Loading...
HomeMy WebLinkAbout21-03 RESOLUTION• • • RESOLUTION NO. 21-03 A RESOLUTION TO APPROVE CHANGE ORDER #1 TO THE CONTRACT WITH TOMLINSON ASPHALT, INC. FOR INCREASED WATER AND SEWER COSTS AND A BUDGET ADJUSTMENT OF $67,198.00 NOW, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order #1 to the contract with Tomlinson Asphalt, Inc. attached as Exhibit "A" and a budget adjustment of $67,198.00. PASSED and APPROVED this the 4th day of February, 2003. V• By: Osaka, j6i Sondra Smith, City Clerk APPROVED: By tit DAN COODY, May. • • CHANGE ORDER Order No. 1 Date: January 15, 2003 Agreement Date: October 15 . 2002 NAME OF PROJECT: Executive Hangar Complex - Drake Field OWNER: City of Fayetteville (Airport Department) CONTRACTOR: Tomlinson Asphalt Company. Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Add Bid Item No. 50 for 4' Force Main from Pump Station to Manhole on Parker Street in Greenland including trenching. backlit!, trace wire and stone backfill over the upper foot along Parker Street: 861 Linear Feet at 513.80 per linear foot. Add cost of $ 11,881.80 to contract. 2. Add BId Item No. 51 for 3 - 4 -inch 45' bends In 4 -Inch force main: 3 Each at 5207.00 per each. Add cost of $ 621.00 to contract 3, Add Bid Item No. 52 for Force Main Cleaning Pig launcher1 Each at 54,200.00 per each. Add cost of $ 4.200.00 to contract. 4. Add BId Item No. 53 for Force Main connection to existing Manhole including valve box for trace wire termination: 1 Lump Sum at 52,874 per lump sum. Add cost of $ 2,874.00 to contract. 5. Add Bid Item No. 54 for 12 -inch steel casing of force main under creek: 24 LF at $ 72.00 per linear foot. Add cost of 5 1,728.00 to contract. 6. Add Bid Item No. 55 for Asphalt Street repair to Parker Street: 99 LF at $ 28.75 per linear foot Add cost of $ 2,846.25 to contract. 7, Add Bid Item No. 56 for 1 foot of Additional Sewer Line Trench Depth tor Line 1: 562 LF at $ 6.30 per linear foot. Add cost of 5 3,540.60 to contract. 8. Add Bid Item No. 57 for Additional depth of Sanitary Sewer Manholes: 6.0 VF at 5 172.50 per Vertical foot. Add cost of $ 1,035.00 to contract. 9. Ado Bid Item No. 58 for 2 - 3 -inch Sch. 40 PVC Conduits for Telephone Cables: 720 LF at $ 5.29 per linear foot. Add cost of $ 3,808.80 to contract. 10. Add Bid Item No. 59 for 2 -inch Sch. 40 PVC Conduit for Cable TV: 720 LF at $ 1.50 per linear foot. Add cost of $ 1,080.00 to contract. 11. Add Bid Item No 60 for 4 -inch Sch. 40 PVC Conduit for Gas Line: 200 LF at $ 4.50 per linear foot. Add cost of $ 900.00 to contract. 12. Increase the quantity of Bid Item No. 27 for B -inch C900 Water Line by 380 Linear Feet form 1025 LF to 1405 LF. 380 LF at 5 20.48 per linear foot. Add cost of S 7,782.40 to contract 13. Increase the quantity of Bid Item No 34 for Class 7 Trench Backfill by 1300 Tons from 450 Tons to 1750: 1300 Tons at $ 14.50 per Ton. Add cost of 518,850.00 to contract. 14. Increase the quantity of Bid Item No. 35 for Sanitary Sewer Manhole by 3 form 3 EA to 6 EA.: 3 EA at $ 1,825.00 Each. Add cost of $5,475.00 to contract 15 Increase the quantity of Bid Item No. 46 for 'Contractor's General Condition- by 5575.00 form $ 2,000.00 to $ 2,575.00: Add cost of 5 575.00 to contract. J1200210221 Wklunaeord.&.ad.r.l.wpd Psi* 1 Justification: 1 thru 6 788. 14. 15. 16. • • The connection of the new Pump Station force main to the existing 8 -inch force main 70 feet away was not allowed and therefore the need to install a 4 -inch Force Main along Parker St. in Greenland for a distance of 861 feet. The sewer line along the east side of the development is deepened for the future capability to gravity flow the entire west side Airport Development to the new Pump Station and the removal of the old pump station north of the Terminal Building. Add conduits for the installation of underground utilities for Electric, Telephone, Cable TV and Gas, as required by the Utility Companies. Increase the amount of the new 8 -inch PVC Water Line to replace the deteriorated existing 8 -inch Ductile Iron Water Line. Increase the amount of Class 7Crushed Stone Trench Backfill for water and sewer line trench for the additional water line length and the additional depth of sewer line. Increase the number of manholes as required by the Ark Dept of Health and to serve the future sewer connections. Increase the General Conditions cost for Change Order No. 1 items. Increase the time for the Contractor for minor weather delays and the delay of water and sewer approvals and for