HomeMy WebLinkAbout25-04 RESOLUTION• • RESOLUTION NO. 25-04 A RESOLUTION APPROVING TASK ORDER NO. 3 WITH McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $29,500.00 FOR ENGINEERING DESIGN AND CONSTRUCTION OVERSITE FOR THE CONSTRUCTION OF AN 8 -BAY T -HANGAR. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 3 with McClelland Consulting Engineers in the amount of $29,500.00 for engineering design and construction oversight for the construction of an 8 -bay T -Hangar. PASSED and APPROVED this 17th day of February 2004. "-- .tcat ATTEST: / By: C4nOGtA4-! �/v +-d SONDRA SMITH, City Clerk APPROVED: By: DAN COODY, Mayo • • • • TASK ORDER NO. 3 AIRCRAFT T -HANGAR BUILDING FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on May 6, 2003, as amended. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville and McClelland Consulting Engineers (MCE) sets forth the project description, project schedule, and engineering fees related to hangar improvements at the Fayetteville Municipal Airport. SECTION I - PROJECT DESCRIPTION The project is to consist of: assistance in applying for state funding for the project; the preliminary and final engineering design for a 60' by 200' 8 -Bay Aircraft T -Hangar Building on the east side of the Airport; preliminary and final cost estimates; meetings with the City's Airport Department to review various aspects of the project; and engineering services associated with detailed design and construction. J:\DRAKE FIELD\CONTRACTS\2003-20061Task Order 3.doc 1 • • • • SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), MCE will endeavor to execute the project as expeditiously as possible to enable the City of Fayetteville to solicit competitive bids for construction as soon as possible in March or April 2004. SECTION III - SCOPE OF SERVICES MCE shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, this project is likely to include: A. Assisting the City of Fayetteville in making application for a grant from the Arkansas Department of Aeronautics. B. Topographic Surveying. C. Formulating preliminary and final construction cost estimates. D. Meeting with the City of Fayetteville and their Tenant to discuss design criteria, desired features, and schedule. E Performing the detailed design of the construction project as determined by the City of Fayetteville and their Tenet. G. Advertising for competitive bids and recommending the award of a construction contract. H. Construction administration and inspection. I. Construction staking for a baseline and benchmark. J:\DRAKE FIELD \CONTRACTS\2003.20061Task Order3.doc 2 • • • J. Construction materials testing. K. Providing a set of "Record Drawings" at the completion of construction based upon the Contractor's mark-ups. SECTION IV - FEES AND PAYMENTS The following fees are to be paid to MCE as compensation for his services: A. Application to State: a lump sum of $600. B. Topographic Survey : a lump sum of $1,100. C. Engineering Detailed Design: a lump sum of $3,500. E Bidding Service:: a lump sum of $1,200. F. Construction Administration & Inspection: hourly rates, estimated to be $2'1,700. G. Construction Staking: a lump sum of $650. H. Construction materials testing: hourly rates & unit prices, estimated to be $ 750. Appendices A, B, & C presents hourly rates for personnel anticipated to be assigned to this project and the unit prices as well as the basis of payments to be made to MCE SECTON V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. J:\DRAKE FIELD \CONTRACTS\20D32006\Task Order 3.doc 3 • • FOR THE CITY OF FAYETTEVILLE: _By: PYA—" Trek, • •te ' Miss Ii 1 !'TONte. ''' FOR McCLELLAND CONSULTING ENGINEERS, INC.: By: Attest: Vi Presiden /p President J:\DRAKE FIELD\CONTRACTS\2003-2006\Task Order 3.doc 4 RAKE FIELD \CONTRACTS\ 2003-2008Vee sheets TO 3 Fee.w03 ca D ca N T i xi -D y macs W1473m m C 0 • Z zti y o 0 p X ft.t2 oz O Q D 9• Wm O • m - 1 Z 0 Z m m xi • 11. _ S 0 T IF 0 0 > r- Z y c lIAM C elmiLn ulna Inwl ni nuwwnl a 1 • 1 1 1 o Z' y A C 0 z � y m y z 1 M cio ti O m 0 Elunly I c unu nnu I cunnI > 3 1 ; 1 1 1 t i Jwwl AL, was 1 nVL HUNrnASt p OC !Loy i -1- SAS Iva mz iyu co Z � 11 w-1 - C Z 1`w__..