HomeMy WebLinkAbout129-04 RESOLUTION• RESOLUTION NO.12 9- 0 4 A RESOLUTION TO APPROVE A CONSTRUCTION CONTRACT WITH CANDO, INC. FOR AMBER DRIVE DRAINAGE IMPROVEMENTS IN THE AMOUNT OF $71,703.40, PLUS A CONTINGENCY OF $15,755.51 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the contract attached as Exhibit "A" with Cando, Inc. for Amber Drive drainage improvements in the amount of $71,703.40, plus a project contingency of $15,755.51. PASSED and APPROVED this 7th day of September, 2004. ATTEST: By: 01.44600 SONDRA SMITH, City C6/144A) • By: APPROVED: DAN COODY, Mayor E G' G\ (Y .......... • SGP •F U;It FAYETfEVILLE• : ,EE syGatsr9RP•'J) y• KANS id, ..�o r1 • • s BID BOND Conforms with The American Institute of Architects, A.I.A. Document No. A-310 KNOW ALL BY THESE PRESENTS, That we, Cando, Inc. and the Employers Mutual Casualty Company as Principal, hereinafter called the Principal, of P.O. Box 712, Des Moines, Iowa , a corporation duly organized under the laws of the State of Iowa . as Surety, hereinafter called the Surety, arc held and firmly bound unto City of Faretteville,_Arltansas as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount of Bid Dollars (S 5% of Bid ), for the payment of which sum well and truly to be made, the said Principal and the said Surety. bind outsches, our heirs, executors. administrators, successors and assigns, Jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Amber Drive Drainane lmnrovements Fayetteville, Arkansas NOW. THEREFORE, if the Obligee skill accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in thc bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material burnished in the prosecution thereoff, or in the event of thc failure of the Principal to enter such Contract and give such bond or bonds. if the Principal shall pay to thc Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bit then this obligation shall be null and void. otherwise to remain in full force and effect. Signed and scaled this i ear.J _ • • 30th day of Wi 07.at;�. 4'!wzc Witness August 2004 Emmnlo ers Mutual Casualty Company y Schou_en At THE FACE OF THIS DOCUMENTt1AS A COLORED BACKGROI''"' ON WHITE PAPER • BACK OF THIS DOCUMENT HAS A SIM'.. ' TED WATERMARK - HGL r +T AH ANGLE TO VIEW. AV C Insurance Companies No. 585635 P.O. Box 712 • Des Moines, IA 50303-0712 CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY-IN-FACT KNOW ALL MEN BY THESE PRESENTS, that 1. Employers Mutual Casualty Company, an Iowa Corporation 5. Dakota Fire Insurance Company, a North Dakota Corporation 2. EMCASCO Insurance Company, an Iowa Corporation 6. EMC Property 8 Casualty Company, an Iowa Corporation 3. Union Insurance Company of Providence, an Iowa Corporation 7. The Hamilton Mutual Insurance Company, an Ohio Corporation 4. Illinois EMCASCO Insurance Company, an Iowa Corporation hereinafter referred to severally as 'Company" and collectively as "Companies", each does, by these presents, make, constitute and appoint: PAMELA K. HAYS, KNIGHT CASHION, BENSON A. CASHION, MATTHEW K. CASHION, JR., JUDY SCHOGGEN, WILLIAM H. GRIFFIN, CYNTHIA L. WADLEY, NICK W. PETERS, KAREN W. FREELAND, INDIVIDUALLY, LITTLE ROCK, ARKANSAS its true and lawfufIllattomey-in-fact, with full power and authority conferred to sign, seal, and execute its lawful bonds, undertakings, and other obligatory instruments of a IN INilar ae as AN ��OUNT NOT EXCEEDING TEN MILLION DOLLARS .