HomeMy WebLinkAbout161-04 RESOLUTIONRESOLUTION NO. 161- 04 A RESOLUTION TO APPROVE A CONTRACT IN THE AMOUNT OF $23,940.00 PLUS POSSIBLE EXPENSES OF UP TO $5,250.00 WITH WALKER PARKING CONSULTANTS/ ENGINEERS, INC. FOR ENGINEERING SERVICES RELATED TO THE REHABILITATION AND REPAIR OF THE MEADOW STREET PARKING DECK BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the Agreement for Professional Engineering Services with Walker Parking Consultants/Engineers, Inc. in the amount of $23,940.00, plus expenses of up to $5,250.00 for a total of $29,190.00 as attached as Exhibit "A". PASSED and APPROVED this 19`" day of October, 2004. By: ATTEST: APPROVED: ........... rri... By: pox,, `� ' S.U� p= :FAYETTEVILLE� SOA SMITH, City Clerk Oct ,� MSP' 'y.NGTON C�.`,. "nanuu..... yt • • AGREEMENT For PROFESSIONAL ENGINEERING SERVICES Between CITY OF FAYETTEVILLE, ARKANSAS And WALKER PARKING CONSULTANTS/ENGINEERS, INC. THIS AGREEMENT is made this NM day of October, 2004, by and between City of Fayetteville, Arkansas and Walker Parking Consultants/Engineers, Inc., with an office in Houston, Texas (Walker Parking). The City of Fayetteville requires professional engineering and architect services in connection with the repair and rehabilitation of the City's Meadow Street Parking Facility (the "Project"). Therefore, the City of Fayetteville and Walker Parking in consideration of their mutual covenants agree as follows: Walker Parking Consultants shall serve as City of Fayetteville's professional consultant in those assignments to which this Agreement applies, and shall give consultation and advice to the City of Fayetteville during the performance of Walker Parking's services. All services shall be performed under the direction of a professional engineer or architect registered in the State of Arkansas and qualified in the particular field. The Construction Phase Services which are to be provided by Walker Parking under this Agreement shall be executed under the observation of a professional engineer or architect registered in the State of Arkansas in accordance with Arkansas Code Annotated §22-9-101. SECTION I AUTHORIZATION OF SERVICES A. Upon acceptance of this contract by the City Council and its execution by the Mayor, Walker Parking Consultants are authorized to begin to perform services. B. Changes, modifications or amendments in scope, price or fees to this contract shall not be allowed without a formal contract amendment approved by the Mayor and City Council in advance of the change in scope, costs, fees, or delivery schedule. • • SECTION II SCOPE OF SERVICES TO BE PERFORMED BY WALKER PARKING CONSULTANTS A. Phase I — Construction Document Preparation and Bidding Services 1. Discuss with City of Fayetteville representatives confirmation of the program, budget and schedule, and establish lines of communication. 2. Prioritize the estimates of probable construction costs for the repairs. 3. Prepare plans and details for the entire repair program. 4. Prepare final bid documents and technical specifications and distribute at the direction of the City of Fayetteville. 5. Prepare an updated engineer's estimate of the probable construction cost of the repairs. 6. Assist and be present at a pre-bid meeting to answer the Contractor's questions, and review the limitations and extent of work required by the repair documents. 7. Prepare addenda to the bid documents, if required. 8. Assist in the evaluation of bids and award of a contract to the successful bidder. B. Phase II — Construction Administration and Observations Services 1. Direct a pre -construction meeting with the Contractor at the job -site to review each work item, establish construction quality control, and establish phasing of the repair work. 2. Review shop drawings and material sample submittals for conformance with the intent of the design documents. 3. Make visits to the job -site at intervals appropriate to the various stages of construction to observe the progress and quality of the contractor's work. A total of 4 visits, based on an estimated two months of construction are included in the lump sum fee. 4. Direct project progress meetings. These will be done in conjunction with scheduled observation trips discussed above. 2 • • 5. Issue necessary interpretations and clarifications of the contract documents and assist in the resolution of problems or conflicts due to unforeseen latent conditions. 6. Review Contractor pay -requests and advise the City accordingly. 