___ ._....ILIL___.. NVN i 10 '.1 ' 1 I w KtVISIUNS 10 PLANS 8 SPECS SUBTOTAL, DETAILED ENGINEERING RtVIEW Mtt IING WITH OWNER 12i 1Ut IAIL DES.: ELECTRICAL PLAN 8 DETAILS :I Ut !AIL Uts.: AIKSIUt AGetSS PLA DETAIL DES.: LANDSIDE ACCESS PUG Ut !AIL uta.RAINAt PLAN 8 DETAILS DETAIL DES.: UTILITY PLAN & DETAILS DETAIL DES. :HANGAR PLAN 8 DETAILS DETAIL DES.: FLOOR/FOUNDATION PLAN i 00 �DDOZ 1-r>2 i00 50oOR :�9b-,3 :O� l 0 �O zO GZi X1 D DV C. G. IUt I AILtU tNGINtt(ING 1 1 1 1 1 j 1 : I I UPUGHAPHIG SURVEY y G m 2 0 IAPPLIUA I ION TO STATE FOR FUNDING ; I I, TASK DESCRIPTION xwuY RATE. IAL CDSI tSIIMAIE -OC IC_ Imp iAC i-2 I^�u ;0 1 NILADUN 1 DETAILS DETAILS kN DETAILS + O O + + 0 0 PROJECT DIRECTOR $105.00 o O O o a N o N 0.5 0.5 0.5 0+ U 0.5 w PROJECT MGRJENGR. $90.00 + a O8 O O O y N+ N ++++ N + PROJECT ENGINEER $80.00 N0 0 0 N Y N + (J I 0.5 o o I 0 o e 10'� 0 0 0 0 0 0 en +++ N y 0 0 0 o o 1 2 2 2 3 2 1 - 0 NO 0.5 I O 0 0 N O N 0 or 0 O 0 J 0 a 0 0 y y + a a N CLERK TYPIST $35.00 O O gC. $ 0 0 O 0 o O t)i O O O o ..G O O c [ en nn� c < en nal 00 N0 0 O N a o Itnnn N bo O0 O b o 0 O N 0 0 III !O tO a O O O V Y6 C 83.615.00 $18.077.50 es 0 4 Y C VIAU.UU I D129.UU $74.00 $250.00 $148.00 $193.00 $231.00 $242.00 $163.00 ) 1.1 r 0 u. O ca D ca N T i xi -D y macs W1473m m C 0 • Z zti y o 0 p X ft.t2 oz O Q D 9• Wm O • m - 1 Z 0 Z m m xi • • • CATEGORY • APPENDIX B TASK ORDER NO. 3 Hourly Rates for Personnel Fayetteville Municipal Airport Project Director Project Manager Engineer III Engineer 11 Engineer I Registered Surveyor Computer Technician Senior Engineering Technician Engineering Technician Survey Crew (2 man) Clerical Support CADD Technician III CADD Technician II CADD Technician 1 Soils Lab Supervisor Soils Technician II Soils Technician I J:\DRAKE FIELD\CONTRACTS\2003-2006\Appendix B T03.doc BILLABLE HOURLY RATE RANGE $105 to $130 $95 to $105 $75 to $95 $55 to $75 $45 to $55 $50 to $70 $46 to $60 $55 to $65 $45 to $60 $80 to $105 $30 to $45 $50 to $60 $40 to $50 $25 to $40 $35 to $50 $35 to $40 $25 to $35 • • APPENDIX C CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 3 GENERAL: Laboratory Field Technician ' AHTD-Qualified Technician' Engineering Technician * Senior Engineering Technician Lab Supervisor Consultation: Lab Supervisor Field Engineer Project Engineer Project Manager Principal Engineer Lab Report Preparation SOILS: AHTD-Qualified Field Technician Soils Field Technician (1 -hour minimum) In -Place Compaction Test -Nuclear Gauge ASTM D 2922 Sample Pickup Nuclear Density Gauge Fee (per project, per day) Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318 Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140 Sieve Analysis -Dry ASTM D 422 Hydrometer Analysis ASTM D 422 Specific Gravity ASTM D 854 Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145 Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99 Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180 Potential Volume Change -Swell Pressure California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional) Shrinkage ASTM D 427 Soil Bearing Capacity (Engineering Tech., 2 -hour minimum) Non -ASTM Procedures Available On Request CONCRETE. Concrete Mix Design Review Concrete Mix Design (Lab Supervisor) Confirm Concrete Mix Design Concrete Field Technician (1 -hour minimum): [For any of the following 6 items:] • Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 • Concrete Cylinder or Beam Molding ASTM C 31 • Concrete Cylinder or Beam Pickup • Concrete Slump Test ASTM C 