($10,000,000.00) and to bind each Company thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of each such Company; and all of the acts of said attorney pursuant to the authority hereby given are hereby ratified and confirmed. April 1, 2005 The authority hereby granted shall expire unless sooner revoked. AUTHORITY FOR POWER OF ATTORNEY This Power-of-Attomey is made and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at a regularly scheduled meeting: of each company duly called and held in 1999: RESOLVED: The President and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers MutualCasualty Company shall have power and authority to (1) appoint attorneys -in -fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof, and (2) to remove any such attomey-in-fact at any time and revoke the power and authority given to him or her. Attorneys -in -fact shall have power and authority, subject to the terms and limitations of the power-of-attomey issued to them, to execute and deliver on behalf of the Company, and to attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof, and any such instrument executed by any such attomey-in-fact shall be fully and in all respects binding upon the Company. Certification as to the validity of any power-of-attorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and in all respects binding upon this Company. The facsimile or mechanically reproduced signature of such officer, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power-ofattomey of the Company, shall be valid and binding upon the Company with the same force and affect as though manually affixed. IN vyacESS WHEREOF, the Com ws have caused these p� Rts to be signed for each by their officers as shown, and the Corporate seals to be hereto affixed this day of Seals INSe74''' 4S 'a,Poe' 9''; € SEAL `t ' M' 5op'No"°°"4%'09' 3; SEAL ow9 j '1 0 ()MR.; 00,1 ,P � '€ 1953 •o • /O W,., ``r,3 UA, C'., 5 �'PP0F4�%(i :Of4 f _mss SEAL oc RUTA KRUMINS Commission Number 176255 My Comm. Exp. Seot. 30, 2006 Bruce G. Kelley, Chairman of Companies 2, 3, 4, 5 & 6; President of Company 1; Vice Chairman and CEO of Company 7 Jeffrey S. Birdsley Assistant Secretary 16th June 2004 On this _ day of AD before me a Notary Public in and for the State of Iowa, personalty appeared Bruce G. Kelley and Jeffrey S. Birdsley, who, being by me duly swom, did say that they are and are known to me to be the Chairman, President, Vice Chairman and CEO, and/or Assistant Secretary, respectively, of each of The Companies above; that the seals affixed to this instrument are the seals of said corporations; that said instrument was signed and sealed on behalf of each of the Companies by authority of their respective Boards of Directors; and that the said Bruce G. Kelley and Jeffrey S. Birdsley, as such officers, acknowledge the execution of said instrument to be the voluntary act and deed of each of the Companies. My Commission Expires September 30, 2006. Notary Public in and for the State of Iowa CERTIFICATE 1, David L. Hixenbaugh, Vice President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the Companies, e a June 16, 2004 �liiglg�r r ,s �e+�6f teSfe lg n an . on behalf of are true and correct and are still in fait force and effect. Cynthia L. Wadley, Nick W. Peters, Karen W. Freeland In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 30thda of ALgLst 7 dull 11. .]I I III,. Vice -President Form 7832(9102) "For verification of the authenticity of the Power of Attorney you ma call (515) 280-2689." NAME OF FILE: CROSS REFERENCE: Item # Date Resolution No. 129-04 w/Project Manual & Performance Bond Document 1 1 08/30/04 memo to mayor & City Council 2 list of bid opening 8/31/04 3 copy of Res. 114-04 4 copy of budget adjustment 5 Staff Review Form 6 memo to Mike Rozelle 7 draft of Amber Drive Drainage Improvements Project Manual 8 9 10 11 12 13 14 15 16 17 NOTES: aotc wr- as Aril City Council Meeting o September 7, 2004 CITY COUNCIL AGENDA REQUEST To: Mayor and City Council Thru: Hugh Earnest, Chief Administrative Officer From: Tim Conklin, Community Planning and Engineering Services Director( - Date: August 30, 2004 Subject: 1. Approval of a resolution awarding the construction contract in the amount of $71,703.40 with Cando, Inc. for the construction of Amber Drive Drainage Improvements. 