HomeMy WebLinkAbout64-03 RESOLUTION• • RESOLUTION NO. 64-03 A RESOLUTION APPROVING, CONTINGENT UPON THE EXECUTION OF A LEASE AGREEMENT WITH THE UNIVERSITY OF ARKANSAS, TASK ORDER NO. 1 WITH McCLELLAND CONSULTING ENGINEERS, INC. FOR ENGINEERING SERVICES AND CONSTRUCTION OBSERVATION ASSOCIATED WITH THE CONSTRUCTION OF AN 80' x 120' HANGAR AT THE FAYETTEVILLE MUNICIPAL AIRPORT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves, contingent upon the execution of a Lease Agreement with the University of Arkansas, Task Order No. 1 with McClelland Consulting Engineers for engineering services and construction observation associated with the const -ruction of an 80' x 120' hangar at the Fayetteville Municipal Airport. PASSED and APPROVED this 6th day of May, 2003. �FrE,It; 't f r tat q i- �*. nth • •0 c A" TWOS' T By: Aoki, £ SONDRA SMITH, City Clerk APPROVED: By: DAN COODY Mayor • • TASK ORDER NO. 1 COMMERICAL HANGAR BUILDING FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on May _, 2003, as amended. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville and McClelland Consulting Engineers (MCE) sets forth the project description, project schedule, and engineering fees related to hangar improvements at the Fayetteville Municipal Airport. SECTION I - PROJECT DESCRIPTION The project is to consist of: assistance in applying for state funding for the project; the preliminary and final engineering design for a 120" by 80' Corporate Aircraft Hangar Building on the west side of the Airport; preliminary and final cost estimates; meetings with the City's Airport Department and their Tenant to review various aspects of the protect; and engineering services associated with detailed design and construction. 1:\DRAKE HELD \CONTRACrS\2003-2006\Task Order 1 doc • • SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), MCE will endeavor to execute the project as expeditiously as possible to enable the City of Fayetteville to solicit competitive bids for construction as soon as possible late June to middle of July 2003. SECTION III - SCOPE OF SERVICES MCE shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, this project is likely to include: A. Assisting the City of Fayetteville in making application for a grant from the Arkansas Department of Aeronautics. B. Topographic Surveying. C. Performing preliminary engineering including Geotechnical Report. D. Formulating preliminary and final construction cost estimates. E. Meeting with the City of Fayetteville and their Tenant to discuss design criteria, desired features, and schedule. F. Performing the detailed design of the construction project as determined by the City of Fayetteville and their Tenet. G. Advertising for competitive bids and recommending the award of a construction contract. H. Construction administration and inspection. I. Construction staking for a baseline and benchmark. 1:\DRAKE FIELD\CONIRACTS\2003-2006\Task Order I.doc • J. Construction materials testing. K. Providing a set of "Record Drawings upon the Contractor's mark-ups. SECTION IV - FEES AND PAYMENTS • at the completion of construction based The following fees are to be paid to MCE as compensation for his services: A. B. C. D. E F. G. H. Application to State: Topographic Survey : Geotechnical Investigation: Preliminary Engineering: Detailed Design: Bidding Service: : Construction Administration & Inspection: Construction Staking: a lump sum of a lump sum of a lump sum of a lump sum of a lump sum of a lump sum of $620. $900. $2,300. $18,100. $11,150. $1,200. hourly rates, estimated to be $21,750. a lump sum of $650. Construction materials testing: hourly rates & unit prices, estimated to be $2,600. Appendices Al B, C, & D presents hourly rates for personnel anticipated to be assigned to this project and the unit prices as well as the basis of payments to be made to the MCE SECTON V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. J:\DRAKE