7. Prepare a punch list near project completions of Phase II and conduct a final project review of punch list items addressed by the Contractor. SECTION III COMPENSATION A. The City of Fayetteville shall pay $15,700 00 as a lump sum fee to Walker Parking Consultants/Engineers, Inc. for its completion of Phase I — Construction Document Preparation and Bidding. B. The City of Fayetteville shall pay $8,240.00 as a lump sum fee to Walker Parking Consultants/Engineers, Inc. for its completion of Phase II — Construction Administration and Observations. C. The City of Fayetteville shall pay to Walker Parking consultants up to $5,250.00 for travel and miscellaneous expenses which are reasonably incurred by Walker Parking and necessary to accomplish its duties during Phase I and II of the Project. SECTION IV GENERAL CONSIDERATIONS A. Insurance During the course of performance of these services, Walker Parking will maintain (in U.S. Dollars) the following minimum insurance coverages: Type of Coverage Workers' Compensation Employers' Liability Commercial General Liability Bodily Injury Property Damage Professional Liability Insurance 3 Limits of Liability Statutory $500,000.00 Each Accident $1,000,000.00 Combined Single Limit $1,000,000.00 Each Claim • • • Walker Parking will provide to the City of Fayetteville certificates as evidence of the specified insurance within ten days of the date of this Agreement and upon each renewal of coverage. B. Professional Responsibility 1. Walker Parking will exercise reasonable skill, care and diligence in the performance of Walker Parking's services and will carry out its responsibilities in accordance with customarily accepted professional engineering practices. The City of Fayetteville will promptly report to Walker Parking any defects or suspected defects in Walker Parking's services of which the City of Fayetteville becomes aware, so that Walker Parking can take measures to minimize the consequences of such a defect. The City of Fayetteville and Walker Parking further agree to impose a similar notification requirement on all construction contractors in the Bid Documents and shall require all subcontracts at any level to contain a like requirement. The City of Fayetteville retains all remedies to recover for its damages caused by any negligence of Walker Parking. 2. In addition Walker Parking will be responsible to the City of Fayetteville for damages caused by its negligent conduct during its activities at the Project Site at least to the extent covered by Walker Parking's Commercial General Liability Insurance policy as specified in Paragraph A. C ADA REQUIREMENTS The Americans with Disabilities Act (ADA) requires the removal of architectural barriers in existing facilities where such removal is readily achievable. The City of Fayetteville acknowledges that the definition of "readily achievable" contained in the ADA is flexible and subject to interpretation on a case-by-case basis. The requirements of the ADA will therefore be subject to various and possible contradictory interpretations. Walker Parking will use its reasonable professional efforts and judgment to interpret applicable ADA requirements and to advise the City of Fayetteville as to the modifications to the Meadow Street Parking Facility that may be required to comply with the ADA. D. TERMINATION 1. This Agreement may be terminated in whole or in part in writing by either party in the event of substantial failure by the other party to fulfill its obligations under this Agreement through no fault of the terminating party, provided that no termination may be effected unless the other party is given: 4 • • a. Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate; b. An opportunity for consultation with the terminating party prior to termination. 2. This Agreement may be terminated in whole or in part in writing by City of Fayetteville for its convenience, provided that Walker Parking is given. a. Not less than ten (10) calendar days written notice, delivered by certified mail, return receipt requested) of intent to terminate; b. An opportunity for consultation with the terminating party prior to termination; c. If termination for default is effected by City of Fayetteville, an equitable adjustment in the price provided for in this Agreement shall be made; but d. No amount shall be allowed for anticipated profit on unperformed services or other work; e. Any payment due to Walker Parking at the time of termination may be adjusted to cover any additional costs to City of Fayetteville because of Walker Parking's default. 3. Upon receipt of a termination action under termination paragraphs above, Walker Parking shall: a. Promptly discontinue all affected work (unless the notice directs otherwise); b. Deliver or otherwise make available to the City of Fayetteville all data, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by Walker Parking in performing this Agreement, whether completed or in process; c. Upon termination the City of Fayetteville may take over the work and may award another party an agreement to complete the work under this Agreement. 