143 • Concrete Air Content Test ASTM C 231 or C 173 • Cement Mortar or Group Sampling AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items] Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap) Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped) Spare Cylinders Specimens Processed but not Tested Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum) J DRAKE FIEIUCONTRACTS3 W 3-2000APPENDIX C TO5.. ['COPT! ACI Grade I Concrete Field Testing Technician $ 35.00 per hour 40.00 per hour 50.00 per hour 62.00 per hour 50.00 per hour 45.00 per hour 75.00 per hour 85.00 per hour 105.00 per hour 120.00 per hour 35.00 per hour 40.00 per hour 35.00 per hour 20.00 each 50.00 each 35.00 per sieve 8.00 per sieve 90.00 each 50.00 each 110.00 each 120.00 each 135.00 each 100.00 each 150.00 each 50.00 each 50.00 per hour Price on Request 45.00 per hour Price on Request 35.00 per hour 40.00 per hour 15.00 each 20.00 each 10.00 each 50.00 per hour Page 1 of 2 • • • APPENDIX C CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 3 CONCRETE (Continued): Flexural Strength of Concrete Beams ASTM C 78 or C 293 Spare Beam Specimens Processed but not Tested Compressive Strength of Grout Cubes Compressive Strength of Cement Mortar Cubes Concrete Coring (3" or 4"): Core Machine & Lab Technician Additional Lab Technician, as required Compressive Strength of Concrete Cores (3" or 4") Other Core Sizes Aggregate Sieve Analysis: Dry Sieve ASTM C 136 Wet Sieve ASTM C 117 Fineness Modules Decantation Deleterious Materials Specific Gravity and Absorption of Aggregate ASTM C 127 & C 128 Dry Rodded Unit Weight of Aggregate ASTM C 29 Sodium or Magnesium Sulfate Soundness (5 cycles) ASTM C 88 Additional Cycles ASPHALT: Asphalt Mix Design Review Asphalt Mix Design (Lab Supervisor) Asphalt Field Technician In -Place Compaction Test -Nuclear Gauge (Lab Technician) Sample Pickup Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids, Percent Voids in Mineral Aggregate (3 specimens per test) Extraction including percent Bitumen and Aggregate Gradation Laboratory Density of Cored Plugs including Depth Measurement Asphalt Coring (3" or 4"): Core Machine & Lab Technician Additional Lab Technician, if required Sample Pickup FIREPROOFING: Unit Weight, Bonding Strength, Thickness and Sampling (actual time required for Lab Technicians) Report Preparation (Lab Supervisor) STRUCTURAL STEEL: Bolt Torque Testing: Lab Technician(s) Field Engineer Pneumatic Torque Wrench Calibration (twice per day) Visual Weld Inspection Field Engineer Services not Listed are Available on Request HCFANE FIELLICONTRACTS2001¢00ENPPENOIX O 70e.00C1m 30.00 each 25.00 each 25.00 each 20.00 each 65.00 per hour 35.00 per hour 30.00 each Price on Request 8.00 each 35.00 each 25.00 each 35.00 each 60.00 each 85.00 each 60.00 each 300.00 each 50.00 each Price on Request 50.00 per hour 35.00 per hour 35.00 per hour 300.00 each 200.00 each 25.00 each 60.00 per hour 35.00 per hour 35.00 per hour 35.00 per hour/Tech. 50.00 per hour 35.00 per hour 75.00 per hour 50.00 each 75.00 per hour Page 2 of 2 • i NAME OF FILE: Resolution No. 25-04 wITask Order No. 3 CROSS REFERENCE: Item # Date Document 1 01/30/04 memo to mayor and city council 2 draft resolution 3 Staff Review Form 4 copy of fax to James Nicholson 5 copy of memo to Ray Boudreaux NOTES: FAYETTEWLLE THE CITY OF FAYETTEVILLE, ARKANSAS DAN COODY, MAYOR TO: THRU: FROM: DATE: SUBJECT: MEMORANDUM Dan Coady, Mayor Members of the City Council Staff Review Committee Ray M. Boudreaux, Director, Aviation and Economic January 30, 2004 T Hangar "F" project Task Order #3 approval ts. 2,,710 4:;-s—ote /.