FIELD \CONTRACTS\2003-2006Vrask Order 1 doc • • IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE: By: at Mayor Attest: Date: 5— (a -03 FOR McCLELLAND CONSULTING ENGINEERS, INC.: By: Attest: (/tr-tet_ 1:\DRAKE FIELD \CON IRACIS\2003-2006\Task Order Ldoc EXTENDED TOTAL S » o » 1- 12195 „RInlnR14761�F-Spl -'-'8_'8888.8�yy�A8p8 a 5298 00 5405 25 S 00 8888=' -no 'o, �. r n 8 m r 1480 00 I 8 - 82 $- R - 88 r 121762.50 I 8 1 8 a x IRECT PENS 8. » 88 8 88 888'8 109'OSS 8 w 8• . » o w NLL YT. S 0000595 I _ S » n Y TT '� '� 38 g8 FF 8 S » 5650 00 1 E Y S 342 INSPECTOR 'MILEAGEI 143.00 10.35 1111 - C VI EE C' +» ^ 1� 00 400 $00§ ~IIN' O O 0 O n 8 C m» um O e » O O UCENSED SURVEYOR 560.00 e e o N CADD OPER.3 134.00 - 4 I mv- m No -- o mW o o o m CADD OPER. 2 149.00 2 le 3 I 2 hvhN NN 2 104h4h Nt 0 0 0 2 CADO OPER. 1 159.00 9 1 h 05 1 n g 0 0 0 0 0 zz VO S0 • I e o o O 2 2 IIIIIIIIII I 1 I 05 2004cc.d.-:ow n_.N_ m R R 0.5 I ^ PROJECT MGRJENGR. 190.00 n O _ ,g.„ - O O -N, - 05 1 N ' O O_ 0 N N N- N N 10 I 0 - O PROJECT DIRECTOR 1105.00 O - -- On - 1 1C z 0 F 2 y o Y N 4 F !APPLICATION TO STATE FOR FUNDING ISURVEVING T p a (GEOTECHNICAL. INVESTIGATION [PRELIMINARY ENGINEERING SCJlPINf. MFFTING u 2 i w 1 PRELIMINARY LAYOUT I 1 OE$ DEVELDRAWING ORGANIZATION GES. DEVEL. GRADING PLAN/SET ELEVATIONS 1 DES DEVEL. DRAINAGE PLAN DES DEVEL. UTILITY PLAW'UIILITY SERVICES 1 DFS DEVEL HANGAR PLANSIRUC(URAL 1 DES DEVEL: FLOOR/FOUNDATION PLAN DFS DEVEL AIRSIDE ACCESS PLAN IDES DEVEL.' LANOSIDE ACCESS PLAN OE$ DEVEL.' ELECTRICAUMECHANICAL RAN DES DEVEL. OFFICE PLAN wN 4 U LL LL w• 0 o UPDATE COST ESTIMATE IN.IIOU$E OA REVIEWS MEETING WITH OWNER SUBTOTAL, PRELIMINARY ENGINEERING DETAILED PLANS DETAIL DES DRAWING ORGANIZATION DETAIL DES ' GRADING PLAN 8 DETAILS DETAIL DES: DRAINAGE PLAN 8 DETAILS DETAIL DES.: UTILITY PLAN 8 DETAILS DETAIL DE$ HANGAR PLAN 8 DETAILS DETAIL DES - FLOOR/FOUNDATION PLAN UEtshL DE$ AIRSIDE err. 55 PIAN DETAILS DETAIL DES LANDSIDE ACCESS PLAN DF,TAILS DETAIL DES - ELECTR;CAL RAN 8 OETAILS 1 DETAIL DES - OFFICE PLAN 8 DETAILS 1 SPECIFICATIONS 1 INHOUSE REVIEWS I FINAL COST ESTIMATE REVIEW MEETING WITH OWNER REVISIONS TO PLANS 8 SPECS SUBTOTAL, DETAILED DESIGN u z o m CONSTR. ADMIN. AND INSPECTION CON$TR. ADMINISTRATION CONSTR INSPECTION SUBTOTAL, CONSTRUCTION PHASE CONSTRUCTION STARING CONSTRUCTION MILS TESTING (Estimated To Ba) GRAND TOTAL, ENGINEERING SERVICES �y Z 4 m V 0 w LL 0 Z - APPENDIX B TASK ORDER NO. 1 Hourly Rates for Personnel Fayetteville Municipal Airport CATEGORY Project Director Project Manager Engineer III Engineer 11 Engineer I Registered Surveyor Computer Technician Senior Engineering Technician Engineering Technician Survey Crew (2 man) Clerical Support CADD Technician III CADD Technician 11 CADD Technician! Soils Lab Supervisor Soils Technician 11 Soils Technician 1 1:\DRAKE FIELD \CONTRACTS\2003-2006\Appendix B TO!.doc BILLABLE HOURLY RATE RANGE $105 to $130 $85 to $105 $70 to $85 $50 to $70 $40 to $50 $40 to $55 $46 to $55 $55 to $65 $45 to $55 $80 to $105 $25 to $45 $50 to $60 $40 to $50 $25 to $40 $35 to $50 $30 to $35 $25 to $30 APPENDIX "C" TASK ORDER NO. 1 GEOTECHNICAL INVESTIGATION 80' BY 120' CORPORATE HANGAR DRAKE FIELD, FAYETTEVILLE MUNICIPAL AIRPORT April 25, 2003 Item No. Iltem Description / ASTM Designation 1 Quantity 1 Units 1 Unit Price 1 Extended 1 Equipment Mobilization and Demobilization ($2.10/mi each way; 1 LS 2 Boring Layout Boring Setup Charges 575.00 $75.00 Subtotal $75.00 1 HR $60.00 $60.00 3 EA $35.00 5105.00 3 Soil Drilling and Sampling, ASTM D-1586 & ASTM D-1587 Soil Drilling in Apron Area (3 Borings - 15 feet max. ) 75 LF 4 Soil and Rock Laboratory Testing ASTM D-2216, Moisture Content Determination ASTM D-4318, Liquid and Plastic Limit of Soils ASTM D-422, Gradation Analysis of Soils (6 Sieves ) ASTM D-2166. Dry Unit Weight of Soil Specimens ASTM D-2166, Unconfined