Loading...
HomeMy WebLinkAbout51-04 RESOLUTION• RESOLUTION NO. 51-04 A RESOLUTION APPROVING TASK ORDER NO. 4 WITH McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $84,110.00 TO DESIGN AND PROVIDE ENGINEERING SERVICES FOR THE EXTENSION OF TAXIWAY "A" TO MEET THE EXTENSION OF TAXIWAY "E" AT THE FAYETTEVILLE MUNICIPAL AIRPORT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 4 with McClelland Consulting Engineers in the amount of $84,110.00 to design and provide engineering services for the extension of *Taxiway "A" to meet the extension of Taxiway "E" at the Fayetteville Municipal Airport. PASSED and APPROVED this 6th day of April 2004. SONDRA SMITH, City Clerk APPROVED: By: DAN COODY, Mayor TASK ORDER NO. 4 PARALLEL TAXIWAY EXTENSION and CONNECTING TAXIWAY FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on April 30, 2003. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed 4on the date indicated below the signature block, by and between the City of Fayetteville and McClelland Consulting Engineers (ENGINEER) sets forth the project description, project schedule, and engineering fees related to eastside parallel taxiway extension and connecting taxiway, Fayetteville Municipal Airport, Drake Field. SECTION I - PROJECT DESCRIPTION The project is to consist of: detailed design and construction of the phase II of development of the east parallel taxiway and connecting Taxiway "E" to the runway, a distance of approximately 950 feet (with a minimum paved width of 50 feet). JADRAKE FIELD \ CONTFtACTS \ 2003-2006 \TASK ORDER 4.DOC SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), the ENGINEER will endeavor to execute the project within the following time periods: Task Completion After NTP A. Detailed Design, Phase II 90 calendar days B. Advertise for bids, Phase II 210 calendar days SECTION III - SCOPE OF SERVICES The ENGINEER shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, the project is to include: A. Meeting with the City of Fayetteville to discuss sources of funding and an implementation schedule for each phase of construction. B. Performing the detailed design of the Phase II construction project as determined by the City of Fayetteville. C. Coordinating with the U.S. Forestry Service, Federal Aviation Administration and the Arkansas State Department of Aeronautics to secure their review of the proposed project. D. Advertising for competitive bids and recommending the award of a construction contract for Phase 11. E Construction administration and inspection for Phase II. F. Construction staking for a baseline for Phase II. G. Construction materials testing for Phase II. H. Providing a set of Record Drawings" for Phase 11 at the completion of construction based upon the Contractor's mark-ups. JADRAKE FIELD \ CONTRACTS \2003-2006 \TASK ORDER 4.DOC 2 SECTION IV - FEES AND PAYMENTS The following fees are to be paid to the Engineer as compensation for his services: A. Detailed Plans & Specs for Phase II: a lump sum of $26,000. B. Coordination with Regulatory Agencies: hourly rates, estimated to be $ 1,250. C. Bidding Service: a lump sum of $ 2,640. D. Construction Administration & Inspection: Const. Administration Construction Observation Record Drawings: a lump sum of $ 2,320. hourly rates, estimated to be $37,500. a lump sum of $ 1,600. E Construction Staking: a lump sum of $ 550 F. Construction materials testing: hourly rates & unit prices, estimated to be $12,250. Appendix A presents the basis of payments to the ENGINEER. Appendix B presents hourly rates for personnel anticipated to be assigned to this project by the ENGINEER. Appendix C presents the hourly rates and unit price basis of payments to the ENGINEER for Construction Materials Testing for this project. SECTION V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. JADRAKE FIELD \CONTRACTSU003-2006 \TASK ORDER 4.DOC • • IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date arid year first her FOR THE CITY OF FAYETTEVILL By: Date: Mayor •-•-•••••• FOR McCLELLAND CONSULTING ENGINEERS, INC.: Date: 3 fQ -021 JADRAKE FIELD \CONTRACTS \ 2003-2006 \TASK ORDER 4.D0C Attest: JADRAKE FIELD \ CONTRACTS12003-2006Vee sheets1TO 4 FEE.wb3 W m m 0 0 0 110 A r z m [GRAND TOTAL, ENGINEERING SERVICES I SUBTOTAL, CONSTRUCTION PHASE 'CONSTRUCTION MLS TESTING 'CONSTRUCTION STAKING 1 RECORD DRAWINGS 1 CONSTR. INSPECTION 1 CONSTR. ADMINISTRATION 'CONSTR. ADMIN. AND INSPECTION m 5 0 E 0 'COORDINATION WITH REGULATORY AGENCIES SUBTOTAL, DETAILED DESIGN PHASE REVISIONS TO CONTRACT DOCUMENTS REVIEW MEETINGS WITH AIRPORT IN-HOUSE QA REVIEWS DETAILED COST ESTIMATE FINAL QUANTITIES SPECIFICATIONS PREPARE CONSTR. MATERIALS TESTING PLAN STRIPING PLAN PAVEMENT DETAILS PAVEMENT JOINTING PLAN EROSION CONTROL PLAN DRAINAGE PLAN FOR TAXIWAY GRADING PLAN FOR TAXIWAY SITE PLAN FOR TAXIWAY 8 m A 'DETAILED DESIGN TASK DESCRIPTION n E io I N N M N ... -. _. PROJECT DIRECTOR 1120.00 M C--I -• ''. PROJECT MGRJENGR. 1105.00 NI CD -4 N M a00 a N 43; I OL I I 141 313343”170.8133aNata3 j 12 8170.33 PROJECT ENGINEER $80.00 N + -. 0 ENGINEERING TECHNICIAN 158.00 N o a a m m mm -....4 0 -00 gm> opO b 0 o-• t -4 -4 g R.I. mommr.,m y GADD OPER. 2 150.00 -. 0 m 12 m 2 8 m mmomm OL 1 w GADD OPER. 3 $40.00 -. -. 0 LICENSED SURVEYOR 170.00 a a a 0 00•0014 M3213 A3ANDS a m m mm 14 m CD 1‘.) to 1 24 CLERK TYPIST 140.00 650 650 650 0 INSPECTOR 148.00 S e 8 m 0 MILEAGE 10.35 e S . 0 « e 6 0 m c co me) no z 11744 «« -. ... les p g -. _. h g g m p 8 442' 0 ggg m 0 w 6 o « " -.4 m g Qt 0300 ggg iA .2 4*ca " o 6 0 DIRECT EXPENSE g bMN C 42 g 152,468.501 512.245.001 V 2 g 6, 013.4 828 ggg m 03 m N t . 0 0 m + `k.' . 0 0 m m C . 1 0 0 64 W -,., 6 0 I 1602.501 m 0,w t..mam 6666666666660 00000001=200000 E 6461 -9., "-• Olvi to in O. kl.---4,. o .63. o 411 (A SI w a 403 -tea m fa -v.); m CA EXTENDED . TOTAL • APPENDIX B • Hourly Rates for Personnel Drake Field, Fayetteville Municipal Airport CATEGORY Project Director Project Manager Project Engineer Design Engineer II Design Engineer I Registered Surveyor Computer Technician Senior Engineering Technician/Observer Engineering Technician/Observer Junior Engineering Technician Survey Crew (2 man) Clerical Support CADD Technician III CADD Technician II CADD Technician I Soils Lab Supervisor Soils Technician II Soils Technician I JADRAKE FIELD \CONTRACTS \2003-2006 \Appendix B T04.doc BILLABLE HOURLY RATE RANGE $105 to $130 $85 to $105 $70 to $85 $50 to $75 $40 to $55 $40 to $55 $46 to $55 $55 to $70 $40 to $55 $30 to $45 $55 to $68 $22 to $38 $50 to $60 $40 to $50 $25 to $40 $35 to $45 $30 to $35 $25 to $30 • • APPENDIX C CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 4 GENERAL: Laboratory Field Technician AHTD-Qualified Technician* Engineering Technician * Senior Engineering Technician Lab Supervisor Consultation: Lab Supervisor Field Engineer Project Engineer Project Manager Principal Engineer Lab Report Preparation SOILS: AHTD-Qualified Field Technician Soils Field Technician (1 -hour minimum) In -Place Compaction Test -Nuclear Gauge ASTM D 2922 Sample Pickup Nuclear Density Gauge Fee (per project, per day) Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318 Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140 Sieve Analysis -Dry ASTM D 422 Hydrometer Analysis ASTM D 422 Specific Gravity ASTM D 854 Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145 Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99 Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180 Potential Volume Change -Swell Pressure California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional) Shrinkage ASTM D 427 Soil Bearing Capacity (Engineering Tech., 2 -hour minimum) Non -ASTM Procedures Available On Request CONCRETE: Concrete Mix Design Review Concrete Mix Design (Lab Supervisor) Confirm Concrete Mix Design Concrete Field Technician * (1 -hour minimum): [For any of the following 6 items] • Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 • Concrete Cylinder or Beam Molding ASTM C 31 • Concrete Cylinder or Beam Pickup • Concrete Slump Test ASTM C 143 • Concrete Air Content Test ASTM C 231 or C 173 • Cement Mortar or Group Sampling AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items] Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap) Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped) Spare Cylinders Specimens Processed but not Tested Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum) JAIDPAKE FIELOCONTRACTS12033-2000LAPPENDIX C /04 DOCIm ACI Grade I Concrete Field Testing Technician $ 35.00 per hour 40.00 per hour 48.00 per hour 62.00 per hour 45.00 per hour 45.00 per hour 75.00 per hour 85.00 per hour 105.00 per hour 120.00 per hour 35.00 per hour 40.00 per hour 35.00 per hour 20.00 each 50.00 each 35.00 per sieve 8.00 per sieve 90.00 each 50.00 each 110.00 each 120.00 each 135.00 each 100.00 each 150.00 each 50.00 each 45.00 per hour Price on Request 45.00 per hour Price on Request 35.00 per hour 40.00 per hour 15.00 each 20.00 each 10.00 each 45.00 per hour Page 1 of 2 • APPENDIX C CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 4 GENERAL: Laboratory Field Technician AITD-Qualified Technician* Engineering Technician * Senior Engineering Technician Lab Supervisor Consultation: Lab Supervisor Field Engineer Project Engineer Project Manager Principal Engineer Lab Report Preparation SOILS: AITD-Qualified Field Technician Soils Field Technician (1 -hour minimum) In -Place Compaction Test -Nuclear Gauge ASTM D 2922 Sample Pickup Nuclear Density Gauge Fee (per project, per day) Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318 Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140 Sieve Analysis -Dry ASTM D 422 Hydrometer Analysis ASTM D 422 Specific Gravity ASTM D 854 Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145 Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99 Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180 Potential Volume Change -Swell Pressure California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional) Shrinkage ASTM D 427 Soil Bearing Capacity (Engineering Tech., 2 -hour minimum) Non -ASTM Procedures Available On Request CONCRETE: Concrete Mix Design Review Concrete Mix Design (Lab Supervisor) Confirm Concrete Mix Design Concrete Field Technician (1 -hour minimum): [For any of the follovving 6 items] • Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 • Concrete Cylinder or Beam Molding ASTM C 31 • Concrete Cylinder or Beam Pickup • Concrete Slump Test ASTM C 143 • Concrete Air Content Test ASTM C 231 or C 173 • Cement Mortar or Group Sampling AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items] Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap) Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped) Spare Cylinders Specimens Processed but not Tested Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum) J %DRAKE FIEL TRACTSI2003.200MAPPENC4X C TO4 DOC jm ACI Grade !Concrete Field Testing Technician $ 35.00 40.00 48.00 6200. 