Loading...
HomeMy WebLinkAbout32-03 RESOLUTIONRESOLUTION NO. 32-03 A RESOLUTION APPROVING TASK ORDER NO. 14 IN AN AMOUNT NOT TO EXCEED SIXTY-SIX THOUSAND TWO HUNDRED DOLLARS ($66,200.00) WITH McCLELLAND CONSULTING ENGINEERS FOR ENGINEERING SERVICES ASSOCIATED WITH THE CONSTRUCTION OF A THREE -BAY CORPORATE HANGAR AT THE FAYETTEVILLE MUNICIPAL AIRPORT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby approves Task Order No. 14 in an amount not to exceed Sixty -Six Thousand Two Hundred Dollars ($66,200.00)with McClelland Consulting Engineers for engineering services associated with the construction of a three -bay corporate hangar at the Fayetteville Municipal Airport. PASSED and APPROVED this 4th day of March, 2003. By SONDRA SMITH, City Clerk APPROVED: By BOOL DAN COODY, Mayo, • • TASK ORDER NO. 14 FBO HANGAR FAYETTEVILLE MUNICIPAL AIRPORT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the basic agreement entitled CITY OF FAYETTEVILLE, AGREEMENT FOR ENGINEERING SERVICES, executed on March 7, 2000, as amended. The referenced basic agreement pertains to proposed improvements to Drake Field, Fayetteville's Municipal Airport. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville and McClelland Consulting Engineers (MCE) sets forth the project description, project schedule, and engineering fees related to hangar improvements at the Fayetteville Municipal Airport. SECTION 1 - PROJECT DESCRIPTION The project is to consist of: assistance in applying for state funding for the project; the preliminary and final engineering design for a 60' x 190', 3 bay, - 60' x 60' Corporate Hangar, Building on the east side of the East Apron Complex; preliminary and final cost estimates; meetings with the City to review various aspects of the project; and engineering services associated with detailed design and construction. Also design assistance with the Self -Serve Fueling Station and Consultation and assistance, as may be requested by the Airport Director and/or Airport Board. 1:\2003\032109\Task Orders\Task Order 14.doc • • SECTION II - PROJECT SCHEDULE From the time the City of Fayetteville issues the Notice To Proceed (NTP), MCE will endeavor to execute the project as expeditiously as possible to enable the Owner to solicit competitive bids for construction during the month of May 2003. SECTION III - SCOPE OF SERVICES MCE shall, generally, provide those services listed in the basic agreement which are applicable to this specific Task Order. Specifically, the project is likely to include: A Assisting the City in making application for a grant from the Arkansas Department of Aeronautics. B. Surveying. C. Performing preliminary engineering. D. Formulating preliminary and final construction cost estimates. E. Meeting with the City to discuss design criteria, desired features, and schedule. F. Performing the detailed design of the construction project as determined by the City. G. Coordinating with the Arkansas Department of Aeronautics to secure their review of the proposed project. H. Advertising for competitive bids and recommending the award of a construction contract. Construction administration and inspection. J. Construction staking for a baseline and benchmark. K. Construction materials testing. J:\2003\032109\Task Orders\'Task Order 14.doc • • L. Providing a set of "Record Drawings" at the completion of construction based upon the Contractor's mark-ups. SECTION IV - FEES AND PAYMENTS The following fees are to be paid to the Engineer as compensation for his services: A. Application to State: B. Topographic Survey : C. Geotechnical Investigation: D. Preliminary Engineering: E Detailed Design: F. Bidding Service: : G. Construction Administration & Inspection: H. Construction Staking: I. Construction materials testing a lump sum of a lump sum of a lump sum of a lump sum of a lump sum of a lump sum of $800. $1,500. $2,800. $14,500. $12,250. $1,200. hourly rates, estimated to be $20,500. a lump sum of $650. hourly rates & unit prices, estimated to be $2,500. J. Design Assistance with Self -Serve Fueling Station: hourly rates, est. to be $4,250. K. Consultation Services and Assistance to Airport Director and Airport Board at various meetings, as requested/required: hourly rates, estimated to be $5,250 Appendices A, B, C, & D presents hourly rates for personnel anticipated to be assigned to this project and the unit prices as well as the basis of payments to be made to the MCE. J:\2003\032109\Task Ordcrs\l'ask Order 14.doc SECTON V - BASIC AGREEMENT IN EFFECT: Except as amended specifically herein, the basic AGREEMENT FOR ENGINEERING SERVICES shall remain in full force as originally approved and executed. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be duly executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE: FOR McCLELLAND CONSULTING ENGINEERS, INC.: Vice President J:\2003\032109\Task Orders\Task Order 14.doc EXTENDED' TOTAL 8 d SZT851 88888. .8 _ $25 001 888 5125001 888 8888 31052001 28828882W2 8 316.832 501 8 2 8 8 8 2 uw z'3 W R» 8 8 88 8 R 8g8 3 >8 $o F >>88i2.4 88»» 8 8 8 8 Vi »- 8 2 8 9 w ro » 8 8 2 8 8 » e Y y § Y y ]�5]j{j 4 8 x 8 St 88 iR 8 2 8 A 8 8 » O; 12 s 0 R - ' ' ee = 3 INSPECTOR $38.00 no o CLERK TYPIST $35.09 » - 2 3 So R - - INA - e 0 0 0 o. n SURVE CREW 333.00 0 r m 1 3 0 e o .-' 1 0 e LICENSE0DF SURVEY 38000 o n - - 0 0 0 - 0 n « No $� o" a -. m .. m „.m mg a 0 0 0 n on8 o n n an- l ^ n -nn N 2 4 n J 0 » gag VWNe 0 n • n o o e o ENGINEERING TECHNICIAN S5700 tw8 W112 oW WI 05 0OhN OL 32 0 PROJECT MGR IENGR. 190.00 - o ---- 05 "'-- SO n o0nnn`o'n„ n- • ] 01 o e � 2 Y» teas Ng0 0o - - n ._ ita .. � j 1 TASK DESCRIPTION _ [APPLICATION TO STATE FOR FUNDING SURVEYING TOPOGRAPHIC SURVEY JGEOT ECIINICAL. INVESTIGATION PRELIMINARY ENGINEERING 1 SCOPING MEETING 1 1 SURVEYING 1 PRELIMINARY LAYOUT ULS DLVEL DRAWN(: ORGANIZATION DFS DEVEL GRADING PLAN/SET ELEVATIONS I 1 DES DEVEL DRAINAGE PLAN/COORD WWAPRON DES DEVEL UTILITY PI AN/UTILITY SLRVICES DES DEVEL HANGAR PLANSTRUCTl1RAURR 1 DES DEVEL PAVING SECTIONS 1 DES DEVEL AIRSIDE ACCESS PLAN 1 DFS DEVEL LANDSIDE ACCESS PLAN DES DEVEL ELECTRICAL PLAN OUTLINE SPECIE ICA IIONS UPDATE. COST ESTIMATE. INHOUSE OA REVIEWS MIL I TNG WIIII OWMLR SUBTOTAL, PRELIMINARY ENGINEERING DETAILED PLANS DETAIL DES DRAWING (IRGANILAI ION DETAIL DES GRADING PLAN & DETAILS DE TAIL DES DRAINAGE PLAN 8 DETAILS DETAIL DES UTILITY PLAN & DETAILS DETAILED DES HANGAR PLAN 8 DETAILS/RR DL TAIL DIS PAVING DE TAILS DF.TAII. DES AIRSIDE ACCESS PLAN DETAILS DETAIL DES LANDSIDE ACCESS PLAN DETAILS DETAIL DES ELECTRICAL PLAN 8 DETAILS 1 SPECIFICATIONS s J 0 O FINAL COST ESTIMATE REVIEW MEETING WITH OWNER REVISIONS TO PLANS & SPECS — _ SUBTOTAL, DETAILED DESIGN 1 0 Z 8 o CONSTR. ADMIN. AND INSPECTION CONSTR ADMINISTRATION _1 CONSTR INSPECTION J SUBTOTAL, CONSTRUCTION PHASE CONSTRUCTION STAKING 1 CONSTRUCTION MILS TESTING (Estimated To Be) 1 o L To L 2 LI 5i E c j 4 8 Consultation Services to Airport (Various Meetings) 1 GRAND TOTAL, ENGINEERING SERVICES 1 J 4 m V O w u 0 S - -,x Tosn._Order Nola APPENDIX B TASK ORDER NO. 14 Hourly Rates for Personnel Fayetteville Municipal Airport CATEGORY Project Director Project Manager Engineer III Engineer II Engineer I Registered Surveyor Computer Technician Senior Engineering Technician Engineering Technician Survey Crew (2 man) Clerical Support CADD Technician III CADD Technician II CADD Technician I Soils Lab Supervisor Soils Technician II Soils Technician I J:\DRAKE FIELD \CONTRACTS\Appendix B Hourly Rates T014.doc BILLABLE HOURLY RATE RANGE $105 to $130 $85 to $105 $70 to $85 $50 to $70 $40 to $50 $40 to $55 $46 to $55 $55 to $65 $45 to $55 $80 to $105 $25 to $45 $50 to $60 $40 to $50 $25 to $40 $35 to $50 $30 to $35 $25 to $30 APPENDIX "C" TASK ORDER NO. 14 GEOTECHNICAL INVESTIGATION THREE BAY 60' BY 60' CORPORATE HANGARS DRAKE FIELD, FAYETTEVILLE MUNICIPAL AIRPORT February 14, 2003 I Item No. 