Compressive Strength of Soils 5 Geotechnical Engineering Report and Recommendations Engineering Supervision (Project Manager) Engineering Analysis & Recommendations (Project Engr.) Boring Piot Log Preparation (Senior Draftsman) Boring Plot Plan Preparation (Draftsman) Report Preparation (Clerical) 20 EA 3 EA 3 EA 4 EA 2EA 2 HR 4 HR 2 HR 1 HR 1 HR Subtotal $165.00 58.50 $637.50 Subtotal 5637.50 512.00 $55.00 $50.00 $12.00 $40.00 $240.00 $165.00 $150.00 $48.00 $80.00 Subtotal $683.00 $105.00 $75.00 $60.00 $45.00 $35.00 5210.00 5300.00 $120.00 $45.00 535.00 Subtotal $710.00 ESTIMATED GEOTECHNICAL INVESTIGATION $2,270.50 J.1DRAKE FIELD \CONTRACTS \1999-2002Vee sheels\geotechfeeTol 5.wb3wj • • APPENDIX D CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 1 GENERAL: Laboratory Field Technician • AHTD-Qualified Technician' Engineering Technician • Senior Engineering Technician Lab Supervisor Consultation: Lab Supervisor Field Engineer Project Engineer Project Manager Principal Engineer Lab Report Preparation SOILS: AHTD-Qualified Field Technician Soils Field Technician (1 -hour minimum) In -Place Compaction Test -Nuclear Gauge ASTM D 2922 Sample Pickup Nuclear Density Gauge Fee (per project, per day) Liquid Limit, Plastic Limit, Plasticity Index (3 point) ASTM D 4318 Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140 Sieve Analysis -Dry ASTM D 422 Hydrometer Analysis ASTM D 422 Specific Gravity ASTM D 854 Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145 Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99 Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180 Potential Volume Change -Swell Pressure California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional) Shrinkage ASTM D 427 Soil Bearing Capacity (Engineering Tech., 2 -hour minimum) Non -ASTM Procedures Available On Request CONCRETE: Concrete Mix Design Review Concrete Mix Design (Lab Supervisor) Confirm Concrete Mix Design Concrete Field Technician ' (1 -hour minimum): [For any of the following 6 items] • Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 • Concrete Cylinder or Beam Molding ASTM C 31 • Concrete Cylinder or Beam Pickup • Concrete Slump Test ASTM C 143 • Concrete Air Content Test ASTM C 231 or C 173 • Cement Mortar or Group Sampling AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items] Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap) Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped) Spare Cylinders Specimens Processed but not Tested Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum) • ACI Grade I Concrete Field Testing Technician J jXr F t VGONTAC1s20011C(MPPO 0 TO I oot /n $ 32.00 per hour 38.00 per hour 50.00 per hour 61.00 per hour 45.00 per hour 45.00 per hour 65.00 per hour 75.00 per hour 105.00 per hour 120.00 per hour 30.00 per hour 38.00 per hour 32.00 per hour 15.00 each 48.00 each 35.00 per sieve 8.00 per sieve 90.00 each 50.00 each 110.00 each 120.00 each 135.00 each 100.00 each 150.00 each 50.00 each 45.00 per hour Price on Request 45.00 per hour Price on Request 32.00 per hour 38.00 per hour 10.00 each 15.00 each 10.00 each 45.00 per hour Pago of 2 APPENDIX D CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 1 CONCRETE (Continued): Flexural Strength of Concrete Beams ASTM C 78 or C 293 Spare Beam Specimens Processed but not Tested Compressive Strength of Grout Cubes Compressive Strength of Cement Mortar Cubes Concrete Coring (3" or 4"): Core Machine & Lab Technician Additional Lab Technician, as required Compressive Strength of Concrete Cores (3" or 4") Other Core Sizes Aggregate Sieve Analysis: Dry Sieve ASTM C 136 Wet Sieve ASTM C 117 Fineness Modules Decantation Deleterious Materials Specific Gravity and Absorption of Aggregate ASTM C 127 & C 128 Dry Rodded Unit Weight of Aggregate ASTM C 29 Sodium or Magnesium Sulfate Soundness (5 cycles) ASTM C 88 Additional Cycles ASPHALT: Asphalt