45.00 45.00 75.00 85.00 105.00 120.00 35.00 per hour per hour per hour per hour per hour per hour per hour per hour per hour per hour per hour 40.00 per hour 35.00 per hour 20.00 each 50.00 each 35.00 per sieve 8.00 per sieve 90.00 each 50.00 each 110.00 each 120.00 each 135.00 each 100.00 each 150.00 each 50.00 each 45.00 per hour Price on Request 45.00 per hour Price on Request 35.00 per hour 40.00 per hour 15.00 each 2000.each 10.00 each 45.00 per hour Page 1 of 2 • NAME OF FILE: Resolution No. 51-04 w/Task Order No. 4 CROSS REFERENCE: Item # Date Document • 1 03/19/04 memo to mayor & city council 2 draft resolution 3 03/18/04 letter to Ray Boudreaux 4 03/24/04 Staff Review Form memo to Ray Boudreaux NOTES: FAYETTEWLLE THE CITY OF FAYETTEVILLE, ARKANSAS DAN COODY, MAYOR TO: THRU: FROM: DATE: SUBJECT: • 5 1 -401 /ne,C 61 aytei/ artekr 4. el/ nir for MEMORANDUM Dan Coody, Mayor Staff Contract Review Committee Ray M. Boudreaux, Director, Aviation and Economic evefopment March 19, 2004 Approval of Task Order #4 with McClelland Consulting Engineers, Inc. for design and engineering services associated with Parallel Taxiway "A" extension and connecting Taxiway "E" construction. Requested Action: Approve Task Order #4 with McClelland Consulting Engineers, Inc. in the amount of $84,110.00 for the design, advertising, bid administration, construction oversight and contract administration for Taxiway "A" extension with Taxiway "E" connection pursuant to AIP#32 in the amount of $84,110.00. Discussion: Task Order #4 to McClelland Consulting Engineers, Inc. is to design and provide engineering services to the Fayetteville Municipal Airport, Drake Field for the extension of Taxiway "A" to the South to meet the new extension of Taxiway "E" east of the runway. The FAA has agreed to award a grant AIP #32 for this project. Budget Considerations This contract will be paid for with the proceeds of AIP #32 covering 95% of the project and the State of Arkansas Department grant for the remaining 5% of the project. Attachments: Task Order #4 Staff Review Form Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field 4500 South School Avenue, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director RESOLUTION NO. A RESOLUTION APPROVING TASK ORDER NO. 4 WITH McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $84,110.00 TO DESIGN AND PROVIDE ENGINEERING SERVICES FOR THE EXTENSION OF TAXIWAY "A" TO MEET THE EXTENSION OF TAXIWAY "E" AT THE FAYETTEVILLE MUNICIPAL AIRPORT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 4 with McClelland Consulting Engineers-inifile amount of $84,110.00 to design and provide engineering service's '67 ttie extension of Taxiway "A" to meet the extension of 1 at the Fayetteville Municipal Airport. PASSED and APPROVED this 6th day of April 2004. APPROVED: A I liEST. By ONDIA SMITH, City Clerk AIN COODY, Mayor • MtECONSULTING McCLELLAND I DESIGNED To SERVE I ENGINEERS, INC. • PO. Box 1229 Fayetteville, Arkansas 72702-1229 479-443-2377 FAX 479-443-9241 March 18, 2004 Mr. Ray Boudreaux Airport Manager, Fayetteville Municipal Airport 4500 S. School Suite F Fayetteville, AR 72701 RECEIVED MAR 1 6 2004 AIRPORT Re: East Side Taxiway Extension Fayetteville Municipal Airport Dear Mr. Boudreaux: In response to your request, please find three (3) copies of Task Order No. 4 for the above referenced project. Please advise if you need further information regarding this Task Order. Thank you for this opportunity to extend our services. Sincerely, E { ANDJC�NSULTING ENGINEERS, INC. Way nes, P E Vice P si ent Enclosure: Task Order No. 4 (3 copies) J:\2004\042110\correspondence\boudreaux-0328.wpd:ch TASK ORDER NO. 4 PARALLEL TAXIWAY EXTENSION and CONNECTING TAXIWAY FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on April 30, 2003. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville and McClelland Consulting Engineers (ENGINEER) sets forth the project description, project schedule, and engineering fees related to eastside parallel taxiway extension and connecting taxiway, Fayetteville Municipal Airport, Drake Field. SECTION I - PROJECT DESCRIPTION The project is to consist of: detailed design and construction of the phase II of development of the east parallel taxiway and connecting Taxiway "E" to the runway, a distance of approximately 950 feet (with a minimum paved width of 50 feet). JADRAKE FIELD \ CONTRACTS \ 2003-2006 \ TASK ORDER 4.DOC SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), the ENGINEER will endeavor to execute the project within the following time periods: Task Completion After NTP A. Detailed Design, Phase II 90 calendar days B. Advertise for bids, Phase II 210 calendar days SECTION III - SCOPE OF SERVICES The ENGINEER shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, the project is to include: A. Meeting with the City of Fayetteville to discuss sources of funding and an implementation schedule for each phase of construction. B. Performing the detailed design of the Phase II construction project as determined by the City of Fayetteville. C. Coordinating with the U.S. Forestry Service, Federal Aviation Administration and the Arkansas State Department of Aeronautics to secure their review of the proposed project. D. Advertising for competitive bids and recommending the award of a construction contract for Phase II. E Construction administration and inspection for Phase II. F. Construction staking for a baseline for Phase II. G. Construction materials testing for Phase II. H. Providing a set of "Record Drawings" for Phase II at the completion of construction based upon the Contractor's mark-ups. JADRAKE FIELD \CONTRACTS \ 2003-2006 \TASK ORDER 4.DOC 2 SECTION IV - FEES AND PAYMENTS The following fees are to be paid to the Engineer as compensation for his services: A. Detailed Plans & Specs for Phase II: a lump sum of $26,000. B. Coordination with Regulatory Agencies: hourly rates, estimated to be $ 1,250. C. Bidding Service: a lump sum of $ 2,640. D. Construction Administration & Inspection: Const. Administration Construction Observation Record Drawings: a lump sum of $ 2,320. hourly rates, estimated to be $37,500. a lump sum of $ 1,600. E Construction Staking: a lump sum of $ 550 F. Construction materials testing: hourly rates & unit prices, estimated to be $12,250. Appendix A presents the basis of payments to the ENGINEER. Appendix B presents hourly rates for personnel anticipated to be assigned to this project by the ENGINEER. Appendix C presents the hourly rates and unit price basis of payments to the ENGINEER for Construction Materials Testing for this project. SECTION V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. JADRAKE FIELD \ CONTRACTS \2003-2006 \TASK ORDER 4.DOC IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE: By: Attest: Mayor Date: FOR McCLELLAND CONSULTING ENGINEERS, INC.: By: V e Pr sident Date: M .-044 JADRAKE FIELD \CONTRACTS.2003-2006 \TASK ORDER 4.DOC Attest: JADRAKE FIELD1CONTRACTS12003-20062ee sheets \ TO 4 FEE.w133 0 0 3.11: 0 -crn WT• rocamm rnExmm E >ozr" z coo -1 z xmg agm x ro- > ZOO> r 100>-1 11▪ Z M MY fri Z 0 11 0 . m m 0 0 ED 11. > r z m GRAND TOTAL, ENGINEERING SERVICES L SUBTOTAL, CONSTRUCTION PHASE LCONSTRUCT1ON FATLS TESTING [CONSTRUCTION STAKING 1 RECORD DRAWINGS 1 CONSTR. INSPECTION 1 CONSTR. ADMINISTRATION !CONSTR. ADMIN. AND INSPECTION [BIDDING [COORDINATION WITH REGULATORY AGENCIES 1 SUBTOTAL, DETAILED DESIGN PHASE REVISIONS TO CONTRACT DOCUMENTS 1 REVIEW MEETINGS WITH AIRPORT 1 IN-HOUSE tK REVIEWS 1 DETAILED COST ESTIMATE FINAL QUANTITIES 1 SPECIFICATIONS 1 PREPARE CONSTR. MATERIALS TESTING PLAN 1 STRIPING PLAN 1 PAVEMENT DETAILS PAVEMENT JOINTING PLAN 1 EROSION CONTROL PLAN DRAINAGE PLAN FOR TAXIWAY 1 GRADING PLAN FOR TAXIWAY 1 COVER 1 SITE PLAN FOR TAXIWAY !DETAILED DESIGN TASK DESCRIPTION ? 10 m m m . m .. . . PROJECT DIRECTOR $120.00 59 17 . mmm m m 42 I PROJECT MGRJENGR. 1105.00 213 --4 co a I 40 I I 20 I I 18 am 141 mmamn'flmm 0,-....-hc mom PROJECT ENGINEER $130.00 . e m I 12 I ENGINEERING TECHNICIAN 1513.00 m m a I 4 I . m m mm -.m -. 0 -0 0 Sill> e?)0 6 0 e" t --4 I 7 I m m -& m mmommom GADD OPER. 150.00 .. e a .