2. Approval of a project contingency in the amount of $15,755.51 which includes $10,755.51 (15%) for unforeseen project expenditures and variations in final quantities, and $5,000 for materials testing, in-house management & inspection. RECOMMENDATION Staff recommends approval of the resolution awarding the contract to Cando, Inc. in the amount of $71,703.40 and establishing a project contingency of $15,755.51. BACKGROUND This drainage improvement project replaces existing undersized drainage infrastructure located near the corner of Old Wire Road and Amber Drive. This project is the result of Council's decision to address the drainage problems experienced by the neighborhood on three occasions this year which resulted in floodwater overtopping Amber Drive and flooding a house and shed located at 1312 Amber Drive. A conceptual design plan and estimate was presented to City Council on July 13, 2004. At that meeting council approved a budget adjustment to allocate $100,000 toward the project based on the concept presented on staffs estimate of costs. Bids were opened on August 30, 2004. One contractor submitted a bid in the amount of $71,703.40. DISCUSSION Bids were opened on August 30, 2004. One contractor submitted a bid in the amount of $71,703.40.The project engineer has reviewed the bids and recommends awarding the contract to Cando, Inc., in the amount of $71,703.40 (see the attached bid tabulation sheet). The estimated total project costs including the project contingency for unforeseen project expenditures are as follows: • City Council Meeting of September 7, 2004 Contractor Bid Amount Materials Testing In-house Management & Inspection 15% Contingency TOTAL BUDGET IMPACT $ 71,703.40 $ 3,500.00 $ 1,500.00 $ 10,755.51 $ 87,458.91 Funds of $100,000 are available as this project was budgeted through a budget adjustment approved July 13, 2004. 2 • • RESOLUTION NO. A RESOLUTION TO APPROVE A CONSTRUCTION CONTRACT WITH CANDO, INC. FOR AMBER DRIVE DRAINAGE IMPROVEMENTS IN THE AMOUNT OF $71,703.40, PLUS A CONTINGENCY OF $15,755.51 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS• Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the contract attached as Exhibit "A" with Cando, Inc. for Amber Drive drainage improvements in the amount of $71,703.40, plus a project contingency of $15,755.51. PASSED and APPROVED this 7th day of September, 2004. ATTEST: By: SONDRA SMITH, City Clerk APPROVED: By: DAN COODY, Mayor co co co- ca 41. 0 • • Amber Drive Drainage Improvements Bid Opening, August 30th @ 2:OOpm t' la' ��� El, tel �LlV,_�;;;;;.7:7,=e cc ,��taaa'"— - : � zr tal;;c;;; t \ \ } \ Relocate ex Sewer Service 'Lower 6" PVC Waterline IRemove and Reinstall 6' Wood Fence Drop Inlet Silt Fence (E-6) a / Baled Straw Ditch Check \� ®k #A 'Seeding and Mulching Concrete Apron ° ( Remove and Replace 9" Reinforced concrete street Modify Existing Area Inlet to Accept 22"x36" RCAP Area Inlet (5x5) 'Drop Inlet Extension (41)1 Curb Inlet (Type C Sx5') Curb Inlet (Type A 5'x5') 22" X 36" Reinforced Concrete Arch Pipe (RCAP) Concrete Curb and Gutter Aggregate Base Course (Class 7) } E. & . Unclassified Excavation R & D Concrete Sidewalk RD - ^ ` R & D 18" - 24" Corrugated Metal Pipe (CMP) 2 2 ƒ Excavation Safety Tree Protection Fencing Maintenance of Traffic Construction Staking ( E ' 7 , CY ,I „ ; EA 1 LF LF „ .r.;' .