5 • • E. Ownership of Documents All documents provided by the City of Fayetteville including original drawings, disks of CADD drawings and cross sections, estimates, specification field notes, and date are and remain the property of the City of Fayetteville. Walker Parking may retain reproduced copies of drawings and copies of other documents. Engineering documents, drawings and specifications prepared by Walker Parking as part of its services shall become the property of the City of Fayetteville when Walker Parking has been compensated for all such services rendered, provided, however, that Walker Parking shall have the unrestricted right to their use. Walker Parking shall, however, retain its right in its standard drawings details, specifications, databases, computer software, and other proprietary property. Rights to intellectual property developed, utilized, or modified in the performance of the services shall remain the property of Walker Parking. F. Notices Any notice required under this Agreement will be in writing, addressed to the appropriate party at the following addresses: City of Fayetteville Office of the Mayor 113 West Mountain Street Fayetteville, AR 72701 Walker Parking Consultants 17049 El Camino Real, Suite 202 Houston, TX 77058 G. Successor and Assigns The City of Fayetteville and Walker Parking each binds themselves and their successors, executors, administrators, and assigns to the other party of this Agreement and to the successors, executors, administrators, and assigns of such other party, in respect to all covenants of this Agreement; except as above, neither the City of Fayetteville nor Walker Parking shall assign, sublet, or transfer their interest in the Agreement without the written consent of the other. H. Controlling Law This Agreement shall be subject to, interpreted and enforced according to the laws of the State of Arkansas without regard to any conflicts of law provisions. 6 • • I. Arkansas Freedom of Information Act City contracts and documents, including internal documents and documents of subcontractors and subconsultants, prepared while performing City contractual work are subject to the Arkansas Freedom of Information Act (FOIA). If a Freedom of Information Act request is presented to the City of Fayetteville, Walker Parking will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. J. Additional Responsibilities Walker Parking shall have these additional responsibilities: 1. The City of Fayetteville's review, approval, or acceptance of design drawings, specifications, reports and other services furnished hereunder shall not in any way relieve Walker Parking of the responsibility for the technical adequacy of the work. Neither the City of Fayetteville's review, approval or acceptance of, nor payment for any of the services shall be construed as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement. 2. Walker Parking shall be and shall remain liable, in accordance with applicable law, for all damages to the City of Fayetteville caused by Walker Parking's negligent performance of any of the services famished under this Agreement except for errors, omissions or other deficiencies to the extent attributable to the City of Fayetteville or City of Fayetteville -furnished data. 3. Walker Parking's obligations under this clause are in addition to Walker Parking's other express or implied assurances under this Agreement or State law and in no way diminish any other rights that the City of Fayetteville may have against Walker Parking for faulty materials, equipment or work. K. Remedies Except as may be otherwise provided in this Agreement, all claims, counterclaims, disputes and other matters in question between the City of Fayetteville and Walker Parking arising out of or relating to this Agreement or the breach thereof will be decided in a court of competent jurisdiction within Washington County, Arkansas. 7 • • L. Entire Agreement This Agreement represents the entire Agreement between Walker Parking and the City of Fayetteville. IN WITNESS WHEREOF, we have hereunto set our hands on the date first written above. WALKER PARKING CONSULTANTS/ENGINEERS, INC. By: al J • r ES A.MORAN Vice President and Managing Principal By: CITY OF FAYETTEVILLE, ARKANSAS �A At D COODY Mayor Attest: 1C)CA/ tt4.aJ Wig-) Sondra Smit iciAxeClerk Rfite s�G.'(,1Y�O Sef :o. ••A: E ;FAYETTEVILLE• r. '%9s :QKA14*.S, ,,,yING •ON�GO,,,, 8 NAME OF FILE: CROSS REFERENC Item # Date • Resolution No. 161-04 w/agreement Document • 1 09/21/04 memo to mayor & City Council 2 letter to Coy Hurd from Walker Parking Consultants 3 draft resolution 4 Staff Review Form 5 memo to Coy Hurd 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 FAYETTEVIPLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE eeS • ////y/o l /6/ - 'Weer wf,6a5 tvlado-ed October 19, 2004 City Council Meeting Mayor Dan Coody and Fayetteville City Council GHtephen Davis, Financial and Internal Services Director *Coy Hurd, Project Manager September 21, 2004 TO: THROUG DATE- SUBJECT: A resolution approving a contract with Walker Parking Consultants for the design and oversight of the restoration of the Meadow Street Municipal Parking Deck. Recommendation: Staff recommends the approval of this contract and the fee in the amount of $29,250. Background: On April 27, 2004, the City's Architect Selection Committee convened to make a recommendation towards the selection of a design firm pursuant to renovation work needed on the Meadow Street Municipal Parking Deck. From the firms considered, it was the unanimous decision of the committee to recommend Walker Parking Consultants of Houston, Texas for this project. Discussion: For some time, the Municipal Parking Deck on Meadow Street has been experiencing problems. The deck will not entirely shed water, thus water ponds in several of the parking spots. This limits the use of these parking spots and inconveniences those who have leased those particular spots. This situation also makes the parking deck slick and dangerous for foot traffic, especially in the winter. Other problems are manifest such as inadequate lighting and the deterioration of the deck's surface. After negotiations, Walker Consultants has agreed to provide these services: 1. Meet with City representatives to confirm the needed program of the project. 