFECT:
Except as amended specifically herein, the basic AGREEMENT FOR
ENGINEERING SERVICES shall remain in full force as originally approved and
executed.
JADRAKE FIELD \ CONTRACTS \2003-2006 \TASK ORDER 4.DOC
IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly
executed as of the date and year first herein written.
FOR THE CITY OF FAYETTEVILLE:
By: Attest:
Mayor
Date:
FOR McCLELLAND CONSULTING ENGINEERS, INC.:
By:
V e Pr sident
Date: M .-044
JADRAKE FIELD \CONTRACTS.2003-2006 \TASK ORDER 4.DOC
Attest:
JADRAKE FIELD1CONTRACTS12003-20062ee sheets \ TO 4 FEE.w133
0
0
3.11: 0
-crn
WT•
rocamm
rnExmm
E >ozr"
z
coo -1
z xmg
agm x
ro-
> ZOO>
r
100>-1
11▪ Z M
MY fri
Z
0
11
0
.
m
m
0
0
ED
11.
>
r
z
m
GRAND TOTAL, ENGINEERING SERVICES
L SUBTOTAL, CONSTRUCTION PHASE
LCONSTRUCT1ON FATLS TESTING
[CONSTRUCTION STAKING
1 RECORD DRAWINGS
1 CONSTR. INSPECTION
1 CONSTR. ADMINISTRATION
!CONSTR. ADMIN. AND INSPECTION
[BIDDING
[COORDINATION WITH REGULATORY AGENCIES
1 SUBTOTAL, DETAILED DESIGN PHASE
REVISIONS TO CONTRACT DOCUMENTS
1 REVIEW MEETINGS WITH AIRPORT
1 IN-HOUSE tK REVIEWS
1 DETAILED COST ESTIMATE
FINAL QUANTITIES
1 SPECIFICATIONS
1 PREPARE CONSTR. MATERIALS TESTING PLAN
1 STRIPING PLAN
1 PAVEMENT DETAILS
PAVEMENT JOINTING PLAN
1 EROSION CONTROL PLAN
DRAINAGE PLAN FOR TAXIWAY
1 GRADING PLAN FOR TAXIWAY
1 COVER
1 SITE PLAN FOR TAXIWAY
!DETAILED DESIGN
TASK DESCRIPTION
?
10
m
m
m
.
m
..
.
.
PROJECT
DIRECTOR
$120.00
59
17
.
mmm
m
m
42 I
PROJECT
MGRJENGR.
1105.00
213
--4
co
a
I 40 I
I 20 I
I 18
am
141
mmamn'flmm
0,-....-hc
mom
PROJECT
ENGINEER
$130.00
.
e
m
I 12 I
ENGINEERING
TECHNICIAN
1513.00
m
m
a
I 4 I
.
m
m
mm
-.m
-.
0
-0 0
Sill>
e?)0
6 0
e"
t
--4
I 7 I
m
m
-&
m
mmommom
GADD
OPER.
150.00
..
e
a
.-.;
r.)
2
I 20
a
01.208m8m
GADD
OPER. 3
940.00
,
,
0
LICENSED
SURVEYOR
170.00
a
a
a
I (1
SURVEY
CREW
1100.00
a
0
0
0”
I 14
0
r
0
NN'11
CLERK
TYPIST
$42.00
650
E
1 650
0
INSPECTOR
Kum
g
0
s
S
MILEAGE
$0.35
o
P
0
0
••
o
6
o
m
c
m
Mel
MO
z
fol
,
,
i
«
P
g
«
9
8
n
88g8
0mo
a
b
0
«
.4
a
g
Ing
ggg
a
N>
0
6
o
DIRECT
EXPENSE
152,468.501
m
P0
-w
0
g
E
-.
g
4°
-2:
0
g
$35.762.501
n
k),
0
g
6.