'Item Description / ASTM Designation 1 Quantity 1 Units 1 Unit Price 1 Extended 1 Equipment Mobilization and Demobilization ($2 10/mi each wa 1 LS 2 Boring Layout Boring Setup Charges $100.00 $100.00 Subtotal 5100.00 1 HR $60.00 $60.00 4 EA $35.00 5140.00 3 Soil Drilling and Sampling, ASTM D-1586 & ASTM D-1587 Soil Drilling in Apron Area ( 5 Borings - 15 feet max. ) 75 LF 4 Soil and Rock Laboratory Testing ASTM D-2216, Moisture Content Determination ASTM D-4318, Liquid and Plastic Limit of Soils ASTM D-422, Gradation Analysis of Soils (6 Sieves ) ASTM D-2166, Dry Unit Weight of Soil Specimens ASTM D-698, Standard Proctor Test 24 EA 6 EA 6 EA 10 EA 1 EA Subtotal $200.00 $8.50 $637.50 Subtotal $637.50 $12.00 $55.00 $50.00 $12.00 $110.00 $288.00 $330.00 $300.00 $120.00 $110.00 Subtotal 51,148.00 ESTIMATED GEOTECHNICAL INVESTIGATION $2,085.50 J:\DRAKE FIELD\CONTRACTSVee sheets\geotechfeeT014.wt3:wj • • APPENDIX D CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 14 GENERAL: Laboratory Field Technician AHTD-Qualified Technician' Engineering Technician • Senior Engineering Technician Lab Supervisor Consultation: Lab Supervisor Field Engineer Project Engineer Project Manager Principal Engineer Lab Report Preparation SOILS: AHTD-Qualified Field Technician Soils Field Technician (1 -hour minimum) In -Place Compaction Test -Nuclear Gauge ASTM D 2922 Sample Pickup Nuclear Density Gauge Fee (per project, per day) Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318 Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140 Sieve Analysis -Dry ASTM D 422 Hydrometer Analysis ASTM D 422 Specific Gravity ASTM D 854 Soils Classification, Unified or AASHTO ASTM D 2487 or AASHTO M 145 Laboratory Maximum Compaction Test ASTM 0 698 or AASHTO T 99 Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180 Potential Volume Change -Swell Pressure California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional) Shrinkage ASTM D 427 Soil Bearing Capacity (Engineering Tech., 2 -hour minimum) Non -ASTM Procedures Available On Request CONCRETE Concrete Mix Design Review Concrete Mix Design (Lab Supervisor) Confirm Concrete Mix Design Concrete Field Technician * (1 -hour minimum): [For any of the following 6 items] • Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 • Concrete Cylinder or Beam Molding ASTM C 31 • Concrete Cylinder or Beam Pickup • Concrete Slump Test ASTM C 143 • Concrete Air Content Test ASTM C 231 or C 173 • Cement Mortar or Group Sampling AHTD-Qualified Concrete Technician: [For any of the foregoing 6 items.] Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap) Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped) Spare Cylinders Specimens Processed but not Tested Schmidt Hammer Testing (Engineering Tech, 2 -hour minimum) J 1DRAKE FEIDCORTRACTS tfduo T014 .oam • ACI Grade I Concrete Field Testing Technician $ 32.00 per hour 38.00 per hour 50.00 per hour 61.00 per hour 45.00 per hour 45.00 per hour 65.00 per hour 75.00 per hour 105.00 per hour 120.00 per hour 30.00 per hour 38.00 per hour 32.00 per hour 15.00 each 48.00 each 35.00 per sieve 8.00 per sieve 90.00 each 50.00 each 110.00 each 120.00 each 135.00 each 100.00 each 150.00 each 50.00 each 45.00 per hour