2. Provide estimates of probable construction costs of needed repairs. 3. Prepare plans and specifications for the work. 4. Develop bid documents for the project. 5. Conduct a pre-bid meeting of interested Contractors. 6. Prepare any needed addenda to the bid documents. 7. Conduct a pre -construction conference with apparent low bidder. • • • 8. Negotiate a construction contract. 9. Review shop drawings in connection with the project. 10. Visit the work in progress no Tess than four times to oversee the progress. 11. Direct site meetings. 12. Issue clarifications of contract documents. 13. Review Contractor pay requests. 14. Prepare punch list near completion of the work. Budget Impact: The fee that Walker Consultants proposed for the above listed scope of work amounts to $24,000, with a reimbursable budget of not to exceed $5,250. The total fee and reimbursable is then $29,250. This amount is allotted in the Parking Management Budget. • • • 4 PARKING CONSULTANTS WALKER January 6, 2004 (Revised August 30, 2004) Mr. Coy Hurd, P.E. City of Fayetteville 113 West Mountain Street Fayetteville, Arkansas 72701 Re: Proposal for Restoration Design Services Meadows Street Garage Fayetteville, Arkansas Dear Mr. Hurd: WALKER PARKING CONSULTANTS 17049 El Camino Real Suite 202 Houston, TX 77058 Voice: 281.280.0068 Fax: 281.280.0373 www.walkerporking.com Walker Parking Consultants is pleased to submit for your review this proposal to provide Restoration Design Services for the above referenced protect. The services include the preparation of construction documents; bidding services, and construction administration. We are pleased with the opportunity to continue to provide restoration services for this protect. PROPOSED SCOPE OF SERVICES We understand that you would like Walker Parking Consultants to prepare construction documents to complete the recommended repairs identified in our November, 2003 Condition Appraisal Report. Walker proposes to prepare the Division 1 contract sections, technical specifications, construction plans, and repair details. The estimated construction budget for this work is $152,000. We will also provide Bidding and Construction Administration Phase services in order to document compliance with design intent. Following is a description of tasks to be performed: PHASE I - CONSTRUCTION DOCUMENT PREPARATION AND BIDDING SERVICES 1. Discuss with City of Fayetteville representatives confirmation of the program, budget and schedule, and establish lines of communication. 2. Prioritize the estimates of probable construction costs for the repairs. • • • WALKER PARKING CONSULTANTS • Mr. Coy Hurd May 10, 2004 (Revised August 30, 2004) Page 2 3. Prepare plans and details for the entire repair program. 4. Prepare final bid documents and technical specifications and distribute at the direction of the Owner's representative. 5. Prepare an updated engineer's estimate of the probable construction cost for the repairs. 6. Assist and be present at a pre-bid meeting to answer Contractor questions, and review the limitations and extent of work required by the repair documents. 7. Prepare addenda to the bid documents, if required. 8. Assist in the evaluation of bids and award of a contract to the successful bidder. PHASE II - CONSTRUCTION ADMINISTRATION AND OBSERVATIONS SERVICES 1. Direct a pre -construction meeting with the Contractor at the job -site to review each work item, establish construction quality control, and establish phasing of the repair work. 2. Review shop drawings and material sample submittals for conformance with the intent of the design documents. 3. Make visits to the job -site at intervals appropriate to the various stages of construction to observe the progress and quality of the contractor's work. A total of 4 visits, based on an estimated 2 months of construction are included in our fee estimate. 4. Direct protect progress meetings. These will be done in conjunction with scheduled observation trips discussed above. 5. Issue necessary interpretations and clarifications of the contract documents and assist in the resolution of problems or conflicts due to unforeseen latent conditions. 6. Review Contractor pay -requests and advise the City accordingly. 