0
"
w
a
b
o
11,2T-10.00
m
«
- "
0
a
a
6
0
1 53.258.501
m-64.!`)Nmr.tro
8829
ms.mmommomplo..s
60600666
0000000O
«
44«
888;:l
«««««
0O
214
1 $345.001
1 $1,730.00.1
EXTENDED
TOTAL
0
0
3.11: 0
-crn
WT•
rocamm
rnExmm
E >ozr"
z
coo -1
z xmg
agm x
ro-
> ZOO>
r
100>-1
11▪ Z M
MY fri
Z
0
11
0
•
APPENDIX B
•
Hourly Rates for Personnel
Drake Field, Fayetteville Municipal Airport
CATEGORY
Project Director
Project Manager
Project Engineer
Design Engineer II
Design Engineer I
Registered Surveyor
Computer Technician
Senior Engineering Technician/Observer
Engineenng Technician/Observer
Junior Engineering Technician
Survey Crew (2 man)
Clerical Support
GADD Technician III
GADD Technician II
GADD Technician I
Soils Lab Supervisor
Soils Technician II
Soils Technician I
JADRAKE FIELD \CONTRACTS \2003-2006 \Appendix B T04.doc
BILLABLE HOURLY
RATE RANGE
$105 to $130
$85 to $105
$70 to $85
$50 to $75
$40 to $55
$40 to $55
$46 to $55
$55 to $70
$40 to $55
$30 to $45
$55 to $68
$22 to $38
$50 to $60
$40 to $50
$25 to $40
$35 to $45
$30 to $35
$25 to $30
•
•
APPENDIX C
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
TASK ORDER NO. 4
GENERAL:
Laboratory Field Technician
AHTD-Qualified Technician*
Engineering Technician
Senior Engineering Technician
Lab Supervisor
Consultation:
Lab Supervisor
Field Engineer
Project Engineer
Project Manager
Principal Engineer
Lab Report Preparation
SOILS:
AITD-Qualified Field Technician
Soils Field Technician (1 -hour minimum)
In -Place Compaction Test -Nuclear Gauge ASTM D 2922
Sample Pickup
Nuclear Density Gauge Fee (per project, per day)
Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318
Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140
Sieve Analysis -Dry ASTM D 422
Hydrometer Analysis ASTM D 422
Specific Gravity ASTM D 854
Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145
Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99
Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180
Potential Volume Change -Swell Pressure
California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional)
Shrinkage ASTM D 427
Soil Bearing Capacity (Engineering Tech., 2 -hour minimum)
Non -ASTM Procedures Available On Request
CONCRETE.
Concrete Mix Design
Review Concrete Mix Design (Lab Supervisor)
Confirm Concrete Mix Design
Concrete Field Technician * (1 -hour minimum): [For any of the following 6 items:]
• Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138
• Concrete Cylinder or Beam Molding ASTM C 31
• Concrete Cylinder or Beam Pickup
• Concrete Slump Test ASTM C 143
• Concrete Air Content Test ASTM C 231 or C 173
• Cement Mortar or Group Sampling
AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items]
Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap)
Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped)
Spare Cylinders Specimens Processed but not Tested
Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum)
* ACI Grade I Concrete Field Testing Technician
JADRAKE FIELOCONTRACTS12003-20001APPENDIX C104 00C Jim
$ 35.00 per hour
40.00 per hour
48.00 per hour
62.00 per hour
45.00 per hour
45.00 per hour
75.00 per hour
85.00 per hour
105.00 per hour
120.00 per hour
35.00 per hour
40.00 per hour
35.00 per hour
20.00 each
50.00 each
35.00 per sieve
8.00 per sieve
90.00 each
50.00 each
110.00 each
120.00 each
135.00 each
100.00 each
150.00 each
50.00 each
45.00 per hour
Price on Request
45.00 per hour
Price on Request
35.00 per hour
40.00 per hour
15.00 each
20.00 each
10.00 each
45.00 per hour
Page 1 of 2