HomeMy WebLinkAbout38-04 RESOLUTION•
RESOLUTION NO. 38-04
A RESOLUTION TO APPROVE A CONTRACT WITH
AEP/SWEPCO, INC. TO BURY UTILITY LINES ALONG
SCHOOL AVENUE AT THE NEW LIBRARY FOR THE
AMOUNT OF $186,395.41 PLUS A CONTINGENCY OF
$6,000.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS -
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby
approves the proposed contract with AEP/SWEPCO, Inc. to bury utility lines along
School Avenue at the new library for the amount of $186,395.41, plus a contingency of
$6,000.00.
PASSED and APPROVED this the 16`h day of March, 2004.
,tskk
riT rT��i�;
�
•i:d1 1 • 1. i� �
� ' �
9*.
ATTEST:
By: 1 4
/V1a,ltil�
SONDRA SMITH, City Clerk
By:
APPROVED:
DAN COODY, Mayo
•
Mr. Kip Guthrie
Garver Engineers
3810 Front St., Suite 10
Fayetteville, Ar. 72703
Dear Mr. Guthne:
• UTHWESTERN
ELICTRIC
POWER®
January 30, 2004
Re: Fayetteville Public Library
School Ave. - Electrical Distnbution
Relocation
Following for your information, and per your request, is an estimate of cost for AEP/SWEPCO t� replace
the existing 12.5 KV overhead electrical distnbution system on the west side of School Ave., between
Mountain St. and Rock St. in Fayetteville, with an underground electrical system.
Please find attached AEP drawing D - 04 — 30 that outlines the scope of work proposed for this
relocation.
AEP/SWEPCO would provide all labor and material for the excavation and installation of conduit, pulling
vaults, and cable on the west side of School Ave., and the excavation, conduit, and necessary
equipment to provide underground distnbution across School Ave. to an apartment complex and two
residences on the east side of School Ave. Service from the street to the point of metenng on the
buildings would remain overhead
•
AEP's scope of work also includes the installation of conduit for other utilities as indicated on the
drawing, but does not include the material cost of this conduit.
The cost for AEP/SWEPCO to perform the above work is estimated to be $186,395.41. This estimate is
based on AEP/SWEPCO' s contractor's ability to perform the ditch excavation utilizing conventional
backhoe equipment. In the event significant rock is encountered that would require additional equipment
for rock removal to achieve required trench depth, AEP/SWEPCO would request reimbursement for this
additional equipment cost.
If you have any questions concerning this proposal, please contact me at
973-2301.
PROPOSAL A
age
Dan Coody, Mayor
Sin rely,
Floyd Homaday
Project Engineer
ATTES
•
•
.42
EFYE`flfy
o .ra Smith, Cit C erk
O/4L—lot ez)
NAME OF FILE:
CROSS REFERENCE:
Item #
Date
e
Resolution No. 38-04
w/agreement
Document
•
1
02/26/04
memo to mayor & city council
2
draft resolution
3
02/17/04
copy of memo to Bob Kohler
4
02/27/04
Staff Review Form
5
03/17/04
email to Louise Schaper
6
03/17/04
email to city clerk ofc
7
03/31/04
memo to Louise Schaper
NOTES:
• ,3.JP k/
City Council ]v ing of March 16, 2004 32 _Dy
CITY COUNCIL AGENDA MEMO
To: Mayor and City Council
Thru: Hugh Earnest, Chief Administrative Officer
From: Louise Schaper, Executive Director - Fayetteville Public Library
Date: February 26, 2004
Subject:: A resolution to award a contract in the amount of $186,395.41 to
AEP/SWEPCO for the burial of utilities along School Avenue in behalf of the new
Fayetteville Public Library located at 401 W. Mountain Street.
RECOMMENDATION
We recommend the City Council approve the resolution in the amount of $186,395.41 to
award the contract to AEP/SWEPCO for utility burial along School Avenue. Plus a
contingency allowance of $6,000 for a total of $192,395.
•
BACKGROUND
On February 5, 2002 the Fayetteville City Council approved an ordinance waiving
requirements for competitive bidding for the burial of utilities for the library project. This
enables pre -qualified subcontractors of AEP/SWEPCO to bid on the work to provide 1)
electric power ducts and vaults, and 2) telephone, TV cable, and any fiber optic ducts.
The City will contract directly with AEP/SWEPCO for this work. Time is of the essence
on this request due to the project schedule and interfacing with city engineering and
construction requirements for improvements to School Ave. prior to library opening date.
DISCUSSION
The City building code requirement to bury the new and existing utilities on the east side
of the new library creates challenge as well as opportunity. The opportumty to create a
more safe and visually appealing aspect of the project is highly desirable for the project
and the surrounding area. The apartment building and two residences facing the new
building on the east side of School Avenue are directly affected by this change due to the
existing overhead utility poles currently serving them With the removal of those poles
the residences are entitled to new service connections including electric power and TV
cable. This resolution enables the work to proceed that replaces the existing 12.5 KV
overhead electrical distnbution system on the west side of School Ave. between
Mountain Street and Rock Street with an underground electncal system. The resolution
• City Council Meting of March 16, 2004
also includes the labor for installation of conduit for the other utilities and street cut
repair adhering to City of Fayetteville specifications. The scope of work is fully outlined
and prepared under a separate document.