Mix Design Review Asphalt Mix Design (Lab Supervisor) Asphalt Field Technician In -Place Compaction Test -Nuclear Gauge (Lab Technician) Sample Pickup Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids, Percent Voids in Mineral Aggregate (3 specimens per test) Extraction including percent Bitumen and Aggregate Gradation Laboratory Density of Cored Plugs including Depth Measurement Asphalt Coring (3" or 4"): Core Machine & Lab Technician Additional Lab Technician, if required Sample Pickup FIREPROOFING: Unit Weight, Bonding Strength, Thickness and Sampling (actual time required for Lab Technicians) Report Preparation (Lab Supervisor) STRUCTURAL STEEL: Bolt Torque Testing: Lab Technician(s) Field Engineer Pneumatic Torque Wrench Calibration (twice per day) Visual Weld Inspection Field Engineer Services not Listed are Available on Request ,OVAL SC. PCW:MC I AD>XOPAPPOQ o TOl OCC 25.00 20.00 20.00 15.00 60.00 32.00 30.00 each each each each per hour per hour each Price on Request 8.00 each 35.00 each 25.00 each 30.00 each 60.00 each 85.00 each 50.00 each 250.00 each 50.00 each 45.00 32 00 32.00 225.00 170.00 25.00 60.00 32.00 32.00 Price on Request per hour per hour per hour each each each per hour per hour per hour 32.00 per hour/Tech. 45.00 per hour 32 00 per hour 65.00 per hour 50.00 each 70.00 per hour Page 2 0l 2 NAME OF FILE: CROSS REFERENCE: Item # Date • Resolution No. 64-03 Document 1 1 04/15/03 Res. 64-03 w/Ex. A 2 04/23/03 Staff Review Form w/attachments memo to mayor and city council letter to Ray Boudreaux copy of proposed agreement handwritten note to Sondra Smith 3 05/12/03 memo to Ray Boudreaux NOTES: • FAYETTEA LLE THE CITY OF FAYETTEVILLE. ARKANSAS DEPARTMENTAL CORRESPONDENCE • To: Ray B. Boudreaux Airport From: Clarice Buffalohead-Pearman City Clerk's Division Date: May 12, 2003 Re: Resolution 64-03 Attached hereto is a copy of the above resolution passed by the City Council, May 6, 2003, approving Task Order No., 1 with McClelland Engineers, Inc., contingent upon the execution of a lease agreement with the University of Arkansas. (We are still waiting for a lease agreement). The original resolution and task order will be microfilmed and filed in the city clerk's office. If anything else is needed please let the city clerk's office know. /cbp Attachment(s) cc Nancy Smith, Internal Auditor AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW • STAFF REVIEW FORM entb c• Task Order ill - UA Hangar 5/0/03 McClelland Consult Engineers,. 67,03 'For the Fayetteville City Council Meeting of: /'lay bhi, 1 003 FROM: Ray M. Boudreaux Aviation & Economic Development Name Division Economic Development Department ACTION REQUIRED: Review and approval of Task Order #1 with McClelland Consulting Engineers, Inc., for Engineering design and construction oversite services to construct an 80'x120' hangar to be leased to the University of Arkansas Flight Department under long term agreement. Approval of a lease with the U of A which will be based on the construction cost of the hangar. The monthly lease to be paid from the U of A is estimated to be $2,530.60 and is based on a $400,000 construction contract. COST TO CITY: $60,000.00 S 500,000.00 Economic Devlopment Matches Cost of this request Category/Project Budget 4470.9470.5315.00 S Account Number Funds Used to Date 02050 S Program Category / Project Name Other Capital Improvements Program / Project Category Name 500,000.00 Sales Tax Capital Improvement Project Number Remaining Balance Fund Name BUDGET REVIEW: X Budgeted Item Budget 'Mana4er t3-07 Date Budget Adjustment Attached CONTRACT/GRANT/LEASE REVIEW: ina Acc oun ting Manager V City Attorney MARlith ahkU4-11C-cleVil. Date Internal Au itor Date Purchasing Manager X123103 Date 4 4a 403 Date STAFF RECOMMENDATION: Staff recomends approval of Task Order #1 with McClelland Consulting Engineers, Inc. 40101MI Department Director Date 