7. Prepare a punch list near project completion of Phase II and conduct a final protect review of punch list items addressed by the Contractor. • • • WALKER PARKING CONSULTANTS • Mr. Coy Hurd May 10, 2004 (Revised August 30, 2004) Page 3 PROFESSIONAL FEES AND EXPENSES PHASE 1 - CONSTRUCTION DOCUMENT PREPARATION AND BIDDING We propose to perform these services for a lump sum fee plus customary reimbursable expenses basis to complete documents as follows: FEE SCHEDULE Lump Sum $15,760.00 PHASE II - CONSTRUCTION ADMINISTRATION AND OBSERVATIONS We propose to perform these services for a lump sum fee plus customary reimbursable expenses basis to complete documents as follows: FEE SCHEDULE Lump Sum $8,240.00 All work would be completed in accordance with the terms and conditions of the attached Walker Document General Conditions of Agreement For Consulting Services and Standard Billing Rates. We suggest you budget the following for miscellaneous expenses for this protect: EXPENSE SCHEDULE Phase I Phase II $2,750.00 $2,500.00 • SCHEDULE • WALKER PARKING CONSULTANTS • Mr. Coy Hurd May 10, 2004 (Revised August 30, 2004) Page 4 We are prepared to start one week after receiving authorization to proceed. We estimate we can complete the design and bid document preparation to 90% within four (4) weeks for owner review and comments can be incorporated within one week upon reception Restoration contractors will use the documents that are prepared for bidding purposes. A typical bid period for restoration repair work is three weeks. We recommend a shorter period of 2 weeks to expedite the protect work. The successful contractor will then be the responsible party to complete the contract work as bid. Thank you again for the opportunity to propose on this project. If you need additional information, please do not hesitate to call at any time. If the above proposal meets your approval, please sign and return one copy of this letter as our Authorization and Notice to Proceed. Sincerely, WALKER PARKING CONSULTANTS Jim Moran, Vice President Managing Principal Lu Casey Wagner, P.E. Director of Operations Enclosures: General Conditions of Agreement For Consulting Services Standard Billing Rates AUTHORIZATION Trusting the above meets with your approval, please sign and return one copy of this proposal, indicating your acceptance and authorization to proceed. Approved by: Title: Date: 4 • STANDARD BILLING RATES - 2004 CONSULTING SERVICES WALKER PARKING CONSULTANTS PRINCIPALS Senior Principal $300.00 Principal $245.00 PROJECT MANAGEMENT Senior Protect Manager $215.00 Protect Manager $180.00 Assistant Protect Manager $140.00 PARKING CONSULTANTS Senior Parking Consultant $215.00 Parking Consultant $180.00 Parking Analyst / Planner $140.00 DESIGN Senior Engineer / Senior Architect $175.00 Engineer / Architect $140.00 Designer $130.00 TECHNICAL Senior Technician $113.00 Technician $ 98.00 Field Auditor $ 67.00 SUPPORT Senior Admin Assistant / Business Mgr $ 77.00 Administrative Assistant $ 57.00 Subject to annual adjustment on January 1 each year. • • RESOLUTION NO. A RESOLUTION TO APPROVE A CONTRACT IN THE AMOUNT OF $23,940.00 PLUS POSSIBLE EXPENSES OF UP TO $5,250.00 WITH WALKER PARKING CONSULTANTS/ ENGINEERS, INC. FOR ENGINEERING SERVICES RELATED TO THE REHABILITATION AND REPAIR OF THE MOUNTAIN STREET PARKING DECK BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the Agreement for Professional Engineering Services with Walker Parking Consultants/Engineers, Inc. in the amount of $23,940.00, plus expenses of up to $5,250.00 for a total of $29,190.00 as attached as Exhibit "A". PASSED and APPROVED this 5th day of October, 2004. ATTEST: By: SONDRA SMITH, City Clerk By: APPROVED: �4 DAN COODY, Mayor STAFF VIEW FORM - FINANCIAL OBLIGATI, XX AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council Meeting of: October 19, 2004 FROM: Coy Hurd Building Services Financial and Internal Services Name Division Department ACTION REQUIRED: The action required is the approval of a resolution accepting a proposed fee (not to exceed) of $29,250 from Walker Consultants for the design and oversight of renovation work at the Meadow Street Municipal Parking Deck. COST TO CITY: $29,250.00 217,814.00 Parking Deck Rehabilitation Cost of this request Category/Project Budget 21309130 5411.00 none Account Number Offstreet Parking Imporvements Funds Used to Date Program / Project Category Name 02085.1 $ 217,814.00 Offstreet Parking Project Number Remaining Balance Fund Name BUDGET REVIEW• Budget Manager Budgeted Item Date Budget Adjustment Attached CONTRACT/GRANT/LEASE REVIEW: nager City Attorne Date g123/p Date Guy c wft1,, 9�da�oy Int rnal A itor Date (SLIC Purchasing Manager Divisi ate Department Director Finance S Internal Services Dir. 1a4 �/ Chief / ini .ative • icer . tide Mayor Date Date 9 26-0)1 Date Received in Mayor's Office 9130164 Date /a Cross Reference: Previous Ord/Res#: Orig. Contract Date: Orig. Contract Number: New Item: Yes No Otaff Review Form - Page 2 Description Walker Consultants/Meadow St. Parking Deck Comments: Budget Manager Accounting Manager City Attorney 7 � ntu,... � yp,(5 ) oMei lirnlb- fC . r.ir . --)17-t• Purchasing Manager ADA Coordinator Internal Auditor Grants Coordinator • Meeting Date October 19, 2004 Reference Comments: