HomeMy WebLinkAbout153-04 RESOLUTION• •
RESOLUTION NO. 15 3- 04
A RESOLUTION APPROVING A CONTRACT WITH MULTI -
CRAFT CONTRACTORS, INC. FOR EMERGENCY REPAIRS TO
SECONDARY CLARIFIER NO. 1 AT THE NOLAND
WASTEWATER TREATMENT PLANT IN THE AMOUNT OF
$42,120.00.
BE IT RESOLVED BY THE .CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas
hereby approves a contract with Multi -Craft Contractors, Inc. for emergency
repairs to Secondary Clarifier No. 1 at the Noland Wastewater Treatment Plant
in the amount of $42,120.00
PASSED and APPROVED this 5th day of October 2004.
ATTEST.
By:
APPROVED:
By
...
E
``„PRj f1 �g ,,'
�GS�0'°.
.U� As
E--- :FAYETTEVILLE:
CONTRACT
This contract executed this 6441 day of OCitohll/ , 2004,
between the City of Fayetteville, Arkansas, and Multi -Craft
Contractors Inc. at PO Box 1760, Springdale, AR 72765-1760.
In consideration of the mutual covenants contained herein,
the parties agree as follows:
1. Multi -Craft Contractors Inc. at its own cost and expense
shall furnish all labor, materials, supplies, machinery,
equipment, tools, supervision, bonds, insurance, tax
permits, and all other accessories and services necessary
to complete items bid per bid 04-69 as stated in Multi -
Craft Contractors Inc bid proposal, and in accordance with
specifications attached hereto and made a part hereof under
Bid #04-69, all included herein as if spelled out word for
word.
2. The City of Fayetteville shall pay Multi -Craft Contractors
Inc. based on their bid proposal in an amount not to exceed
$42,120.00. Payments will be made after approval and
acceptance of work and submission of invoice. Payments
will be made approximately 30 days after receipt of
invoice.
3. The Contract documents which comprise the contract between.
the City of Fayetteville and Multi -Craft Contractors Inc.
consist of this Contract and the following documents
attached hereto, and made a part hereof:
A. Bid form identified as Invitation to Bid 04-69 with
the specifications and conditions typed thereon.
B. Multi -Craft Contractors Inc. bid proposal.
C. The Notice to Prospective Bidders and the Bid
Tabulation.
4. These Contract documents constitute the entire agreement
between the City of Fayetteville and Multi -Craft
Contractors Inc. and may be modified only by a duly
executed written instrument signed by the City of
Fayetteville and Multi -Craft Contractors Inc.
• •
5 Multi -Craft Contractors Inc. shall not assign it's duties
under the terms of this agreement.
6. Multi -Craft Contractors Inc. agrees to hold the City of
Fayetteville harmless and indemnify the City of
Fayetteville, against any and all claims for property
damage, personal injury or death, arising from Multi -Craft
Contractors Inc. performance of this contract. This
clause shall not in any form or manner be construed to
waive that tort immunity set forth under Arkansas Law.
7. Multi -Craft Contractors Inc. shall furnish a certificate of
insurance addressed to the City of Fayetteville, showing
that he carries the following insurance which shall be
maintained throughout the term of the Contract. Any work
sublet, the contractor shall require the subcontractor
similarly to provide worker's compensation insurance. In
case any employee engaged in work on the project under this
contract is not protected under Worker's Compensation
Insurance, Multi -Craft Contractors Inc. shall provide and
shall cause each Subcontractor to provide adequate
employer's liability insurance for the protection of such
of his employees as are not otherwise protected.
Workmen's Compensation Statutory Amount
Comprehensive General &
Automobile Insurance
Bodily Injury Liability
Property Damage Liability
$250,000 for each person
injured.
$500,000 for each
accident.
$100,000 aggregate.
The premiums for all insurance and the bond required herein
shall be paid by Multi -Craft Contractors Inc.
8. Multi -Craft Contractors Inc. to furnish proof of licensure
as required by all local and state agencies.
9. This contract may be terminated by the City of Fayetteville
or Multi -Craft Contractors Inc. with 10 days written
notice.
10. Freedom of Information Act: City of Fayetteville contracts
and documents prepared while performing city contractual
work are subject to the Arkansas Freedom of Information
Act. If a Freedom of Information Act request is presented
to the City of Fayetteville, the contractor will do
everything possible to provide the documents in a prompt
and timely manner as prescribed in the Arkansas Freedom of
Information Act (A.C.A. 25-19-101 et. Seq.). Only legally
authorized photo coping costs pursuant to the FOIA may be
assessed for this compliance.