Price on Request 45.00 per hour Price on Request 32.00 per hour 38.00 per hour 10.00 each 15.00 each 10.00 each 45.00 per hour Page 1 of 2 APPENDIX D CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE TASK ORDER NO. 14 CONCRETE (Continued): Flexural Strength of Concrete Beams ASTM C 78 or C 293 25.00 each Spare Beam Specimens Processed but not Tested 20.00 each Compressive Strength of Grout Cubes 20.00 each Compressive Strength of Cement Mortar Cubes 15.00 each Concrete Coring (3" or 4"): Core Machine & Lab Technician Additional Lab Technician, as required Compressive Strength of Concrete Cores (3" or 4") Other Core Sizes Aggregate Sieve Analysis: Dry Sieve ASTM C 136 8.00 each Wet Sieve ASTM C 117 35.00 each Fineness Modules 25.00 each Decantation 30.00 each Deleterious Materials 60.00 each Specific Gravity and Absorption of Aggregate ASTM C 127 & C 128 85.00 each Dry Rodded Unit Weight of Aggregate ASTM C 29 50.00 each Sodium or Magnesium Sulfate Soundness (5 cycles) ASTM C 88 250 00 each Additional Cycles 50.00 each 60.00 per hour 32.00 per hour 30.00 each Price on Request ASPHALT: Asphalt Mix Design Review Asphalt Mix Design (Lab Supervisor) Asphalt Field Technician In -Place Compaction Test -Nuclear Gauge (Lab Technician) Sample Pickup Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids, Percent Voids in Mineral Aggregate (3 specimens per test) Extraction including percent Bitumen and Aggregate Gradation Laboratory Density of Cored Plugs including Depth Measurement Asphalt Coring (3" or 4"): Core Machine & Lab Technician Additional Lab Technician, if required Sample Pickup FIREPROOFING: Unit Weight, Bonding Strength, Thickness and Sampling (actual time required for Lab Technicians) Report Preparation (Lab Supervisor) STRUCTURAL STEEL: Bolt Torque Testing: Lab Technician(s) Field Engineer Pneumatic Torque Wrench Calibration (twice per day) Visual Weld Inspection Field Engineer Services not Listed are Available on Request J ORME PELOCONTRACTSMp .Mo O T014 ..pp fen Price on Request 45.00 per hour 32.00 per hour 32 00 per hour 225.00 each 170.00 each 25.00 each 60.00 per hour 32.00 per hour 32.00 per hour 32.00 per hour/Tech. 45.00 per hour 32.00 per hour 65.00 per hour 50.00 each 70.00 per hour Page 2 of 2 FAYETTEVI LLE THE CITY OF FAYETEVILLL LIKANSAS DEPARTMENTAL CORRESPONDENCE Ray Boudreaux Airport From: Clarice Buffalohead-Pearman City Clerk's Division Date: 3/10/2003 Re: Resolution No. 32-03 A copy of the above resolution passed by the City Council, March 4, 2003 is attached hereto. Also attached are two of three original copies of Task Order No. 14 with McClelland Engineers. If anything else is needed please let the city clerk's office know. The originals) of this information will be microfilmed and filed in the city clerk's office. /cbp cc Nancy Smith, Internal Auditor NAME OF FILE: CROSS REFERENCE: Item # Date Resolution No. 32-03 Document 1 03/04/03 Res. 32-03 w/Task Order No. 14 2 02/20/03 Staff Review Form w/attachments: because James picked up 2/14/03 memo to mayor/city council 2/14/03 letter to Boudreaux from McClelland Eng NOTES: no memo to airport personnel w/copy of task order because James picked up after the mayor signed. i • AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of March 4, 2003 STAFF REVIEW FORM 3? -03 rgSK O'dar fie.1 cJe11a4d SiLtl°3 FROM: Ray M. Boudreaux Airport Division Name Aviation & Economic Development Department ACTION REQUIRED: Review and approve Task Order No. 14 with McClelland Consulting Engineers for engineering services to design and construct three small corporate hangars at Fayetteville Municipal Airport, Drake Field. COST TO CITY: 66,200 Cost of this Request 5550.3960.5314.00 Account