1114442293 D3 a e 4-2-5-o3 Date Fin: nce & Internal Services Dir. Chie 'AQFlinistrative Mayor Date v Date Cross Reference New Item: X Yes Previous Ord/Resit: Orig. Contract Date Orig. Contract Number No • RESOLUTION NO. • 4967 CA+S.ad' A RESOLUTION APPROVING, CONTINGENT UPON THE EXECUTION OF A LEASE AGREEMENT WITH THE UNIVERSITY OF ARKANSAS, TASK ORDER NO 1 WITH McCLELLAND CONSULTING ENGINEERS, INC. FOR ENGINEERING SERVICES AND CONSTRUCTION OBSERVATION ASSOCIATED WITH THE CONSTRUCTION OF AN 80' x 120' HANGAR AT THE FAYETTEVILLE MUNICIPAL AIRPORT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayettev hereby approves, contingent upon the execution of a Gro University of Arkansas, Task Order No. 1 with McCle for engineering services and construction obse construction of an 80' x 120' hangar at the ;c yetteville PASSED and APPROVED this 6th day o th the eers th the _afc4frr. -K, I 4.01 ONDRA SMITH, City Clerk DAN COODY, Mayor • • RESOLUTION NO. • A RESOLUTION APPROVING, CONTINGENT UPON EXECUTION OF A LEASE AGREEMENT WITH UNIVERSITY OF ARKANSAS, TASK ORDER NO. 1 McCLELLAND CONSULTING ENGINEERS, IN ENGINEERING SERVICES AND CON OBSERVATION ASSOCIATED WITH THE CONS AN 80' x 120' HANGAR AT THE FAYETTEVI AIRPORT. E TH E TH FOR RUCTION UCTION OF MUNICIPAL BE IT RESOLVED BY THE CITY CO NCIL OF THE CITY OF FAYETTE LLE, ARKANSAS: Section hereby approves) University of Arka for engineering se construction of an 80 That the City Council o contingent upon the e sas, Task Order No. ices and cons 120' hangar a the City of Fayetteville;Agans�s ith the ineers th the ecution of a Groun with McClellan ction obserio the Fayetteville NI' PASSED and APPROV 1 this 6 K day of 2003. 2003. PROMS l DAN COODY, Mayor ATI' ONDRA SMITH, City Clerk FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DAN COODY, MAYOR TO: THRU: FROM: DATE: SUBJECT: MEMORANDUM Dan Goody, Mayor City Council Staff Review Committee Ray M. Boudreaux, Director, Aviation and .noi April 18, 2003 University of Arkansas lease and Hangar Project • lopment Background: Last Fall the University of Arkansas aircraft was damaged in an incident and as a result their aviation department acquired two aircraft to replace the one. They have a Beech King Air 200 and a Beech Jet 400. The hangar they currently lease from the airport will only hold one aircraft and it is really too small for either. The U of A has requested that we build them a hangar. They will sign a 20 year lease and will pay monthly at a rate equal to the cost to build the hangar amortized for 20 years at an agreed upon discount rate (approximately 4.5% . interest). This project meets the intent of the first Vision 2020 goal: "Our City The Home of the University of Arkansas," and supports guiding principals 4 thru 7. Purpose: The purpose of this action is to approve the task order to McClelland Consulting Engineers for the design, bid administration and construction oversight of a new hangar for the U of A and to approve the lease to the U of A for 20 years. The new hangar will be 120 X 80 and will be constructed at the southwest comer of the new executive ramp. Budget Considerations: The building will cost roughly $400,000 to build including engineering, bid administration and construction oversight. The U of A will pay a monthly rate of approximately $2530.60 if the total construction cost is $400,000. Funds are available in the economic development fund. Requested Action: Approve the new hangar for the U of A and Mayor, sign the contracts. Attachments: Staff Review Form Lease with U of A Budget Amendment Task Order 1 Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field 4500 South School Avenue, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director • McCLELLAND CONSULTING 1 OESILNEO ro SERVE / ENGINEERS, INC V.O. Box 1229 Fayetteville, Arkansas 72702-1229 479-443-2377 FAX 479-443-9241 April 18, 2003 Mr. Ray Boudreaux Airport Director, Fayetteville Municipal Airport 4500 S. School Suite F Fayetteville, AR 72701 Re: Proposed Task Order No. 15 80'x120' Corporate Hangar Dear Mr. Boudreaux: In response to your request, please find three (3) copies of Task Order No. 15 for the above referenced project. Please advise if you need further information regarding this Task Order. Thank you for this opportunity to extend our services. Sincerely, ELLAND CON . LTING ENGINEERS, INC. R. ayne Vice President Enclosure: ' Task Order No. 15 (3 copses) J:Q0031032109 \ conespondenceboudreaux-0418.9wpd:th • TASK ORDER NO. 15 C o MMERICAL HANGAR B LDING FAY STATE OF ARKANSAS COUNTY OF WASHINGTON AIRPORT This Task Order is written pursuant to FAYETTEVILLE, AGREEMENT FOR E 2003, as amended. The reference improvements to Drake Field, Fayette into and executed on the date indica sic agreement entitled CITY OF INEERING SERVICES, executed on April c agreement pertains to proposed icipal Airport. This Task Order entered d below the signature block, by and between the City of Fayetteville and McClelland onsulting Engi eers (MCE) sets forth the project description, project schedule, anengineering fees r= ated to hangar improvements at the Fayetteville Municipal Airpo SECTION I - PROJECT DE '• CRIPTION The project is to consist of assistance in applying for state funmg for the project; the preliminary and final eng eenng design for a 120" by 80' Corpo :te Aircraft Hangar Building on the west si•e of the Airport, preliminary and final cost : stimates; meetings with the City's Airport • epartment and their Tenet to review various' : spects of the project; and engine- ring services associated with detailed design and onstruction. G:\2003-2006\Tas Order 15.doc • • SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), MCE will endeavor to execute the project as expeditiously as possible to enable the City of Fayetteville to solicit competitive bids for constructionps soon as possible late June to middle of July 20031 SECTION III - SCOPE OF SERVICES MCE shall, generally provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, this project is likely to include: A. Assisting the City of Fayetteville in making application for a grant from the Arkansas Department of Aeronautics. B. Topographic Surveying. C. Performing preliminary engineering including Geotechnical Report. D. Formulating preliminary and final construction cost estimates. E Meeting with the City of Fayetteville and their Tenet to discuss design criteria, desired features, and schedule. F. Performing the detailed design of the construction project as determined by the City of Fayetteville and their Tenet. G. Advertising for competitive bids and recommending the award of a construction contract. H. Construction administration and inspection. I. Construction staking for a baseline and benchmark G:12003-20061Task Order I5.doc • • J. Construction materials testing. K. Providing a set of "Record Drawings" at the completion of construction based upon the Contractor's mark-ups. SECTION IV - FEES AND PAYMENTS The following fees are to be paid to MCE as compensation for his services: A. Application to State: • a lump sum of $620. B. Topographic Survey : a lump sum of $900. C. Geotechnical Investigation: a lump sum of $2,300. D. Preliminary Engineering: a lump sum of $18,100. E Detailed Design: a lump sum of $11,150. F. Bidding Service: : a lump sum of $1,200. G. Construction Administration & Inspection: hourly rates, estimated to be $21,750. H. Construction Staking: a lump sum of $650. I. Construction materials testing: hourly rates & unit prices, estimated to be $2,600. Appendices A, B, C, & D presents hourly rates for personnel anticipated to be assigned to this project and the unit prices as well as the basis of payments to be made to the MCE SECTON V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. G:\2003-2006\Task Order 15.doc