`Q ;;;;;;;E \ ; I Loa I ; 3.00 §w!§ g8gg ' 0.50 l °-� 888888888888g88g8.8;888!| --§,&"§;e§--5---fm ® '44,4, !§§\2,7 ■as8p.; [os'ss 4, »#5;] ■r aa» 1 53.200.00 - /))m;§;;;§,)§#\ 888888888888888 ® - - - 00f0Is 1 1 00' l} = *E o .. ,t;tt sa«;;;aaar;;; 88888 t 888 - - 88 ! 8 53.200.00' S2.O80.00I - *:a 888888888888888 - _u. a«;.saga«;aa -u. - - - - 00'SOnS Extended Price 2\\§#29#\e9 888888888;; $2,500.00 SI,000.00 SI00.00 §\\}29922§2 88888888888 0O'000'l$ 1 k#\\\} 88888° City of Fayetteville sags« 888 8 5375.001 {888 ■ae;; 8 ' S2,500.001 \\\\§/§\§\\\\7\\ a»«g«!aa«s«aa;:e 1oo'000'SS Extended Price Amber Drive Drainage Improvements Bid Opening, August 30th @ 2:OOpm RESOLUTION NO.114-04 A RESOLUTION TO APPROVE A BUDGET ADJUSTMENT OF $100,000.00 TO FINANCE DRAINAGE IMPROVEMENTS FOR AMBER DRIVE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment of $100,000.00 to finance drainage improvements for Amber Drive. PASSED and APPROVED this 20th day of July, 2004. ATTEST: •4SG': aV A. FAYETfEVILLE• 3 ti° •..• o 'e.,,NGT0tVeiiiii 52.``•. SONDRA SMITH, City Clerk APPROVED: BY: / .// D • "ttCOODY, Mayor �rt • City of Fayetteville, Arkansas Budget Adjustment Form Budget Year 2004 Department Sales Tax Capital Improvements Division: Program: Date Requested 7/20/2004 Adjustment Number Project or Item Requested: $100,000 in the Amber Drive Drainage Improvements capital project. Project or Item Deleted: $100,000 from the Stormwater Drainage Study capital project. Justification of this Increase: Justification of this Decrease: Sufficient funding remains to complete 2004 objectives. Account Name Bridge & drainage improve Increase Budget (Decrease Revenue) Account Number Amount Project Number 4470 9470 5817 00 100,000 04037 Decrease Budget (Increase Revenue) Account Name Account Number Amount Project Number Bridge & drainage improve 4470. 9470 5817 00 98,718 02097 1 Professional services 4470 9470 - 5314 00 1,282 02097 1 Approval Signatures Requested B :u•• et Mana•er "graMal 110 ent Dir tor. Date Date 722 Date Finance & Internal $Egvices Director Date Mayor j Date Budget Office Use Only Type: A B C Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log Initial Date Initial Date Initial Date Initial Date STAFF REVIEW FORM - FINANCIAL OBLIGATI. X AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council Meeting of: September 7, 2004 FROM: Michael Rozelle Engineering Comm. Planning & Engineering Svcs. Name Division Department ACTION REQUIRED: 1. Approval of a resolution awarding the construction contract in the amount of $71,703.40 with Cando, Inc. for the construction of Amber Drive Drainage Improvements. 2. Approval of a project contingency in the amount of $15,755.51 which includes $10,755.51 (15%) for unforseen project expenditures and variations in final quantities; and $5,000.00 for materials testing, in-house management and inspection. Bid opening was Monday August 30, 2004. COST TO CITY: $ 87,458.91 S 100,000.00 Amber Drive Drainage Improvements Cost of this request Category/Project Budget Program Category / Project Name 4470.9470.5817.00 S Account Number Bridge & Drainage Improvements Funds Used to Date Program / Project Category Name 04037 S Project Number 100,000.00 Remaining Balance Sales Tax Capital Improvements Fund Name BUDGET REVIEW: Budget Manager j( Budgeted Item Date X Budget Adjustment Attached CONTRACT/GRANT/LEASE REVIEW: 04. /ate .7431/e l Date 0410- n tt 4 i Ioq In rnal ditor Date Purchasing Manager Date STAFF RECOMMENDATION: Staff recommends approval of resolution and project contingency. Received in Mayor's Office Division Head