Number • Project Number 450,000 Category/Protect Budget 0 Funds used to date 450,000 Remaining Balance Services/Charges Category/Project Name Capital Program Name _Airport Fund 2R.1 G T REVIEW: J/2 Budget Manager 2 &03 Date X__ Budgeted Item Budget Adjustment Attached Administrative Services Dir. Date CONTRACT/GRANT/LEASE REVIEW: � ;j ofeP co ung Man ger ate Internal Audi Ctj mey Dit19 SADA Coordinator Purchasing Officer • c hAL t/18/o3 Date GRANTING AGENCY Date Date Grants Coordinator Date STAFF RECOMMENDATION: Approve Task Order No. 14 & Mayor sign the agreement. Cross Reference New Item: Yes X No Prev. Ord/Res#: Orig Cont. Date: Orig Cont #: • STAFF REVIEW FORM Page 2 Meeting Date: N/A Comments: Task Order No.14 approved by the Airport Board at their meeting February 13, 2003. Project is budgeted and funds are available. Review and approve Task Order No. 14 for signature by Mayor. Budget Manager Accounting Manager City Attorney Purchasing Officer Internal Auditor ADA Coordinator Grants Coordinator Reference Comments: Reference Comments: Reference Comments: Reference Comments: Reference Comments Reference Comments: Reference Comments: FAYETTEVILLE THE CITY OF FAYETTEVILLE, PRKANSAS DAN COODY, MAYOR TO: THRU: FROM: DATE: SUBJECT: MEMORANDUM Dan Coody, Mayor City Council Members Staff Review Committee Ray M. Boudreaux, Directorcbnomic Development February 14, 2003 McClelland Consulting Engineers Task Order No. 14, Small Corporate Hangars And Self Serve Fuel System. r Background: The Airport Board approved at their meeting of February 13, 2003, construction of three small corporate hangars and a self serve fuel system. This task order is for design through construction of the projects and is in an amount NTE $66,200. The three small corporate hangars are in a single building with three bays each being 60' X 60' and 3600 square feet. Each hangar will be available for separate tenants and each will have separate entrances and separate utility services. They will have heat and small unisex bathrooms and able to hold up to a King Air 350. The three hangar building is estimated to cost $450,000 including engineering. We will apply for a State grant with the Department of Aeronautics for a portion of the cost. The self serve system will be located on the east side of the airport and will be primarily for the east side tenants. The tank system, a 500 gallon 100LL double well Avgas tank is estimated to cost $20,000. We will apply for a state grant for the credit card dispensing equipment and inventory control system. Purpose: Review, approval and signature by the Mayor Budget Considerations: Funds are available and budgeted. Requested Action: Mayor sign the contract. Attachments: Staff Review Form Task order No. 14 (3 Copies) Aviation and Economic Development Department Fayetteville Municipal Airport, Drake Field 4500 South School Avenue, Suite F Fayetteville, Arkansas 72701 Ray M. Boudreaux, Director 4 MttMcCLELLAND CONSULT/NG ENGINEERS, INC. / DESIGNED 10 SIM / PO. Box 1229 Fayetteville, Arkansas 72702-1229 501-443-2377 FAX 501-443-9241 February 14, 2003 Mr. Ray Boudreaux Airport Director, Fayetteville Municipal Airport 4500 S. School Suite F Fayetteville, AR 72701 R ECE6VE D FEB 1 4 2003 AIRPORT Re: Proposed Task Order No. 14 3 Bay 60'x60' Corporate Hangars Dear Mr. Boudreaux: In response to your request, please find three (3) copies of Task Order No. 14 for the above referenced project. Please advise if you need further information regarding this Task Order. Thank you for this opportunity to extend our services. Sincerely, LAND CONSULTING ENGINEERS, INC. iI iyJone:, • E Iden Enclosure: Task Order No. 14 (3 copies) J:220031032109'boudreaux-0214.wpd-.ch