the possible sewer line rerouting to the Greenland Pump Station. CONTRACT PRICE prior to this Change Order: 2rKrfai Beereese in Contract Price: Revised CONTRACT PRICE Including this Change Order: Final Completion Time Prior to This Change Order: Net Time Change Resulting From This Change Order: Current Contract Completion Dates Including This Change Order: Completion Date: Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (decreased) by 20 calendar days. $ 616,207.70 $ 67.197.85 $ 683,405.55 150 Calendar Days 20 Calendar Days March 17, 2003 Approvals Required: To be effective this Order must be approved by the Owner if it changes the scope or objective or the PROJECT, or as may otherwise be re red by the ENEAL CO'.JDITIONS. Requested by: Recommended by: Approved by: Tomlinson As halt Corr>/6a City of Fayettevill J-12002\0221041 \c -ordeal wpd Page 2 Date /-15-03 Date ate .4 • • CHANGE ORDER Order No. 1 Date: January 15. 2003 Agreement Date: October 15 . 2002 NAME OF PROJECT: Executive Hangar Complex - Drake Field OWNERCity of Fayetteville (Airport Department) CONTRACTOR: Tomlinson Asphalt Company, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Add Bid Item No 50 for 4" Force Main from Pump Station to Manhole on Parker Street in Greenland Including trenching. backfill, trace wire and stone backfill over the upper foot along Parker Street: 861 Linear Feet at $13.80 per linear foot. Add cost of S 11.881.80 to contract. 2. Add Bid Item No. 51 for 3 - 4 -inch 45' bends in 4 -inch force main: 3 Each at $207 00 per each. Add cost of $ 621.00 to contract 3. Add Bid Item No. 52 for Force Main Cleaning Pig launcher:1 Each at 54,200.00 per each. Add cost of S 4.200.00 to contract. 4. Add Bid Item No. 53 for Force Main connection to existing Manhole including valve box for trace wire termination: 1 Lump Sum at $2,874 per lump sum. Add cost of $ 2,874.00 to contract. 5. Add Bid Item No. 54 for 12 -inch steel casing of force main under creek: 24 LF at S 72.00 per linear foot. Add cost of $ 1,728.00 to contract 6. Add Bid Item No. 55 for Asphalt Street repair to Parker Street: 99 LF at $ 28.75 per linear foot. Add cost of S 2,846.25 to contract. 7. Add Bid Item No. 56 for 1 foot of Additional Sewer Line Trench Depth for Line 1: 562 LF at $ 6.30 per linear foot. Add cost of S 3,540.60 to contract 8. Add Bid Item No. 57 for Additional depth of Sanitary Sewer Manholes: 6.0 VF at $ 172.50 per Vertical foot. Add cost of S 1,035.00 to contract. 9. Add Bid Item No. 58 for 2 - 3 -inch Sch. 40 PVC Conduits for Telephone Cables: 720 LF at S 5.29 per linear foot. Add cost of S 3,808.80 to contract. 10. Add Bid Item.No. 59 for 2 -inch Sch. 40 PVC Conduit for Cable TV: 720 LF at $ 1.50 per linear foot. Add cost of S 1,080.00 to contract 11. Add Bid Item No 60 for 4 -inch Sch. 40 PVC Conduit for Gas Line: 200 LF at $ 4.50 per linear foot. Add cost of $ 900.00 to contract. 12. Increase the quantity of Bid Item No. 27 for 8 -inch C900 Water Line by 380 Linear Feet form 1025 LF to 1405 LF: 380 LF 81$ 20.48 per linear foot. Add cost of $ 7,782.40 to contract 13. Increase the quantity of Bid Item No. 34 for Class 7 Trench Backfill by 1300 Tons from 450 Tons to 1750: 1300 Tons at $ 14.50 per Ton. Add cost of $18,850.00 to contract. 14. Increase the quantity of Bid Item No. 35 for Sanitary Sewer Manhole by 3 form 3 EA. to 6 EA : 3 EA at S 1.825.00 Each. Add cost of 55,475.00 to contract 15 Increase the quantity of Bid Item No. 46 for 'Contractors General Condition' by 5575 00 form $ 2,000.00 to $ 2,575.00: Add cost of $ 575.00 to contract. .I:0007022104lcharp•- rdeAtorder-1.wpd Ppsl • 4 • Justification: 1 thru 6 7&8. 14. 15. 16. • • The connection of the new Pump Station force main to the existing 8 -inch force main 70 feet away was not allowed and therefore the need to install a 4 -inch Force Main along Parker St. in Greenland for a distance of 861 feet. The sewer line along the east side of the development is deepened for the future capability to gravity flow the entire west side Airport Development to the new Pump Station and the removal of the old pump station north of the Terminal Building. Add conduits for the installation of underground utilities for Electric, Telephone. Cable TV and Gas. as required by the Utility Companies. Increase the amount of the new 8 -inch PVC Water Line to replace the deteriorated existing 8 -inch Ductile Iron Water Line. Increase the amount of Class 7Crushed Stone Trench Backfill for water and sewer line trench for the additional