-.; r.) 2 I 20 a 01.208m8m GADD OPER. 3 940.00 , , 0 LICENSED SURVEYOR 170.00 a a a I (1 SURVEY CREW 1100.00 a 0 0 0” I 14 0 r 0 NN'11 CLERK TYPIST $42.00 650 E 1 650 0 INSPECTOR Kum g 0 s S MILEAGE $0.35 o P 0 0 •• o 6 o m c m Mel MO z fol , , i « P g « 9 8 n 88g8 0mo a b 0 « .4 a g Ing ggg a N> 0 6 o DIRECT EXPENSE 152,468.501 m P0 -w 0 g E -. g 4° -2: 0 g $35.762.501 n k), 0 g 6. 0 " w a b o 11,2T-10.00 m « - " 0 a a 6 0 1 53.258.501 m-64.!`)Nmr.tro 8829 ms.mmommomplo..s 60600666 0000000O « 44« 888;:l ««««« 0O 214 1 $345.001 1 $1,730.00.1 EXTENDED TOTAL 0 0 3.11: 0 -crn WT• rocamm rnExmm E >ozr" z coo -1 z xmg agm x ro- > ZOO> r 100>-1 11▪ Z M MY fri Z 0 11 0 • APPENDIX B • Hourly Rates for Personnel Drake Field, Fayetteville Municipal Airport CATEGORY Project Director Project Manager Project Engineer Design Engineer II Design Engineer I Registered Surveyor Computer Technician Senior Engineering Technician/Observer Engineenng Technician/Observer Junior Engineering Technician Survey Crew (2 man) Clerical Support GADD Technician III GADD Technician II GADD Technician I Soils Lab Supervisor Soils Technician II Soils Technician I JADRAKE FIELD \CONTRACTS \2003-2006 \Appendix B T04.doc BILLABLE HOURLY RATE RANGE $105 to $130 $85 to $105 $70 to $85 $50 to $75 $40 to $55 $40 to $55 $46 to $55 $55 to $70 $40 to $55 $30 to $45 $55 to $68 $22 to $38 $50 to $60 $40 to $50 $25 to $40 $35 to $45 $30 to $35 $25 to $30 • • APPENDIX C CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 4 GENERAL: Laboratory Field Technician AHTD-Qualified Technician* Engineering Technician Senior Engineering Technician Lab Supervisor Consultation: Lab Supervisor Field Engineer Project Engineer Project Manager Principal Engineer Lab Report Preparation SOILS: AITD-Qualified Field Technician Soils Field Technician (1 -hour minimum) In -Place Compaction Test -Nuclear Gauge ASTM D 2922 Sample Pickup Nuclear Density Gauge Fee (per project, per day) Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318 Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140 Sieve Analysis -Dry ASTM D 422 Hydrometer Analysis ASTM D 422 Specific Gravity ASTM D 854 Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145 Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99 Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180 Potential Volume Change -Swell Pressure California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional) Shrinkage ASTM D 427 Soil Bearing Capacity (Engineering Tech., 2 -hour minimum) Non -ASTM Procedures Available On Request CONCRETE. Concrete Mix Design Review Concrete Mix Design (Lab Supervisor) Confirm Concrete Mix Design Concrete Field Technician * (1 -hour minimum): [For any of the following 6 items:] • Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 • Concrete Cylinder or Beam Molding ASTM C 31 • Concrete Cylinder or Beam Pickup • Concrete Slump Test ASTM C 143 • Concrete Air Content Test ASTM C 231 or C 173 • Cement Mortar or Group Sampling AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items] Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap) Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped) Spare Cylinders Specimens Processed but not Tested Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum) * ACI Grade I Concrete Field Testing Technician JADRAKE FIELOCONTRACTS12003-20001APPENDIX C104 00C Jim $ 35.00 per hour 40.00 per hour 48.00 per hour 62.00 per hour 45.00 per hour 45.00 per hour 75.00 per hour 85.00 per hour 105.00 per hour 120.00 per hour 35.00 per hour 40.00 per hour 35.00 per hour 20.00 each 50.00 each 35.00 per sieve 8.00 per sieve 90.00 each 50.00 each 110.00 each 120.00 each 135.00 each 100.00 each 150.00 each 50.00 each 45.00 per hour Price on Request 45.00 per hour Price on Request 35.00 per hour 40.00 per hour 15.00 each 20.00 each 10.00 each 45.00 per hour Page 1 of 2