BY
WITNESS OUR HANDS THIS 541 DAY OF Oclofier
MAYOR
ATTEST CLE
MULTI -CRAFT CONTRACTORS INC.
ATTEST: iF SECRETARY
4/1 sated
2004.
CITY OF FAYETTEVILLE,
FAYETTEVILLE, ARKANSAS
�.. ?YJTR ''�.,,
��':•-• Y R,r SG'P'a
� �P'
;FAYETTEVILLE'
W.111,4? SI;I'Veseiel
uumu %%
Pb. goy. (7W- SPt;N6OftLE /1 -12 -
BUSINESS ADDRESS 72745_(7b00
City of Fayetteville
Bid 04-69
INVITATION TO BID
DATE ISSUED: September 3, 2004
DATE & TIME OF OPENING: September 17, 2004 — 3:00 P.M.
BUYER: Peggy Vice, Purchasing Manager, Room 306 - (479) 575-8289
F.O.B. Fayetteville, AR
Part I- General
1.1
•
Specification for the Clarifier Drive Replacement
and
Inspection of Clarifier Drive Number 1
The Contractor shall provide all labor, tools, equipment, cranes, lubricants, new turntable
assembly, weather seal and supervision required to completely remove, replace, test and
place into satisfactory operation the clarifier turntable drive unit on clarifier drive 111.
Inspections of another clarifier drive to be selected by owner. These clarifier drives are
located at the Paul R. Noland Wastewater Treatment Plant, 1400 N. Fox Hunter Rd.,
Fayetteville, Alt 72701.
1.2 Work in this section shall be performed by a qualified Contractor who has experience in
- the repairing of wastewater treatment plant equipment.
1.3
Contractor will disconnect the electrical and mechanical equipment from the existing
turntable unit The sweep mechanism will be blocked and secured so that it will not be
damaged when the [amiable unit is removed and the new turntable is installed. The sweep
mechanism will be re -installed to the new turntable and leveled and set so it will rotate
around the entire clarifier with out rubbing the walls or the floor. The contractor is
responsible for adjusting the sweep so it operates properly. The. contractor is responsible
. for adjusting the scum rakes so they work properly. The Contractor will test the turntable
overload mechanism to insure it is set correctly and functions properly.
1.4 The contractor is responsible for the reinstallation of all electrical, water lines, walkways
and any other items removed in order to remove and install the clarifier drive.
1.5 The contractor will be responsible for the replacement of any fasteners that are not in good
condition.
1.6 Any electrical wiring that is damaged or worn will be replaced from existing junction to
the nearest junction toward the supply panel.
1.7, The primary drive unit will be removed from the existing turntable base drive and installed
on the new turntable base drive after the oil seals have been replaced in this unit.
1.8 All equipment and parts removed and or not reused will stay the property of the City and
will be turned over to the City upon the completion of the work.
1.9 Remove weather seal assembly and install new seal, after Dorr Oliver Representative
inspects additional clarifier drive. Owner will select this drive during the time the
contractor is on site.
1.10 Disassemble the old turntable for inspection, by the Dorr Oliver representative.
Part II- Parts and Products
2.1 The Contractor shall famish the Dorr-Oliver EIMCO clarifier turntable base drive unit
(T/T ASSY 4851 standard) , weather seal assembly (48S1, 04C11266 rev. 6 D/O ref.
04A1081401) and any other parts needed to be installed to make the clarifier drive
complete and functional.
2.2 All other parts, fasteners, sealant, gaskets and miscellaneous items are the responsibility
of the Contractor.
Part III- Execution
3.1 Completion
3.1.1 The Contractor has 14 continuous workdays to complete the work, after the
delivery of the turntable to the plant site.
3.2 Warranty
3.2.1 The Contractor shall release and convey all manufactures warranties to the City
of Fayetteville, AR
33 Testing
33.1 The Clarifier drive system and all components shall be reassembled on site and
tested on site and front of plant personnel. During the Contractor's test period
the clarifier drive system shall be adjusted as required to assure proper
operation. -
Proposals must conform to the following specification and include
appropriate evidence for each:
• Bidder shall have a state of Arkansas Contractors License if Bid
amounts are 20,000 or greater.
• Bidder shall have workers' compensation as required by Arkansas State
statutes.
• Bidder shall have general liability insurance as required at minimum of
$500,000.00
• A bid bond of 5% and 100% performance/payment bond are required if
bid amounts are $20,000 or more.
•
EXECUTION OF BID - Upon signing thls Bid, the bidder certifies that they have read and agree to
the requirements set forth in this bid proposal, including specifications, terms and standard
conditions, and pertinent information regarding the articles being bid on, and agree to fumish
these articles at the prices stated. Unsigned bids will be rejected. Items marked * are mandatory
for consideration.
*NAME OF FIRM:
Multi -Craft Contractors, Inc. Arkansas Contractor's License #0025810305
'BUSINESS ADDRESS:
P.O. Box 1760
•CITY: Springdale
*STATE: AR *ZIP: 72765-1760
*PHONE: 479-751-4330 *FAX: 479-751-4399
*AHORIZED SIG UR
`PRINTED NAME:
Dennis Kelly
*TITLE:
Executive Vice President
PLEASE NOTE: ALL ITEMS MARKED • ARE CONSIDERED MANDATORY REQUIREMENT
FOR CONSIDERATION OF BID. FAILURE TO COMPLETETHESEITEMS MAY RESULT IN
REJECTION OF BID.
THIS REQUEST FOR BID IS NOT TO BE CONSTRUED AS AN OFFER, A
CONTRACT, OR A COMMITMENT OF ANY KIND; NOR DOES IT COMMIT
THE CITY TO PAY ANY COSTS INCURRED BY THE BIDDER IN THE
PREPARATION OF THIS BID.
1. All bids shall be submitted on forms provided by the City with the item bid and the bid
number stated on the face of the sealed envelope. Bidders MUST provide the City with
their bids signed by an employee or officer having legal authority to submit bids on behalf
of the bidder. The entire cost of preparing and providing responses shall be borne by the
bidder.
2. Bids received after the date and time set for receiving bids will NOT be considered. The
City will NOT be responsible for misdirected bids. Vendor should call or e-mail the
Purchasing Office at (479) 575-8289 or purchasingtaci.favetteville.ar.us to insure receipt
of their bid documents prior to opening date and time listed on the bid form.
The City reserves the right to accept or reject any or all bids, waive formalities in the
bidding and make a bid award deemed to be in the best interest of the City.
4. The City assumes no responsibility for the safety of the Bidder during inspection of the
item listed herein.
5. Arrangements for inspection may be made by appointment with Stanley Williams
OMI Construction Coordinator 1400 N. Fox Hunter Rd, Fayetteville, Alt 72701.
Phone: 479-443-3292, Fax 479-443-5613, Cell: 479-530-2074
6. The item bld and the bid number shall be stated on the face of the sealed bid envelope.
Bids must be mailed to:
City of Fayetteville
Purchasing Office
113 W. Mountain St.
Fayetteville, AR 72701
t �►
Multi -Craft Contractors, Inc.
City of Fayetteville
Bid # 04-69
Clarifier Drive Replacement
And
Inspection of Clarifier Drive Number
Phone: 501-751-4330
Fax 501-751-4399
Post Office Box 1760
2300 Lowell Road
Springdale, AR 72765
Base Bid, including Bond: $35,084.00
Sales tax: 2,236 00
Total Base Bid: $37,320.00
Alternate adder: The specifications indicate that a Dorr Oliver
Representative must inspect the additional clarifier drive. When
contacted, they indicated that they usually do not find this necessary.
However if required, please add the following value for travel and fees
for the Dorr Oliver Representative:
1 day & travel: $2,400 00
Each additional day: $1,200.00
Thank you,
i)
Dennis Kelly
Executive Vice President
DK:pap
NN\Ke11y.City.Faye. W WTP.o4-69.Sept-i7.o4
The&Pain
Surety
BID BOND
•
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
United Stales Fidelity and Guaranty Company
Fidelity and Guaranty Insurance Underwriter, Inc.
Fidelity and Guaranty Insurance Company
Principal Office; 385 Washington Street
St. Paul, Minnesota 55102
Seaboard Surety Company
Principal Office: 5801 Smith Avenue
Baltimore, Maryland 21209
KNOW ALL MEN BY TII ESE PRESENTS, that Multi Craft Contractors Inc.
of Springdale, AR
as Principal,
and United States Fidelity & Guaranty Comp. a Maryland
bound unto City of Fayetteville
corporation, as Surety, arc hold and firmly
as Obligee, in the MI and just sum
of 5% of Bid Dollars
'«""""""""""""'«««" Dollars, lawful money of the United States, for the payment of which sum,
well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly
by these presents.
WHEREAS, the said Principal is herewith submitting its proposal
Clarifier Drive Replacement and Inspection of Clarifier Drive #1 04-69
THE CONDITION OF THIS OBLIGATION is such that if the aforesaid Principal shall be awarded the contract the said
Principal will, within the time required, enter into a formol contract and give a good and sufficient bond to secure the performance of
the terms and conditions of the contract, then this obligation to be void; otherwise the Principal and Surety will pay unto the Obligee
the difference in money between the amount of the bid of thc said Principal and thc amount for which thc Obligee legally contracts
with another party to perform the work if the latter amount be in excess of the former. but in no event shall liability hereunder exceed
the penal sum hereof
Signed, scaled and delivered 16th , day of September
Multi Craft Contractors Inc.
85274 Rev. 9-2000 Printed in LISA
411/7Jt+a.w...
2004
(Seal)
(Seal)
Artorney-m
Tabatha Moody
StPaVl Surety St. Paul Fin and Marine Insurance Company
S. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
Seaboard Surely Company
United States Fidelity and Guaranty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
5r. Pool Medical Liability lnsaraace Company
Bond No- Bid Bond
RIDER CONTAINING
DISCLOSURE NOTICE OF TERRORISM COVERAGE
This disclosure notice is required by the Terrorism Risk Insurance Act of 2002 (the
"Act"). No action is required on your part. This Disclosure Notice is incorporated in
and a part of the attached bond, and is effective the date of the bond.
You should know that, effective November 26, 2002, any losses covered by the
attached bond that are caused by certified acts of terrorism would be partially
reimbursed by the United States under a formula established by the Act. Under this
formula, the United States reimburses 90% of covered terrorism losses exceeding
the statutorily established deductible paid by the insurance company providing the
coverage.
Under the Act, there is a cap on our liability to pay for covered terrorism losses if the
aggregate amount of insured losses under the Act exceeds $100,000,000,000 during
the applicable period for all insureds and all insurers combined. In that case, we will
not be liable for the payment of any amount which exceeds that aggregate amount of
$100,000,000,000.
The portion of your premium that is attributable to coverage for acts of terrorism is
50.00.
IMPORTANT NOTE: THE COST OF TERRORISM COVERAGE IS SUBJECT TO
CHANGE ON ANY BONDS THAT PREMIUM IS CHARGED ANNUALLY.
•
•
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Seaboard Surety Company, SI. Paul
Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, United Stales Fidelity and Guaranty Company,
Fidelity and Guaranty Insurance Company, and Fidelity and Guaranty Insurance Underwriters, Inc. on September 2, 1998, which resolutions are now in full force and
effect, reading as follows:
RESOLVED, that in connection with the fidelity and surety insurance business of the Company, all bonds, undertakings, contracts and other instruments relating
to said business may be signed, executed, and acknowledged by persons or entities appointed as Attorney(s)-in-Fact pursuant to a Power of Attorney issued in
accordance with these resolutions. Said Power(s) of Attorney for and on behalf of the Company may and shall be executed in the name and on behalf of the
Company, either by the Chairman, or the President, or any Vice President, or an Assistant Vice President, jointly with the Secretary or an Assistant Secretary,
under their respective designations. The signature of such officers may be engraved, printed or lithographed. The signature of each of the foregoing officers and
the seal of the Company may be affixed by facsimile to any Power of Attomey or to any certificate relating thereto appointing Attomey(s)-in-Fact for purposes
only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and subject to any limitations set forth therein, any
such Power of Anomey or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company, and any such power so
executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to
which it is validly attached; and
RESOLVED FURTHER, that Attomey(s)-in-Fact shall have the power and authority, and, in any case, subject to the terms and limitations of the Power of
Attomey issued them, to execute and deliver on behalf of the Company and to attach the seal of the Company to any and all bonds and undertakings, and other
writings obligatory in the nature thereof, and any such instrument executed by such Attomey(s)-in-Fact shall be as binding upon the Company as if signed by an
Executive Officer and sealed and attested to by the Secretary of the Company.
I, Thomas E. Huibregtse, Assistant Secretary of Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company,
St. Paul Mercury Insurance Company, United States Fidelity and Guaranty Company, Fidelity and Guaranty Insurance Company, and Fidelity and Guaranty Insurance
Underwriters, Inc. do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force
and effect and has not been revoked
IN TESTIMONY WHEREOF, 1 hereunto set my hand this /(e day of
•
R.a}8'°,.
7b verify the authenticity of this Power of Attorney, call /.800.{2.1`)880 oath !r or rhg`•ver of
the above-named individuals and the details of the bond to wh A hepai?e�si � p�sd � y
g �33BBVV�" �b
ict �sa,O �b�
Thomas E. Huibregtse, Assistant Secretary.
Attorney clerk Please refer to the Power of Attorney number,
• •
NORTHWEST ARKANSAS EDITION
Arkansas Democrat° Gazette
RECEIVED
SEP 1 52004
AFFIDAVIT OF PUBLICATION'RCHASING
1
, .1. Il do solemnly swear that I am
Lega I -r • he .;.> Demo rat-Gazette/Northwest Arkansas
Times n: wspaper, printed and published in Lowell, Arkansas, and that
from my own personal knowledge and reference to the files of said
publication, that advertisement of:
b'rd was inserted in the .regular editions on
¶ fl$ . -1 ar 1412014
PO#
** Publication Charge: $ 145 . 00
Subscribed and sworn tp before me this
14
day of Stet , 2004.
Notary Public
My Commission Expires: o713S/.013
** Please do not pay from Affidavit.
An invoice will be sent.
Official Seal
SEAN-N'tOHAEt. ARGO
NOtaty pubiic-Arkansa
vWASrHiNGTONCOUNNs
_3
Pf:Y C
mission Expires 07-2_ �X
212 NORTH EAST AVENUE • P.O. BOX 1607 • FAYETTEVILLE, ARKANSAS 72702 • (501) 442-1700
HALM
CITY. OF FAYETTEVILLE
BID ATTENDANCE SHEET
BID NO. 4'CO
COMMODITY. 2 �
DATE:
TIME: c?: ad /9/77
TITLE.
7.
8.
NAME OF FILE:
CROSS REFERENCE:
Item #
Date
•
Resolution No. 153-04
w/Contract
Document
•
1
09/17/04
memo to mayor & City Council
2
Staff Review Form
3
memo to City Council
4
memo to Greg Boettcher from Burns & McDonnell
5
copy of
Forcasted Cash Flow
6
copy of Expected Construction Period
7
copy of Design
Contracts - September
Progression on Wastewater Design
2004
8
draft resolution
g
copy of Invitation to Bid, Bid 04-69
10
copy of Multi -Craft Contractors bid
11
copy of St Paul Insurance bid bond
12
copy of
St. Paul Insurance Rider
13
email to Greg Boettcher
14
memo to Greg Boettcher
15
16
NOTES:
es
//53V
aye vI leAo °u Gi P `Y
City Council Meeting of October 5, 2004
CITY COUNCIL AGENDA MEMO
To: Mayor and City Council
Thru: Hugh Earnest From: Greg Boettcher
Chief Administrative Officer Water/Wastewater Director
Date: September 17, 2004
Subject: Resolution authorizing award of a contract to Multi -Craft Contracts, Inc. for the
emergency repairs of Secondary Clarifier No. 1 at the Noland Wastewater Treatment
Plant. The funds for the repairs will be secured from the Plant Pumps & Equipment
Account.
RECOMMENDATION
Fayetteville City Administration recommends approval of resolution authorizing the Mayor to
execute a contract with Multi -Craft Contractors, Inc. in the amount of $42,120.00 (base bid plus
3 days of technical field services). This contract relates to emergency repairs on Clarifier No. 1 at
the Noland Wastewater Plant. the rebuilding of the Wiese -Flow Screens at the Noland
Wastewater Plant for $72,514.00 including approval of an associated budget adjustment.
BACKGROUND
Secondary clarifier no. 1 was installed as part of the last major upgrading project and has been in
service for approximately 18 years. The large clarifier mechanism's bearing support system
recently failed without notice causing damages to the steel scaper system and rupturing the
bearing turntable. Since this unit is to be continued in service as part of the upgrading plan and is
needed to handle peak flows, the repair of the mechanism is a necessary and prudent activity. A
new mechanism will be installed and the scope of work includes inspection of an adjacent
mechanism for signs of wear and impending failure. Due to the need to use a crane to remove
and install the clarifier no. 1 mechanism, the scope of this contract includes inspection and repairs
to a second unit to capture mobilization cost savings.