BUDGET IMPACT
This $186,395.41 expenditure is included in the project budget.
# # #
upas 6.1 CL
2
•
• •
RESOLUTION NO.
A RESOLUTION TO APPROVE A CONTRACT WITH
AEP/SWEPCO, INC. TO BURY UTILITY LINES ALONG
SCHOOL AVENUE AT THE NEW LIBRARY FOR THE
AMOUNT OF $186,395.41 PLUS A CONTINGENCY OF
$6,000.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby
approves the proposed contract with AEP/SWEPCO, Inc. to bury utility lines along
School Avenue at the new library for the amount of $186,395.41, plus a contingency of
$6,000.00.
PASSED and APPROVED this the 2"d day of March, 2004.
ATTEST:
By:
SONDRA SMITH, City Clerk
By:
APPROVED:
DRAFT
DAN COODY, Mayor
411
AmirmoezFosterHaileyJohnson
MEMORANDUM
To: Bob Kohler
From: Jim Fos
Reference:
Public Library, School Avenue Utilities
Architects & Planners
February 17, 2004
For Cit ' -• . • cling purposes, attached are the AEP letter proposal dated January
30, 2004 and the original drawing prepared by AEP/SWEPCO.
Post Office Box 790. 100 West Center, Suite 302 • Fayetteville, AR 72702.479-442-5565 • FAX 479-442-8849
1
XX AGENDA REQUEST
XX CONTRACT REVIEW
GRANT REVIEW
• STAFF REVIEW FORM •
For the Fayetteville City Council Meeting of: March 16, 2004
Louise Schaper Library General Govemment
Name
Division Department
; ACTION REQUIRED: Approve a resolution to award a contract to ASP/SWEPCO for $186,395.41
plus a contingency of $6,000 for utility burial along School Avenue
COST TO CITY:
$192,395.00 S 8,950,917.00 New Main Library
Cost of this request Program Category / Project Name
4470-9470-5804-00
Account Number
$
6,539,639.00 Library Improvements
Funds Used to Date Program / Project Category Name
99073-1 $ 2,411,278.00 Sales Tax Capital Improvement Fund
Project Number
Remaining Balance Fund Name
BUDGET REVIEW:
X Budgeted Item
Budget Manager Date
Budget Adjustment Attached
CONTRACT/GRANT/LEASE REVIEW:
Acc ting Mana
Attorney
Date
r170`{
Date
Internal Auditor Date
Purchasing Manager Date
STAFF RECOMMENDATION:
Division Head Date
Departm nt Director Date
-7 6-2•7r-014.
Finance Internal Services Dir. Date
564 2 -t -?-u"
CHief(/Adlministrative Officer Date
Mayo
bwepco.xit
Cross Reference
New Item:
Yes No
Previous Ord/Res#•
Orig. Contract Date
Orig. Contract Number
Description
Comments:
Budget Manager
• Staff Review Form - Page 2 •
Meeting Date
Reference Comments:
Accounting Manager
7/D 401-tfa(of atLOIJ2cte ✓tinea..)
City Attorney
Purchasing Manager
ADA Coordinator
Internal Auditor
�o GLN ^a(A" -b reViu-c)
Grants Coordinator
Swepco.xf
Clarice Pearman - AEP/SWEPCO
Page 1)
From: Clarice Pearman
To: Ischaper@fayettevillelibrary.org
Subject: AEP/SWEPCO
The Council passed a resolution approving this item March 16, 2004. Please see that the clerk's office
gets a signed original contract to continue the resolution process.
Thanks.
Clarice Pearman - RE AEP/SWEPCO •
Page 1
From: "Louise Schaper" <Ischaper@faylib.org>
To: "Clarice Pearman" <cpearman@ci fayetteville.ar.us>
Date: 3/17/04 3:22PM
Subject: RE. AEP/SWEPCO
Will do. Thanks, Louise
----Original Message ---
From: Clarice Pearman [mailto:cpearman@ci.fayetteville.ar.us]
Sent: Wednesday, March 17, 2004 3:16 PM
To: Louise Schaper
Subject: AEP/SWEPCO
The Council passed a resolution approving this item March 16, 2004. Please see that the clerk's office
gets a signed original contract to continue the resolution process.
Thanks.
CC: "Cathy ReW' <crew@faylib.org>
FAYETTEVILE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
To: Louise Schaper
Fayetteville Public Library
From Clarice Buffalohead-Pearman
City Clerk Division
Date: March 31, 2004
Re: Resolution 38-04
Attached is a copy of the above resolution passed by the City Council, March 16, 2004, approving
a contract to bury utility lines with AEP/SWEPCO. This is to confirm that Cathy Rew did pick up
the library's copy of the resolution and contract this morning.
The resolution and agreement will be recorded and microfilmed. If anything else is needed
please let the clerk's office know.
/cbp
attachments
cc: Nancy Smith, Internal Auditor