%a1 ii .d asis4» , Requested Action: Approve Task Order #3 with McClelland Consulting Engineers for construction of a new T Hangar at Fayetteville Municipal Airport, Drake Field. Discussion: T Hangar "F" will be the eighth T hangar building constructed at the airport. Currently there are 11 individuals on the waiting list for a hangar. The new building will have 8 individual hangars. The airport board approved this capital project in the five year capital plan and the project is funded for FY 2004. Project award and acceptance of bids will be presented to Council for approval in separate action following receipt of bids. Budget Considerations: Funds are available and in the FY 2004 Capital Program Attachments: Staff Review Form Task Order #3 with McClelland Consulting Engineers Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field 4500 South School Avenue, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director • • RESOLUTION NO. A RESOLUTION APPROVING TASK ORDER NO. 3 WITH McCLELLAND CONSULTING ENGINEERS IN THE AMOUNT OF $29,500.00 FOR ENGINEERING DESIGN AND CONSTRUCTION OVERSITE FOR THE CONSTRUCTION OF AN 8 -BAY T -HANGAR. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 3 with McClelland Consulting Engineers in the amount of $29,500.00 for engineering design and construction oversight for-th construction of an 8 -bay T -Hangar. PASSED and APPROVED this 17th day of February 2004 PPROVED: A-101 EST: By: AN CO`ODY, Mayr 9 ! 7 SONDRAASMITH itit Clerk STA REVIEW FORM - FINANCIAL OBLIGIOPON X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW Task Ord #3 McClelland Eng. For the Fayetteville City Council Meeting of: February 17, 2004 FROM: Ray M. Boudreaux Name Aviation & Economic Development Airport Division Department ACTION REQUIRED: A Resolution to approve Task Order # 3 to McClelland Consulting Engineers, Inc., for engineering design and construction oversite to construct an 8 -Bay T -hangar. Signature of the Mayor required. COST TO CITY: $29,500.00 $ 350,000.00 10 Bay T -Hangar Cost of this request Category/Project Budget Program Category / Project Name 5550.3960.5314.00 $ Account Number mo Capital Funds Used to Date Program / Project Category Name 03013-1 $ 350,000.00 Airport Project Number Remaining Balance Fund Name BUDGET REVIEW• X Budgeted Item Budget Manager /-30--or Date Budget Adjustment Attached CONTRACT/GRANT/LEASE REVIEW: Manalger City Attor fy • GtAA Date Internal Auditor ate Purchasing Manager 1/'30/0¢ Date laio¢ Date STAFF RECOMMENDATION: Staff recommends approval Received in Mayor's Office Date Department Director 4 Finance & Internal Services Dir. z/i/ Date Cross Reference: Previous Ord/Res#: Orig. Contract Date: Orig. Contract Number: New Item: Yes X • • Fayetteville, Arkansas City Clerk's Division 113 West Mountain Fayetteville, AR 72701 479-575-8323 fax: 479-718-7695 Send to: Airport From: Clarice Buffalohead-Pearman Attention: James Date: 4/22/04 Office location: Office location: 113 West Mountain Fax number: 718-7646 Phone number: 479-575-8309 ZPer Your Request ['Reply ['Please comment ['Please review ['FYI Total pages, including cover: 9 Comments: Attached is Res. No. 25-04, McClelland Task Order No. 3. Sorry I didn't get this out to you after the meeting. I don't what happened that it wasn't returned to you but I will send you the original via your mailbox downstairs. FAYETTEVFLLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Ray Boudreaux Aviation & Economic Development From: Clarice Buffalohead-Pearman City Clerk Division Date: April 22, 2004 Re: Resolution No. 25-04 Attached is a copy of the above resolution passed by the City Council February 17, 2004, approving the Task Order No. 3 with McClelland Consulting Engineers. I have attached two originals of the contract with the appropriate signatures and have kept one to attach with the resolution. These items will be recorded in the city clerk's office and microfilmed. If anything else is needed please let the clerk's office know. /cbp attachments cc' Nancy Smith, Internal Auditor