Department Dire Finance &/IInnte Chief Admini ative Officer Mayor Date or Date % )lrte Date Date Date Date Cross Reference: Previous Ord/Res#: 114-04 Orig. Contract Date: Orig. Contract Number: New Item: Yes X No FAYETTEVALLE THE CITY OF FAYETTEVILLE, ARKANSAS City Clerk Division DEPARTMENTAL CORRESPONDENCE • 113 West Mountain Fayetteville, AR 72701 Telephone: (479) 575-8323 To: Mike Rozell Engineering Division From: Clarice Buffalohead-Pearman VV OCZ City Clerk Division Date: September 27, 2004 Re: Resolution No. 129-04 The City Council passed a resolution, September 7, 2004, approved a contract with Cando, Inc. for the Amber Drive Drainage Improvements. I have attached a copy of the resolution. This will also confirm that you picked up from Tracy the originals of the signed contracts. The resolution, with attachments, will be recorded in the city clerk's office and microfilmed. If anything else is needed please let the clerk's office know. /cbp attachments cc: Nancy Smith, Internal Auditor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I= 1 teafti- Project Manual Frist.,rS7-11-1 \f CITY OF FAYETTEVILLE ARKANSAS &z c4 /147/ Lit ; .bra/AGI.c 4292 Amber Drive Drainage Improvements BID # 04-62 August 2004 SET No. to Project Manual FAYET-IF EVI LLE CITY OF FAYETTEVILLE ARKANSAS Amber Drive Drainage Improvements BID # 04-62 August 2004 Section 00005 TABLE OF CONTENTS Amber Drive Drainage Improvements Section No. Title Pages 00005 Table of Contents 00005-1 to 00005-2 00020 Advertisement for Bids 00020-1 BIDDING REQUIREMENTS 00100 Instructions to Bidders 00100-1 to 00100-8 00300 Bid Form 00300-1 to 00300-6 00350 Bid Bond 00350-1 to 00350-3 CONTRACT FORMS AND CONDITIONS 00500 Agreement Form Between Owner & Contractor 00500-1 to 00500-6 Construction Performance Bond - Exhibit A 00500-7 Construction Payment Bond - Exhibit B 00500-8 Certificates of Insurance - Exhibit C 00500-9 Notice to Proceed 00500-10 00700 General Conditions 1 to 42 00800 Supplementary Conditions 00800-1 to 00800-12 SPECIFICATIONS Division 1 - General Requirements 01010 Summary of Work 01010-1 to 01010-2 01025 Measurement and Payment 01025-1 to 01025-10 01027 Applications for Payment 01027-1 to 01027-2 01035 Modification Procedure 01035-1 to 01035-3 01040 Coordination and Meetings 01040-1 to 01040-3 01051 Construction Surveys 01051-1 to 01051-2 01060 Regulatory Requirements 01060-1 to 01060-3 01090 Reference Standards and Abbreviations 01090-1 to 01090-3 01300 Submittals 01300-1 to 01300-3 01310 Progress Schedules 01310-1 to 01310-2 01410 Testing Laboratory Services 01410-1 to 01410-3 01500 Construction Facilities & Temporary Controls 01500-1 to 01500-4 01620 Storage and Protection 01620-1 to 01620-2 01630 Product Options and Substitutions 01630-1 to 01630-2 01700 Contract Closeout 01700-1 to 01700-5 Amber Drive Drainage Improvements City of Fayetteville Engineering Division August 16, 2004 Page 00005-1 Division 2 - Site Work 02050 Demolition 02100 Site Preparation 02161 Excavation Safety 02220 Excavation and Embankment 02230 Road Bed Preparation 02261 Site Restoration 02270 Slope Protection and Erosion Control 02500 Asphaltic Cement Paving 02600 Pipelaying 02720 Storm Sewer System 02900 Landscaping Division 3 - Concrete 02050-1 to 02050-2 02100-1 to 02100-3 02161-1 to 02161-1 02220-1 to 02220-9 02230-1 to 02230-5 02261-1 to 02261-5 02270-1 to 02270-3 02500-1 to 02500-5 02600-1 to 02600-5 02720-1 to 02720-3 02900-1 to 02900-9 03210 Reinforcing Steel 03210-1 to 03210-3 03316 Miscellaneous Concrete Work 03316-1 to 03316-10 End of Section 00005 Amber Drive Drainage Improvements City of Fayetteville Engineering Division August 16, 2004 Page 00005-2