water line length and the additional depth of sewer line. Increase the number of manholes as required by the Ark Dept of Health and to serve the future sewer connections. Increase the General Conditions cost for Change Order No. 1 items. Increase the time for the Contractor for minor weather delays and the delay of water and sewer approvals and for the possible sewer line rerouting to the Greenland Pump Station. CONTRACT PRICE prior to this Change Order: Ir cr case Decrease in Contract Price: Revised CONTRACT PRICE Including this Change Order: Final Completion Time Prior to This Change Order: Net Time Change Resulting From This Change Order: Current Contract Completion Dates Including This Change Order: Completion Date: Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (decreased) by 20 calendar days. $ 616,207.70 $ 67.197.85 $ 683,405.55 150 Calendar Days 20 Calendar Days March 17, 2003 Approvals Required: To be effective this Order must be approved by the Owner if it changes the scope or objective or the PROJECT, or as may otherwiObe require • b the G NERAL CONDITIONS. Requested by: Recommended by: Approved by: Company Inc. nsulting Engineers, Inc. City of Fayettevil J.12002\022104¢.order.1.wpd Page 2 /-tf -- 03 Date 1 - fir 03 Date ate • NAME OF FILE: CROSS REFERENCE: Resolution No. 21-03 Document • NOTES: 1 02/04/03 Resolution 21-03 w/Change Order No. 1 2 01/27/03 Staff Review Form w/attachments 1/21/03 memo to mayor/city council copy of letter from McClelland Eng. copy of 2/4/03 budget adjustment 3 02/18/03 memo to Boudreaux NOTES: FAYETTEVIP[.LE TNS CITY OF FAYITTIVIUL ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Ray Boudreaux Airport Division From Clarice Buffalohead-Pearman City Clerk's Division Date: 2/18/2003 Re: Res. 21-03 Attached you will find an executed copy of the above referenced resolution, with attachments, passed by the City Council on February 4, 2003, approving Change Order No. 1 to the contract with Tomlinson Asphalt, Inc. The clerk's office has retained one original copy for our records and retuming two originals to you for forwarding to Tomlinson Asphalt, Inc. Also attached is a copy of the budget adjustment in the amount of $67,198.00 approved by the City Council. If anything else is needed please let the city clerk's office know. /cbp cc• Nancy Smith, Internal Auditor Kevin Springer, Budget & Research X AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW • STAFF REVIEW FORM • Executive Hangar Complex CO # 1 - Tomlinson Asphalt For the Fayetteville City Council Meeting of: February 4, 2003 FROM: Ray M. Boudreaux Aviation & Economic Development Airport Name Division Department ACTION REQUIRED: Review and City Council approval of Change Order #1 fromTomlinson Asphalt, Inc., comprising necessary or required changes to water/sewer infrastructure. Will increase the project cost $67,19.85. Forward to the Mayor for signature. Approval of a budget adjustment. COST TO CITY: $67,197.85 $ 677,829.00 South Hangar Apron Complex Cost of this request 5550.3960.5804.00 Account Number Category/Project Budget Program Category / Project Name $ 673,168.00 Capital Funds Used to Date Program / Project Category Name 02131-1 S Project Number 4,661.00 Airport Remaining Balance Fund Name BUDGET REVIEW: X Budgeted Item X Budget Adjustment Attached 7_103 Budget Mana•'r Date Administrative Services Director Date CONTRACT/GRANT/LEASE REVIEW: Accounting JJMa ger �N= Attorne Purchasing Manager %/,7//03 Date /l?7(63 Date i or O3 Date tancd- Q. 1 lav-io.3 Internal Audi for Date ADA Coordinator Date Grant Coordinator Date STAFF RECOMMENDATION: Staff recommends approval of Change Order #1 - Tomlinson Asphalt, Inc. Cross Reference Date New Item: Yes No X Previous Ord/Res#: 163-02 Orig. Contract Date Orig. Contract Number 10/15/2002 876 • Staff Review Form - Page 2 • Description Change Order 41 Tomlinson Asphalt S. Exec Hangar Complex Comments: Budget Manager Accounting Manager City Attorney Purchasing Manager ADA Coordinator Internal Auditor Grants Coordinator Meeting Date February 4, 2003 Reference Comments: FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS DAN GOODY, MAYOR TO: THRU: FROM: DATE: SUBJECT: Dan Coody, Mayor City Council Members Staff Review Committee Ray M. Boudreaux, Director, Aviatio January 21, 2002 Executive Ramp Development Project Change Order #1 • • ccoriomic\Development 4500 School An., Sulo F Fayetteville, AR 72701 Background: Attached please find an amendment to the project br utilities. OMI asked