DISCUSSION
This work was advertised with sealed bids being opened on September 17, 2004, the sole and low
bid being submitted by Multi -Craft Contrators, Inc. Review of the.bid finds the prices to be
competitive and the expenditure justified. The funding for this activity will be secured from the
2004 budget for wastewater treatment plant capital.
BUDGET IMPACT
The approval of the resolution will have no adverse budget impact; the wastewater treatment
plant capital budget for 2004 has adequate capital improvement funds to enable the completion of
the proposed improvements.
X AGENDA REQUEST
CONTRACT REVIEW
GRANT REVIEW
STAFFIEW FORM - FINANCIAL OBLIGATION
For the Fayetteville City Council Meeting of:
October 5, 2004
FROM:
Greg Boettcher
Name
Water & Wastewater
Division
Wastewater Treatment Plant
Department
ACTION REQUIRED: Approval of an emergency repairs contract for secondary clarifier no. 1 with Multi -Craft
Contractors, Inc., referencing bid number 0469. The sole and low bid is $42,120.00 (base bid with 3 days of
technical field support). Funds for this work are available in the Plant Pumps & Equipment account.
COST TO CITY:
92/120, Da
Cost of this request
5400-5800-5414-00
Account Number
02069.1
Project Number
$ /�z,ls9
Category/Project Budget
$ /02/663
Funds Used to Date
$ 561, c/016
Remaining Balance
Plant Pumps & Equipment
Program Category / Project Name
Wastewater Treatment Improvements
Program / Project Category Name
Water & Sewer
Fund Name
BUDGET REVIEW:
Budget Manager
X Budgeted
2- Zg'e
Date
Item Budget Adjustment Attached
CONTRACT/GRANT/LEASE REVIEW:
'l2/S/4o
coo nntinngg Manager
City
City Attor$ey
Date
-MAL: r t,rccntirtt^
Internal 4y¢iitor
Purchasing Manager
9/20/ort
Date
9iaa10+
Date
STAFF RECOMMENDATION:
Division Head
Department Director
Finan e & Internal Services Dir.
Ch of : fl 'ni Officer
trative
Mayor
Date
Date
Date
2t
Date
Date
Received in Mayor's Office
Cross Reference:
Previous Ord/Res#:
Orig. Contract Date:
Orig. Contract Number -
New Item.
Staff Review Form - Page 2
Date
Yes
No
• •
Wetta
MEMORANDUM
Water and Wastewater Department September 30, 2004
TO: Fayetteville City Council
COPY TO: Hugh Earnest, David Jurgens
FROM: Greg Boettcher, Water and Wastewater
SUBJECT: October Agenda Items -Summary Information
Being unable to attend the City Council Agenda Session on September 28, 2004
(Farmington Mediation Meeting in Bentonville), the Sewer Committee suggested that the
attached information be shared with all of the City Council. In an abbreviated form, I
offer the following for your further awareness and information:
McClelland Engineering Contract -The contract covers planning, design and bidding .
phases of the Mount Sequoyah Pressure Plane Improvements Project. These services
were included in the project's 2004 budget.
Multi -Craft Contract Awards -These bids relate to the rebuilding of the Wiese -Flow
Screens and the replacement of a secondary clarifier mechanism at the Noland
Wastewater Plant. These activities are funded by the 2004 capital improvements budget
for the treatment plant.
Wiese -Flow Screen at Noland Wastewater Plant -To be rebuilt
•
Wee 1e
•
MEMORANDUM
Water and Wastewater Department September 30, 2004
Clarifier No. 1 Mechanism -To be replaced
Sales and Use Bond for Wastewater System Improvements Project -Sale of the
additional private market sales tax bonds has been coordinated with the Arkansas Soil
and Water Conservation Commission and is to be accomplished with equivalent
financing costs. Favorable tax receipts have retired the initial issue more rapidly than
predicted necessitating issuance of the second issue to protect the city's right to
continue collection of the approved %-cent sales tax for debt retirement purposes. The
wastewater improvements project continues to advance on schedule and will be
expedited by the expanded use of the private placement bonds. It is planned to
construct all of the east side pipelines and plant work using only city funds, removing the
approvals by ASWCC from the east projects' requirements and streamlining these
portions of the project. An updated project split, a predicted project schedule and the
anticipated cash flows from the various sources are included for reference It is
expected that the Department of Health approval of Contract EL -1 will be forthcoming in
the next few weeks allowing this work to be released for bids. The design of the west
side treatment plant has been completed and is not under review by the various state
agencies.
If there are questions on any of the current agenda items, please do not hesitate to
contact me at 575-8302.