that we change the sewer and route the pump station to a Greenland manhole rather than enter an adjacent force main. This increased the cost by $24,150.25. They additionally asked us to study the possibility of running gravity sewer to the Greenland lift station. This option proved way too expensive. We did however lower the sanitary sewer lines to be able to accept outlow from the current airport pump station should it e\er require replacement. This increased the project cost by $10,050.60. The project required the contractor to connect the water supply to a City main which was discovered to be bad and in dire need of replacement. It had leaked several times. That replacement cost to replace the Citywater main increased the cost by $19,785.00. The utility companies required that we install conduits under the pavement for the electric, gas telephone and cable. This increased the price by$5,788.00. Additional backfill was required at an increase of $6,849.00. General conditions mere increased by $575.00 and approved by the engineer. Purpose: The purpose of this Change order is to fund the additional costs of the ramp development project. Budget Considerations: Funds are available and a budget adjustment is included. Water Department will cover the cost of the water line replacement from the water line replacement fund. The remainder will be covered in the contingency fund of the project. Requested Action: Staff recommends the City Council approve the change order, and authorize the Mayor to sign the documents increasing the total project cost by$67,197.85. Attachments: Change Order Staff Review Form • • • MCE CONSULTING r rlr`,r:,rn 70 � ENGINEERS, INC. • PO. Box 1229 Fayetteville, Arkansas 72702.1229 501.443-2377 FAX S01 -44J.9241 January 23, 2003 Mr. Ray Boudreaux Airport Department City of Fayetteville 113 West Mountain Fayetteville, AR 72701 RE: Executive Hangar Complex Fayetteville Municipal Airport • Dear Mr. Boudreaux: The Change Order for this protect includes the force main, per City W. & S. and Engr. Depts. requirements, to a manhole in Greenland; the lowering of a portion of the sewer line to accommodate future sewer line extension to the north, and additional manholes required; the replacement of the 8 -inch water line for School Ave. due to the severe corrosion of the existing ductile iron pipe and bedding across the apron area; the conduits for utilities to the five hangar buildings; and the additional trench backfill for slightly wider and deeper trenches than originally estimated. The cost for these items are as follows: Force Main to Manhole on Parker St. in Greenland Lowering Sewer Line and Added Manholes Replacement of water line and Trench Backfill Conduits for Utilities to Hangars Additional Trench Backfill Additional "General Conditions" Cost Total Cost for Change Order No. 1 $ 24,150.25 $ 10,050.60 $ 19,785.00 $ 5,788.00 $ 6,849.00 $ 575.00 $ 67,197.85 If there are any questions regarding this project, please contact us. Sincerely, McCLELLAND CON!/SULTING ENGINEERS, INC. 1 . Avs4Q—c.„-- R Wayne`Japes, P.E. Vice President J:1200210221041cwresponcence\Boudreau.-012] wpivd Budget Year 2003 • City of Fayetteville, Arkansas Budget Adjustment Form Department: General Government Division: Aviation & Economic Development Program: Airport Capital • Date Requested 2/4/2003 Adjustment Number Project or Item Requested: $67,198 in the South Apron Hangar capital project. Project or Item Deleted: None. To increase the Use of Fund Balance account by $67,198. Justification of this Increase: Will provide additional water/sewer infrastructure improvements in conjunction with the S. Executive Ramp pavement expansion project. The increase is necessitated by regulatory requirements, as well as the need to replace existing deteriorated materials while ground is open. Justification of this Decrease: Sufficient funding remains to comply with City policy. Increase Expense (Decrease Revenue) Account Name Account Number Amount Project Number Building costs 5550 3960 5804 00 67,198 02131 1 Decrease Expense (Increase Revenue) Account Name Account Number Amount Project Number Use of fund balance 5550 0955 4999 99 67,198 Approval Signatures Requested y Date /-Lz. -03 Budget ger Date Department Director Date Administrative Seryjdbs Directof., Date Mayor 2/1(e--- Budget Office Use Only Type. A B C Cif) E Date of Approval Posted to General Ledger Posted to Project Accounting Entered in Category Log Date Initial Date Initial Date Initial Date Initial